← Back to search
GOLBARAN INC
POTOMAC, MD, 20854
Unclaimed
Subcontracting experience
1 record from government sources. Past participation is not evidence of current teaming interest.
| Role | Agency | Description | Vehicle | Obligated | Action date | Period |
|---|---|---|---|---|---|---|
| Subcontractor | Department of Defense | • FURNISH AND INSTALL REQUIRED METAL STUD FRAMING BEHIND 150 DRYWALL PATCHES.
• FURNISH AND INSTALL ALL GYPSUM BOARD FOR ABOVE REFERENCED PATCHES.
• FURNISH AND INSTALL FINISHING (TAPE, BLOCK, SKIM AND SAND) FOR ALL ABOVE REFERENCED PATCHES, READY FOR PAINT.
• FURNISH AND INSTALL ALL METAL STUD FRAMINGS FOR 43 CHASES.
• FURNISH AND INSTALL ALL GYPSUM BOAD AND CORNER BEADS OVER CHASES.
• FURNISH AND INSTALL FINISHING (TAPE, BLACK, SKIM AND SAND) ON ALL ABOVE CHASES, READY FOR PAINT.
• MODIFY EXISTING STRUCTURAL FRAMING TO CREATE (15) OPENINGS FOR DUCT WORK INCLUDING REMOVAL OF STRUCTURAL STUDS, ADD HEADER, SILL, AND SIDE JAMBS. SVI-2319033-ACC-F540 Parent award context Parent award agency: Department of Defense · Washington Headquarters Services Parent award NAICS: 236220 Parent award performance state: DC Parent award description: DESIGN-BUILD CONSTRUCTION FOR PENTAGON WEDGE 1 5E PHASE 4 REFRESH View parent award on USAspending | HQ003421D0024USAspending | $56,559 | Jun 16, 2026 | — – — |
Contract vehicles are shown only when present in the source record. Linked award numbers and vehicles open the authoritative record on USAspending.gov.