← Back to search

V. E. ANDERSON, INC.

Doing business as VE ANDERSON INC

WALNUT, CA, 91789

Unclaimed

Subcontracting experience

7 records from government sources. Past participation is not evidence of current teaming interest.

RoleAgencyDescriptionVehicleObligatedAction datePeriod
Subcontractor
Department of Defense
1. DESIGN WORKING DOG OBEDIENCE COURSE FREE STANDING CLEAR SPAN STEEL SHADE CANOPY (96€„¢X181€„¢). 2. GALVALUME PBR DECK 26 GAUGE. 36€Ͽ½ COVER, 8€Ͽ½ ZEE PURLINS 14 GAUGE 8X2-1/2 GALVANIZED. 3. FRAME MANUFACTURED BY MORRIS ADVANCE AWNING. FOUR (4) SECTIONS BOLTED WITH GRADE 8 BOLTS (PER PLANS). CORROSIVE RESISTANT. 4. STEEL PRIMED AND PAINTED EITHER BROWN OR GRAY. COLOR TO BE CONFIRMED BY VSFB REVIEWERS. 5. COLUMNS 12€„¢-6€Ͽ½ AND 21€„¢-6€Ͽ½ RESPECTIAVELY REACHING 14€„¢ AND 22€„¢ AFTER TOP FRAME BOLTED. 6. EPOXY ¾â‚¬Ï¿½ ALL THREAD THROUGH 16X16X3/4 BASE PLATE. LEVEL AND GROUTED. 7. ¼â‚¬Ï¿½ CABLE BRACING (PER PLANS). 8. PROVIDE FINISH TRIM ON EITHER END OF STRUCTURE. 9. PROVIDE 65%, 95%, AND 100% DESIGN DRAWINGS TO INCORPORATE INTO PROJECT DESIGN ANALYSIS DELIVERABLE COMPILED BY OTHERS. 10. SUBMIT ELECTRONIC FILES VIA EMAIL INCLUDING A CAD PROJECT FILE LIST, ALL DRAWINGS FILES, XREFS, AND IMAGE IN PDF AND DWG FORMAT. 11. DESIGN WILL COMPLY WITH DOD UNIFIED FACILITY CRITERIA (UFC) AND UNFIED FACILITY GUIDE SPECIFICATIONS (UFGS). 12. ALL ELEMENTS FO DESIGN WILL ADHERE TO THE REQUIREMENTS OF AIR FORCE STANDARD DESIGN MILITARY WORKING DOG FACILITY. 13. ALL ELEMENTS OF DESIGN WILL ADHERE TO THE REQUIREMENTS OF VANDENBERG INSTALLATION FACILITY STANDARDS. 14. ALL DRAWINGS WILL BE CREATED IN ACCORDANCE WITH THE VAFB CAD STANDARDS. 15. FINAL DRAWING PACKAGE WILL BE STAMPED AND SIGNED BY AN STRUCTURAL ENGINEER LICENSED IN THE STATE OF CALIFORNIA. 16. SUPPLY, DELIVER TO JOBSITE, AND ERECT FREE STANDING CLEAR SPAN STEEL SHADE CANOPY, INCLUDING ROOF ASSEMBLY. CAST-IN-PLACE CONCRETE FOUNDATION BY OTHERS. 17. FURNISH AND INSTALL RAIN GUTTER AND DOWSPOTS. 18. CREW TO REMAIN ON SITE UNTIL COMPLETION. ESTIMATED THREE (3) WEEKS FOR INSTALL.
22-0006.03
Parent award context
Parent award agency: Department of Defense · Department of the Air Force
Parent award NAICS: 236220
Parent award performance state: CA
Parent award description: RENOVATE MILITARY WORKING DOG OBEDIENCE COURSE, BUILDING 6447 PROJECT NUMBER 17-1121C3
View parent award on USAspending
FA461020D0009USAspending$465,000Oct 25, 2022— – —
Subcontractor
Department of Defense
1. DESIGN WORKING DOG OBEDIENCE COURSE FREE STANDING CLEAR SPAN STEEL SHADE CANOPY (96€„¢X181€„¢). 2. GALVALUME PBR DECK 26 GAUGE. 36€Ͽ½ COVER, 8€Ͽ½ ZEE PURLINS 14 GAUGE 8X2-1/2 GALVANIZED. 3. FRAME MANUFACTURED BY MORRIS ADVANCE AWNING. FOUR (4) SECTIONS BOLTED WITH GRADE 8 BOLTS (PER PLANS). CORROSIVE RESISTANT. 4. STEEL PRIMED AND PAINTED EITHER BROWN OR GRAY. COLOR TO BE CONFIRMED BY VSFB REVIEWERS. 5. COLUMNS 12€„¢-6€Ͽ½ AND 21€„¢-6€Ͽ½ RESPECTIAVELY REACHING 14€„¢ AND 22€„¢ AFTER TOP FRAME BOLTED. 6. EPOXY ¾â‚¬Ï¿½ ALL THREAD THROUGH 16X16X3/4 BASE PLATE. LEVEL AND GROUTED. 7. ¼â‚¬Ï¿½ CABLE BRACING (PER PLANS). 8. PROVIDE FINISH TRIM ON EITHER END OF STRUCTURE. 9. PROVIDE 65%, 95%, AND 100% DESIGN DRAWINGS TO INCORPORATE INTO PROJECT DESIGN ANALYSIS DELIVERABLE COMPILED BY OTHERS. 10. SUBMIT ELECTRONIC FILES VIA EMAIL INCLUDING A CAD PROJECT FILE LIST, ALL DRAWINGS FILES, XREFS, AND IMAGE IN PDF AND DWG FORMAT. 11. DESIGN WILL COMPLY WITH DOD UNIFIED FACILITY CRITERIA (UFC) AND UNFIED FACILITY GUIDE SPECIFICATIONS (UFGS). 12. ALL ELEMENTS FO DESIGN WILL ADHERE TO THE REQUIREMENTS OF AIR FORCE STANDARD DESIGN MILITARY WORKING DOG FACILITY. 13. ALL ELEMENTS OF DESIGN WILL ADHERE TO THE REQUIREMENTS OF VANDENBERG INSTALLATION FACILITY STANDARDS. 14. ALL DRAWINGS WILL BE CREATED IN ACCORDANCE WITH THE VAFB CAD STANDARDS. 15. FINAL DRAWING PACKAGE WILL BE STAMPED AND SIGNED BY AN STRUCTURAL ENGINEER LICENSED IN THE STATE OF CALIFORNIA. 16. SUPPLY, DELIVER TO JOBSITE, AND ERECT FREE STANDING CLEAR SPAN STEEL SHADE CANOPY, INCLUDING ROOF ASSEMBLY. CAST-IN-PLACE CONCRETE FOUNDATION BY OTHERS. 17. FURNISH AND INSTALL RAIN GUTTER AND DOWSPOTS. 18. CREW TO REMAIN ON SITE UNTIL COMPLETION. ESTIMATED THREE (3) WEEKS FOR INSTALL.
22-0006.03
Parent award context
Parent award agency: Department of Defense · Department of the Air Force
Parent award NAICS: 236220
Parent award performance state: CA
Parent award description: RENOVATE MILITARY WORKING DOG OBEDIENCE COURSE, BUILDING 6447 PROJECT NUMBER 17-1121C3
View parent award on USAspending
FA461020D0009USAspending$465,000Oct 25, 2022— – —
Subcontractor
Department of Defense
1. DESIGN WORKING DOG OBEDIENCE COURSE FREE STANDING CLEAR SPAN STEEL SHADE CANOPY (96€„¢X181€„¢). 2. GALVALUME PBR DECK 26 GAUGE. 36€Ͽ½ COVER, 8€Ͽ½ ZEE PURLINS 14 GAUGE 8X2-1/2 GALVANIZED. 3. FRAME MANUFACTURED BY MORRIS ADVANCE AWNING. FOUR (4) SECTIONS BOLTED WITH GRADE 8 BOLTS (PER PLANS). CORROSIVE RESISTANT. 4. STEEL PRIMED AND PAINTED EITHER BROWN OR GRAY. COLOR TO BE CONFIRMED BY VSFB REVIEWERS. 5. COLUMNS 12€„¢-6€Ͽ½ AND 21€„¢-6€Ͽ½ RESPECTIAVELY REACHING 14€„¢ AND 22€„¢ AFTER TOP FRAME BOLTED. 6. EPOXY ¾â‚¬Ï¿½ ALL THREAD THROUGH 16X16X3/4 BASE PLATE. LEVEL AND GROUTED. 7. ¼â‚¬Ï¿½ CABLE BRACING (PER PLANS). 8. PROVIDE FINISH TRIM ON EITHER END OF STRUCTURE. 9. PROVIDE 65%, 95%, AND 100% DESIGN DRAWINGS TO INCORPORATE INTO PROJECT DESIGN ANALYSIS DELIVERABLE COMPILED BY OTHERS. 10. SUBMIT ELECTRONIC FILES VIA EMAIL INCLUDING A CAD PROJECT FILE LIST, ALL DRAWINGS FILES, XREFS, AND IMAGE IN PDF AND DWG FORMAT. 11. DESIGN WILL COMPLY WITH DOD UNIFIED FACILITY CRITERIA (UFC) AND UNFIED FACILITY GUIDE SPECIFICATIONS (UFGS). 12. ALL ELEMENTS FO DESIGN WILL ADHERE TO THE REQUIREMENTS OF AIR FORCE STANDARD DESIGN MILITARY WORKING DOG FACILITY. 13. ALL ELEMENTS OF DESIGN WILL ADHERE TO THE REQUIREMENTS OF VANDENBERG INSTALLATION FACILITY STANDARDS. 14. ALL DRAWINGS WILL BE CREATED IN ACCORDANCE WITH THE VAFB CAD STANDARDS. 15. FINAL DRAWING PACKAGE WILL BE STAMPED AND SIGNED BY AN STRUCTURAL ENGINEER LICENSED IN THE STATE OF CALIFORNIA. 16. SUPPLY, DELIVER TO JOBSITE, AND ERECT FREE STANDING CLEAR SPAN STEEL SHADE CANOPY, INCLUDING ROOF ASSEMBLY. CAST-IN-PLACE CONCRETE FOUNDATION BY OTHERS. 17. FURNISH AND INSTALL RAIN GUTTER AND DOWSPOTS. 18. CREW TO REMAIN ON SITE UNTIL COMPLETION. ESTIMATED THREE (3) WEEKS FOR INSTALL.
22-0006.03
Parent award context
Parent award agency: Department of Defense · Department of the Air Force
Parent award NAICS: 236220
Parent award performance state: CA
Parent award description: RENOVATE MILITARY WORKING DOG OBEDIENCE COURSE, BUILDING 6447 PROJECT NUMBER 17-1121C3
View parent award on USAspending
FA461020D0009USAspending$465,000Oct 25, 2022— – —
Subcontractor
Department of Defense
1. DESIGN WORKING DOG OBEDIENCE COURSE FREE STANDING CLEAR SPAN STEEL SHADE CANOPY (96€„¢X181€„¢). 2. GALVALUME PBR DECK 26 GAUGE. 36€Ͽ½ COVER, 8€Ͽ½ ZEE PURLINS 14 GAUGE 8X2-1/2 GALVANIZED. 3. FRAME MANUFACTURED BY MORRIS ADVANCE AWNING. FOUR (4) SECTIONS BOLTED WITH GRADE 8 BOLTS (PER PLANS). CORROSIVE RESISTANT. 4. STEEL PRIMED AND PAINTED EITHER BROWN OR GRAY. COLOR TO BE CONFIRMED BY VSFB REVIEWERS. 5. COLUMNS 12€„¢-6€Ͽ½ AND 21€„¢-6€Ͽ½ RESPECTIAVELY REACHING 14€„¢ AND 22€„¢ AFTER TOP FRAME BOLTED. 6. EPOXY ¾â‚¬Ï¿½ ALL THREAD THROUGH 16X16X3/4 BASE PLATE. LEVEL AND GROUTED. 7. ¼â‚¬Ï¿½ CABLE BRACING (PER PLANS). 8. PROVIDE FINISH TRIM ON EITHER END OF STRUCTURE. 9. PROVIDE 65%, 95%, AND 100% DESIGN DRAWINGS TO INCORPORATE INTO PROJECT DESIGN ANALYSIS DELIVERABLE COMPILED BY OTHERS. 10. SUBMIT ELECTRONIC FILES VIA EMAIL INCLUDING A CAD PROJECT FILE LIST, ALL DRAWINGS FILES, XREFS, AND IMAGE IN PDF AND DWG FORMAT. 11. DESIGN WILL COMPLY WITH DOD UNIFIED FACILITY CRITERIA (UFC) AND UNFIED FACILITY GUIDE SPECIFICATIONS (UFGS). 12. ALL ELEMENTS FO DESIGN WILL ADHERE TO THE REQUIREMENTS OF AIR FORCE STANDARD DESIGN MILITARY WORKING DOG FACILITY. 13. ALL ELEMENTS OF DESIGN WILL ADHERE TO THE REQUIREMENTS OF VANDENBERG INSTALLATION FACILITY STANDARDS. 14. ALL DRAWINGS WILL BE CREATED IN ACCORDANCE WITH THE VAFB CAD STANDARDS. 15. FINAL DRAWING PACKAGE WILL BE STAMPED AND SIGNED BY AN STRUCTURAL ENGINEER LICENSED IN THE STATE OF CALIFORNIA. 16. SUPPLY, DELIVER TO JOBSITE, AND ERECT FREE STANDING CLEAR SPAN STEEL SHADE CANOPY, INCLUDING ROOF ASSEMBLY. CAST-IN-PLACE CONCRETE FOUNDATION BY OTHERS. 17. FURNISH AND INSTALL RAIN GUTTER AND DOWSPOTS. 18. CREW TO REMAIN ON SITE UNTIL COMPLETION. ESTIMATED THREE (3) WEEKS FOR INSTALL.
22-0006.03
Parent award context
Parent award agency: Department of Defense · Department of the Air Force
Parent award NAICS: 236220
Parent award performance state: CA
Parent award description: RENOVATE MILITARY WORKING DOG OBEDIENCE COURSE, BUILDING 6447 PROJECT NUMBER 17-1121C3
View parent award on USAspending
FA461020D0009USAspending$465,000Oct 25, 2022— – —
Subcontractor
Department of Defense
1. DESIGN WORKING DOG OBEDIENCE COURSE FREE STANDING CLEAR SPAN STEEL SHADE CANOPY (96€„¢X181€„¢). 2. GALVALUME PBR DECK 26 GAUGE. 36€Ͽ½ COVER, 8€Ͽ½ ZEE PURLINS 14 GAUGE 8X2-1/2 GALVANIZED. 3. FRAME MANUFACTURED BY MORRIS ADVANCE AWNING. FOUR (4) SECTIONS BOLTED WITH GRADE 8 BOLTS (PER PLANS). CORROSIVE RESISTANT. 4. STEEL PRIMED AND PAINTED EITHER BROWN OR GRAY. COLOR TO BE CONFIRMED BY VSFB REVIEWERS. 5. COLUMNS 12€„¢-6€Ͽ½ AND 21€„¢-6€Ͽ½ RESPECTIAVELY REACHING 14€„¢ AND 22€„¢ AFTER TOP FRAME BOLTED. 6. EPOXY ¾â‚¬Ï¿½ ALL THREAD THROUGH 16X16X3/4 BASE PLATE. LEVEL AND GROUTED. 7. ¼â‚¬Ï¿½ CABLE BRACING (PER PLANS). 8. PROVIDE FINISH TRIM ON EITHER END OF STRUCTURE. 9. PROVIDE 65%, 95%, AND 100% DESIGN DRAWINGS TO INCORPORATE INTO PROJECT DESIGN ANALYSIS DELIVERABLE COMPILED BY OTHERS. 10. SUBMIT ELECTRONIC FILES VIA EMAIL INCLUDING A CAD PROJECT FILE LIST, ALL DRAWINGS FILES, XREFS, AND IMAGE IN PDF AND DWG FORMAT. 11. DESIGN WILL COMPLY WITH DOD UNIFIED FACILITY CRITERIA (UFC) AND UNFIED FACILITY GUIDE SPECIFICATIONS (UFGS). 12. ALL ELEMENTS FO DESIGN WILL ADHERE TO THE REQUIREMENTS OF AIR FORCE STANDARD DESIGN MILITARY WORKING DOG FACILITY. 13. ALL ELEMENTS OF DESIGN WILL ADHERE TO THE REQUIREMENTS OF VANDENBERG INSTALLATION FACILITY STANDARDS. 14. ALL DRAWINGS WILL BE CREATED IN ACCORDANCE WITH THE VAFB CAD STANDARDS. 15. FINAL DRAWING PACKAGE WILL BE STAMPED AND SIGNED BY AN STRUCTURAL ENGINEER LICENSED IN THE STATE OF CALIFORNIA. 16. SUPPLY, DELIVER TO JOBSITE, AND ERECT FREE STANDING CLEAR SPAN STEEL SHADE CANOPY, INCLUDING ROOF ASSEMBLY. CAST-IN-PLACE CONCRETE FOUNDATION BY OTHERS. 17. FURNISH AND INSTALL RAIN GUTTER AND DOWSPOTS. 18. CREW TO REMAIN ON SITE UNTIL COMPLETION. ESTIMATED THREE (3) WEEKS FOR INSTALL.
22-0006.03
Parent award context
Parent award agency: Department of Defense · Department of the Air Force
Parent award NAICS: 236220
Parent award performance state: CA
Parent award description: RENOVATE MILITARY WORKING DOG OBEDIENCE COURSE, BUILDING 6447 PROJECT NUMBER 17-1121C3
View parent award on USAspending
FA461020D0009USAspending$331,370Oct 25, 2022— – —
Subcontractor
Department of Defense
1. DESIGN WORKING DOG OBEDIENCE COURSE FREE STANDING CLEAR SPAN STEEL SHADE CANOPY (96€„¢X181€„¢). 2. GALVALUME PBR DECK 26 GAUGE. 36€Ͽ½ COVER, 8€Ͽ½ ZEE PURLINS 14 GAUGE 8X2-1/2 GALVANIZED. 3. FRAME MANUFACTURED BY MORRIS ADVANCE AWNING. FOUR (4) SECTIONS BOLTED WITH GRADE 8 BOLTS (PER PLANS). CORROSIVE RESISTANT. 4. STEEL PRIMED AND PAINTED EITHER BROWN OR GRAY. COLOR TO BE CONFIRMED BY VSFB REVIEWERS. 5. COLUMNS 12€„¢-6€Ͽ½ AND 21€„¢-6€Ͽ½ RESPECTIAVELY REACHING 14€„¢ AND 22€„¢ AFTER TOP FRAME BOLTED. 6. EPOXY ¾â‚¬Ï¿½ ALL THREAD THROUGH 16X16X3/4 BASE PLATE. LEVEL AND GROUTED. 7. ¼â‚¬Ï¿½ CABLE BRACING (PER PLANS). 8. PROVIDE FINISH TRIM ON EITHER END OF STRUCTURE. 9. PROVIDE 65%, 95%, AND 100% DESIGN DRAWINGS TO INCORPORATE INTO PROJECT DESIGN ANALYSIS DELIVERABLE COMPILED BY OTHERS. 10. SUBMIT ELECTRONIC FILES VIA EMAIL INCLUDING A CAD PROJECT FILE LIST, ALL DRAWINGS FILES, XREFS, AND IMAGE IN PDF AND DWG FORMAT. 11. DESIGN WILL COMPLY WITH DOD UNIFIED FACILITY CRITERIA (UFC) AND UNFIED FACILITY GUIDE SPECIFICATIONS (UFGS). 12. ALL ELEMENTS FO DESIGN WILL ADHERE TO THE REQUIREMENTS OF AIR FORCE STANDARD DESIGN MILITARY WORKING DOG FACILITY. 13. ALL ELEMENTS OF DESIGN WILL ADHERE TO THE REQUIREMENTS OF VANDENBERG INSTALLATION FACILITY STANDARDS. 14. ALL DRAWINGS WILL BE CREATED IN ACCORDANCE WITH THE VAFB CAD STANDARDS. 15. FINAL DRAWING PACKAGE WILL BE STAMPED AND SIGNED BY AN STRUCTURAL ENGINEER LICENSED IN THE STATE OF CALIFORNIA. 16. SUPPLY, DELIVER TO JOBSITE, AND ERECT FREE STANDING CLEAR SPAN STEEL SHADE CANOPY, INCLUDING ROOF ASSEMBLY. CAST-IN-PLACE CONCRETE FOUNDATION BY OTHERS. 17. FURNISH AND INSTALL RAIN GUTTER AND DOWSPOTS. 18. CREW TO REMAIN ON SITE UNTIL COMPLETION. ESTIMATED THREE (3) WEEKS FOR INSTALL.
22-0006.03
Parent award context
Parent award agency: Department of Defense · Department of the Air Force
Parent award NAICS: 236220
Parent award performance state: CA
Parent award description: RENOVATE MILITARY WORKING DOG OBEDIENCE COURSE, BUILDING 6447 PROJECT NUMBER 17-1121C3
View parent award on USAspending
FA461020D0009USAspending$465,000Oct 25, 2022— – —
Subcontractor
Department of Defense
1. DESIGN WORKING DOG OBEDIENCE COURSE FREE STANDING CLEAR SPAN STEEL SHADE CANOPY (96€„¢X181€„¢). 2. GALVALUME PBR DECK 26 GAUGE. 36€Ͽ½ COVER, 8€Ͽ½ ZEE PURLINS 14 GAUGE 8X2-1/2 GALVANIZED. 3. FRAME MANUFACTURED BY MORRIS ADVANCE AWNING. FOUR (4) SECTIONS BOLTED WITH GRADE 8 BOLTS (PER PLANS). CORROSIVE RESISTANT. 4. STEEL PRIMED AND PAINTED EITHER BROWN OR GRAY. COLOR TO BE CONFIRMED BY VSFB REVIEWERS. 5. COLUMNS 12€„¢-6€Ͽ½ AND 21€„¢-6€Ͽ½ RESPECTIAVELY REACHING 14€„¢ AND 22€„¢ AFTER TOP FRAME BOLTED. 6. EPOXY ¾â‚¬Ï¿½ ALL THREAD THROUGH 16X16X3/4 BASE PLATE. LEVEL AND GROUTED. 7. ¼â‚¬Ï¿½ CABLE BRACING (PER PLANS). 8. PROVIDE FINISH TRIM ON EITHER END OF STRUCTURE. 9. PROVIDE 65%, 95%, AND 100% DESIGN DRAWINGS TO INCORPORATE INTO PROJECT DESIGN ANALYSIS DELIVERABLE COMPILED BY OTHERS. 10. SUBMIT ELECTRONIC FILES VIA EMAIL INCLUDING A CAD PROJECT FILE LIST, ALL DRAWINGS FILES, XREFS, AND IMAGE IN PDF AND DWG FORMAT. 11. DESIGN WILL COMPLY WITH DOD UNIFIED FACILITY CRITERIA (UFC) AND UNFIED FACILITY GUIDE SPECIFICATIONS (UFGS). 12. ALL ELEMENTS FO DESIGN WILL ADHERE TO THE REQUIREMENTS OF AIR FORCE STANDARD DESIGN MILITARY WORKING DOG FACILITY. 13. ALL ELEMENTS OF DESIGN WILL ADHERE TO THE REQUIREMENTS OF VANDENBERG INSTALLATION FACILITY STANDARDS. 14. ALL DRAWINGS WILL BE CREATED IN ACCORDANCE WITH THE VAFB CAD STANDARDS. 15. FINAL DRAWING PACKAGE WILL BE STAMPED AND SIGNED BY AN STRUCTURAL ENGINEER LICENSED IN THE STATE OF CALIFORNIA. 16. SUPPLY, DELIVER TO JOBSITE, AND ERECT FREE STANDING CLEAR SPAN STEEL SHADE CANOPY, INCLUDING ROOF ASSEMBLY. CAST-IN-PLACE CONCRETE FOUNDATION BY OTHERS. 17. FURNISH AND INSTALL RAIN GUTTER AND DOWSPOTS. 18. CREW TO REMAIN ON SITE UNTIL COMPLETION. ESTIMATED THREE (3) WEEKS FOR INSTALL.
22-0006.03
Parent award context
Parent award agency: Department of Defense · Department of the Air Force
Parent award NAICS: 236220
Parent award performance state: CA
Parent award description: RENOVATE MILITARY WORKING DOG OBEDIENCE COURSE, BUILDING 6447 PROJECT NUMBER 17-1121C3
View parent award on USAspending
FA461020D0009USAspending$465,000Oct 25, 2022— – —

Contract vehicles are shown only when present in the source record. Linked award numbers and vehicles open the authoritative record on USAspending.gov.

V. E. ANDERSON, INC. – Walnut, CA | UEI TJTTCDHBWXW5 | FedSub