GRAZEL FOUNDATION L.L.C

TRUJILLO ALTO, PR, 00976

Unclaimed
Minority Owned

Subcontracting experience

2 records from government sources. Past participation is not evidence of current teaming interest.

RoleAgencyDescriptionVehicleObligatedAction datePeriod
Subcontractor
General Services Administration
INSTALL SHEET PILES AND STONE COLUMNS
GRAZEL FOUNDATION
Parent award context
Parent award agency: General Services Administration · Public Buildings Service
Parent award NAICS: 236220
Parent award performance state: PR
Parent award description: CBP MAYAGUEZ MARINE UNIT NEW CONSTRUCTION OF ADMINISTRATIVE BUILDING, BOAT MAINTENANCE, STORAGE HANGAR AND EXTERIOR VEHICLE PARKING SPACES LOCATED AT PR KM, 18.5 BOQUERON, CABO ROJO, PR 00623
View parent award on USAspending
—$23,499Jun 3, 2025— – —
Subcontractor
General Services Administration
THE PROJECT CONSISTS OF A ONE STORY WAREHOUSE STRUCTURE WITH A FOOTPRINT OF 7,100 SQ-FT. FOR THIS PRELIMINARY PRICE ONLY THE STRUCTURE WAS CONSIDERED FOR VIBRO-REPLACEMENT TREATMENT. CONSTRUCTION SEQUENCE AND CONSIDERATIONS THE FOLLOWING IS THE CONSTRUCTION SEQUENCE FOR THIS PROJECT: 1. GRAZEL FOUNDATION SUBMITS SHOP DRAWINGS AND SUBMITTALS FOR APPROVAL. 2. THE SITE IS STRIPPED, CLEARED AND GRUBBED BY OTHERS. 3. ANY EXISTING UTILITIES ARE REMOVED BY OTHERS. 4. THE SITE IS LEVELED AND MADE ACCESSIBLE FOR GF EQUIPMENT. 5. THE STONE COLUMN LOCATIONS ARE LOCATED IN THE FIELD BY OTHERS. 6. GF MOBILIZES TO THE SITE AND PREPARES EQUIPMENT FOR PRODUCTION. 7. GF PERFORMS PRODUCTION VR. 8. GF DEMOBILIZES FROM THE SITE AND BUILDING PAD CONSTRUCTION (FILLING, SCRAPING, ROLLING, ETC.) IS PERFORMED BY OTHERS. SURFACE CLEANUP: THE VR PROCESS WILL CREATE SOME SURFACE SPOILS AND POSSIBLY SOME SURFACE WATER. GF WILL DIVERT THE SPOILS WITHIN THE WORK AREA, BUT THE GENERAL CONTRACTOR WILL BE REQUIRED TO REMOVE THE SPOILS FROM THE SITE AS REQUIRED SO THAT THEY DO NOT AFFECT GF€„¢S WORK. PROOF-ROLLING: THE VR PROCESS WILL DEPOSIT FINES AND LOOSEN THE WORKING SURFACE. THEREFORE, SURFACE LEVELING AND ROLLING WILL HAVE TO BE PERFORMED FOLLOWING THE VR TO DENSIFY THE UPPER TWO TO THREE FEET OF SOIL. GF HAS NOT INCLUDED THE COST OF REGRADING AND ROLLING. ROCK BACKFILL: GF HAS INCLUDED THE COST OF ALL ROCK BACKFILL FOR THE VR INSTALLATION PROCESS. QUALITY ASSURANCE AND QUALITY CONTROL PROGRAM SHOP DRAWING: GF WILL DEVELOP AND SUBMIT A SHOP DRAWING BEFORE THE WORK IS PERFORMED, SHOWING THE STONE COLUMN LOCATIONS. THE LOCATIONS WILL BE SURVEYED IN BY THE GENERAL CONTRACTOR. PRODUCTION LOG: THE GF CRANE OPERATOR WILL KEEP A LOG AS THE WORK IS PERFORMED. THE LOG INCLUDES RECORDING THE STONE COLUMN NUMBER, DEPTH, AMPERAGE, ESTIMATED STONE QUANTITY, CONSTRUCTION TIME, AND COMMENTS FOR EACH COLUMN. A COPY WILL BE PROVIDED TO THE GENERAL CONTRACTOR AND THE OWNER€„¢S INSPECTOR DAILY. MODULUS TEST: IF RECOMMENDED BY THE SOILS ENGINEER, GF WILL INCLUDE THE COST FOR ONE MODULUS TEST. INSPECTION: FULL TIME INSPECTION BY A REPRESENTATIVE OF AN INDEPENDENT LABORATORY MAY BE REQUIRED BY THE SPECIFICATIONS. ACCEPTANCE CRITERIA THE VR PROGRAM WILL BE CONSIDERED ACCEPTABLE UPON COMPLETION OF THE CONSTRUCTION OF THE VR PROGRAM AS DESCRIBED IN THIS PROPOSAL, AND SHOWN ON THE SHOP DRAWING. WARRANTY GF WARRANTIES THAT THE PROGRAM STATED IN THIS PROPOSAL WILL BE PERFORMED FOR THE STATED PRICE SUBJECT TO THE TERMS AND CONDITIONS PRESENTED. FIELD LAYOUT, ACCESS, SCHEDULE LAYOUT: THE GENERAL CONTRACTOR SHALL LOCATE ALL VR LOCATIONS IN THE FIELD. ACCESS: THE GENERAL CONTRACTOR SHALL PROVIDE SAFE, UNINTERRUPTED ACCESS FOR GF€„¢S AND ITS SUPPLIERS€„¢ EQUIPMENT AND MATERIAL TRUCKS OPERATING UNDER THEIR OWN POWER. THIS EQUIPMENT MAY INCLUDE CRAWLER CRANES, RUBBER TIRED LOADERS, AND ROCK TRAILERS. THE WORKING PLATFORM SHOULD BE RELATIVELY LEVEL AND FIRM TO SAFELY SUPPORT THE EQUIPMENT. SCHEDULE: GF ESTIMATES THAT THE VR CAN BE COMPLETED IN A 14 WEEK TIME FRAME. THIS SCHEDULE WILL BE ATTAINED WITH ONE RIG AND WORKING ONE SHIFT OF 8 HOURS.
3930-22
Parent award context
Parent award agency: General Services Administration · Public Buildings Service
Parent award NAICS: 236220
Parent award performance state: PR
Parent award description: CBP MAYAGUEZ MARINE UNIT NEW CONSTRUCTION OF ADMINISTRATIVE BUILDING, BOAT MAINTENANCE, STORAGE HANGAR AND EXTERIOR VEHICLE PARKING SPACES LOCATED AT PR KM, 18.5 BOQUERON, CABO ROJO, PR 00623
View parent award on USAspending
—$600,000Jan 4, 2023— – —

Contract vehicles are shown only when present in the source record. Linked award numbers and vehicles open the authoritative record on USAspending.gov.