← Back to search

ROCKET LAB USA INC

Location not reported

Unclaimed

AI-Generated Company Overview

Generating overview from available records...

Source Records

No company-reported description yet. Owners can add one after claiming the profile.

Capabilities

No capabilities recorded.

Prime contracting experience

No prime contract awards on record in current sources.

Subcontracting experience

1 record from government sources. Past participation is not evidence of current teaming interest.

RoleAgencyDescriptionVehicleObligatedAction datePeriod
Subcontractor
—
ROCKET LAB WILL PROVIDE THE NECESSARY PERSONNEL AND EXPERTISE TO UCB DURING ESCAPADE€„¢S 8 MONTH PHASE B EXTENSION PERIOD, BEGINNING AS SOON AS IS PRACTICAL AFTER DECEMBER 1, 2020, TO HELP ENSURE A SUCCESSFUL DELTA PRELIMINARY DESIGN REVIEW (DPDR), SUPPORT A SUCCESSFUL KEY DECISION POINT C (KDP-C), AND PREPARE FOR A SUCCESSFUL IMPLEMENTATION IN PHASE C: €¢WORK CLOSELY WITH UCB TO GENERATE SPACECRAFT BUS AND SUBSYSTEM DESIGNS, ASSOCIATED DEVELOPMENT PLANS, AND ANALYSES TO MEET THE MISSION REQUIREMENTS €¢DEVELOP DETAILED DESIGNS AND DOWNSELECT COMPONENTS, PREPARE TO LET SUPPLIER CONTRACTS, AND START FABRICATION AT THE START OF PHASE C (IF APPROVED) €¢PRESENT THE SPACECRAFT BUS DESIGN AT AN INFORMAL PRE-PDR PEER REVIEW IN ~MID MAY2021 €¢SUPPORT THE DPDR IN ~MID JUNE 2021 AND KDP-C IN ~MID TO LATE JULY 2021 ROCKET LAB WILL WORK COLLABORATIVELY WITH UCB TO SUPPORT THE DEVELOPMENT AND IMPLEMENTATION OF THE ESCAPADE MISSION WITH TASKS INCLUDING: €¢SUPPORT DESIGN TRADES TO OPTIMIZE THE BUS DESIGN TO MEET THE MISSION REQUIREMENTS €¢ENSURE SUBSYSTEM DESIGNS MEET SAFETY AND MISSION ASSURANCE REQUIREMENTS AND MEETS NASA TRL 6 FOR THE ESCAPADE ENVIRONMENTS AND DURATION BY DPDR €¢DEVELOP PRELIMINARY DESIGNS FOR SPACECRAFT BUS, REQUIRED AVIONICS, AND ASSOCIATED GROUND SUPPORT EQUIPMENT INCLUDING BASELINE DESIGN FOR THIRD-PARTY SUBSYSTEMS INCLUDING TELECOM, PROPULSION, AND POWER €¢GENERATE THERMAL, STRUCTURAL ANALYSES, RESOURCE MARGINS FOR THE PRELIMINARY DESIGN €¢BASELINE SUBSYSTEM VENDORS AND NEGOTIATE SCHEDULE AND STATEMENTS OF WORK INCLUDING SITE VISITS TO KEY SUBCONTRACTORS AND VENDORS AS NEEDED FOR DOWN-SELECT AND DESIGN REVIEWS €¢COORDINATE ESCAPADE NEEDS WITH CONTINUED ROCKET LAB DEVELOPMENT AND TESTING OF ROCKET LAB INTERNAL SUBSYSTEMS €¢PRESENT THE BUS DESIGN AT AN INFORMAL PEER REVIEW €¢SUPPORT THE NASA DELTA PRELIMINARY DESIGN REVIEW, PRESENTING THE BUS DESIGN €¢PROVIDE DETAILED INPUTS TO THE ESCAPADE INTEGRATED MASTER SCHEDULE €¢DERIVE PHASE C/D BUDGET AND SOW IN SUPPORT OF DPDR AND KPD-C €¢SUPPORT CONFIRMATION REVIEW (KDP-C) AT NASA HQ €¢SUPPORT WEEKLY SPACECRAFT AND MISSION DESIGN TELECONS €¢SUPPORT MONTHLY INSTRUMENT ACCOMMODATIONS MEETINGS €¢SUPPORT ANY LAUNCH VEHICLE (LV) MEETINGS AND ADDRESS SECONDARY LV QUESTIONS €¢SUPPORT MONTHLY ROCKET LAB STATUS/BUDGET/RISK PROGRAM MANAGEMENT TELECONS €¢GENERATE MONTHLY TECHNICAL AND FINANCIAL REPORTS INCLUDING 533M; MONTHLY INVOICING €¢PROVIDE DOCUMENTS CALLED OUT IN THE CONTRACT TERMS AND CONDITIONS €¢SUPPORT ADJUSTMENT AS NEEDED OF PLANS AND DOCUMENTATION REQUIRED TO REACH DPDRPER 7120.5E AND 7123.1B REQUIREMENTS AS TAILORED FOR CLASS D
00010676
Parent award context
Parent award agency: National Aeronautics and Space Administration · National Aeronautics and Space Administration
Parent award NAICS: 541715
Parent award description: ESCAPE AND PLASMA ACCELERATION AND DYNAMICS EXPLORERS (ESCAPADE) MISSION -.PHASE A CONCEPT STUDY.
View parent award on USAspending
CONT_AWD_80MSFC19C0041_8000_-NONE-_-NONE-$33,039,581May 5, 2021— – —

Contract vehicles are shown only when present in the source record.

Agencies supported

None recorded.

ROCKET LAB USA INC — Federal Contractor Profile | FedSub