OZARK INTEGRATED CIRCUITS INC
FAYETTEVILLE, AR, 72701
Prime contracting experience
8 records from government sources. Past participation is not evidence of current teaming interest.
| Role | Agency | Description | Vehicle | Obligated | Action date | Period |
|---|---|---|---|---|---|---|
| Prime | Department of Defense Department of the Air Force | SYSTEM INTEGRATION OF NON-VOLATILE FERROELECTRIC MEMORY FOR HIGH TEMPERATURE APPLICATIONS | — | $3,361,160 | May 26, 2026 | Apr 3, 2024 – Apr 3, 2028 |
| Prime | Department of Defense Missile Defense Agency | SBIR/STTR PHASE II R&D | — | $1,494,380 | Mar 13, 2026 | Oct 3, 2023 – Oct 5, 2026 |
| Prime | Department of Defense Defense Advanced Research Projects Agency | THE HIGH OPERATIONAL TEMPERATURE SENSORS (HOTS)PROGRAM WILL DEVELOP A TECHNOLOGY FOR HIGH-BANDWIDTH, HIGH-DYNAMIC-RANGE SENSING AT HIGH TEMPERATURE. | — | $5,588,096 | Oct 21, 2025 | Mar 1, 2024 – Dec 29, 2025 |
| Prime | Department of Defense Department of the Army | NEW DARPA SBIR II TITLED "HIGH FIDELITY ANALOG INTEGRATION TECHNIQUES FOR HIGH TEMPERATURE APPLICATIONS" | — | $1,492,065 | May 8, 2024 | Jun 2, 2022 – Apr 30, 2025 |
| Prime | Department of Defense Department of the Army | DARPA SMALL BUSINESS INNOVATION RESEARCH (SBIR) PHASE II EFFORT ENTITLED, "HIGH-TEMPERATURE INSTRUMENTATION FOR THE ADVANCEMENT OF HYPERSONIC ENGINE DEVELOPMENT" | — | $1,740,422 | Nov 2, 2023 | May 7, 2021 – Aug 31, 2024 |
| Prime | Department of Defense Department of the Air Force | COVID-19 - HIGH TEMPERATURE BY DESIGN (HTBD) TECHNIQUES FOR A RELIABLE, HIGH PERFORMANCE MICROCONTROLLER | — | $749,903 | Aug 9, 2023 | Jul 15, 2020 – Jan 16, 2024 |
| Prime | National Aeronautics and Space Administration National Aeronautics and Space Administration | EXTREME ENVIRONMENT SYSTEM INTEGRATION TECHNIQUES FOR VENUS IN-SITU PROCESSING | — | $759,995 | May 26, 2023 | Jul 10, 2020 – Jul 9, 2024 |
| Prime | National Aeronautics and Space Administration National Aeronautics and Space Administration | NASA HAS INVESTED SIGNIFICANT TIME AND MONEY IN DEVELOPING HIGH-TEMPERATURE TECHNOLOGIES FOR VENUS SURFACE EXPLORATION. DUE TO THE HARSH ENVIRONMENT OUTSIDE AN INSULATED LANDER BODY (~462OC, 92 BAR PRESSURE, CO2 ATMOSPHERE), CONVENTIONAL, HIGH-TRL COMPONENTS AND MATERIALS WILL NOT SURVIVE, EVEN FOR A SHORT DURATION MISSION LASTING ONLY A FEW HOURS..TO MEET THIS NEED, OZARK IC HAS WORKED WITH NASA'S JFET-R INTEGRATED CIRCUIT TECHNOLOGY (UNDER LICENSE SINCE 2016) TO PROVIDE SENSING AND ACTUATION SOLUTIONS THAT CAN SURVIVE IN THIS HARSH ENVIRONMENT. HONEYBEE ROBOTICS (HBR) HAS BUILT AND TESTED SEVERAL MOTOR, SENSOR AND GEARBOX PROTOTYPES FOR A VENUS ROCK SAMPLING DRILL. THE DRILL INCLUDES TWO BLDC MOTORS TO DRIVE THE AUGER AND PERCUSSION MECHANISMS AND A STEPPER MOTOR TO DRIVE THE DRILL FEED STAGE...IN PHASE I OF THIS EFFORT, OZARK IC SHOWED, THROUGH A LABORATORY DEMONSTRATION, THAT NASA'S JFET-R TECHNOLOGY CAN CONTINUOUSLY RUN A STEPPER MOTOR FOR OVER 1,000 HOURS OF OPERATION AT 470OC. IN PARALLEL, HONEYBEE ROBOTICS DEMONSTRATED THAT ITS TRL-6 LEVEL VENUS MOTORS ARE CAPABLE OF BEING USED IN A STEPPER CONFIGURATION TO ACHIEVE THE REQUIRED AUGER NEEDS FOR A VENUS DRILL..WHAT REMAINS FOR PHASE 2 IS TO FABRICATE A COMBINED MOTOR CONTROL CHIPSET, ASSEMBLE MODULES, AND DEMONSTRATE THE COMBINED MOTOR AND ELECTRONICS OPERATING TOGETHER AT THE VENUS SURFACE TEMPERATURE. THE MOTOR AND DRIVE ELECTRONICS WILL THEN BE TESTED AT VENUS TEMPERATURE AND CHARACTERISTIC MEASUREMENTS INCLUDING POWER AND TORQUE WILL BE MONITORED USING HBR'S HIGH TEMPERATURE MOTOR CHARACTERIZATION SYSTEM. 500 HOURS OF OPERATION IS TARGETED FOR THIS EFFORT.. | — | $754,517 | Jun 1, 2022 | Jul 29, 2019 – Aug 1, 2022 |
Contract vehicles are shown only when present in the source record. Linked award numbers and vehicles open the authoritative record on USAspending.gov.
Subcontracting experience
2 records from government sources. Past participation is not evidence of current teaming interest.
| Role | Agency | Description | Vehicle | Obligated | Action date | Period |
|---|---|---|---|---|---|---|
| Subcontractor | Department of Defense | HIGH-TEMPERATURE SIC CHARACTERIZATION 1125401 Parent award context Parent award agency: Department of Defense · Defense Microelectronics Activity Parent award NAICS: 541330 Parent award performance state: NH Parent award description: THE PURPOSE OF THIS EFFORT IS ANALYZE, DESIGN, FABRICATE AND TEST A HIGH TEMPERATURE SIC DEVICE. View parent award on USAspending | HQ072716D0002USAspending | $88,680 | Feb 12, 2024 | — – — |
| Subcontractor | National Aeronautics and Space Administration | CONSULTING AND TESTING TO SUPPORT WINDSPEED SENSOR FOR PLANETARY SCIENCE APPLICATIONS 650-000-0224 Parent award context Parent award agency: National Aeronautics and Space Administration · National Aeronautics and Space Administration Parent award NAICS: 541715 Parent award performance state: CO Parent award description: E014042 SBIR PHASE II - WINDSPEED SENSOR FOR PLANETARY SCIENCE APPLICATIONS View parent award on USAspending | — | $147,600 | Oct 26, 2023 | — – — |
Contract vehicles are shown only when present in the source record. Linked award numbers and vehicles open the authoritative record on USAspending.gov.
Agencies supported
- Department of DefenseGov-sourced
- National Aeronautics and Space AdministrationGov-sourced
Government-sourced data comes from SAM.gov, SBA and USAspending.gov and is attributed to its source. Items marked company-reported were provided by the company and are verified by FedSub only where labeled. FedSub is a private company and is not affiliated with SBA, GSA/SAM.gov, or any government agency.