← Back to search
TEXAS RESEARCH INSTITUTE , AUSTIN, INC.
AUSTIN, TX, 78733
Unclaimed
Prime contracting experience
Showing the 50 most recent of 53 records from government sources. Past participation is not evidence of current teaming interest.
| Role | Agency | Description | Vehicle | Obligated | Action date | Period |
|---|---|---|---|---|---|---|
| Prime | National Aeronautics and Space Administration National Aeronautics and Space Administration | EO14042 FY22 SBIR PHASE II PERSISTENTLY ANTIMICROBIAL POLYURETHANES FOR IMPROVED PRESSURE GARMENT BLADDERS | — | $749,988 | Aug 6, 2026 | Jul 14, 2022 – Dec 18, 2026 |
| Prime | Department of Defense Department of the Army | SBIR PHASE II TOPIC #A17-035 "INSPECTION SYSTEM FOR BODY AND VEHICLE BALLISTIC ARMOR" | — | $988,970 | Jul 17, 2026 | Mar 14, 2019 – Mar 13, 2024 |
| Prime | Department of Defense Department of the Air Force | HIGH TEMPERATURE PASTE ADHESIVES AND SEALANTS | — | $1,249,995 | Jul 17, 2026 | Jan 17, 2023 – Jan 10, 2027 |
| Prime | Department of Defense Department of the Air Force | NON-DESTRUCTIVE EVAULATION OF THICK SCARF REPAIRED COMPOSITES AND RELATED AS-MANUFACTURED STRUCTURES | — | $2,899,983 | Jul 14, 2026 | Sep 28, 2022 – Aug 31, 2027 |
| Prime | Department of Defense Department of the Navy | SBIR PH II. | — | $1,699,991 | Jul 9, 2026 | Aug 11, 2023 – Dec 31, 2026 |
| Prime | Department of Defense Defense Microelectronics Activity | SBIR PHASE II (24-4H5): HIGH VOLTAGE PACKAGE ENCAPSULATION | — | $1,315,213 | Jul 2, 2026 | Sep 30, 2024 – Apr 13, 2027 |
| Prime | Department of Defense Department of the Air Force | ADDITIVE MANUFACTURING TECHNIQUES FOR ASTRONOMICAL MIRROR | — | $1,249,989 | Jun 30, 2026 | Apr 25, 2024 – Dec 17, 2026 |
| Prime | Department of Defense Department of the Air Force | MAST (MODEL-BASED ADVANCED SENSING FOR TRANSFORMATION) | — | $349,000 | Jun 22, 2026 | Feb 5, 2026 – Feb 1, 2029 |
| Prime | Department of Defense Department of the Army | SMALL BUSINESS INNOVATION RESEARCH PHASE II EFFORT FOR THE DEVELOPMENT OF HYBRID CLASS 3 POLYMER BASED BREATHABLE BARRIER MATERIALS | — | $1,397,124 | Jun 18, 2026 | Apr 13, 2026 – Apr 12, 2028 |
| Prime | Department of Defense Department of the Navy | BASE | — | $1,183,977 | Jun 15, 2026 | Sep 9, 2024 – Aug 13, 2026 |
| Prime | Department of Defense Defense Health Agency | DHA SBIR DIRECT TO PHASE II TOPIC DHA233-D001 PROPOSAL H2D-0146 TITLED TYPE IV MEDICAL OXYGEN STORAGE CYLINDER LOG NUMBER 23000574 | — | $1,299,999 | Jun 4, 2026 | Mar 13, 2024 – Jul 12, 2027 |
| Prime | Department of Defense Defense Contract Management Agency | DEFECT ANALYSIS FOR INSPECTION OF FASTENED PMC STRUCTURE | — | $6,679,307 | Jun 1, 2026 | Apr 29, 2020 – Jun 1, 2026 |
| Prime | National Aeronautics and Space Administration National Aeronautics and Space Administration | SBIR PHASE II | — | $846,760 | May 27, 2026 | Mar 25, 2026 – Mar 10, 2028 |
| Prime | Department of Defense Defense Contract Management Agency | R&D SERVICES FOR DEVELOPMENT OF CONDUCTIVE LIGHTWEIGHT CONCRETE | — | $1,099,998 | May 20, 2026 | Sep 1, 2024 – Aug 31, 2026 |
| Prime | Department of Defense Department of the Navy | BASE | — | $1,399,896 | May 14, 2026 | Apr 3, 2026 – Apr 3, 2029 |
| Prime | Department of Defense Department of the Navy | BASE | — | $1,995,498 | May 7, 2026 | Jan 20, 2026 – Jan 9, 2028 |
| Prime | Department of Defense Department of the Navy | BASE | — | $1,188,107 | Apr 30, 2026 | Aug 28, 2024 – Aug 28, 2027 |
| Prime | Department of Defense Department of the Navy | 873AUTHORITY | — | $998,793 | Apr 29, 2026 | Apr 29, 2026 – Nov 13, 2028 |
| Prime | Department of Defense Department of the Air Force | SPATIAL REGISTRATION OF NDI/E SENSORS FOR CONFINED OR RESTRICTED ACCESS SPACES | — | $1,499,999 | Apr 13, 2026 | Jul 31, 2022 – Jul 30, 2026 |
| Prime | Department of Defense Department of the Air Force | F2D-13599, NONDESTRUCTIVE INSPECTION FOR AIRWORTHINESS APPROVALS FOR COLD SPRAY REPAIRS | — | $1,249,998 | Apr 9, 2026 | Aug 15, 2024 – Nov 30, 2026 |
| Prime | Department of Defense Department of the Navy | BASE AWARD FOR SBIR PHASE II TOPIC #N231-051. | — | $1,359,242 | Mar 18, 2026 | Mar 6, 2025 – Mar 5, 2028 |
| Prime | Department of Defense Department of the Air Force | SMALL BUSINESS RESEARCH INNOVATION (SBIR), DIRECT TO PHASE II, TOPIC AF201-D019: BOLT HOLE EDDY CURRENT (BHEC) SIGNAL INDICATION INTERPRETATION SBIR DIRECT TO PHASE II | — | $1,799,975 | Mar 9, 2026 | Jul 3, 2023 – Oct 31, 2026 |
| Prime | Department of Defense Department of the Navy | RESEARCH AND DEVELOPMENT | — | $1,995,397 | Mar 6, 2026 | Jan 18, 2023 – Sep 22, 2027 |
| Prime | National Aeronautics and Space Administration National Aeronautics and Space Administration | EO14042 SBIR PHASE II ACCELERATED CREEP TEST METHODOLOGIES FOR SPACE HABITAT SOFTGOOD STRUCTURAL MATERIALS | — | $849,999 | Mar 6, 2026 | Jul 10, 2023 – Jul 15, 2026 |
| Prime | Department of Defense Department of the Navy | BASE | — | $1,334,142 | Feb 24, 2026 | Feb 24, 2026 – Feb 24, 2028 |
| Prime | Department of Defense Department of the Air Force | NONDESTRUCTIVE INSTRUMENT TO DETERMINE COMPOSITE SURFACE ACTIVATION | — | $749,992 | Dec 8, 2025 | Feb 25, 2022 – Nov 25, 2026 |
| Prime | Department of Defense Department of the Air Force | MACHINE LEARNING AND ARTIFICIAL INTELLIGENCE FOR ASSISTED DATA ANALYSIS OF IN-FIELD DATA FROM COMPLEX COMPOSITE STRUCTURES | — | $1,249,997 | Dec 2, 2025 | Sep 8, 2023 – Nov 17, 2026 |
| Prime | National Aeronautics and Space Administration National Aeronautics and Space Administration | THE PRIMARY OBJECTIVE OF THIS EFFORT IS TO DESIGN AND BUILD A PRACTICAL MILLIMETER WAVE IMAGING SYSTEM CAPABLE OF EFFECTIVELY ADDRESSING A MYRIAD OF NONDESTRUCTIVE INSPECTION ISSUES RELATED TO COMPLEX COMPOSITES AND STRUCTURES DURING MANUFACTURING AND USE. THE DESIGN OF THIS IMAGING SYSTEM WILL BE FOUNDED ON A LONG HISTORY AND EXTENSIVE EXPERIENCE BY THE PROPOSING TEAM FACILITATING AND ENSURING A SUCCESSFUL OUTCOME. THE SYSTEM IS EXPECTED TO BE DESIGNED TO: I)OPERATE IN THE FREQUENCY RANGE OF 30-40 GHZ: II)HAVE HIGH-SPATIAL AND RANGE RESOLUTIONS IN THE FEW MILLIMETER RANGE RENDERING THE SYSTEM A 3D IMAGER III)PRODUCE AND RENDER IMAGES IN REAL-TIME, IV)PROVIDE HIGH SYSTEM DYNAMIC RANGE FOR HIGH DETECTION SENSITIVITY V)SMALL AND PORTABLE FOR IN-SPACE APPLICATIONS, VI)MODULAR IN DESIGN TO ACCOMMODATE LARGE STRUCTURES IN TERRESTRIAL INSPECTION APPLICATIONS WHILE ALSO SUITABLE FOR IN-SPACE APPLICATIONS BY PERSONNEL WITH VARIED TECHNICAL SKILL-SETS NAMELY, TECHNICIANS, ENGINEERS AND ASTRONAUTS. THE PROPOSED WORK IN THIS PHASE II TO DEVELOP, BUILT AND TEST A PRACTICAL PROTOTYPE IMAGING SYSTEM BUILDS ON THE PHASE I DESIGN WORK. POTENTIAL NASA | — | $1,124,986 | Aug 5, 2025 | Apr 24, 2018 – Nov 22, 2025 |
| Prime | National Aeronautics and Space Administration National Aeronautics and Space Administration | MILLIMETER-WAVE CAMERA | — | $374,997 | Aug 5, 2025 | Aug 22, 2022 – Nov 22, 2025 |
| Prime | Department of Defense Department of the Navy | RESEARCH AND DEVELOPMENT | — | $1,699,991 | Jul 24, 2025 | Jan 12, 2022 – Feb 20, 2026 |
| Prime | Department of Defense Department of the Navy | SBIR PHASE II | — | $999,995 | Jul 21, 2025 | Jul 21, 2025 – Jun 24, 2027 |
| Prime | Department of Defense Department of the Navy | BASE FOR SBIR PHASE II TOPIC N121-063, ABLATIVE MATERIAL TO EFFICIENTLY REPAIR AND RESTORE THE OPERATIONAL CAPABILITIES OF MK 41 VERTICAL LAUNCH SYSTEM (VLS) ABLATIVE MATERIALS. | — | $1,399,723 | May 28, 2025 | May 28, 2025 – May 27, 2027 |
| Prime | Department of Defense Department of the Air Force | RAPID NON CONTACT REPROCESSING OF IMPACT RESISTANT | — | $1,237,274 | May 23, 2025 | Mar 24, 2023 – Nov 26, 2025 |
| Prime | Department of Defense Department of the Navy | RESEARCH AND DEVELOPMENT | — | $1,599,993 | Apr 3, 2025 | Jun 16, 2021 – Aug 14, 2025 |
| Prime | Department of Defense Department of the Air Force | ABRASION COATINGS | — | $1,249,985 | Feb 4, 2025 | Feb 7, 2023 – Nov 7, 2025 |
| Prime | Department of Defense Missile Defense Agency | SBIR/STTR PHASE II R&D LIGHTWEIGHT STRUCTURAL COMPONENTS OF A MISSILE BODY | — | $953,462 | Jan 14, 2025 | Sep 19, 2019 – Mar 17, 2023 |
| Prime | Department of Defense Defense Contract Management Agency | IGF::OT::IGF R&D EXEMPT RESEARCH AND DEVELOP A CONTINUOUS MODE CONVEYOR COOKING APPLIANCE FOR UGR-A FOR MILITARY FIELD FEEDING THAT PROVIDES COOKS WITH HIGH QUALITY, EFFECTIVE APPLIANCES TO MAXIMIZE CAPABILITY, THROUGHPUT, AND FLEXIBILITY TO PREPARE THE ENTIRE FAMILY OF OPERATIONAL RATIONS. | — | $999,985 | Jun 24, 2024 | Dec 15, 2017 – Apr 20, 2021 |
| Prime | Department of Defense Defense Contract Management Agency | EXTRAPOLATING USEFUL LIFE FROM COMPOSITE STRUCTURES USING IN-SERVICE DATA - SBIR 2 | — | $1,939,205 | Apr 30, 2024 | Aug 23, 2018 – Aug 24, 2021 |
| Prime | Department of Defense Department of the Air Force | TRANSITION OF EDDY CURRENT NONDESTRUCTIVE INSPECTION TECHS | — | $2,499,973 | Feb 21, 2024 | Jul 25, 2019 – Aug 28, 2024 |
| Prime | Department of Defense Department of the Air Force | NDE AND ADA FOR DEFECT CHARACTERIZATION IN THICK | — | $644,999 | Sep 25, 2023 | Oct 20, 2021 – Jul 30, 2024 |
| Prime | Department of Defense Department of the Air Force | DIGITAL NONDESTRUCTIVE INSPECTION (NDI) DESIGN FOR SUSTAINMENT | — | $1,249,997 | Sep 19, 2023 | May 9, 2022 – Aug 8, 2024 |
| Prime | Department of Defense Department of the Navy | RESEARCH AND DEVELOPMENT | — | $1,099,989 | Sep 12, 2023 | Oct 5, 2021 – Sep 8, 2025 |
| Prime | Department of Defense Department of the Navy | RESEARCH AND DEVELOPMENT | — | $1,565,072 | Jun 14, 2023 | Dec 7, 2020 – Apr 24, 2024 |
| Prime | Department of Defense Department of the Air Force | NONDESTRUCTIVE EVALUATION OF COMPOSITE SUBSTRATE BELOW THICK | — | $750,000 | Jun 7, 2023 | Apr 30, 2021 – Jan 31, 2024 |
| Prime | Department of Defense Defense Contract Management Agency | SBIR PHASE II TOPIC N141-041 COMPOSITE PAYLOAD CANISTERS | — | $1,478,723 | Apr 5, 2023 | Jan 2, 2018 – Mar 28, 2022 |
| Prime | Department of Defense Defense Contract Management Agency | IGF::OT::IGF | — | $1,494,630 | Mar 15, 2023 | Sep 19, 2016 – Oct 19, 2018 |
| Prime | Department of Defense Department of the Navy | RESEARCH AND DEVELOPMENT | — | $1,499,997 | Dec 30, 2022 | Jan 23, 2020 – Jun 30, 2023 |
| Prime | Department of Defense Department of the Navy | SBIR PH II RESEARCH AND DEVELOPMENT IGF::OT::IGF | — | $1,639,959 | Dec 16, 2022 | Apr 17, 2018 – Aug 7, 2023 |
| Prime | Department of Defense Department of the Air Force | SBIR II NON-DESTRUCTIVE EVALUATION (NDE) TECHNIQUES FOR CARBON-CARBON STRUCTURES APPLICABLE TO HYPER | — | $749,996 | Aug 30, 2022 | Feb 25, 2022 – May 27, 2024 |
| Prime | Department of Defense Department of the Navy | RESEARCH AND DEVELOPMENT | — | $1,499,992 | Jul 29, 2022 | Aug 21, 2019 – May 10, 2023 |
Contract vehicles are shown only when present in the source record. Linked award numbers and vehicles open the authoritative record on USAspending.gov.
Subcontracting experience
4 records from government sources. Past participation is not evidence of current teaming interest.
| Role | Agency | Description | Vehicle | Obligated | Action date | Period |
|---|---|---|---|---|---|---|
| Subcontractor | Department of Defense | DEVELOPMENT FOR A COLLABORATIVE ROBOT (COBOT) ENABLED ULTRASONIC PHASED ARRAY INSPECTION SYSTEM (AFIS2) FOR THE INSPECTION OF LOWER WING SKINS ON THE T-38 AIRCRAFT U27668KKS Parent award context Parent award agency: Department of Defense · Department of the Air Force Parent award NAICS: 541715 Parent award performance state: CO Parent award description: CASTLE AT USAFA AND THE T-38 PROGRAM OFFICE (PO) REQUIRES CONTRACTOR SUPPORT TO PERFORM MULTIPLE AIRCRAFT STRUCTURAL INTEGRITY PROGRAM (ASIP)-RELATED TASKS FOR STRUCTURAL SUSTAINMENT AND STRUCTURAL SUSTAINMENT RESEARCH. View parent award on USAspending | FA700025D0016USAspending | $434,215 | Jul 16, 2026 | — – — |
| Subcontractor | Department of Defense | PROVIDE SUBJECT MATTER EXPERT (SME) TECHNICAL SUPPORT THROUGH COMMISSIONED PRODUCT DEVELOPMENT EFFORTS AND/OR ADDITIONAL SPECIALIZED SERVICES. S21-085012 TRI-AUSTIN_TO3 Parent award context Parent award agency: Department of Defense · Department of the Air Force Parent award NAICS: 541715 Parent award performance state: MD Parent award description: DOD INFORMATION ANALYSIS CENTER BASIC CENTER OF OPERATIONS OPTION PERIOD 2 View parent award on USAspending | FA807521D0001USAspending | $70,232 | Mar 1, 2025 | — – — |
| Subcontractor | Department of Defense | EVALUATE AND MATURE C/C COMPOSIT 0000877751 Parent award context Parent award agency: Department of Defense · Department of the Air Force Parent award NAICS: 541715 Parent award performance state: OH Parent award description: MOC3HA EXPANSION OF CARBON/CARBON INDUSTRIAL BASE CAPACITY AND CAPABILITY View parent award on USAspending | FA865020D5703USAspending | $449,996 | Jul 5, 2023 | — – — |
| Subcontractor | Department of Defense | FATIGUE CRACK GROWTH FOR BHEC POD STUDY 6574057750 Parent award context Parent award agency: Department of Defense · Department of the Navy Parent award NAICS: 336411 Parent award performance state: TX Parent award description: FY21-23 GLOBAL F-35 AIR SYSTEM SUSTAINMENT View parent award on USAspending | — | $167,575 | Mar 1, 2022 | — – — |
Contract vehicles are shown only when present in the source record. Linked award numbers and vehicles open the authoritative record on USAspending.gov.
Agencies supported
- National Aeronautics and Space AdministrationGov-sourced
- Department of DefenseGov-sourced