← Back to search
SGS LLC
YUKON, OK, 73099
Unclaimed
HUBZoneMinority Owned
Prime contracting experience
19 records from government sources. Past participation is not evidence of current teaming interest.
| Role | Agency | Description | Vehicle | Obligated | Action date | Period |
|---|---|---|---|---|---|---|
| Prime | Department of Defense Department of the Army | DESIGN-BUILD DFAC BUILDING 2457 RENOVATION, FORT BLISS, TEXAS | W9126G23D0030USAspending | $17,089,991 | Jul 22, 2026 | Oct 15, 2024 – Nov 16, 2026 |
| Prime | Department of Defense Department of the Army | FY24 MISSILE ASSEMBLY SUPPORT BUILDING, WHITE SANDS MISSILE RANGE, NEW MEXICO | — | $25,989,820 | Jul 17, 2026 | Jun 16, 2025 – Mar 22, 2028 |
| Prime | Department of Defense Department of the Army | AIR TRAFFIC CONTROL TOWER | — | $19,671,254 | Jul 17, 2026 | Sep 26, 2022 – Mar 24, 2026 |
| Prime | Department of Defense Department of the Army | DESIGN-BID-BUILD CONSTRUCTION OF INFORMATION SYSTEMS FACILITY AT FORT JOHNSON, LOUISIANA | — | $13,865,230 | Jul 9, 2026 | Oct 21, 2024 – Oct 20, 2026 |
| Prime | Department of Defense Department of the Army | CONSTRUCTION OF INSTALLATION SYSTEMS FACILITY (ISF) AT FORT POLK, LA | — | $36,796,222 | Jun 30, 2026 | Jul 13, 2023 – Jul 5, 2026 |
| Prime | Department of Defense Department of the Army | CONSTRUCTION OF INFORMATION SYSTEM FACILITY AT WSMR, NM | — | $53,642,075 | Jun 8, 2026 | Mar 26, 2021 – Sep 24, 2026 |
| Prime | Department of Defense Department of the Army | DFAC CONSTRUCTION | — | $37,684,816 | Jun 2, 2026 | Jun 20, 2023 – May 22, 2026 |
| Prime | Department of Defense Department of the Army | CONSTRUCT THE CHILD DEVELOPMENT CENTER, FORT JOHNSON, LA | — | $36,890,121 | Jun 1, 2026 | Jul 30, 2023 – Jul 14, 2026 |
| Prime | Department of Defense Department of the Army | B6940 HANGAR REPAIR FORT HOOD | — | $20,009,310 | May 1, 2026 | Sep 30, 2022 – Jun 29, 2025 |
| Prime | Department of Defense Department of the Army | COMMERCIAL VEHICLE INSPECTION FACILITY | — | $21,347,337 | Aug 6, 2025 | Oct 31, 2022 – Sep 21, 2024 |
| Prime | Department of Defense Department of the Army | IGF::OT::IGF NORTH COMPOSITE SHOP ADD'L REPAIRS, CCAD, TX | W9126G14D0070USAspending | $11,290,887 | Aug 2, 2024 | Sep 30, 2017 – Jun 30, 2024 |
| Prime | Department of Defense Department of the Army | EO14042. THIS WORK INVOLVES THE RENOVATION OF BUILDING 213 AT ALTUS AIR FORCE BASE, OK. THE WORK INCLUDES REPLACING THE HEATING/COOLING SYSTEM, THE DRAIN AND WASTE SYSTEM, DOMESTIC PLUMBING SYSTEM, AND STANDING SEAM METAL ROOF | — | $12,641,221 | Apr 16, 2024 | Dec 21, 2021 – Mar 7, 2024 |
| Prime | Department of Defense Department of the Army | TEMF 3824&3830 | — | $12,604,764 | Nov 13, 2023 | Sep 30, 2020 – Apr 7, 2023 |
| Prime | Department of Defense Department of the Army | DESIGN, NON-DESIGN&CONSTRUCTION FIRE RESCUE FACILITY, ALTUS AFB, OK | — | $19,953,240 | Oct 26, 2023 | Mar 23, 2020 – Aug 25, 2023 |
| Prime | Department of Defense Department of the Army | HANGER REPAIR | W9126G14D0049USAspending | $9,489,351 | Jun 30, 2023 | Oct 29, 2018 – Jul 31, 2021 |
| Prime | Department of Defense Department of the Army | IGF::OT::IGF KC-46A FLIGHT TRAINING CENTER SIMULATOR FACILITY AT ALTUS AIR FORCE BASE OKLAHOMA | — | $11,163,192 | Jun 29, 2023 | Jul 6, 2017 – May 18, 2019 |
| Prime | Department of Defense Department of the Army | IGF::OT::IGF FY14 UNMANNED AERIAL VEHICLE COMPLEX (UAV) LOCATED ON FORT BLISS ARMY MILITARY INSTALLATION IN EL PASO, TEXAS. CONSTRUCTION OF AN UNMANNED AERIAL SYSTEMS (UAS) LAUNCH AND RECOVERY COMPLEX WITHIN RESTRICTED AIRSPACE. PRIMARY FACILITIES INCLUDE STANDARD DESIGN UNMANNED AERIAL VEHICLE (UAV) MAINTENANCE HANGAR WITH ASSOCIATED MAINTENANCE SHOPS, ADMINISTRATIVE SPACE, STORAGE SPACE, 5-TON BRIDGE CRANE, OIL/WATER SEPARATOR, AIRCRAFT CONTAINER AND FORKLIFT STORAGE, UAV RUNWAY, TAXIWAY, ACCESS APRON, OIL AND HAZARDOUS WASTE STORAGE BUILDINGS, VEHICLE STORAGE FACILITIES, AND OVERHEAD PROTECTION/CANOPY | — | $36,046,402 | Mar 6, 2023 | Dec 5, 2014 – Feb 17, 2023 |
| Prime | Department of Defense Department of the Army | PRIMARY FACILITY | — | $13,016,024 | Nov 10, 2022 | Jun 17, 2019 – Feb 24, 2022 |
| Prime | Department of Defense Department of the Army | DESIGN AND CONSTRUCTION OF A SINGLE STORY, 13,838 SF BLOOD DONOR CENTER AT FORT BLISS, TEXAS. | — | $9,327,404 | Oct 6, 2022 | Feb 3, 2020 – Aug 26, 2022 |
Contract vehicles are shown only when present in the source record. Linked award numbers and vehicles open the authoritative record on USAspending.gov.
Agencies supported
- Department of DefenseGov-sourced