← Back to search

WEST PACIFIC ELECTRIC COMPANY CORPORATION

Doing business as WEST PACIFIC ELECTRIC CO CORP

PISMO BEACH, CA, 93449

Unclaimed
Small Business8(a)EDWOSBWOSBMinority OwnedSmall Disadvantaged

Prime contracting experience

1 record from government sources. Past participation is not evidence of current teaming interest.

RoleAgencyDescriptionVehicleObligatedAction datePeriod
Prime
Department of Defense
Department of the Army
WORK ASSOCIATED WITH CONSTRUCTION FOR—$4,249,493Mar 8, 2022Sep 5, 2018 – Sep 29, 2029

Contract vehicles are shown only when present in the source record. Linked award numbers and vehicles open the authoritative record on USAspending.gov.

Subcontracting experience

6 records from government sources. Past participation is not evidence of current teaming interest.

RoleAgencyDescriptionVehicleObligatedAction datePeriod
Subcontractor
Department of Defense
DEVELOP, SUPPLY A B9 & B7 CIRCUIT COORDINATION STUDY. • ALL OUTAGE NARRATIVES AND MOPS WILL BE WRITTEN BY WPEC WITH PERFORMANCE DATES AND TIMES STATED IN THE WRITE-UP. DATE OF OUTAGES WILL BE BASED OFF THE 30 CE SWITCHING SCHEDULE AND REQUEST MADE BY WPEC. • PERFORM TRAFFIC CONTROL PER PLAN (TRAFFIC CONTROL PLAN DEVELOPMENT BY OTHER) • USE OF VACUUM UTILITY LOCATING • OPEN-CUT TRENCHING AND DIRECTIONAL DRILLING WHERE ALLOWED • FOR ELECTRICAL WORK ONLY WPEC TO USE AND OR PROVIDE ALL BACKFILL MATERIALS, NATIVE SOILS, SAND AND OR RED CONCRETE ENCASED DUCT BANK. • ROADWAY REPAIR “PATCH WORK” FOR ELECTRICAL WORK ONLY. • EARTHWORK FOR ALL SECTIONAL SWITCHES AND TRANSFORMER EQUIPMENT PADS, DEPRESSED CURBS, SIDEWALKS & RAMP REPAIR. • IF ADVERSE GROUND CONDITIONS OR ADVERSE WEATHER AFFECT WORKING CONDITIONS, CONSTRUCTION ACTIVITIES WILL NOT BE COMMENCED OR CONTINUED UNLESS THE PARTIES AGREE UPON ADDITIONAL COMPENSATION AND OR ADDITIONAL TIME FOR COMPLETION AND THE CONTRACT IS ADJUSTED ACCORDINGLY. • SUPPLY ALL CONCRETE AND ASPHALT MATERIALS AND LABOR TO INSTALL ALL REQUIRING TASK TO COMPLETE THE ELECTRICAL WORK REQUIRED TO COMPLETE THE PROJECT. • ALL TREE TRIMMING/REMOVAL, GRUB AND CLEAR WILL FOLLOW VAFB STANDARDS WILL BE PERFORMED DURING THE NONNESTING AND DRY SEASON.
24021-01
Parent award context
Parent award agency: Department of Defense · Department of the Air Force
Parent award NAICS: 236220
Parent award performance state: CA
Parent award description: VANDENBERG AFB, EDWARDS AFB, AND LOS ANGELES AFB MULTIPLE AWARD CONSTRUCTION CONTRACT (VELA MACC)
View parent award on USAspending
FA461020D0006USAspending$8,650,000Oct 9, 2024— – —
Subcontractor
Department of Defense
MAINTAIN 480V CIRCUIT BREAKERS AT PILLAR POINT AFS
24004-01
Parent award context
Parent award agency: Department of Defense · Department of the Air Force
Parent award NAICS: 236220
Parent award performance state: CA
Parent award description: TFWY171054A MAINTAIN 480V CIRCUIT BREAKER AT PILLAR POINT AFS VANDENBERG AFB, EDWARDS AFB, AND LOS ANGELES AFB MULTIPLE AWARD CONSTRUCTION CONTRACT (VELA MACC) IAW THE SOW AND ALL OTHER ATTACHMENTS IN SECTION J
View parent award on USAspending
FA461020D0006USAspending$4,539,878Jun 28, 2024— – —
Subcontractor
Department of Defense
WORK WITH ELECTRICAL ENGINEERING THROUGH THE DEVELOPMENT OF 35% THROUGH 100% READY FOR CONSTRUCTION PLANS AND SPECIFICATIONS · SUBCONTRACTOR UTILITY VERIFICATION BY WAY OF HYDRO-VACUUMING AFTER ALL LOCATIONS FOR EXCAVATION HAVE BEEN MARKED BY OTHERS (THIS CAN BE DONE IN PHASES TO PROTECT SURVEY MARKINGS) · PROVIDE AND OR TESTING OF €œVLF CABLE TESTING, 3 POINT FALL GROUNDING, RELAYS, BREAKERS, TRANSFORMERS, POLE & PADMOUNT SWITCHES, GROUND FAULT, TESTING AND NEW STREET LIGHTING WITH PHOT CONTROL ON EACH FIXTURE TOTAL OF FIVE · ALL OUTAGE NARRATIVE WILL BE WRITTEN BY SUBCONTRACTOR WITH PERFORMANCE TIMES STATED IN THE WRITE-UP. DATE OF OUTAGES WILL BE BASED OFF THE 30 CES SWITCHING SCHEDULE AND REQUEST MADE BY SUBCONTRACTOR · PERFORM TRAFFIC CONTROL (TRAFFIC CONTROL PLAN DEVELOPMENT BY OTHER) · USE OF VACUUM UTILITY LOCATING · OPEN-CUT TRENCHING AND DIRECTIONAL DRILLING WHERE ALLOWED · FOR ELECTRICAL WORK ONLY SUBCONTRACTOR TO USE AND OR PROVIDE ALL BACKFILL MATERIALS, NATIVE SOILS, SAND AND OR RED CONCRETE ENCASED DUCT BANK. (COMPACTION CONCRETE AND OR SOILS TESTING BY QA-OTHER) · ALL ELECTRICAL EQUIPMENT PADS BY SUBCONTRACTOR · IF ADVERSE GROUND CONDITIONS OR ADVERSE WEATHER AFFECT WORKING CONDITIONS, CONSTRUCTION ACTIVITIES SHALL BE HAULTED UNTIL ALL PARTIES MUTUALLY AGREE UPON ADDITIONAL COMPENSATION AND/OR ADDITIONAL TIME FOR COMPLETION WITH CONTRACT ADJUSTED ACCORDINGLY · SUPPLY ALL CONCRETE AND LABOR TO INSTALL ALL REQUIRING TASK TO COMPLETE THE ELECTRICAL PORTION OF THE PROJECT · REMOVAL OF ALL ELECTRICAL COMPONENTS, POLES, WIRE CROSSARMS, INSULATORS, CUTOUTS, POLE MOUNT AND PADMOUNT TRANSFORMERS AND DELIVER TO EITHER VAFB RECYCLE OR THE HAZMAT CONTRACTOR BGI
2313703
Parent award context
Parent award agency: Department of Defense · Department of the Air Force
Parent award NAICS: 237310
Parent award performance state: CA
Parent award description: REPAIR NEW MEXICO ROAD AND INTERSECTION.
View parent award on USAspending
—$680,770Aug 3, 2023— – —
Subcontractor
Department of Defense
PROJECT PHASES - DESIGN, GOVERNMENT PLAN CHECK REVIEW UTILITY VERIFICATION - HYDRO VACCUMING - ELECTRICAL TESTING VLF CABLE TESTING, 3 POINT FALL GROUNDING RELAYS, BREAKERS M TRANSFORMERS, POLE & PADMOUNT SWITCHES, SHORT CIRCUIT, GROUND FAULT, TESTING PERFORM TESTING AND INPUT SETTINGS AT OAK MOUNTAIN MAIN CIRCUIT BREAKER AND NEW PAD MOUNTED - PG&E METERED SWITCHGEAR - ALL OUTAGE NARRATIVE - TRAFFIC CONTROL
22093-01
Parent award context
Parent award agency: Department of Defense · Department of the Air Force
Parent award NAICS: 236220
Parent award performance state: CA
Parent award description: REPLACE OVERHEAD DISTRIBUTION LINE FOR OAK MOUNTAIN, VANDENBERG SPACE FORCE BASE, CALIFORNIA
View parent award on USAspending
FA461020D0006USAspending$5,305,429May 6, 2023— – —
Subcontractor
Department of Defense
"DEMO U/G & O/H, POLES, CONDUCTORS NEW ELECTRICAL UTILITY POLES, CROSSARMS, HARDWARE REINSULATE ELECTRICAL UTILITY POLES REINSULATE POLE LINE HARDWARE DOWN GUYS, RODS, PLATE, WIRE, HARDWARE NEW UNDERGROUND DUCTS, ELBOWS & FITTINGS PRECAST MANHOLES SWITCHES TESTING"
I22002-001001
Parent award context
Parent award agency: Department of Defense · Department of the Air Force
Parent award NAICS: 237130
Parent award performance state: CA
Parent award description: REPLACE OVERHEAD DISTRIBUTION LINE CIRCUIT B6 ON VANDENBERG SPACE FORCE BASE, CALIFORNIA
View parent award on USAspending
—$8,036,453Jul 18, 2022— – —
Subcontractor
Department of Defense
PERFORM FIELD INVESTIGATION AND INSPECTIONS INCLUDING; EXISTING WOOD POLES AND EQUIPMENT, HAZARDOUS MATERIAL SURVEYS, VLF TESTING. PROCURE AND INSTALL CONCRETE POLES, 4/0 WIRE, S.S. HARDWARE, CROSS ARMS, PVC & U.G. CABLE, AND SECTIONAL SWITCHES. PROVIDE LABOR, EQUIPMENT AND MATERIALS FOR CONCRETE AND ASPHALT WORK INCLUDING ROAD CROSSINGS, SIDEWALK, C&G, DUCTBANKS AND EQ. PADS. PROVIDE VEGETATION AND TREE TRIMMING AND REMOVAL FOR HV WORK. PROVIDE TRAFFIC CONTROL.
I22002-001001
Parent award context
Parent award agency: Department of Defense · Department of the Air Force
Parent award NAICS: 237130
Parent award performance state: CA
Parent award description: REPLACE OVERHEAD DISTRIBUTION LINE CIRCUIT B6 ON VANDENBERG SPACE FORCE BASE, CALIFORNIA
View parent award on USAspending
—$8,036,453Jul 18, 2022— – —

Contract vehicles are shown only when present in the source record. Linked award numbers and vehicles open the authoritative record on USAspending.gov.

Agencies supported

  • Department of DefenseGov-sourced
WEST PACIFIC ELECTRIC COMPANY CORPORATION – Pismo Beach, CA | UEI WFBUTZJL3LK4 | FedSub