| Role | Agency | Description | Vehicle | Obligated | Action date | Period |
|---|---|---|---|---|---|---|
| Prime | National Archives and Records Administration National Archives and Records Administration | NEW LANDSCAPE AND GROUNDS MAINTENANCE SERVICES FOR THE RONALD REAGAN PRESIDENTIAL LIBRARY. | — | $2,395,182 | Sep 5, 2024 | Mar 1, 2019 – Apr 30, 2024 |
| Prime | Department of Defense Department of the Air Force | REMOVE RUBBER AND REPAINT AIRFIELD RUNWAY AT VANDENBERG SPACE FORCE BASE, CALIFORNIA | — | $601,016 | Sep 19, 2022 | Sep 19, 2022 – Feb 22, 2023 |
Contract vehicles are shown only when present in the source record. Linked award numbers and vehicles open the authoritative record on USAspending.gov.
Subcontracting experience
12 records from government sources. Past participation is not evidence of current teaming interest.
| Role | Agency | Description | Vehicle | Obligated | Action date | Period |
|---|---|---|---|---|---|---|
| Subcontractor | Department of Defense | 1. SUBCONTRACTOR SHALL PROVIDE TRAFFIC CONTROL FOR THE DURATION OF THE PROJECT.
2. SUBCONTRACTOR TO FURNISH AND INSTALL SILT FENCE, STRAW WATTLES, DIVERSION SYSTEMS, AND MAINTENANCE/ADJUSTMENTS OF REQUIRED BMP€„¢S NECESSARY FOR THE CONTROL OF €œSURFACE DISCHARGE€Ͽ½ DURING/AFTER WEATHER EVENTS CAUSING HIGH WATER RUNOFF TURBIDITY, ALL WITHIN THE PARAMETERS OF THE APPROVED EPP.
3. SUBCONTRACTOR SHALL PROVIDE CLEARING AND GRUBBING OF VEGETATION IN AREAS OF WORK. ALL GRUBBING WILL BE LAID OUT ONSITE AND TRACK WALKED IN FOR DECOMPOSITION.
4. SUBCONTRACTOR SHALL LAY OUT ACCESS ROAD AND ENTRANCE. A 380€„¢X 20€„¢ X 6€Ͽ½ THICK AGGREGATE BASE EQUIPMENT ACCESS ROAD WILL BE INSTALLED TO ALLOW ACCESS TO BOTTOM OF THE WASHOUT AREA. ACCESS ROAD TO BE REMOVED ONCE RESTORATION IS COMPLETE.
5. SUBCONTRACTOR SHALL HAUL AND PROVIDE IMPORT FILL MATERIAL AS NEEDED.
6. SUBCONTRACTOR SHALL BACKFILL AND COMPACT FILL SLOPE. THE SLOPE WILL BE RESTORED AT A 2:1 RATION FROM THE BOTTOM TO THE SURFACE WITH A 6€„¢ SHOULD FROM EXISTING EDGE OF PAVEMENT.
7. SUBCONTRACTOR SHALL HYDRO-SEED AREA, THEN FURNISH AND INSTALL COCO STRAW MAT AND BIO-WADDLES AT RESTORED SLOPES.
8. K-RAIL TO BE REMOVED AND RELOCATED TO THE REQUESTED SITE AND OFF LOADED 22-0015.05 Parent award context Parent award agency: Department of Defense · Department of the Air Force Parent award NAICS: 236220 Parent award performance state: CA Parent award description: REPAIR EROSION AT SANTA YNEZ ROAD, VANDENBERG SPACE FORCE BASE, CALIFORNIA View parent award on USAspending | FA461020D0009USAspending | $586,333 | Nov 17, 2022 | — – — |
| Subcontractor | Department of Defense | 1. SUBCONTRACTOR SHALL PROVIDE TRAFFIC CONTROL FOR THE DURATION OF THE PROJECT.
2. SUBCONTRACTOR TO FURNISH AND INSTALL SILT FENCE, STRAW WATTLES, DIVERSION SYSTEMS, AND MAINTENANCE/ADJUSTMENTS OF REQUIRED BMP€„¢S NECESSARY FOR THE CONTROL OF €œSURFACE DISCHARGE€Ͽ½ DURING/AFTER WEATHER EVENTS CAUSING HIGH WATER RUNOFF TURBIDITY, ALL WITHIN THE PARAMETERS OF THE APPROVED EPP.
3. SUBCONTRACTOR SHALL PROVIDE CLEARING AND GRUBBING OF VEGETATION IN AREAS OF WORK. ALL GRUBBING WILL BE LAID OUT ONSITE AND TRACK WALKED IN FOR DECOMPOSITION.
4. SUBCONTRACTOR SHALL LAY OUT ACCESS ROAD AND ENTRANCE. A 380€„¢X 20€„¢ X 6€Ͽ½ THICK AGGREGATE BASE EQUIPMENT ACCESS ROAD WILL BE INSTALLED TO ALLOW ACCESS TO BOTTOM OF THE WASHOUT AREA. ACCESS ROAD TO BE REMOVED ONCE RESTORATION IS COMPLETE.
5. SUBCONTRACTOR SHALL HAUL AND PROVIDE IMPORT FILL MATERIAL AS NEEDED.
6. SUBCONTRACTOR SHALL BACKFILL AND COMPACT FILL SLOPE. THE SLOPE WILL BE RESTORED AT A 2:1 RATION FROM THE BOTTOM TO THE SURFACE WITH A 6€„¢ SHOULD FROM EXISTING EDGE OF PAVEMENT.
7. SUBCONTRACTOR SHALL HYDRO-SEED AREA, THEN FURNISH AND INSTALL COCO STRAW MAT AND BIO-WADDLES AT RESTORED SLOPES.
8. K-RAIL TO BE REMOVED AND RELOCATED TO THE REQUESTED SITE AND OFF LOADED 22-0015.05 Parent award context Parent award agency: Department of Defense · Department of the Air Force Parent award NAICS: 236220 Parent award performance state: CA Parent award description: REPAIR EROSION AT SANTA YNEZ ROAD, VANDENBERG SPACE FORCE BASE, CALIFORNIA View parent award on USAspending | FA461020D0009USAspending | $586,333 | Nov 17, 2022 | — – — |
| Subcontractor | Department of Defense | 1. SUBCONTRACTOR SHALL PROVIDE TRAFFIC CONTROL FOR THE DURATION OF THE PROJECT.
2. SUBCONTRACTOR TO FURNISH AND INSTALL SILT FENCE, STRAW WATTLES, DIVERSION SYSTEMS, AND MAINTENANCE/ADJUSTMENTS OF REQUIRED BMP€„¢S NECESSARY FOR THE CONTROL OF €œSURFACE DISCHARGE€Ͽ½ DURING/AFTER WEATHER EVENTS CAUSING HIGH WATER RUNOFF TURBIDITY, ALL WITHIN THE PARAMETERS OF THE APPROVED EPP.
3. SUBCONTRACTOR SHALL PROVIDE CLEARING AND GRUBBING OF VEGETATION IN AREAS OF WORK. ALL GRUBBING WILL BE LAID OUT ONSITE AND TRACK WALKED IN FOR DECOMPOSITION.
4. SUBCONTRACTOR SHALL LAY OUT ACCESS ROAD AND ENTRANCE. A 380€„¢X 20€„¢ X 6€Ͽ½ THICK AGGREGATE BASE EQUIPMENT ACCESS ROAD WILL BE INSTALLED TO ALLOW ACCESS TO BOTTOM OF THE WASHOUT AREA. ACCESS ROAD TO BE REMOVED ONCE RESTORATION IS COMPLETE.
5. SUBCONTRACTOR SHALL HAUL AND PROVIDE IMPORT FILL MATERIAL AS NEEDED.
6. SUBCONTRACTOR SHALL BACKFILL AND COMPACT FILL SLOPE. THE SLOPE WILL BE RESTORED AT A 2:1 RATION FROM THE BOTTOM TO THE SURFACE WITH A 6€„¢ SHOULD FROM EXISTING EDGE OF PAVEMENT.
7. SUBCONTRACTOR SHALL HYDRO-SEED AREA, THEN FURNISH AND INSTALL COCO STRAW MAT AND BIO-WADDLES AT RESTORED SLOPES.
8. K-RAIL TO BE REMOVED AND RELOCATED TO THE REQUESTED SITE AND OFF LOADED 22-0015.05 Parent award context Parent award agency: Department of Defense · Department of the Air Force Parent award NAICS: 236220 Parent award performance state: CA Parent award description: REPAIR EROSION AT SANTA YNEZ ROAD, VANDENBERG SPACE FORCE BASE, CALIFORNIA View parent award on USAspending | FA461020D0009USAspending | $586,333 | Nov 17, 2022 | — – — |
| Subcontractor | Department of Defense | 1. SUBCONTRACTOR SHALL PROVIDE TRAFFIC CONTROL FOR THE DURATION OF THE PROJECT.
2. SUBCONTRACTOR TO FURNISH AND INSTALL SILT FENCE, STRAW WATTLES, DIVERSION SYSTEMS, AND MAINTENANCE/ADJUSTMENTS OF REQUIRED BMP€„¢S NECESSARY FOR THE CONTROL OF €œSURFACE DISCHARGE€Ͽ½ DURING/AFTER WEATHER EVENTS CAUSING HIGH WATER RUNOFF TURBIDITY, ALL WITHIN THE PARAMETERS OF THE APPROVED EPP.
3. SUBCONTRACTOR SHALL PROVIDE CLEARING AND GRUBBING OF VEGETATION IN AREAS OF WORK. ALL GRUBBING WILL BE LAID OUT ONSITE AND TRACK WALKED IN FOR DECOMPOSITION.
4. SUBCONTRACTOR SHALL LAY OUT ACCESS ROAD AND ENTRANCE. A 380€„¢X 20€„¢ X 6€Ͽ½ THICK AGGREGATE BASE EQUIPMENT ACCESS ROAD WILL BE INSTALLED TO ALLOW ACCESS TO BOTTOM OF THE WASHOUT AREA. ACCESS ROAD TO BE REMOVED ONCE RESTORATION IS COMPLETE.
5. SUBCONTRACTOR SHALL HAUL AND PROVIDE IMPORT FILL MATERIAL AS NEEDED.
6. SUBCONTRACTOR SHALL BACKFILL AND COMPACT FILL SLOPE. THE SLOPE WILL BE RESTORED AT A 2:1 RATION FROM THE BOTTOM TO THE SURFACE WITH A 6€„¢ SHOULD FROM EXISTING EDGE OF PAVEMENT.
7. SUBCONTRACTOR SHALL HYDRO-SEED AREA, THEN FURNISH AND INSTALL COCO STRAW MAT AND BIO-WADDLES AT RESTORED SLOPES.
8. K-RAIL TO BE REMOVED AND RELOCATED TO THE REQUESTED SITE AND OFF LOADED 22-0015.05 Parent award context Parent award agency: Department of Defense · Department of the Air Force Parent award NAICS: 236220 Parent award performance state: CA Parent award description: REPAIR EROSION AT SANTA YNEZ ROAD, VANDENBERG SPACE FORCE BASE, CALIFORNIA View parent award on USAspending | FA461020D0009USAspending | $586,333 | Nov 17, 2022 | — – — |
| Subcontractor | Department of Defense | 1. SUBCONTRACTOR SHALL PROVIDE TRAFFIC CONTROL FOR THE DURATION OF THE PROJECT.
2. SUBCONTRACTOR TO FURNISH AND INSTALL SILT FENCE, STRAW WATTLES, DIVERSION SYSTEMS, AND MAINTENANCE/ADJUSTMENTS OF REQUIRED BMP€„¢S NECESSARY FOR THE CONTROL OF €œSURFACE DISCHARGE€Ͽ½ DURING/AFTER WEATHER EVENTS CAUSING HIGH WATER RUNOFF TURBIDITY, ALL WITHIN THE PARAMETERS OF THE APPROVED EPP.
3. SUBCONTRACTOR SHALL PROVIDE CLEARING AND GRUBBING OF VEGETATION IN AREAS OF WORK. ALL GRUBBING WILL BE LAID OUT ONSITE AND TRACK WALKED IN FOR DECOMPOSITION.
4. SUBCONTRACTOR SHALL LAY OUT ACCESS ROAD AND ENTRANCE. A 380€„¢X 20€„¢ X 6€Ͽ½ THICK AGGREGATE BASE EQUIPMENT ACCESS ROAD WILL BE INSTALLED TO ALLOW ACCESS TO BOTTOM OF THE WASHOUT AREA. ACCESS ROAD TO BE REMOVED ONCE RESTORATION IS COMPLETE.
5. SUBCONTRACTOR SHALL HAUL AND PROVIDE IMPORT FILL MATERIAL AS NEEDED.
6. SUBCONTRACTOR SHALL BACKFILL AND COMPACT FILL SLOPE. THE SLOPE WILL BE RESTORED AT A 2:1 RATION FROM THE BOTTOM TO THE SURFACE WITH A 6€„¢ SHOULD FROM EXISTING EDGE OF PAVEMENT.
7. SUBCONTRACTOR SHALL HYDRO-SEED AREA, THEN FURNISH AND INSTALL COCO STRAW MAT AND BIO-WADDLES AT RESTORED SLOPES.
8. K-RAIL TO BE REMOVED AND RELOCATED TO THE REQUESTED SITE AND OFF LOADED 22-0015.05 Parent award context Parent award agency: Department of Defense · Department of the Air Force Parent award NAICS: 236220 Parent award performance state: CA Parent award description: REPAIR EROSION AT SANTA YNEZ ROAD, VANDENBERG SPACE FORCE BASE, CALIFORNIA View parent award on USAspending | FA461020D0009USAspending | $753,459 | Nov 17, 2022 | — – — |
| Subcontractor | Department of Defense | 1. SUBCONTRACTOR SHALL PROVIDE TRAFFIC CONTROL FOR THE DURATION OF THE PROJECT.
2. SUBCONTRACTOR TO FURNISH AND INSTALL SILT FENCE, STRAW WATTLES, DIVERSION SYSTEMS, AND MAINTENANCE/ADJUSTMENTS OF REQUIRED BMP€„¢S NECESSARY FOR THE CONTROL OF €œSURFACE DISCHARGE€Ͽ½ DURING/AFTER WEATHER EVENTS CAUSING HIGH WATER RUNOFF TURBIDITY, ALL WITHIN THE PARAMETERS OF THE APPROVED EPP.
3. SUBCONTRACTOR SHALL PROVIDE CLEARING AND GRUBBING OF VEGETATION IN AREAS OF WORK. ALL GRUBBING WILL BE LAID OUT ONSITE AND TRACK WALKED IN FOR DECOMPOSITION.
4. SUBCONTRACTOR SHALL LAY OUT ACCESS ROAD AND ENTRANCE. A 380€„¢X 20€„¢ X 6€Ͽ½ THICK AGGREGATE BASE EQUIPMENT ACCESS ROAD WILL BE INSTALLED TO ALLOW ACCESS TO BOTTOM OF THE WASHOUT AREA. ACCESS ROAD TO BE REMOVED ONCE RESTORATION IS COMPLETE.
5. SUBCONTRACTOR SHALL HAUL AND PROVIDE IMPORT FILL MATERIAL AS NEEDED.
6. SUBCONTRACTOR SHALL BACKFILL AND COMPACT FILL SLOPE. THE SLOPE WILL BE RESTORED AT A 2:1 RATION FROM THE BOTTOM TO THE SURFACE WITH A 6€„¢ SHOULD FROM EXISTING EDGE OF PAVEMENT.
7. SUBCONTRACTOR SHALL HYDRO-SEED AREA, THEN FURNISH AND INSTALL COCO STRAW MAT AND BIO-WADDLES AT RESTORED SLOPES.
8. K-RAIL TO BE REMOVED AND RELOCATED TO THE REQUESTED SITE AND OFF LOADED 22-0015.05 Parent award context Parent award agency: Department of Defense · Department of the Air Force Parent award NAICS: 236220 Parent award performance state: CA Parent award description: REPAIR EROSION AT SANTA YNEZ ROAD, VANDENBERG SPACE FORCE BASE, CALIFORNIA View parent award on USAspending | FA461020D0009USAspending | $753,459 | Nov 17, 2022 | — – — |
| Subcontractor | Department of Defense | SUBCONTRACTOR SHALL PROVIDE CLEARING AND GRUBBING OF VEGETATION IN AREAS OF WORK.
2. SUBCONTRACTOR SHALL LOCATE THE EXISTING UTILITIES AND CONFIRM LOCATIONS BY PROVIDING POTHOLE METHOD FOR PARTIAL EXCAVATION.
3. SUBCONTRACTOR SHALL PROVIDE TRAFFIC CONTROL (FOR POTTER ENTERPRISES ACTIVITIES)
4. SUBCONTRACTOR SHALL PROVIDE AND INSTALL ALL CONCRETE REPAIR TO ALL CURBS, GUTTERS, SIDEWALKS AND PAVEMENT DISTURBED BY THIS PROJECT.
5. SUBCONTRACTOR SHALL PROVIDE AND INSTALL ALL ASPHALT PAVEMENT PREPARATIONS AND PATCHES, INCLUDING SUBBASE ROCK.
6. SUBCONTRACTOR SHALL PROVIDE AND INSTALL ALL STRIPING FOR REPAIRED PAVEMENT AREAS.
7. SUBCONTRACTOR SHALL PROVIDE AND INSTALL BOLLARDS AS REQUIRED.
8. EXPORT OF EXCESS FILL MATERIAL AND DEMO€„¢ED CONCRETE AND ASPHALT. 22-0001.02 Parent award context Parent award agency: Department of Defense · Department of the Air Force Parent award NAICS: 236220 Parent award performance state: CA Parent award description: REPAIR OVERHEAD DISTRIBUTION LINE B1 AT VANDENBERG SPACE FORCE BASE View parent award on USAspending | FA461020D0009USAspending | $254,775 | Apr 1, 2022 | — – — |
| Subcontractor | Department of Defense | SUBCONTRACTOR SHALL PROVIDE CLEARING AND GRUBBING OF VEGETATION IN AREAS OF WORK.
2. SUBCONTRACTOR SHALL LOCATE THE EXISTING UTILITIES AND CONFIRM LOCATIONS BY PROVIDING POTHOLE METHOD FOR PARTIAL EXCAVATION.
3. SUBCONTRACTOR SHALL PROVIDE TRAFFIC CONTROL (FOR POTTER ENTERPRISES ACTIVITIES)
4. SUBCONTRACTOR SHALL PROVIDE AND INSTALL ALL CONCRETE REPAIR TO ALL CURBS, GUTTERS, SIDEWALKS AND PAVEMENT DISTURBED BY THIS PROJECT.
5. SUBCONTRACTOR SHALL PROVIDE AND INSTALL ALL ASPHALT PAVEMENT PREPARATIONS AND PATCHES, INCLUDING SUBBASE ROCK.
6. SUBCONTRACTOR SHALL PROVIDE AND INSTALL ALL STRIPING FOR REPAIRED PAVEMENT AREAS.
7. SUBCONTRACTOR SHALL PROVIDE AND INSTALL BOLLARDS AS REQUIRED.
8. EXPORT OF EXCESS FILL MATERIAL AND DEMO€„¢ED CONCRETE AND ASPHALT. 22-0001.02 Parent award context Parent award agency: Department of Defense · Department of the Air Force Parent award NAICS: 236220 Parent award performance state: CA Parent award description: REPAIR OVERHEAD DISTRIBUTION LINE B1 AT VANDENBERG SPACE FORCE BASE View parent award on USAspending | FA461020D0009USAspending | $254,775 | Apr 1, 2022 | — – — |
| Subcontractor | Department of Defense | SUBCONTRACTOR SHALL PROVIDE CLEARING AND GRUBBING OF VEGETATION IN AREAS OF WORK.
2. SUBCONTRACTOR SHALL LOCATE THE EXISTING UTILITIES AND CONFIRM LOCATIONS BY PROVIDING POTHOLE METHOD FOR PARTIAL EXCAVATION.
3. SUBCONTRACTOR SHALL PROVIDE TRAFFIC CONTROL (FOR POTTER ENTERPRISES ACTIVITIES)
4. SUBCONTRACTOR SHALL PROVIDE AND INSTALL ALL CONCRETE REPAIR TO ALL CURBS, GUTTERS, SIDEWALKS AND PAVEMENT DISTURBED BY THIS PROJECT.
5. SUBCONTRACTOR SHALL PROVIDE AND INSTALL ALL ASPHALT PAVEMENT PREPARATIONS AND PATCHES, INCLUDING SUBBASE ROCK.
6. SUBCONTRACTOR SHALL PROVIDE AND INSTALL ALL STRIPING FOR REPAIRED PAVEMENT AREAS.
7. SUBCONTRACTOR SHALL PROVIDE AND INSTALL BOLLARDS AS REQUIRED.
8. EXPORT OF EXCESS FILL MATERIAL AND DEMO€„¢ED CONCRETE AND ASPHALT. 22-0001.02 Parent award context Parent award agency: Department of Defense · Department of the Air Force Parent award NAICS: 236220 Parent award performance state: CA Parent award description: REPAIR OVERHEAD DISTRIBUTION LINE B1 AT VANDENBERG SPACE FORCE BASE View parent award on USAspending | FA461020D0009USAspending | $254,775 | Apr 1, 2022 | — – — |
| Subcontractor | Department of Defense | SUBCONTRACTOR SHALL PROVIDE CLEARING AND GRUBBING OF VEGETATION IN AREAS OF WORK.
2. SUBCONTRACTOR SHALL LOCATE THE EXISTING UTILITIES AND CONFIRM LOCATIONS BY PROVIDING POTHOLE METHOD FOR PARTIAL EXCAVATION.
3. SUBCONTRACTOR SHALL PROVIDE TRAFFIC CONTROL (FOR POTTER ENTERPRISES ACTIVITIES)
4. SUBCONTRACTOR SHALL PROVIDE AND INSTALL ALL CONCRETE REPAIR TO ALL CURBS, GUTTERS, SIDEWALKS AND PAVEMENT DISTURBED BY THIS PROJECT.
5. SUBCONTRACTOR SHALL PROVIDE AND INSTALL ALL ASPHALT PAVEMENT PREPARATIONS AND PATCHES, INCLUDING SUBBASE ROCK.
6. SUBCONTRACTOR SHALL PROVIDE AND INSTALL ALL STRIPING FOR REPAIRED PAVEMENT AREAS.
7. SUBCONTRACTOR SHALL PROVIDE AND INSTALL BOLLARDS AS REQUIRED.
8. EXPORT OF EXCESS FILL MATERIAL AND DEMO€„¢ED CONCRETE AND ASPHALT. 22-0001.02 Parent award context Parent award agency: Department of Defense · Department of the Air Force Parent award NAICS: 236220 Parent award performance state: CA Parent award description: REPAIR OVERHEAD DISTRIBUTION LINE B1 AT VANDENBERG SPACE FORCE BASE View parent award on USAspending | FA461020D0009USAspending | $254,775 | Apr 1, 2022 | — – — |
| Subcontractor | Department of Defense | SUBCONTRACTOR SHALL PROVIDE CLEARING AND GRUBBING OF VEGETATION IN AREAS OF WORK.
2. SUBCONTRACTOR SHALL LOCATE THE EXISTING UTILITIES AND CONFIRM LOCATIONS BY PROVIDING POTHOLE METHOD FOR PARTIAL EXCAVATION.
3. SUBCONTRACTOR SHALL PROVIDE TRAFFIC CONTROL (FOR POTTER ENTERPRISES ACTIVITIES)
4. SUBCONTRACTOR SHALL PROVIDE AND INSTALL ALL CONCRETE REPAIR TO ALL CURBS, GUTTERS, SIDEWALKS AND PAVEMENT DISTURBED BY THIS PROJECT.
5. SUBCONTRACTOR SHALL PROVIDE AND INSTALL ALL ASPHALT PAVEMENT PREPARATIONS AND PATCHES, INCLUDING SUBBASE ROCK.
6. SUBCONTRACTOR SHALL PROVIDE AND INSTALL ALL STRIPING FOR REPAIRED PAVEMENT AREAS.
7. SUBCONTRACTOR SHALL PROVIDE AND INSTALL BOLLARDS AS REQUIRED.
8. EXPORT OF EXCESS FILL MATERIAL AND DEMO€„¢ED CONCRETE AND ASPHALT. 22-0001.02 Parent award context Parent award agency: Department of Defense · Department of the Air Force Parent award NAICS: 236220 Parent award performance state: CA Parent award description: REPAIR OVERHEAD DISTRIBUTION LINE B1 AT VANDENBERG SPACE FORCE BASE View parent award on USAspending | FA461020D0009USAspending | $254,775 | Apr 1, 2022 | — – — |
| Subcontractor | Department of Defense | SUBCONTRACTOR SHALL PROVIDE CLEARING AND GRUBBING OF VEGETATION IN AREAS OF WORK.
2. SUBCONTRACTOR SHALL LOCATE THE EXISTING UTILITIES AND CONFIRM LOCATIONS BY PROVIDING POTHOLE METHOD FOR PARTIAL EXCAVATION.
3. SUBCONTRACTOR SHALL PROVIDE TRAFFIC CONTROL (FOR POTTER ENTERPRISES ACTIVITIES)
4. SUBCONTRACTOR SHALL PROVIDE AND INSTALL ALL CONCRETE REPAIR TO ALL CURBS, GUTTERS, SIDEWALKS AND PAVEMENT DISTURBED BY THIS PROJECT.
5. SUBCONTRACTOR SHALL PROVIDE AND INSTALL ALL ASPHALT PAVEMENT PREPARATIONS AND PATCHES, INCLUDING SUBBASE ROCK.
6. SUBCONTRACTOR SHALL PROVIDE AND INSTALL ALL STRIPING FOR REPAIRED PAVEMENT AREAS.
7. SUBCONTRACTOR SHALL PROVIDE AND INSTALL BOLLARDS AS REQUIRED.
8. EXPORT OF EXCESS FILL MATERIAL AND DEMO€„¢ED CONCRETE AND ASPHALT. 22-0001.02 Parent award context Parent award agency: Department of Defense · Department of the Air Force Parent award NAICS: 236220 Parent award performance state: CA Parent award description: REPAIR OVERHEAD DISTRIBUTION LINE B1 AT VANDENBERG SPACE FORCE BASE View parent award on USAspending | FA461020D0009USAspending | $254,775 | Apr 1, 2022 | — – — |
Contract vehicles are shown only when present in the source record. Linked award numbers and vehicles open the authoritative record on USAspending.gov.
Agencies supported
- National Archives and Records AdministrationGov-sourced