← Back to search

WG TOMKO INC

FINLEYVILLE, PA, 15332

Unclaimed

Subcontracting experience

1 record from government sources. Past participation is not evidence of current teaming interest.

RoleAgencyDescriptionVehicleObligatedAction datePeriod
Subcontractor
Department of Health and Human Services
• CAMERA AND ROD OUT UNDERGROUND SEWER TO THE NEAREST MANHOLE. • UNDERGROUND PVC SANITARY TO POINTS OF CONNECTION TO THE EXISTING SYSTEM CURRENTLY SHOWN ON THE PLUMBING DRAWINGS. • UNDERGROUND SITE GAS PIPING FROM THE BUILDING TO THE GENERATOR. • ABOVE GROUND PVC SANITARY, WASTE AND VENT PIPING. • ABOVE GROUND COPPER DOMESTIC HOT AND COLD-WATER PIPING. • ABOVE GROUND CPVC REVERSE OSMOSIS DEIONIZED WATER PIPING. • ABOVE GROUND BLACK STEEL NATURAL GAS PIPING. • ABOVE GROUND COPPER LABORATORY AIR, NITROGEN, AND VACUUM PIPING. • ABOVE GROUND 3/8” STAINLESS STEEL TUBING FOR BREATHABLE AIR PIPING. • ALL LABORATORY EQUIPMENT WILL BE SUPPLIED, OFF-LOADED, AND SET IN PLACE BY OTHERS WITH FINAL CONNECTIONS BY SUBCONTRACTOR. • ONE (1) JOB-SITE MOBILIZATION • ACT 45 SALES TAX • PLUMBING FIXTURES • FIXTURES SUPPORTS • FLOOR DRAINS • CLEANOUTS • BACKFLOW PREVENTERS • SHOCK ABSORBERS • MIXING VALVES • TRAP PRIMERS • FLOOR DRAIN FLASHINGS • ACCESS PANELS • WATER HEATERS • EXPANSION TANK • RECIRCULATING PUMP • AQUASTAT • REVERSES OSMOSIS DEIONIZED WATER SKID(BOD) • NITROGEN GENERATOR(F&I) (14 WEEKS) • PRESSURE GAUGES & THERMOMETERS • GAS PRESSURE REGULATORS • PIPE IDENTIFICATION • PIPE INSULATION • CORE HOLES • FIRE-STOPPING • EXCAVATION, BEDDING AND BACKFILL • BUY AMERICAN PER FAR 52.225-9 • DAVIS BACON WAGES INCLUDING CERTIFIED PAYROLL CLIN 0001: • FURNISH AND INSTALL (1) ROOFTOP UNIT (34-36 WEEKS) • FURNISH AND INSTALL (4) SPLIT SYSTEMS • FURNISH AND INSTALL (1) LAB EXHAUST FAN (27 WEEKS) • FURNISH AND INSTALL (2) EXHAUST FANS • FURNISH AND INSTALL (3) FAN FILTER UNITS • FURNISH AND INSTALL (19) VARIABLE VOLUME BOXES • FURNISH AND INSTALL (5) SUPPLY AIR VALVES WITH HOT WATER COIL • FURNISH AND INSTALL (8) EXHAUST AIR VALVES • FURNISH AND INSTALL (3) FUME HOOD VALVES • FURNISH AND INSTALL (3) BOILERS • FURNISH AND INSTALL (2) HOT WATER PUMPS • FURNISH AND INSTALL (1) AIR SEPARATOR • FURNISH AND INSTALL (1) EXPANSION TANK CLIN 0002: • FURNISH AND INSTALL (2) ROOFTOP UNITS (26 WEEKS) • FURNISH AND INSTALL (1) VARIABLE VOLUME BOX • FURNISH AND INSTALL (3) SUPPLY AIR VALVES WITH HOT WATER COIL • FURNISH AND INSTALL (2) EXHAUST AIR VALVES • FURNISH AND INSTALL (8) FUME HOOD VALVES • REFRIGERANT PIPING • ONE (1) JOB SITE MOBILIZATION • MINIMAL DEMOLITION IF NECESSARY • CONDENSATE DRAIN PIPING • NEW DUCTWORK AND ACCESSORIES • HOT WATER PIPING • FIRE DAMPERS AS SHOWN • CONTROL DAMPERS AS SHOWN • GRILLES, REGISTERS AND DIFFUSERS • COMMISSIONING ASSIST • BACKDRAFT DAMPER AS SHOW • TESTING, ADJUSTING AND BALANCING • EQUIPMENT IDENTIFICATION • AUTOMATIC TEMPERATURE CONTROLS BY SIEMENS • DUCTWORK AND PIPING INSULATION • START-UP OF OUR EQUIPMENT • FIRE STOPPING AS REQUIRED • DUCT MOUNTED SMOKE DETECTORS • TEMPORARY FILTERS AS REQUIRED • BOND
SVI-2319063-WGT
Parent award context
Parent award agency: Department of Health and Human Services · Centers for Disease Control and Prevention
Parent award NAICS: 236220
Parent award performance state: PA
Parent award description: PITT B141
View parent award on USAspending
—$4,338,000Nov 2, 2023— – —

Contract vehicles are shown only when present in the source record. Linked award numbers and vehicles open the authoritative record on USAspending.gov.

WG TOMKO INC – Finleyville, PA | UEI JTKZZZAHW4J3 | FedSub