← Back to search
ESTES BROS. CONST. INC.
Doing business as ESTES BROS CONSTRUCTION INC
JONESVILLE, VA, 24263
Unclaimed
HUBZone
Prime contracting experience
33 records from government sources. Past participation is not evidence of current teaming interest.
| Role | Agency | Description | Vehicle | Obligated | Action date | Period |
|---|---|---|---|---|---|---|
| Prime | Department of Transportation Federal Highway Administration | NP NATR 3N18, 3H27, ETC - GEOTECHNICAL, PAVEMENT REHABILITATION, AND STRUCTURAL REPAIRS BETWEEN MP 121 AND MP 204 (PHASE 2), PROJECT MS NP NATR 3N18 3H27 ETC, SOLICITATION NUMBER 693C73-25-B-000003, LOCATED IN ATTALA, CHOCTAW, LEAKE, MADISON, AND WEB | — | $32,592,744 | Sep 3, 2026 | Apr 21, 2025 – Jun 10, 2027 |
| Prime | Department of Transportation Federal Highway Administration | TN NP GRSM 11(6): THE PROJECT CONSISTS OF REPAIRING PAVEMENT EDGE DROP-OFFS, REMOVING OR PAVING GRAVEL PULL-OFF AREAS AND REPLACING TIMBER GUARDRAIL. THE WORK INCLUDES SHOULDER HARDENING, WHICH CONSISTS OF CONSTRUCTING A 2-FOOT WIDE ASPHALT PAVED SH | 693C7320D000008USAspending | $3,245,516 | Aug 31, 2026 | Oct 30, 2025 – Sep 30, 2028 |
| Prime | Department of Transportation Federal Highway Administration | PROJECT NC NP BLRI 2M30: THE PROJECT CONSISTS OF HURRICANE DAMAGE REPAIRS AT MP 342.7, 343.7 AND 343.8. THE WORK INCLUDES SLIDE REPAIRS, CULVERT REPLACEMENT AND CLEANING, STONE MASONRY HEADWALL INSTALLATION, RIPRAP PLACEMENT, CURB AND GUARDRAIL IN | 693C7320D000008USAspending | $13,176,296 | Aug 10, 2026 | Nov 25, 2025 – Jun 21, 2027 |
| Prime | Department of Transportation Federal Highway Administration | PROJECT TN ERFO FS CHRKE804 2021-1(2): THE PROJECT CONSISTS OF DESIGN SERVICES, SLOPE STABILIZATION, ROADWAY RECONSTRUCTION, ASPHALT CONCRETE PAVEMENT, AND OTHER MISCELLANEOUS WORK. | 693C7326D000008USAspending | $2,835,372 | Jul 15, 2026 | Jul 15, 2026 – Jan 17, 2028 |
| Prime | Department of Transportation Federal Highway Administration | PROJECT MS NP NATR 3P27: THE PROJECT CONSISTS OF MILLING AND OVERLAY OF MULTI-USE TRAILS, ASPHALT CONCRETE REHABILITATION, AGGREGATE SURFACING, MINOR TRAIL PROFILE ADJUSTMENTS, AND OTHER MISCELLANEOUS WORK. | 693C7320D000008USAspending | $2,903,556 | Jul 1, 2026 | Nov 21, 2024 – Sep 30, 2027 |
| Prime | Department of Transportation Federal Highway Administration | PROJECT VA NP BLRI 1K1: THE PROJECT CONSISTS OF PAVEMENT REHABILITATION FROM MP 86 TO MP 89 ON THE BLUE RIDGE PARKWAY. THE WORK INCLUDES FULL DEPTH RECLAMATION, DRAINAGE IMPROVEMENT, SIGNAGE, AND OTHER MISCELLANEOUS WORK. | — | $5,975,689 | Jun 17, 2026 | Feb 3, 2026 – Jan 29, 2027 |
| Prime | Department of Transportation Federal Highway Administration | PROJECT TN ERFO FS 2019-1(2): THE PROJECT CONSISTS OF RECONSTRUCTING SINK MOUNTAIN LAUNCH ROAD AND CONSTRUCTING A NEW PARKING AREA. THE WORK INCLUDES CLEARING AND GRUBBING, EMBANKMENT CONSTRUCTION, ASPHALT PAVEMENT, REINFORCED CONCRETE BOX CULVERT I | 693C7320D000008USAspending | $3,181,075 | Jun 12, 2026 | Dec 5, 2024 – May 26, 2026 |
| Prime | Department of Transportation Federal Highway Administration | PROJECT NP BLRI PVT PRES FY24(1): THE PROJECT CONSISTS OF PAVEMENT PRESERVATION ON THE BLUE RIDGE PARKWAY MAINLINE FROM MILEPOST 121 TO MILEPOST 143. THE WORK INCLUDES PLACEMENT OF CHIP SEAL AND FOG SEAL, PATCHING, CRACK CLEANING AND SEALING, PAVEME | 693C7320D000004USAspending | $2,423,182 | Jun 12, 2026 | Sep 5, 2024 – May 8, 2026 |
| Prime | Department of Transportation Federal Highway Administration | PROJECT: NP NP BLRI 1L9, 1M22, ETC - THE PROJECT CONSISTS OF THE REHABILITATION OF APPROXIMATELY 24 MILES OF THE BLUE RIDGE PARKWAY (BLRI) BETWEEN MILEPOST (MP) 97 AND 121 IN BEDFORD, BOTETOURT, AND ROANOKE COUNTIES, VIRGINIA. THE WORK CONSISTS OF RE | — | $64,333,552 | Jan 27, 2026 | Sep 6, 2023 – Jul 31, 2028 |
| Prime | Department of Transportation Federal Highway Administration | PROJECT NP NATR 3N17, 3H26, ETC. - THE PROJECT CONSISTS OF THE DRAINAGE IMPROVEMENTS OF THE NATCHEZ TRACE PARKWAY (NATR) FROM MILEPOST (MP) 121 TO MP 204 INCLUDING SOME PARKING AREAS. THE WORK CONSISTS OF DESIGN AND INSTALLATION OF DESIGNATED INLETS | — | $23,064,071 | Jan 21, 2026 | Jun 3, 2024 – Jan 31, 2028 |
| Prime | Department of Transportation Federal Highway Administration | PROJECT NP-BISC 10(2): THE PROJECT CONSISTS OF DESIGNING AND REHABILITATION/RECONSTRUCTION OF THE ROADWAY AND PARKING AREAS, PAVEMENT MARKING, DEVELOPMENT AND IMPLEMENTATION OF A TRAFFIC CONTROL PLAN, INSTALLATION OF EROSION AND SEDIMENT CONTROL MEA | 693C7320D000017USAspending | $3,689,241 | Nov 25, 2025 | Sep 6, 2022 – Sep 30, 2025 |
| Prime | Department of Transportation Federal Highway Administration | PROJECT VA NP BLRI BMS FY23(1): THE PROJECT CONSISTS OF PERFORMING PREVENTATIVE BRIDGE REPAIRS TO 18 BRIDGES ALONG THE BLUE RIDGE PARKWAY. THE WORK INCLUDES REPOINTING STONE MASONRY JOINTS, CLEANING AND COATING EXPOSED REBAR, CLEANING AND RESEALING | 693C7320D000004USAspending | $794,382 | Jul 22, 2025 | May 21, 2024 – Apr 25, 2025 |
| Prime | Department of Transportation Federal Highway Administration | TO SOLICIT PROJECT: NP-NATR 2A18,B7,C6,D11,3A17,B9. | — | $62,149,395 | Jun 2, 2025 | Nov 6, 2020 – May 21, 2025 |
| Prime | Department of Transportation Federal Highway Administration | PROJECT NP GRSM 14(3), 112(1), ETC. THE PROJECT CONSISTS OF REHABILITATION OF 9 BRIDGES ON THE TENNESSEE SIDE OF THE GREAT SMOKY MOUNTAIN NATIONAL PARK. THE WORK INCLUDES ASPHALT WEARING COURSE REMOVAL, SCOUR PROTECTION AROUND EXISTING ABUTMENTS AN | — | $2,954,544 | Apr 10, 2025 | Aug 20, 2020 – Sep 30, 2023 |
| Prime | Department of Transportation Federal Highway Administration | PROJECT FL NP DESO 900(1): THE PROJECT CONSISTS OF RESURFACING THE VISITOR ENTRANCE ROAD AND PARKING AREAS. THE WORK INCLUDES MILLING AND OVERLAY, FULL DEPTH PATCH, AND OTHER MISCELLANEOUS WORK. | 693C7320D000017USAspending | $302,073 | Mar 26, 2025 | Apr 17, 2024 – Feb 14, 2025 |
| Prime | Department of Transportation Federal Highway Administration | PROJECT MS ERFO NPS VICK 2020-1(1). THE PROJECT CONSIST OF RECONSTRUCTING ROADS TO RESTORE TO PRE-DISASTER CONDITION. THE WORK INCLUDES SLIDE REPAIRS AND BRIDGE REPAIRS. THE WORK ITEMS WILL INCLUDE EROSION AND SEDIMENT CONTROL, TEMPORARY DIVERSION B | 693C7320D000008USAspending | $2,064,212 | Dec 2, 2024 | Jan 4, 2022 – Apr 30, 2024 |
| Prime | Department of Transportation Federal Highway Administration | GREAT SMOKY MOUNTAINS NATIONAL PARK - NP-GRSM 116(1) - THE PROJECT CONSISTS OF RESURFACING APPROXIMATELY 3.3 MILES OF ROADWAYS OF THE DEEP CREEK AREA, INCLUDING PARKING AREAS AND PULL-OFFS, WITHIN THE GREAT SMOKY MOUNTAINS NATIONAL PARK. THE WORK I | — | $1,190,248 | Dec 2, 2024 | Sep 6, 2019 – Oct 18, 2022 |
| Prime | Department of Transportation Federal Highway Administration | PROJECT NP-BLRI PVT PRES FY20 THE PROJECT CONSISTS OF PAVEMENT PRESERVATION TREATMENT (THIN-LIFT ASPHALT OVERLAY) OF OVERLOOKS, PICNIC AREAS AND PARKING AREAS ALONG BLUE RIDGE PARKWAY. THE WORK INCLUDES PAVEMENT MARKING INSTALLATION AND OTHER MISCE | 693C7320D000004USAspending | $3,091,188 | Oct 24, 2024 | Feb 25, 2021 – May 31, 2022 |
| Prime | Department of Transportation Federal Highway Administration | PROJECT NP-SER PMS FY19(3) THE PROJECT CONSISTS OF REMOVING PAVEMENT MARKINGS, ADDING PAVEMENT PRESERVATION TREATMENT, REMOVE AND RESET WHEELSTOPS, ADD PAVEMENT MARKINGS ON IDENTIFIED PAVED ROADS AND PARKING AREAS, AND OTHER MISCELLANEOUS WORK. | — | $1,897,921 | Sep 17, 2024 | Jan 30, 2020 – Sep 12, 2024 |
| Prime | Department of Transportation Federal Highway Administration | PROJECT TN ERFO FS 2019-1(4): THE PROJECT CONSISTS OF THE REPAIR OF VARIOUS DAMAGED SITES ON ROUND KNOB ROAD (FS-88), GREYSTONE SPUR (FS-88A), GREENE MOUNTAIN ROAD (FS-98). THE WORK INCLUDES ROADWAY RESURFACING, CONSTRUCTION OF GABION WALLS, REPLACE | — | $1,919,898 | Jul 31, 2024 | Oct 28, 2022 – Jun 17, 2024 |
| Prime | Department of Transportation Federal Highway Administration | PROJECT AL ERFO FW BOSE 2020-1(1): THE PROJECT CONSISTS OF THE REMOVAL AND RECONSTRUCTION OF THE BOARDWALK ON GATOR LAKE TRAIL AND OTHER MISCELLANEOUS WORK. | 693C7320D000008USAspending | $508,229 | Jul 29, 2024 | Dec 20, 2022 – Jun 18, 2024 |
| Prime | Department of Transportation Federal Highway Administration | PROJECT NP-FOOT 8G16, 8H10: THE WORK INCLUDES FULL DEPTH RECLAMATION OF FOOTHILLS PARKWAY SECTIONS 8G AND 8H MAINLINE, PARKING AREAS, AND PULL-OFFS; ESTABLISHING ROADSIDE DITCHES AND RECONDITIONING PAVED WATERWAYS; REPLACING SIGNS AND PAVEMENT MARKI | — | $28,567,648 | Jul 18, 2024 | Jan 26, 2022 – Jun 13, 2024 |
| Prime | Department of Transportation Federal Highway Administration | PROJECT NC NP BLRI BR 5140-097P: THE PROJECT CONSISTS OF REDUCING LAKE WATER LEVEL, REPAIRING DAMAGE TO THE BRIDGE PIERS, AND REPLACING PRE-COMPRESSED FOAM-SUPPORTED SILICONE MATERIAL AT ABUTMENT BRIDGE JOINTS AND ASPHALT CONCRETE WEARING SURFACE | 693C7320D000017USAspending | $545,355 | Jun 7, 2024 | Sep 8, 2022 – Apr 30, 2024 |
| Prime | Department of Transportation Federal Highway Administration | PROJECT FW-FLPA 419(1) THE PROJECT CONSISTS OF PAVEMENT WIDENING ON BOTH SIDES OF SR 29 TO ACCOMMODATE A LEFT TURN LANE IN THE NORTHBOUND DIRECTION AND A RIGHT DECELERATION TURN LANE IN THE SOUTHBOUND DIRECTION, AND A SECTION OF REFUGE ROAD RECONSTR | 693C7320D000017USAspending | $2,180,147 | Feb 28, 2024 | Mar 4, 2021 – Nov 30, 2023 |
| Prime | Department of the Interior National Park Service | GREAT SMOKY MOUNTAINS NP REHAB BALSAM/HEINTOOGA WASTEWATER | — | $535,669 | Dec 13, 2023 | Sep 15, 2023 – May 3, 2024 |
| Prime | Department of the Interior National Park Service | GREAT SMOKY MOUNTAINS NP REHAB BALSAM/HEINTOOGA WATER TANK REHAB SYSTEM | — | $809,518 | Nov 13, 2023 | Sep 11, 2023 – May 3, 2024 |
| Prime | Department of Transportation Federal Highway Administration | PROJECT TN ERFO FS 2019-1(5) THE PROJECT CONSISTS OF REPAIR OF VARIOUS DAMAGED SITES ON MEADOW CREEK ROAD, LOWER PAINT CREEK ROAD, AND WATAUGA POINT ROAD. THE WORK INCLUDES CONSTRUCTION OF ROCK FILLED GABION AND ROCKERY WALLS, AGGREGATE ROADWAY RES | 693C7320D000008USAspending | $414,135 | Sep 20, 2023 | Sep 1, 2021 – Aug 31, 2022 |
| Prime | Department of Transportation Federal Highway Administration | PROJECT NP NATR BMS FY21(1) THE PROJECT CONSISTS OF EIGHTEEN BRIDGE PREVENTIVE MAINTENANCE REPAIRS WITHIN THE NATCHEZ TRACE PARKWAY. THE WORK INCLUDES THE REPAIR OF DETERIORATED EXPANSION JOINTS, ASPHALT PAVEMENT CRACK SEALING AND FILLING, CONCRETE | 693C7320D000008USAspending | $468,756 | Sep 19, 2023 | Jun 14, 2021 – Mar 31, 2023 |
| Prime | Department of Transportation Federal Highway Administration | PROJECT NP-CHCH 500(1), 501(1), ETC. THE PROJECT CONSISTS OF THE REHABILITATION OF APPROXIMATELY 2.00 MILES OF GLENN-KELLY ROAD, 0.82 MILES OF BATTLELINE ROAD, AND 0.33 MILES OF POE ROAD, INCLUDING PARKING AREAS AND PULL-OFFS, ALL WITHIN THE CHICKAM | — | $4,104,367 | Feb 24, 2023 | Aug 26, 2021 – Mar 31, 2024 |
| Prime | Department of Transportation Federal Highway Administration | PROJECT VA ERFO FS 2018-1(1) THE PROJECT CONSISTS OF ROADWAY REPAIRS. THE WORK INCLUDES ROADWAY AND DITCH EXCAVATION, STRUCTURAL BACKFILL, RIPRAP, GABION WALL, AGGREGATE SURFACE COURSE, DITCH RECONDITIONING, STRUCTURAL CONCRETE, STRUCTURAL PLATE BO | 693C7320D000004USAspending | $1,370,645 | Jan 27, 2023 | May 20, 2021 – Jan 26, 2023 |
| Prime | Department of Transportation Federal Highway Administration | PROJECT WV ERFO FS 2016-1(3) THE PROJECT CONSISTS OF REPAIR OF MULTIPLE SEGMENTS OF MAINLINE OF WILLIAM RIVER ROAD (FS ROUTE 86) MILEPOST 12.0 TO 14.7. THE WORK INCLUDES REPAIR OF SLOPE FAILURES, SHOULDER AND DITCH RECONDITIONING, SMALL PIPE CULVERT REPLACEMENTS, AND OTHER MISCELLANEOUS WORK. | — | $583,467 | Oct 20, 2022 | Jun 20, 2019 – Feb 28, 2021 |
| Prime | Department of Transportation Federal Highway Administration | PROJECT NC ERFO COE 2019-1(1) THE PROJECT CONSISTS OF THE CONSTRUCTION OF STEEL H-PILE RETAINING WALL BEHIND EXISTING TIER 1 TIMBER RETAINING WALL, REMOVAL OF TIER 2 TIMBER RETAINING WALL RECONSTRUCTION OF PORTION OF PARKING LOT WITHIN BERRY MOUNTAI | 693C7320D000017USAspending | $843,691 | Oct 20, 2022 | Aug 20, 2021 – Oct 6, 2022 |
| Prime | Department of Transportation Federal Highway Administration | THE PROJECT CONSISTS OF NINETEEN BRIDGE PREVENTIVE MAINTENANCE REPAIRS WITHIN THE NATCHEZ TRACE PARKWAY. THE WORK INCLUDES REPAIR DETERIORATED EXPANSION JOINTS, ASPHALT PAVEMENT CRACKS SEALING AND FILLING, CONCRETE REPAIRS, AND OTHER MISCELLANEOUS W | 693C7320D000008USAspending | $590,444 | Sep 15, 2022 | Aug 13, 2020 – Sep 14, 2022 |
Contract vehicles are shown only when present in the source record. Linked award numbers and vehicles open the authoritative record on USAspending.gov.
Agencies supported
- Department of TransportationGov-sourced
- Department of the InteriorGov-sourced