← Back to search

ECLIPSE COMPANIES, LLC

Doing business as ECLIPSE CO, LLC OF OHIO

CHAGRIN FALLS, OH, 44023

Unclaimed
Small BusinessWOSBSmall Disadvantaged

Prime contracting experience

29 records from government sources. Past participation is not evidence of current teaming interest.

RoleAgencyDescriptionVehicleObligatedAction datePeriod
Prime
Department of Transportation
Federal Highway Administration
PROJECT IN NP INDU 0945(2): THE PROJECT CONSISTS OF BRIDGE SUPERSTRUCTURE REMOVAL, TEMPORARY TRAFFIC CONTROL, AND OTHER MISCELLANEOUS WORK.693C7320D000023USAspending$398,739Oct 23, 2026May 25, 2022 – May 1, 2023
Prime
Department of Transportation
Federal Highway Administration
PROJECT NP-CHAT 102(1), 906(1), 907(1), 908(1): THE PROJECT CONSISTS OF REHABILITATION/RECONSTRUCTION OF THE ROADWAY AND PARKING AREAS, MILLING AND ASPHALT OVERLAY, INSTALLATION OF NEW SIGNS, PAVEMENT MARKING, DEVELOPMENT AND IMPLEMENTATION OF A TRA693C7320D000016USAspending$3,063,807Oct 23, 2026Feb 23, 2023 – May 7, 2026
Prime
Department of Transportation
Federal Highway Administration
PROJECT NC ERFO NP BLRI 2024-1(4) THE PROJECT CONSISTS OF REPAIRING DAMAGE TO THE BLUE RIDGE PARKWAY CAUSED BY HURRICANE HELENE. THE WORK INCLUDES A SLIDE REPAIR WITH REINFORCED SOIL SLOPE (RSS), MINIMAL TREE REMOVAL FOR ACCESS, DITCH RECONDITIONIN693C7320D000016USAspending$3,777,134Aug 27, 2026Feb 26, 2025 – Jun 30, 2027
Prime
Department of Transportation
Federal Highway Administration
PROJECT: MS NP NATR BMS FY23(1): THE PROJECT CONSISTS OF PERFORMING PREVENTATIVE BRIDGE REPAIRS TO 14 BRIDGES ALONG THE NATCHEZ TRACE PARKWAY. THE WORK INCLUDES THE REPAIR OF DETERIORATED EXPANSION JOINTS, CLEANING AND RESEALING JOINTS, CONCRETE REP693C7320D000007USAspending$916,875Aug 18, 2026May 21, 2024 – Oct 31, 2027
Prime
Department of Transportation
Federal Highway Administration
PROJECT TN ERFO FS CHRKE804 2020-1(1) THE PROJECT CONSISTS OF REPAIRS TO ROCKY TOP ROAD (FS 402) FOR A LENGTH OF 3.43 MILES, INCLUDING ROADWAY AND DITCH RECONDITIONING, AGGREGATE SURFACING, DRAINAGE IMPROVEMENTS, AND OTHER MISCELLANEOUS WORK.693C7320D000007USAspending$2,754,992Aug 5, 2026Apr 1, 2025 – Oct 31, 2027
Prime
Department of Transportation
Federal Highway Administration
KY NP CUGA BRG(1) THE WORK INCLUDES REPLACING SUPERSTRUCTURE, CLEANING AND PAINTING RUSTED AREAS OF STEEL ARCH ALONG THE FOUNDATIONS, REMOVING FLOOD DEBRIS AND FALLEN TREES, REPAIRING SCOUR ALONG FOUNDATIONS, MILL AND OVERLAY OF BRIDGE APPROACHES, A693C7320D000023USAspending$1,146,991Jul 15, 2026Sep 12, 2025 – Aug 31, 2028
Prime
Department of Transportation
Federal Highway Administration
PROJECT TN ERFO FS CHRKE804 2021-1(1): THE PROJECT CONSISTS OF REPAIRING STORM AND FLOOD DAMAGE ON HURRICANE GAP ROAD (FS 31). THE SCOPE OF WORK INCLUDES DESIGN SERVICES, SLOPE STABILIZATION, ROADWAY RECONSTRUCTION, ASPHALT CONCRETE PAVEMENT, AND OT693C7326D000007USAspending$1,189,000Jul 14, 2026Jul 14, 2026 – Nov 22, 2027
Prime
Department of Transportation
Federal Highway Administration
PROJECT NC NP BLRI 2M28; NC NP BLRI 2M29: THE PROJECT CONSISTS OF HURRICANE DAMAGE REPAIRS AT MP 336.7, 336.75, 336.85, 336.95, 337.2, 338.2 AND MP 338.4. THE WORK INCLUDES SLIDE REPAIRS, CULVERT CLEANING, CULVERT INSTALLATION, STONE MASONRY HEADWAL693C7320D000007USAspending$18,953,608Jul 7, 2026Nov 25, 2025 – Jun 21, 2027
Prime
Department of Transportation
Federal Highway Administration
PROJECT PA ERFO FW CHV 2020-1(1): THE PROJECT CONSISTS OF THE REHABILITATION OF BACK NINE TRAIL, RIDGE NATURE TRAIL AND RIDGE NATURE PARKING AREA. THE WORK INCLUDES REMOVING AND REPLACING ASPHALT CONCRETE PAVEMENT, ROADWAY EXCAVATION, ROADBED RECOND693C7320D000019USAspending$961,797Jun 23, 2026Jan 10, 2025 – Jul 31, 2027
Prime
Department of Transportation
Federal Highway Administration
THE PROJECT CONSISTS OF THE RECONSTRUCTION OF HATCHERY ENTRANCE ROAD (ROUTE 010), VISITOR OVERFLOW PARKING (ROUTE 900), VISITOR PARKING (ROUTE 903), AND 301AZ WITHIN THE NASHUA NATIONAL FISH HATCHERY. THE WORK INCLUDES ROADWAY EXCAVATION, AGGREGATE B693C7320D000019USAspending$716,733Jun 11, 2026Sep 4, 2025 – Dec 31, 2027
Prime
Department of Transportation
Federal Highway Administration
KY NP MACA 16(1), 200(1): THE PROJECT CONSISTS OF RECONFIGURATION OF THE INTERSECTION OF CAVE CITY ROAD AND FROZEN NIAGARA ROAD. THE WORK INCLUDES INTERSECTION AND ROADWAY REALIGNMENT, ROADWAY OBLITERATION, CLEARING AND GRUBBING, DRAINAGE IMPROVEMEN693C7320D000007USAspending$1,729,584Jun 1, 2026Sep 4, 2025 – Jan 21, 2027
Prime
Department of Transportation
Federal Highway Administration
PROJECT NC NP BLRI 2M31; NC NP BLRI 2N24; NC NP BLRI 2M26, 2N22: THE PROJECT CONSISTS OF HURRICANE DAMAGE REPAIRS AT MP 344.3 TO 351.9. THE WORK INCLUDES SLIDE REPAIRS, CULVERT CLEANING, CULVERT INSTALLATION, STONE MASONRY HEADWALL INSTALLATION, D693C7320D000007USAspending$29,755,768May 15, 2026Dec 17, 2025 – Jun 21, 2027
Prime
Department of Transportation
Federal Highway Administration
PROJECT MS NP NATR 3P28: THE PROJECT CONSISTS OF MILLING AND ROAD OVERLAY OF ACCESS RAMPS TO INTERSTATE 55. THE WORK ALSO INCLUDES BRIDGE REPAIR, SIGNING, PAVEMENT STRIPING AND OTHER MISCELLANEOUS WORK.693C7320D000007USAspending$3,088,625May 1, 2026Nov 21, 2024 – Oct 31, 2028
Prime
Department of Transportation
Federal Highway Administration
PROJECT TN NP GRSM 10N(5) THE PROJECT CONSISTS OF REPAIRING STORM DAMAGE ON NEWFOUND GAP ROAD WITHIN THE GREAT SMOKY MOUNTAINS NATIONAL PARK. THE WORK INCLUDES CONSTRUCTING A REINFORCED ROCKERY WALL, CONSTRUCTING AN AGGREGATE-TOPSOIL COURSE SHOULD693C7320D000007USAspending$2,072,575Mar 5, 2026Aug 19, 2025 – May 31, 2027
Prime
Department of Transportation
Federal Highway Administration
PROJECT AR FW BLD 11(1): THE PROJECT CONSISTS OF ROADWAY RECONSTRUCTION AND RESURFACING OF GRANARY SOUTH ROAD (ROUTE 011). THE WORK INCLUDES BANK STABILIZATION, AGGREGATE BASE (LIMESTONE), AGGREGATE SURFACE COURSE (LIMESTONE), PIPE CULVERT REPLACEME693C7326D000007USAspending$2,144,405Feb 26, 2026Feb 26, 2026 – Mar 9, 2027
Prime
Department of Transportation
Federal Highway Administration
PROJECT MS NP NATR BMS FY24(1): THE PROJECT CONSISTS OF PERFORMING PREVENTATIVE BRIDGE REPAIRS TO 14 BRIDGES ALONG THE NATCHEZ TRACE PARKWAY. THE WORK INCLUDES THE REPAIR OF DETERIORATED EXPANSION JOINTS, CLEANING AND RESEALING JOINTS, CONCRETE REPA693C7320D000007USAspending$529,912Feb 25, 2026Apr 1, 2025 – Feb 28, 2028
Prime
Department of Defense
Department of the Army
MDHP RP-18-03, CONSTRUCTION OF FIVE RISER PIPE GRADE CONTROL STRUCTURES.—$1,659,000Nov 13, 2025Sep 30, 2024 – Sep 28, 2029
Prime
Department of Transportation
Federal Highway Administration
PROJECT LA NP JELA 7530-001P THE PROJECT CONSISTS OF THE REHABILITATION OF STRUCTURE 7530-001P OVER BAYOU DES FAMILLES IN THE JEAN LAFITTE NATIONAL HISTORICAL PARK AND PRESERVE. THE WORK INCLUDES PERFORMING DESIGN SERVICES, REMOVING AND REPLACING BR693C7320D000007USAspending$270,460Nov 3, 2025Nov 14, 2024 – Oct 29, 2025
Prime
Department of Transportation
Federal Highway Administration
AR ERFO FS OZSTF810 2022-1(1): THE PROJECT CONSISTS OF THE PERMANENT SLIDE REPAIR OF WHITE ROCK ROAD (NFSR 1003) AND EAST FLY GAP ROAD (NFSR 1503). THE WORK INCLUDES ROADWAY RECONSTRUCTION AND RECONDITIONING, EMBANKMENT STABILIZATION, CULVERT REPLAC693C7320D000023USAspending$5,735,000Oct 10, 2025Oct 10, 2025 – May 10, 2027
Prime
Department of Transportation
Federal Highway Administration
PROJECT NC NP BLRI 2F12: THE PROJECT CONSISTS OF ROADWAY RECONSTRUCTION AND DRAINAGE REPAIRS AT MP 276.35. THE WORK INCLUDES BRIDGE WORK; GUARD WALL CONSTRUCTION; LOWER RETAINING WALL WORK; DRAINAGE STRUCTURE REPLACEMENTS; AND OTHER MISCELLANEOUS WO693C7320D000016USAspending$1,495,405Jul 30, 2025Nov 15, 2023 – Jul 10, 2025
Prime
Department of Transportation
Federal Highway Administration
PROJECT MS ERFO FW HILL 2020-1(1): THE PROJECT CONSISTS OF THE REMOVAL AND RECONSTRUCTION OF TWO BOARDWALKS AND THE REHABILITATION OF ALLIGATOR SLOUGH NATURE TRAIL AND PARKING. THE WORK INCLUDES GRADING, DRAINAGE, AGGREGATE SURFACE COURSE, CONCRET693C7320D000007USAspending$2,255,831Jul 29, 2025Jun 20, 2024 – Apr 30, 2027
Prime
Department of Transportation
Federal Highway Administration
PROJECT OH ERFO FS WAYNE914 2021-1(1) THE PROJECT CONSISTS OF THE REPAIR AND RECONSTRUCTION OF VESUVIUS ROAD (FS 1955) AND HANGING ROCK SPUR A (FS 105A). THE WORK INCLUDES THE REHABILITATION OF SIX SITES, INVOLVING SLOPE REPAIRS, DEEP PATCHING, RO693C7320D000023USAspending$4,710,697Jul 18, 2025Jul 18, 2025 – May 9, 2028
Prime
Department of Transportation
Federal Highway Administration
PROJECT ME NP ACAD BRG(1): THE PROJECT CONSISTS OF BRIDGE REHABILITATION AND REPAIR OF WILDWOOD ENTRANCE AND JORDAN POND-SEAL HARBOR BRIDGES. THE WORK INCLUDES CUTTING WEEP HOLE OPENINGS INTO ABUTMENTS; CLEANING AND SEALING BRIDGE JOINTS; EROSION RE693C7320D000019USAspending$1,936,039Mar 19, 2025Dec 19, 2023 – Mar 12, 2025
Prime
Department of Transportation
Federal Highway Administration
PROJECT TX FTFW SAMA 10(1)_2: THE PROJECT CONSISTS OF THE REHABILITATION AND REALIGNMENT OF THE ENTRANCE ROAD WITHIN THE SAN MARCOS AQUATIC RESOURCES CENTER.693C7320D000023USAspending$2,262,573Mar 19, 2025Mar 20, 2023 – Feb 10, 2025
Prime
Department of Transportation
Federal Highway Administration
THIS PROJECT CONSISTS OF REPAIRING SLOPE FAILURES AT MILEPOST 106.6 AND MILEPOST 109.7 THE WORK INCLUDES DESIGN SERVICES, EXCAVATION, EMBANKMENT CONSTRUCTION, AND OTHER MISCELLANEOUS WORK.693C7320D000007USAspending$2,526,528Sep 4, 2024Feb 3, 2023 – Sep 3, 2024
Prime
Department of Transportation
Federal Highway Administration
PROJECT FW-GRCO TRL(1): THE PROJECT CONSISTS OF REPLACING THE DAMAGED BOARDWALK ON HEADQUARTERS BOARDWALK TRAIL. THE WORK INCLUDES DESIGN SERVICES, TIMBER PILE AND TIMBER BOARDWALK CONSTRUCTION, AND OTHER MISCELLANEOUS WORK.693C7320D000007USAspending$1,730,806Jul 17, 2024Mar 3, 2023 – Jun 21, 2024
Prime
Department of Transportation
Federal Highway Administration
PROJECT NP-GREE 11(1) THE PROJECT CONSISTS OF RECONSTRUCTION OF ROADWAYS AND PARKING AREAS, CONSTRUCTION OF A BRIDGE, AND REPLACEMENT OF CULVERTS IN THE GREENBELT PARK. THE WORK INCLUDES FULL-DEPTH RECONSTRUCTION OF ASPHALT PAVEMENT, ASPHALT PAVEMENT MILL AND OVERLAY, ASPHALT REMOVAL ON BIKE TRAIL, A GEOSYNTHETIC REINFORCED SOIL-INTEGRATED BRIDGE SYSTEM (GRS-IBS) BRIDGE CONSTRUCTION, HEADWALL AND BOX CULVERT INSTALLATIONS, GRAVEL DIAPHRAGM INSTALLATION AS STORMWATER MANAGEMENT, STEEL-BACKED TIMBER GUARDRAIL REPLACEMENT, AND OTHER MISCELLANEOUS WORK.—$6,482,398May 20, 2024Jan 31, 2019 – May 20, 2024
Prime
Department of Transportation
Federal Highway Administration
PROJECT FW BIOA 12(1) THE PROJECT CONSISTS OF RECONSTRUCTION OF THE FALLING TIMBER BRIDGE ON SHAPE CHARGE ROAD (FW ROUTE 012). THE WORK INCLUDES REPLACEMENT OF FALLING TIMBER BRIDGE, RECONSTRUCTION OF APPROACHES, AGGREGATE RESURFACING, REMOVAL OF S693C7320D000023USAspending$1,527,506Feb 14, 2024Aug 26, 2021 – Jul 29, 2022
Prime
Department of Transportation
Federal Highway Administration
PROJECT MO ERFO FS 2017-1(1) WORK INCLUDES THE RECONSTRUCTION AND REPAIR OF MULTIPLE DAMAGED SITES ALONG THE JOHN J. AUDUBON TRAIL INCLUDING REALIGNMENT AT 2 SITES, PLACING RIPRAP, DITCH RECONDITIONING, AND OTHER MISCELLANEOUS WORK.693C7320D000023USAspending$1,127,341Oct 11, 2023Sep 25, 2020 – Nov 30, 2024

Contract vehicles are shown only when present in the source record. Linked award numbers and vehicles open the authoritative record on USAspending.gov.

Agencies supported

  • Department of TransportationGov-sourced
  • Department of DefenseGov-sourced
ECLIPSE COMPANIES, LLC – Chagrin Falls, OH | UEI RMCMTCKHMFH9 | FedSub