← Back to search
OLGOONIK DIVERSIFIED SERVICES LLC
COLORADO SPRINGS, CO, 80918
Unclaimed
Small BusinessMinority Owned
Prime contracting experience
6 records from government sources. Past participation is not evidence of current teaming interest.
| Role | Agency | Description | Vehicle | Obligated | Action date | Period |
|---|---|---|---|---|---|---|
| Prime | Department of Defense Department of the Air Force | GLEN 19-2302 REPLACEMENT BY UPGRADING AIR HANDLER UNITS MOD 18, BUILDING 400, SCHRIEVER AFB, CO. | FA251715D5001USAspending | $1,267,170 | Aug 25, 2025 | Sep 28, 2019 – Sep 5, 2025 |
| Prime | Department of Commerce National Institute of Standards and Technology | IGF::OT::IGF THE NATIONAL INSTITUTE OF STANDARDS AND TECHNOLOGY (NIST) IN BOULDER, COLORADO IS CURRENTLY MAKING SIGNIFICANT IMPROVEMENTS TO ITS 64-YEAR-OLD BOULDER CAMPUS INCLUDING MAJOR RENOVATIONS OF BUILDING 1, WING 3. NIST AND THE OFFICE OF FACILITIES AND PROPERTY MANAGEMENT (OFPM) REQUIRES THE CONTRACTOR TO DISCONNECT AND TEMPORARILY RELOCATE ALL THE ELECTRICAL AND FIRE ALARM CONDUIT; PERFORM ASBESTOS ABATEMENT AND DEMOLITION IN SPECIFIED OFFICE SPACES; TEMPORARILY CONNECT TO THE WING 1 TEMPORARY CHILLER UNTIL THE PERMANENT CENTRAL UTILITY PLANT (CUP) SUPPLY IS OPERATIONAL IN WING 1; AND INSTALL THE NEW CHILLED WATER AND HEATING WATER UTILITIES IN WING 1 UNLESS THE DOMESTIC COLD WATER PIPE HAS THE ASBESTOS ABATED WHEN THE OTHER EXISTING LINES ARE ABATED; INSTALL A CODE COMPLIANT PRODUCT THE ROOF CONTRACTOR SHALL TO BUILD THE PARAPET UP AND ROOF THIS INTO THE SPECIFIED SYSTEM TO KEEP A CONSISTENT LOOK; REVISE NAME TAGS AND CONTROL DRAWINGS TO MATCH THE REVISED ENGINEERED DRAWINGS TO REFLECT THE NEW VERSIONS OF MAXIMO AND METASYS BEFORE THE SYSTEM IS COMPLETE AND TURNED OVER TO OFPM; IN-STALLED AND INTEGRATED WITH THE NEW CHILLED WATER AND HEATING WATER SYSTEM BEING INSTALLED IN THE SECOND FLOOD SPINE | — | $6,579,869 | Aug 8, 2024 | Jul 28, 2017 – Oct 30, 2024 |
| Prime | Department of Defense Department of the Army | TEN15-504 - RENOVATION OF BUILDING 8000 | FA251715D5001USAspending | $3,757,589 | Jan 11, 2024 | Jul 12, 2018 – Jun 5, 2020 |
| Prime | Department of Defense Department of the Army | MWR20-001, RENOVATE INTERIOR B1526 | FA251715D5001USAspending | $5,475,820 | Jun 23, 2023 | Aug 31, 2020 – Jul 29, 2023 |
| Prime | Department of Defense Department of the Air Force | GLEN 20-1004 CONTRACT TO ADD POWER TO MOD 17A. MOD 17A WILL SERVE AS PRIMARY LOCATION FOR OCX RACKS/ EQUIPMENT TO BE DEPLOYED. SECTION 889 | FA251715D5001USAspending | $659,658 | Jun 28, 2022 | Sep 1, 2020 – Jul 6, 2022 |
| Prime | Department of Defense Department of the Air Force | PROVIDE ALL MATERIAL, LABOR, TRANSPORTATION, AND ANY OTHER RESOURCES REQUIRED TO MODIFY THE EXISTING SPACE TO CREATE A NEW SECURE AREA APPROXIMATELY 45,277 SF. COMPLETE WORK IN ACCORDANCE WITH STATEMENT OF WORK&SABER SPECS | FA251715D5001USAspending | $336,800 | Apr 22, 2022 | Sep 10, 2019 – May 23, 2022 |
Contract vehicles are shown only when present in the source record. Linked award numbers and vehicles open the authoritative record on USAspending.gov.
Agencies supported
- Department of DefenseGov-sourced
- Department of CommerceGov-sourced