← Back to search

ESTES BROS. CONST. INC.

Doing business as ESTES BROS CONSTRUCTION INC

JONESVILLE, VA, 24263

Unclaimed
HUBZone

Prime contracting experience

33 records from government sources. Past participation is not evidence of current teaming interest.

RoleAgencyDescriptionVehicleObligatedAction datePeriod
Prime
Department of Transportation
Federal Highway Administration
NP NATR 3N18, 3H27, ETC - GEOTECHNICAL, PAVEMENT REHABILITATION, AND STRUCTURAL REPAIRS BETWEEN MP 121 AND MP 204 (PHASE 2), PROJECT MS NP NATR 3N18 3H27 ETC, SOLICITATION NUMBER 693C73-25-B-000003, LOCATED IN ATTALA, CHOCTAW, LEAKE, MADISON, AND WEB—$32,592,744Sep 3, 2026Apr 21, 2025 – Jun 10, 2027
Prime
Department of Transportation
Federal Highway Administration
TN NP GRSM 11(6): THE PROJECT CONSISTS OF REPAIRING PAVEMENT EDGE DROP-OFFS, REMOVING OR PAVING GRAVEL PULL-OFF AREAS AND REPLACING TIMBER GUARDRAIL. THE WORK INCLUDES SHOULDER HARDENING, WHICH CONSISTS OF CONSTRUCTING A 2-FOOT WIDE ASPHALT PAVED SH693C7320D000008USAspending$3,245,516Aug 31, 2026Oct 30, 2025 – Sep 30, 2028
Prime
Department of Transportation
Federal Highway Administration
PROJECT NC NP BLRI 2M30: THE PROJECT CONSISTS OF HURRICANE DAMAGE REPAIRS AT MP 342.7, 343.7 AND 343.8. THE WORK INCLUDES SLIDE REPAIRS, CULVERT REPLACEMENT AND CLEANING, STONE MASONRY HEADWALL INSTALLATION, RIPRAP PLACEMENT, CURB AND GUARDRAIL IN693C7320D000008USAspending$13,176,296Aug 10, 2026Nov 25, 2025 – Jun 21, 2027
Prime
Department of Transportation
Federal Highway Administration
PROJECT TN ERFO FS CHRKE804 2021-1(2): THE PROJECT CONSISTS OF DESIGN SERVICES, SLOPE STABILIZATION, ROADWAY RECONSTRUCTION, ASPHALT CONCRETE PAVEMENT, AND OTHER MISCELLANEOUS WORK.693C7326D000008USAspending$2,835,372Jul 15, 2026Jul 15, 2026 – Jan 17, 2028
Prime
Department of Transportation
Federal Highway Administration
PROJECT MS NP NATR 3P27: THE PROJECT CONSISTS OF MILLING AND OVERLAY OF MULTI-USE TRAILS, ASPHALT CONCRETE REHABILITATION, AGGREGATE SURFACING, MINOR TRAIL PROFILE ADJUSTMENTS, AND OTHER MISCELLANEOUS WORK.693C7320D000008USAspending$2,903,556Jul 1, 2026Nov 21, 2024 – Sep 30, 2027
Prime
Department of Transportation
Federal Highway Administration
PROJECT VA NP BLRI 1K1: THE PROJECT CONSISTS OF PAVEMENT REHABILITATION FROM MP 86 TO MP 89 ON THE BLUE RIDGE PARKWAY. THE WORK INCLUDES FULL DEPTH RECLAMATION, DRAINAGE IMPROVEMENT, SIGNAGE, AND OTHER MISCELLANEOUS WORK.—$5,975,689Jun 17, 2026Feb 3, 2026 – Jan 29, 2027
Prime
Department of Transportation
Federal Highway Administration
PROJECT TN ERFO FS 2019-1(2): THE PROJECT CONSISTS OF RECONSTRUCTING SINK MOUNTAIN LAUNCH ROAD AND CONSTRUCTING A NEW PARKING AREA. THE WORK INCLUDES CLEARING AND GRUBBING, EMBANKMENT CONSTRUCTION, ASPHALT PAVEMENT, REINFORCED CONCRETE BOX CULVERT I693C7320D000008USAspending$3,181,075Jun 12, 2026Dec 5, 2024 – May 26, 2026
Prime
Department of Transportation
Federal Highway Administration
PROJECT NP BLRI PVT PRES FY24(1): THE PROJECT CONSISTS OF PAVEMENT PRESERVATION ON THE BLUE RIDGE PARKWAY MAINLINE FROM MILEPOST 121 TO MILEPOST 143. THE WORK INCLUDES PLACEMENT OF CHIP SEAL AND FOG SEAL, PATCHING, CRACK CLEANING AND SEALING, PAVEME693C7320D000004USAspending$2,423,182Jun 12, 2026Sep 5, 2024 – May 8, 2026
Prime
Department of Transportation
Federal Highway Administration
PROJECT: NP NP BLRI 1L9, 1M22, ETC - THE PROJECT CONSISTS OF THE REHABILITATION OF APPROXIMATELY 24 MILES OF THE BLUE RIDGE PARKWAY (BLRI) BETWEEN MILEPOST (MP) 97 AND 121 IN BEDFORD, BOTETOURT, AND ROANOKE COUNTIES, VIRGINIA. THE WORK CONSISTS OF RE—$64,333,552Jan 27, 2026Sep 6, 2023 – Jul 31, 2028
Prime
Department of Transportation
Federal Highway Administration
PROJECT NP NATR 3N17, 3H26, ETC. - THE PROJECT CONSISTS OF THE DRAINAGE IMPROVEMENTS OF THE NATCHEZ TRACE PARKWAY (NATR) FROM MILEPOST (MP) 121 TO MP 204 INCLUDING SOME PARKING AREAS. THE WORK CONSISTS OF DESIGN AND INSTALLATION OF DESIGNATED INLETS—$23,064,071Jan 21, 2026Jun 3, 2024 – Jan 31, 2028
Prime
Department of Transportation
Federal Highway Administration
PROJECT NP-BISC 10(2): THE PROJECT CONSISTS OF DESIGNING AND REHABILITATION/RECONSTRUCTION OF THE ROADWAY AND PARKING AREAS, PAVEMENT MARKING, DEVELOPMENT AND IMPLEMENTATION OF A TRAFFIC CONTROL PLAN, INSTALLATION OF EROSION AND SEDIMENT CONTROL MEA693C7320D000017USAspending$3,689,241Nov 25, 2025Sep 6, 2022 – Sep 30, 2025
Prime
Department of Transportation
Federal Highway Administration
PROJECT VA NP BLRI BMS FY23(1): THE PROJECT CONSISTS OF PERFORMING PREVENTATIVE BRIDGE REPAIRS TO 18 BRIDGES ALONG THE BLUE RIDGE PARKWAY. THE WORK INCLUDES REPOINTING STONE MASONRY JOINTS, CLEANING AND COATING EXPOSED REBAR, CLEANING AND RESEALING693C7320D000004USAspending$794,382Jul 22, 2025May 21, 2024 – Apr 25, 2025
Prime
Department of Transportation
Federal Highway Administration
TO SOLICIT PROJECT: NP-NATR 2A18,B7,C6,D11,3A17,B9.—$62,149,395Jun 2, 2025Nov 6, 2020 – May 21, 2025
Prime
Department of Transportation
Federal Highway Administration
PROJECT NP GRSM 14(3), 112(1), ETC. THE PROJECT CONSISTS OF REHABILITATION OF 9 BRIDGES ON THE TENNESSEE SIDE OF THE GREAT SMOKY MOUNTAIN NATIONAL PARK. THE WORK INCLUDES ASPHALT WEARING COURSE REMOVAL, SCOUR PROTECTION AROUND EXISTING ABUTMENTS AN—$2,954,544Apr 10, 2025Aug 20, 2020 – Sep 30, 2023
Prime
Department of Transportation
Federal Highway Administration
PROJECT FL NP DESO 900(1): THE PROJECT CONSISTS OF RESURFACING THE VISITOR ENTRANCE ROAD AND PARKING AREAS. THE WORK INCLUDES MILLING AND OVERLAY, FULL DEPTH PATCH, AND OTHER MISCELLANEOUS WORK.693C7320D000017USAspending$302,073Mar 26, 2025Apr 17, 2024 – Feb 14, 2025
Prime
Department of Transportation
Federal Highway Administration
PROJECT MS ERFO NPS VICK 2020-1(1). THE PROJECT CONSIST OF RECONSTRUCTING ROADS TO RESTORE TO PRE-DISASTER CONDITION. THE WORK INCLUDES SLIDE REPAIRS AND BRIDGE REPAIRS. THE WORK ITEMS WILL INCLUDE EROSION AND SEDIMENT CONTROL, TEMPORARY DIVERSION B693C7320D000008USAspending$2,064,212Dec 2, 2024Jan 4, 2022 – Apr 30, 2024
Prime
Department of Transportation
Federal Highway Administration
GREAT SMOKY MOUNTAINS NATIONAL PARK - NP-GRSM 116(1) - THE PROJECT CONSISTS OF RESURFACING APPROXIMATELY 3.3 MILES OF ROADWAYS OF THE DEEP CREEK AREA, INCLUDING PARKING AREAS AND PULL-OFFS, WITHIN THE GREAT SMOKY MOUNTAINS NATIONAL PARK. THE WORK I—$1,190,248Dec 2, 2024Sep 6, 2019 – Oct 18, 2022
Prime
Department of Transportation
Federal Highway Administration
PROJECT NP-BLRI PVT PRES FY20 THE PROJECT CONSISTS OF PAVEMENT PRESERVATION TREATMENT (THIN-LIFT ASPHALT OVERLAY) OF OVERLOOKS, PICNIC AREAS AND PARKING AREAS ALONG BLUE RIDGE PARKWAY. THE WORK INCLUDES PAVEMENT MARKING INSTALLATION AND OTHER MISCE693C7320D000004USAspending$3,091,188Oct 24, 2024Feb 25, 2021 – May 31, 2022
Prime
Department of Transportation
Federal Highway Administration
PROJECT NP-SER PMS FY19(3) THE PROJECT CONSISTS OF REMOVING PAVEMENT MARKINGS, ADDING PAVEMENT PRESERVATION TREATMENT, REMOVE AND RESET WHEELSTOPS, ADD PAVEMENT MARKINGS ON IDENTIFIED PAVED ROADS AND PARKING AREAS, AND OTHER MISCELLANEOUS WORK.—$1,897,921Sep 17, 2024Jan 30, 2020 – Sep 12, 2024
Prime
Department of Transportation
Federal Highway Administration
PROJECT TN ERFO FS 2019-1(4): THE PROJECT CONSISTS OF THE REPAIR OF VARIOUS DAMAGED SITES ON ROUND KNOB ROAD (FS-88), GREYSTONE SPUR (FS-88A), GREENE MOUNTAIN ROAD (FS-98). THE WORK INCLUDES ROADWAY RESURFACING, CONSTRUCTION OF GABION WALLS, REPLACE—$1,919,898Jul 31, 2024Oct 28, 2022 – Jun 17, 2024
Prime
Department of Transportation
Federal Highway Administration
PROJECT AL ERFO FW BOSE 2020-1(1): THE PROJECT CONSISTS OF THE REMOVAL AND RECONSTRUCTION OF THE BOARDWALK ON GATOR LAKE TRAIL AND OTHER MISCELLANEOUS WORK.693C7320D000008USAspending$508,229Jul 29, 2024Dec 20, 2022 – Jun 18, 2024
Prime
Department of Transportation
Federal Highway Administration
PROJECT NP-FOOT 8G16, 8H10: THE WORK INCLUDES FULL DEPTH RECLAMATION OF FOOTHILLS PARKWAY SECTIONS 8G AND 8H MAINLINE, PARKING AREAS, AND PULL-OFFS; ESTABLISHING ROADSIDE DITCHES AND RECONDITIONING PAVED WATERWAYS; REPLACING SIGNS AND PAVEMENT MARKI—$28,567,648Jul 18, 2024Jan 26, 2022 – Jun 13, 2024
Prime
Department of Transportation
Federal Highway Administration
PROJECT NC NP BLRI BR 5140-097P: THE PROJECT CONSISTS OF REDUCING LAKE WATER LEVEL, REPAIRING DAMAGE TO THE BRIDGE PIERS, AND REPLACING PRE-COMPRESSED FOAM-SUPPORTED SILICONE MATERIAL AT ABUTMENT BRIDGE JOINTS AND ASPHALT CONCRETE WEARING SURFACE693C7320D000017USAspending$545,355Jun 7, 2024Sep 8, 2022 – Apr 30, 2024
Prime
Department of Transportation
Federal Highway Administration
PROJECT FW-FLPA 419(1) THE PROJECT CONSISTS OF PAVEMENT WIDENING ON BOTH SIDES OF SR 29 TO ACCOMMODATE A LEFT TURN LANE IN THE NORTHBOUND DIRECTION AND A RIGHT DECELERATION TURN LANE IN THE SOUTHBOUND DIRECTION, AND A SECTION OF REFUGE ROAD RECONSTR693C7320D000017USAspending$2,180,147Feb 28, 2024Mar 4, 2021 – Nov 30, 2023
Prime
Department of the Interior
National Park Service
GREAT SMOKY MOUNTAINS NP REHAB BALSAM/HEINTOOGA WASTEWATER—$535,669Dec 13, 2023Sep 15, 2023 – May 3, 2024
Prime
Department of the Interior
National Park Service
GREAT SMOKY MOUNTAINS NP REHAB BALSAM/HEINTOOGA WATER TANK REHAB SYSTEM—$809,518Nov 13, 2023Sep 11, 2023 – May 3, 2024
Prime
Department of Transportation
Federal Highway Administration
PROJECT TN ERFO FS 2019-1(5) THE PROJECT CONSISTS OF REPAIR OF VARIOUS DAMAGED SITES ON MEADOW CREEK ROAD, LOWER PAINT CREEK ROAD, AND WATAUGA POINT ROAD. THE WORK INCLUDES CONSTRUCTION OF ROCK FILLED GABION AND ROCKERY WALLS, AGGREGATE ROADWAY RES693C7320D000008USAspending$414,135Sep 20, 2023Sep 1, 2021 – Aug 31, 2022
Prime
Department of Transportation
Federal Highway Administration
PROJECT NP NATR BMS FY21(1) THE PROJECT CONSISTS OF EIGHTEEN BRIDGE PREVENTIVE MAINTENANCE REPAIRS WITHIN THE NATCHEZ TRACE PARKWAY. THE WORK INCLUDES THE REPAIR OF DETERIORATED EXPANSION JOINTS, ASPHALT PAVEMENT CRACK SEALING AND FILLING, CONCRETE693C7320D000008USAspending$468,756Sep 19, 2023Jun 14, 2021 – Mar 31, 2023
Prime
Department of Transportation
Federal Highway Administration
PROJECT NP-CHCH 500(1), 501(1), ETC. THE PROJECT CONSISTS OF THE REHABILITATION OF APPROXIMATELY 2.00 MILES OF GLENN-KELLY ROAD, 0.82 MILES OF BATTLELINE ROAD, AND 0.33 MILES OF POE ROAD, INCLUDING PARKING AREAS AND PULL-OFFS, ALL WITHIN THE CHICKAM—$4,104,367Feb 24, 2023Aug 26, 2021 – Mar 31, 2024
Prime
Department of Transportation
Federal Highway Administration
PROJECT VA ERFO FS 2018-1(1) THE PROJECT CONSISTS OF ROADWAY REPAIRS. THE WORK INCLUDES ROADWAY AND DITCH EXCAVATION, STRUCTURAL BACKFILL, RIPRAP, GABION WALL, AGGREGATE SURFACE COURSE, DITCH RECONDITIONING, STRUCTURAL CONCRETE, STRUCTURAL PLATE BO693C7320D000004USAspending$1,370,645Jan 27, 2023May 20, 2021 – Jan 26, 2023
Prime
Department of Transportation
Federal Highway Administration
PROJECT WV ERFO FS 2016-1(3) THE PROJECT CONSISTS OF REPAIR OF MULTIPLE SEGMENTS OF MAINLINE OF WILLIAM RIVER ROAD (FS ROUTE 86) MILEPOST 12.0 TO 14.7. THE WORK INCLUDES REPAIR OF SLOPE FAILURES, SHOULDER AND DITCH RECONDITIONING, SMALL PIPE CULVERT REPLACEMENTS, AND OTHER MISCELLANEOUS WORK.—$583,467Oct 20, 2022Jun 20, 2019 – Feb 28, 2021
Prime
Department of Transportation
Federal Highway Administration
PROJECT NC ERFO COE 2019-1(1) THE PROJECT CONSISTS OF THE CONSTRUCTION OF STEEL H-PILE RETAINING WALL BEHIND EXISTING TIER 1 TIMBER RETAINING WALL, REMOVAL OF TIER 2 TIMBER RETAINING WALL RECONSTRUCTION OF PORTION OF PARKING LOT WITHIN BERRY MOUNTAI693C7320D000017USAspending$843,691Oct 20, 2022Aug 20, 2021 – Oct 6, 2022
Prime
Department of Transportation
Federal Highway Administration
THE PROJECT CONSISTS OF NINETEEN BRIDGE PREVENTIVE MAINTENANCE REPAIRS WITHIN THE NATCHEZ TRACE PARKWAY. THE WORK INCLUDES REPAIR DETERIORATED EXPANSION JOINTS, ASPHALT PAVEMENT CRACKS SEALING AND FILLING, CONCRETE REPAIRS, AND OTHER MISCELLANEOUS W693C7320D000008USAspending$590,444Sep 15, 2022Aug 13, 2020 – Sep 14, 2022

Contract vehicles are shown only when present in the source record. Linked award numbers and vehicles open the authoritative record on USAspending.gov.

Agencies supported

  • Department of TransportationGov-sourced
  • Department of the InteriorGov-sourced
ESTES BROS. CONST. INC. – Jonesville, VA | UEI YKVNGM329N76 | FedSub