← Back to search

ARROW INDIAN CONTRACTORS, INC.

TEMPE, AZ, 85281

Unclaimed
EDWOSBWOSB

Prime contracting experience

26 records from government sources. Past participation is not evidence of current teaming interest.

RoleAgencyDescriptionVehicleObligatedAction datePeriod
Prime
Department of Defense
Department of the Air Force
RUNWAY RUBBER ACCUMULATION BE REMOVED WITHIN LANDING ZONES AS SKID RISK REDUCTION MITIGATION. ASPHALT CEMENT CONCRETE PAVEMENT TO BE SURFACE TREATED WITH GILSONITE MODIFIED ASPHALT EMULSION SEAL COAT. AIRFIELD PAINT MARKING RESTORED.FA487721D0008USAspending$1,481,018Jun 4, 2026Sep 22, 2025 – Aug 27, 2026
Prime
Department of Defense
Department of the Air Force
309TH AMARG MAINTENANCE DOCK AND ADMINISTRATION BUILDING PARKING LOTS REQUIRE SUSTAINMENT MAINTENANCE AND REPAIR. COMPLETE REPLACEMENT OF ACC PAVEMENT SURFACE. REPAIR OF UNDERGROUND ELECTRICAL WIRING.FA487721D0008USAspending$419,894Mar 13, 2026Sep 23, 2025 – Jun 30, 2026
Prime
Department of Defense
Department of the Air Force
THE PRINCIPAL ROADS FOR 309TH AMARG COMPLEX HAVE DETERIORATED, AND SUSTAINMENT MAINTENANCE AND REPAIR ARE REQUIRED TO EXTEND SERVICE LIFE. SUSTAINMENT MAINTENANCE IS SURFACE TREATMENTS, CRACK-FILL, AND RESTORATION OF EXISTING PAVEMENT MARKINGS.FA487721D0008USAspending$947,575Jan 9, 2026Aug 10, 2025 – Feb 23, 2026
Prime
Department of Defense
Department of the Air Force
CRAYCROFT ROAD CRACKS NEED TO BE SEALED ADEQUATELY TO PREVENT ACCELERATED DETERIORATION. SEAL THE LONGITUDINAL AND TRANSVERS CRACKING AND ARREST THE LIGHT TO MEDIUM WEATHERING OF THE ACC SURFACE TO EXTEND ITS SERVICE LIFE.FA487721D0008USAspending$861,477Jan 9, 2026Sep 12, 2025 – Feb 23, 2026
Prime
Department of Defense
Department of the Air Force
PRIMARY AND SECONDARY SERVICE ROADS AT DMAFB REQUIRE SUSTAINMENT MAINTENANCE AND REPAIR. CONDUCT SUSTAINMENT MAINTENANCE AND REPAIR WORK OF SURFACE CLEANING, CRACK SEAL, SURFACE TREATMENTS, AND PAINTING AND STRIPING.FA487721D0008USAspending$1,003,206Jan 9, 2026Sep 12, 2025 – Feb 23, 2026
Prime
Department of Defense
Department of the Air Force
PRIMARY AND SECONDARY SERVICE ROADS AT DMAFB REQUIRE SUSTAINMENT MAINTENANCE AND REPAIR. CONDUCT SUSTAINMENT MAINTENANCE AND REPAIR WORK IN THE GENERAL NATURE OF SURFACE CLEANING, CRACK SEAL, SURFACE TREATMENTS, AND PAINTING AND STRIPING.FA487721D0008USAspending$555,204Jan 9, 2026Sep 12, 2025 – Feb 23, 2026
Prime
Department of Defense
Department of the Air Force
PARKING LOTS AND ROADS ALONG 5TH STREET HAVE DETERIORATED TO WHERE SUSTAINMENT, MAINTENANCE AND REPAIR ARE REQUIRED. NATURE OF SUSTAINMENT MAINTENANCE AND REPAIR ARE SURFACE TREATMENTS, CRACK FILLING, AND RESTORATION OF EXISTING PAVEMENT MARKINGS.FA487721D0008USAspending$865,763Jan 9, 2026Sep 12, 2025 – Feb 23, 2026
Prime
Department of the Interior
National Park Service
GEORGE CLAYTON GREENE HOUSE REHABILITATION, SAGUARO NATIONAL PARK—$1,095,192Jul 31, 2025Sep 25, 2020 – Sep 30, 2023
Prime
Department of Defense
Department of the Army
REPAIR & REPLACE SEWER & WATER MAINS—$4,051,667Jul 8, 2025Oct 30, 2023 – Feb 7, 2025
Prime
Department of Defense
Department of the Air Force
AIRFIELD/STREET/PARKING LOT MAINTENANCE AND REPAIR INCLUDING DEMOLITION, UTILITY WORK, SUB-GRADE PREPARATION, CONCRETE CURB, BASE COURSE, ASPHALT SURFACE, SIDEWALK, STRIPING, DRAINAGE, ETC. ON DAVIS-MONTHAN AFB AND AMARG IAW SOW.FA487721D0008USAspending$951,517Jun 25, 2025May 27, 2025 – Sep 16, 2025
Prime
Department of Defense
Department of the Air Force
REPAIRING FIFTH STREET ON DAVIS-MONTHAN AFB, AN ACC PAVEMENT WITH TRANSVERSE BLOCK CRACKING AND MINOR SETTLING. PROJECT AIMS TO ARREST DAMAGE AND EXTEND SERVICE LIFE TO MAXIMUM EXTENT POSSIBLE.FA487721D0008USAspending$369,594Feb 6, 2025Nov 4, 2024 – May 15, 2025
Prime
Department of Defense
Department of the Air Force
AMARG TAXIWAY AND APRONS PHASE 3 AIRFIELD/STREET/PARKING LOT MAINTENANCE AND REPAIR INCLUDING DEMOLITION, UTILITY WORK, SUB-GRADE PREPARATION, CONCRETE CURB, BASE COURSE, ASPHALT SURFACE, SIDEWALK, STRIPING, DRAINAGE, ETC. ON DAVIS-MONTHAN AFB, AZ.FA487721D0008USAspending$706,736Jan 17, 2025Feb 14, 2025 – Nov 30, 2025
Prime
Department of Transportation
Federal Highway Administration
AZ FLAP 202(2) RED CLOUD MINE ROAD 6982AF21C000030 (SOLICITATION #6982AF21B000007) CONSTRUCTION CONTRACT—$1,757,227Jan 16, 2025Jul 30, 2021 – May 14, 2022
Prime
Department of Homeland Security
U.S. Customs and Border Protection
TUCSON BORDER PATROL HEADQUARTERS PARKING LOT REPAIRS.70B01C20G00000003USAspending$795,288Jun 11, 2024Sep 23, 2023 – Aug 30, 2024
Prime
Department of Defense
Department of the Air Force
CONTRACTOR SHALL PERFORM ALL OPS ASSOCIATED WITH AIRFIELD/STREET/PARKING LOT MX AND REPAIR INCLUDING DEMO, UTILITY WORK, SUB-GRADE PREP, CONCRETE CURB, BASE COURSE, ASPHALT SURFACE, SIDEWALK, STRIPING, DRAINAGE, ETC. ON DAVIS-MONTHAN AFB, AZ.FA487721D0008USAspending$1,402,947May 10, 2024Jun 1, 2024 – Jun 1, 2025
Prime
Department of Defense
Department of the Air Force
MUNITIONS TRAILER—$1,823,418Apr 18, 2024Sep 18, 2023 – May 27, 2024
Prime
Department of Homeland Security
U.S. Customs and Border Protection
THIS TASK ORDER IS TO PROVIDE ALL NECESSARY EQUIPMENT, LABOR AND TOOLS TO REPAIR THE GRADE AND BACKFILL THE EROSION ISSUES, THUS PROVIDING A SMOOTH COMPACTED PARKING SURFACE AT THREE POINTS BPS IN TUCSON, AZ70B01C20G00000003USAspending$292,158Sep 20, 2023Sep 20, 2023 – Jan 19, 2024
Prime
Department of the Interior
National Park Service
GRCA-LIFT/DRYING BED—$972,693Jul 19, 2023Sep 23, 2021 – Sep 30, 2023
Prime
Department of the Interior
National Park Service
ORPI REPAIR AJO MOUNTAIN DRIVE—$1,465,828Jan 5, 2023Aug 1, 2022 – Apr 28, 2023
Prime
Department of Homeland Security
U.S. Customs and Border Protection
ROAD AND PARKING PAVING, AND VARIOUS SITE IMPROVEMENTS AT NASOC-SIERRA VISTA—$1,172,455Nov 21, 2022Sep 9, 2021 – Jul 25, 2022
Prime
Department of Homeland Security
U.S. Customs and Border Protection
REPAVE—$592,861Aug 11, 2022Sep 29, 2021 – Sep 15, 2022
Prime
Department of Defense
Department of the Air Force
PKA - APPLYING FOG SEAL AND REAPPLY PAVEMENT MARKINGS AT THE DAVIS-MONTHAN AFB ALERT DETACHMENT FACILITY AND THE AMARG RECLAMATION SHELTER.FA487721D0008USAspending$357,008Jul 19, 2022Jul 19, 2022 – Oct 3, 2022
Prime
Department of Homeland Security
U.S. Customs and Border Protection
THE PURPOSE OF THIS REQUIREMENT IS FOR PARKING LOT PAVE AND REPAIR AT TWO (2) PLACES AT DOUGLAS BORDER PATROL STATION70B01C20G00000003USAspending$720,524May 31, 2022Jul 1, 2021 – Jul 10, 2022
Prime
Department of Defense
Department of the Army
REPLACE WATER DISTRIBUTION SYSTEM, AREA 1300, LAFB, AZ—$1,934,576May 11, 2022Nov 13, 2020 – Jul 1, 2022
Prime
Department of Homeland Security
U.S. Customs and Border Protection
INSTALL CLIMATE CONTROL70B01C20G00000003USAspending$850,432Dec 21, 2021Sep 18, 2020 – Feb 13, 2022
Prime
Department of the Interior
Bureau of Reclamation
GLEN CANYON WAREHOUSE RENOVATION.—$8,821,796Dec 10, 2021Sep 20, 2019 – Oct 28, 2021

Contract vehicles are shown only when present in the source record. Linked award numbers and vehicles open the authoritative record on USAspending.gov.

Agencies supported

  • Department of DefenseGov-sourced
  • Department of the InteriorGov-sourced
  • Department of TransportationGov-sourced
  • Department of Homeland SecurityGov-sourced
ARROW INDIAN CONTRACTORS, INC. – Tempe, AZ | UEI D1LRKHNWT971 | FedSub