| Role | Agency | Description | Vehicle | Obligated | Action date | Period |
|---|---|---|---|---|---|---|
| Prime | Department of Defense Department of the Army | WORK ASSOCIATED WITH CONSTRUCTION FOR | — | $4,249,493 | Mar 8, 2022 | Sep 5, 2018 – Sep 29, 2029 |
Contract vehicles are shown only when present in the source record. Linked award numbers and vehicles open the authoritative record on USAspending.gov.
Subcontracting experience
6 records from government sources. Past participation is not evidence of current teaming interest.
| Role | Agency | Description | Vehicle | Obligated | Action date | Period |
|---|---|---|---|---|---|---|
| Subcontractor | Department of Defense | DEVELOP, SUPPLY A B9 & B7 CIRCUIT COORDINATION STUDY.
• ALL OUTAGE NARRATIVES AND MOPS WILL BE WRITTEN BY WPEC WITH PERFORMANCE DATES AND TIMES STATED IN THE
WRITE-UP. DATE OF OUTAGES WILL BE BASED OFF THE 30 CE SWITCHING SCHEDULE AND REQUEST MADE BY WPEC.
• PERFORM TRAFFIC CONTROL PER PLAN (TRAFFIC CONTROL PLAN DEVELOPMENT BY OTHER)
• USE OF VACUUM UTILITY LOCATING
• OPEN-CUT TRENCHING AND DIRECTIONAL DRILLING WHERE ALLOWED
• FOR ELECTRICAL WORK ONLY WPEC TO USE AND OR PROVIDE ALL BACKFILL MATERIALS, NATIVE SOILS, SAND AND OR RED
CONCRETE ENCASED DUCT BANK.
• ROADWAY REPAIR “PATCH WORK” FOR ELECTRICAL WORK ONLY.
• EARTHWORK FOR ALL SECTIONAL SWITCHES AND TRANSFORMER EQUIPMENT PADS, DEPRESSED CURBS, SIDEWALKS & RAMP
REPAIR.
• IF ADVERSE GROUND CONDITIONS OR ADVERSE WEATHER AFFECT WORKING CONDITIONS, CONSTRUCTION ACTIVITIES WILL NOT
BE COMMENCED OR CONTINUED UNLESS THE PARTIES AGREE UPON ADDITIONAL COMPENSATION AND OR ADDITIONAL
TIME FOR COMPLETION AND THE CONTRACT IS ADJUSTED ACCORDINGLY.
• SUPPLY ALL CONCRETE AND ASPHALT MATERIALS AND LABOR TO INSTALL ALL REQUIRING TASK TO COMPLETE THE ELECTRICAL
WORK REQUIRED TO COMPLETE THE PROJECT.
• ALL TREE TRIMMING/REMOVAL, GRUB AND CLEAR WILL FOLLOW VAFB STANDARDS WILL BE PERFORMED DURING THE NONNESTING
AND DRY SEASON. 24021-01 Parent award context Parent award agency: Department of Defense · Department of the Air Force Parent award NAICS: 236220 Parent award performance state: CA Parent award description: VANDENBERG AFB, EDWARDS AFB, AND LOS ANGELES AFB MULTIPLE AWARD CONSTRUCTION CONTRACT (VELA MACC) View parent award on USAspending | FA461020D0006USAspending | $8,650,000 | Oct 9, 2024 | — – — |
| Subcontractor | Department of Defense | MAINTAIN 480V CIRCUIT BREAKERS AT PILLAR POINT AFS 24004-01 Parent award context Parent award agency: Department of Defense · Department of the Air Force Parent award NAICS: 236220 Parent award performance state: CA Parent award description: TFWY171054A MAINTAIN 480V CIRCUIT BREAKER AT PILLAR POINT AFS VANDENBERG AFB, EDWARDS AFB, AND LOS ANGELES AFB MULTIPLE AWARD CONSTRUCTION CONTRACT (VELA MACC) IAW THE SOW AND ALL OTHER ATTACHMENTS IN SECTION J View parent award on USAspending | FA461020D0006USAspending | $4,539,878 | Jun 28, 2024 | — – — |
| Subcontractor | Department of Defense | WORK WITH ELECTRICAL ENGINEERING THROUGH THE DEVELOPMENT OF 35% THROUGH 100% READY
FOR CONSTRUCTION PLANS AND SPECIFICATIONS
· SUBCONTRACTOR UTILITY VERIFICATION BY WAY OF HYDRO-VACUUMING AFTER ALL LOCATIONS FOR
EXCAVATION HAVE BEEN MARKED BY OTHERS (THIS CAN BE DONE IN PHASES TO PROTECT SURVEY
MARKINGS)
· PROVIDE AND OR TESTING OF €œVLF CABLE TESTING, 3 POINT FALL GROUNDING, RELAYS, BREAKERS,
TRANSFORMERS, POLE & PADMOUNT SWITCHES, GROUND FAULT, TESTING AND NEW STREET LIGHTING
WITH PHOT CONTROL ON EACH FIXTURE TOTAL OF FIVE
· ALL OUTAGE NARRATIVE WILL BE WRITTEN BY SUBCONTRACTOR WITH PERFORMANCE TIMES STATED IN
THE WRITE-UP. DATE OF OUTAGES WILL BE BASED OFF THE 30 CES SWITCHING SCHEDULE AND REQUEST
MADE BY SUBCONTRACTOR
· PERFORM TRAFFIC CONTROL (TRAFFIC CONTROL PLAN DEVELOPMENT BY OTHER)
· USE OF VACUUM UTILITY LOCATING
· OPEN-CUT TRENCHING AND DIRECTIONAL DRILLING WHERE ALLOWED
· FOR ELECTRICAL WORK ONLY SUBCONTRACTOR TO USE AND OR PROVIDE ALL BACKFILL MATERIALS, NATIVE
SOILS, SAND AND OR RED CONCRETE ENCASED DUCT BANK. (COMPACTION CONCRETE AND OR SOILS
TESTING BY QA-OTHER)
· ALL ELECTRICAL EQUIPMENT PADS BY SUBCONTRACTOR
· IF ADVERSE GROUND CONDITIONS OR ADVERSE WEATHER AFFECT WORKING CONDITIONS, CONSTRUCTION
ACTIVITIES SHALL BE HAULTED UNTIL ALL PARTIES MUTUALLY AGREE UPON ADDITIONAL COMPENSATION
AND/OR ADDITIONAL TIME FOR COMPLETION WITH CONTRACT ADJUSTED ACCORDINGLY
· SUPPLY ALL CONCRETE AND LABOR TO INSTALL ALL REQUIRING TASK TO COMPLETE THE ELECTRICAL PORTION
OF THE PROJECT
· REMOVAL OF ALL ELECTRICAL COMPONENTS, POLES, WIRE CROSSARMS, INSULATORS, CUTOUTS, POLE
MOUNT AND PADMOUNT TRANSFORMERS AND DELIVER TO EITHER VAFB RECYCLE OR THE HAZMAT
CONTRACTOR BGI 2313703 Parent award context Parent award agency: Department of Defense · Department of the Air Force Parent award NAICS: 237310 Parent award performance state: CA Parent award description: REPAIR NEW MEXICO ROAD AND INTERSECTION. View parent award on USAspending | — | $680,770 | Aug 3, 2023 | — – — |
| Subcontractor | Department of Defense | PROJECT PHASES - DESIGN, GOVERNMENT PLAN CHECK REVIEW UTILITY VERIFICATION - HYDRO VACCUMING - ELECTRICAL TESTING VLF CABLE TESTING, 3 POINT FALL GROUNDING RELAYS, BREAKERS M TRANSFORMERS, POLE & PADMOUNT SWITCHES, SHORT CIRCUIT, GROUND FAULT, TESTING
PERFORM TESTING AND INPUT SETTINGS AT OAK MOUNTAIN MAIN CIRCUIT BREAKER AND NEW PAD MOUNTED - PG&E METERED SWITCHGEAR - ALL OUTAGE NARRATIVE - TRAFFIC CONTROL 22093-01 Parent award context Parent award agency: Department of Defense · Department of the Air Force Parent award NAICS: 236220 Parent award performance state: CA Parent award description: REPLACE OVERHEAD DISTRIBUTION LINE FOR OAK MOUNTAIN, VANDENBERG SPACE FORCE BASE, CALIFORNIA View parent award on USAspending | FA461020D0006USAspending | $5,305,429 | May 6, 2023 | — – — |
| Subcontractor | Department of Defense | "DEMO U/G & O/H, POLES, CONDUCTORS
NEW ELECTRICAL UTILITY POLES, CROSSARMS, HARDWARE
REINSULATE ELECTRICAL UTILITY POLES
REINSULATE POLE LINE HARDWARE
DOWN GUYS, RODS, PLATE, WIRE, HARDWARE
NEW UNDERGROUND DUCTS, ELBOWS & FITTINGS
PRECAST MANHOLES
SWITCHES
TESTING" I22002-001001 Parent award context Parent award agency: Department of Defense · Department of the Air Force Parent award NAICS: 237130 Parent award performance state: CA Parent award description: REPLACE OVERHEAD DISTRIBUTION LINE CIRCUIT B6 ON VANDENBERG SPACE FORCE BASE, CALIFORNIA View parent award on USAspending | — | $8,036,453 | Jul 18, 2022 | — – — |
| Subcontractor | Department of Defense | PERFORM FIELD INVESTIGATION AND INSPECTIONS INCLUDING; EXISTING WOOD POLES AND EQUIPMENT, HAZARDOUS MATERIAL SURVEYS, VLF TESTING.
PROCURE AND INSTALL CONCRETE POLES, 4/0 WIRE, S.S. HARDWARE, CROSS ARMS, PVC & U.G. CABLE, AND SECTIONAL SWITCHES.
PROVIDE LABOR, EQUIPMENT AND MATERIALS FOR CONCRETE AND ASPHALT WORK INCLUDING ROAD CROSSINGS, SIDEWALK, C&G,
DUCTBANKS AND EQ. PADS.
PROVIDE VEGETATION AND TREE TRIMMING AND REMOVAL FOR HV WORK. PROVIDE TRAFFIC CONTROL. I22002-001001 Parent award context Parent award agency: Department of Defense · Department of the Air Force Parent award NAICS: 237130 Parent award performance state: CA Parent award description: REPLACE OVERHEAD DISTRIBUTION LINE CIRCUIT B6 ON VANDENBERG SPACE FORCE BASE, CALIFORNIA View parent award on USAspending | — | $8,036,453 | Jul 18, 2022 | — – — |