| Role | Agency | Description | Vehicle | Obligated | Action date | Period |
|---|---|---|---|---|---|---|
| Subcontractor | General Services Administration | FOR OUR BUILDING SYSTEMS ASSESSMENT WORK PACKAGE, CONTRACTOR SHALL PROVIDE TRAVEL TO SELECTED SITES AND COMPLETE DETAILED INVENTORIES OF ALL COMPONENTS, HARDWARE AND SOFTWARE OF BUILDING AUTOMATION SYSTEMS, METERING DEVICES, AND TO THE GREATEST EXTENT POSSIBLE, LIGHTING CONTROLS SYSTEM COMPONENTS. BUILDING AUTOMATION SYSTEMS WILL BE DOCUMENTED AT THE IP NETWORK AND SERIAL NETWORK LAYERS. METERING HARDWARE WILL BE DOCUMENTED TO THE EXTENT THAT THEY ARE ACCESSIBLE OUTSIDE OF HIGH OR LOW VOLTAGE ENCLOSURES. LIGHTING CONTROL SYSTEMS HARDWARE AND SOFTWARE WILL BE DOCUMENTED AT THE IP LAYER; AND TO THE GREATEST EXTENT POSSIBLE, LIGHTING PANEL RELAYS WILL BE DOCUMENTED. DOCUMENTATION WILL INCLUDE A SUMMARY NARRATIVE, DETAILED DEVICE
LISTS, AS-IS NETWORK DESIGN DOCUMENTS AND EXTENSIVE PHOTOGRAPHIC DOCUMENTATION.
THE CONTRACTOR SHALL PROVIDE GSA WITH A MILESTONE SCHEDULE AND SHALL BE RESPONSIBLE FOR
COORDINATING ONSITE VISITS WITH THE LOCAL PROPERTY MANAGEMENT TEAM TO COMPLETE ALL WORK
ACTIVITIES SUFFICIENT TO GET THE REQUIRED INFORMATION. TO THE EXTENT POSSIBLE, THE CONTRACTOR WILL DO AS MUCH ADVANCE WORK AS POSSIBLE TO MAKE THE SURVEY EFFICIENT AND KEEP THE REQUIREMENT FOR THE OPERATIONS TEAM'S TIME TO THE SHORTEST AMOUNT POSSIBLE. THE ABILITY OF THE CLIENT TO PROVIDE BUILDING DRAWINGS, CONTRACTOR SUBMITTALS AND RELATED DOCUMENTATION WILL HAVE A MEASURABLE IMPACT ON THE DURATION OF THE SITE VISIT.
TASK 1 - BUILDING SYSTEMS ASSESSMENT, TASK 2 - IT INFRASTRUCTURE, TASK 3 - HVAC CONTROLS, TASK 4 - LIGHTING CONTROLS, TASK 5 - METERING DEVICES, TASK 6 - COMPREHENSIVE DATA FOR ALL LOCAL SERVERS, TASK 7 - NETWORK HEALTH AND CYBERSECURITY CHECK AND TASK 8 - HIGH LEVEL ENERGY CHECKS BLUEVOLUTION_IRASENSORS_2024-09 Parent award context Parent award agency: General Services Administration · Office of Administrative Services Parent award NAICS: 541511 Parent award performance state: DC Parent award description: REQUIREMENT IS FOR IRA SENSORS SURVEY View parent award on USAspending | 47HAA019A0015USAspending | $368,000 | Sep 26, 2024 | — – — |
| Subcontractor | General Services Administration | THE SUBCONTRACTOR SHALL PROVIDE ALL PROFESSIONAL SERVICES NECESSARY FOR
—Ͽ½ THE CONTINUED EVALUATION OF THE CURRENT BAS,
—Ͽ½ PROPOSALS FOR NON-PROPRIETARY BAS SOLUTIONS,
—Ͽ½ ESTIMATES FOR EACH BAS SOLUTION,
—Ͽ½ EXPLANATION CLEARLY IDENTIFYING HOW THE NEW BAS WILL INTERFACE WITH THE FOLEY BAS
—Ͽ½ FURTHER INVESTIGATION OF THE EXISTING VAVS AND THE CONDITION OF EACH UNIT
—Ͽ½ PROPOSALS FOR REPLACING THE ENTIRETY OF VAV INTERNAL COMPONENTS AND CONTROLLERS
(HOUSINGS AND VALVES REMAIN) OR INCREMENTALLY
—Ͽ½ ESTIMATES FOR REPLACING ALL VAV COMPONENTS, OR INCREMENTAL BLUEVOLUTION-REGION10_2023-10 · Prime awardUSAspending | GS35F069GAUSAspending | $145,080 | Oct 2, 2023 | — – — |