UNION LIGHT & POWER CO

Doing business as UNION LIGHT & POWER CO

HYATTSVILLE, MD, 20781

Unclaimed
Small Business

Subcontracting experience

2 records from government sources. Past participation is not evidence of current teaming interest.

RoleAgencyDescriptionVehicleObligatedAction datePeriod
Subcontractor
General Services Administration
PREMEASURE EXISTING TRANSFORMERS FOR FLANGE HEIGHT TO MEET EXISTING NETWORK PROTECTORS. REMOVAL OF 4 TRANSFORMERS AND RECYCLING OF TRANSFORMERS. PROVIDE AND RIG INTO PLACE NEW 750KVA TRANSFORMERS (4) ON WEEKENDS. REMOVE & REINSTALL EXISTING NETWORK PROTECTOR AND NETWORK DISCONNECT. DISCONNECT EXISTING FORSEER SYSTEM AND RECONNECT TO OPERATE AS BEFORE ABM HIRED BY ULP WILL TURN OFF EXISTING 15KV SWGR FEED. LOCKOUT EXISTING SWGR, NETWORK PROTECTOR -- REMOVE EXISTING 15KV CABLE ONE XFMR AT A TIME, 15KV SWGR TO VAULT 1 AND VAULT 1 TO MH NO 4; SPLICE NEW CABLE TO EXISTING CABLE IN MH NO 4; TERMINATE CABLE IN 15KV SWGR AND F&I LOAD BREAK ELBOWS AT XFMR. ABM TO PERFORM ALL MV SPLICING, TERMINATING AND INDEPENDENT TESTING. LIGHTING TO INCLUDE: 12 LED INDUSTRIAL LIGHT FIXTURES, 4000K 2600 LUMENS. ULP WILL PARTICIPATE IN DESIGN AND DESIGN REVIEW.
163002101
Parent award context
Parent award agency: General Services Administration · Public Buildings Service
Parent award NAICS: 236220
Parent award performance state: DC
Parent award description: TO PROVIDE ALL THE LABOR, EQUIPMENT, MATERIALS AND SUPERVISION TO REPAIR THE ELECTRICAL VAULT 1 AT THE HST BUILDING LOCATED IN WASHINGTON, DC
View parent award on USAspending
47PM0518D0030USAspending$1,516,152Sep 19, 2022— – —
Subcontractor
General Services Administration
PM SERVICE IS TO 1) PM S 2 SWGR LINEUPS IN EACH OF THE SWITCH HOUSE TO ENSURE THEY ARE SAFE AND OPERATE. 2) PM 2 MAIN BREAKERS AND 2 EM TIE BREAKERS IN EACH SWITCH HOUSE. 3) PM 2 LOAD €€Œ DISTRIBUTION BREAKERS IN EACH SWITCH HOUSE. 4) CHECK PT€„¢S AND SET PROTECTIVE RELAYS TO ENSURE THE SWGR OPERATES AS INTENDED, TRIPS UNDER A FAULT AND BREAKERS WILL RECLOSE AFTER AN OUTAGE FOR A SAFE OPERATION. THE PURPOSE OF THIS SCOPE OF WORK IS TO ENSURE THAT THE EXISTING EQUIPMENT CAN BE OPERATED SAFELY AND THEN THIS CONTRACTOR CAN OPERATE THEE EQUIPMENT WHILE PERFORMING THE TRACING SERVICES AS NO OWNER OPERATORS ARE AVAILABLE TO OPERATE THIS EQUIPMENT.
1630010.03
Parent award context
Parent award agency: General Services Administration · Public Buildings Service
Parent award NAICS: 236220
Parent award performance state: DC
Parent award description: SH1 AND SH2 COLLAPSED ELECTRICAL FEEDERS AND WATER INTRUSION REPAIRS
View parent award on USAspending
—$201,538Dec 7, 2021— – —

Contract vehicles are shown only when present in the source record. Linked award numbers and vehicles open the authoritative record on USAspending.gov.