← Back to search

OZARK INTEGRATED CIRCUITS INC

FAYETTEVILLE, AR, 72701

UnclaimedClaim this profile (free)

Prime contracting experience

8 records from government sources. Past participation is not evidence of current teaming interest.

RoleAgencyDescriptionVehicleObligatedAction datePeriod
Prime
Department of Defense
Department of the Air Force
SYSTEM INTEGRATION OF NON-VOLATILE FERROELECTRIC MEMORY FOR HIGH TEMPERATURE APPLICATIONS—$3,361,160May 26, 2026Apr 3, 2024 – Apr 3, 2028
Prime
Department of Defense
Missile Defense Agency
SBIR/STTR PHASE II R&D—$1,494,380Mar 13, 2026Oct 3, 2023 – Oct 5, 2026
Prime
Department of Defense
Defense Advanced Research Projects Agency
THE HIGH OPERATIONAL TEMPERATURE SENSORS (HOTS)PROGRAM WILL DEVELOP A TECHNOLOGY FOR HIGH-BANDWIDTH, HIGH-DYNAMIC-RANGE SENSING AT HIGH TEMPERATURE.—$5,588,096Oct 21, 2025Mar 1, 2024 – Dec 29, 2025
Prime
Department of Defense
Department of the Army
NEW DARPA SBIR II TITLED "HIGH FIDELITY ANALOG INTEGRATION TECHNIQUES FOR HIGH TEMPERATURE APPLICATIONS"—$1,492,065May 8, 2024Jun 2, 2022 – Apr 30, 2025
Prime
Department of Defense
Department of the Army
DARPA SMALL BUSINESS INNOVATION RESEARCH (SBIR) PHASE II EFFORT ENTITLED, "HIGH-TEMPERATURE INSTRUMENTATION FOR THE ADVANCEMENT OF HYPERSONIC ENGINE DEVELOPMENT"—$1,740,422Nov 2, 2023May 7, 2021 – Aug 31, 2024
Prime
Department of Defense
Department of the Air Force
COVID-19 - HIGH TEMPERATURE BY DESIGN (HTBD) TECHNIQUES FOR A RELIABLE, HIGH PERFORMANCE MICROCONTROLLER—$749,903Aug 9, 2023Jul 15, 2020 – Jan 16, 2024
Prime
National Aeronautics and Space Administration
National Aeronautics and Space Administration
EXTREME ENVIRONMENT SYSTEM INTEGRATION TECHNIQUES FOR VENUS IN-SITU PROCESSING—$759,995May 26, 2023Jul 10, 2020 – Jul 9, 2024
Prime
National Aeronautics and Space Administration
National Aeronautics and Space Administration
NASA HAS INVESTED SIGNIFICANT TIME AND MONEY IN DEVELOPING HIGH-TEMPERATURE TECHNOLOGIES FOR VENUS SURFACE EXPLORATION. DUE TO THE HARSH ENVIRONMENT OUTSIDE AN INSULATED LANDER BODY (~462OC, 92 BAR PRESSURE, CO2 ATMOSPHERE), CONVENTIONAL, HIGH-TRL COMPONENTS AND MATERIALS WILL NOT SURVIVE, EVEN FOR A SHORT DURATION MISSION LASTING ONLY A FEW HOURS..TO MEET THIS NEED, OZARK IC HAS WORKED WITH NASA'S JFET-R INTEGRATED CIRCUIT TECHNOLOGY (UNDER LICENSE SINCE 2016) TO PROVIDE SENSING AND ACTUATION SOLUTIONS THAT CAN SURVIVE IN THIS HARSH ENVIRONMENT. HONEYBEE ROBOTICS (HBR) HAS BUILT AND TESTED SEVERAL MOTOR, SENSOR AND GEARBOX PROTOTYPES FOR A VENUS ROCK SAMPLING DRILL. THE DRILL INCLUDES TWO BLDC MOTORS TO DRIVE THE AUGER AND PERCUSSION MECHANISMS AND A STEPPER MOTOR TO DRIVE THE DRILL FEED STAGE...IN PHASE I OF THIS EFFORT, OZARK IC SHOWED, THROUGH A LABORATORY DEMONSTRATION, THAT NASA'S JFET-R TECHNOLOGY CAN CONTINUOUSLY RUN A STEPPER MOTOR FOR OVER 1,000 HOURS OF OPERATION AT 470OC. IN PARALLEL, HONEYBEE ROBOTICS DEMONSTRATED THAT ITS TRL-6 LEVEL VENUS MOTORS ARE CAPABLE OF BEING USED IN A STEPPER CONFIGURATION TO ACHIEVE THE REQUIRED AUGER NEEDS FOR A VENUS DRILL..WHAT REMAINS FOR PHASE 2 IS TO FABRICATE A COMBINED MOTOR CONTROL CHIPSET, ASSEMBLE MODULES, AND DEMONSTRATE THE COMBINED MOTOR AND ELECTRONICS OPERATING TOGETHER AT THE VENUS SURFACE TEMPERATURE. THE MOTOR AND DRIVE ELECTRONICS WILL THEN BE TESTED AT VENUS TEMPERATURE AND CHARACTERISTIC MEASUREMENTS INCLUDING POWER AND TORQUE WILL BE MONITORED USING HBR'S HIGH TEMPERATURE MOTOR CHARACTERIZATION SYSTEM. 500 HOURS OF OPERATION IS TARGETED FOR THIS EFFORT..—$754,517Jun 1, 2022Jul 29, 2019 – Aug 1, 2022

Contract vehicles are shown only when present in the source record. Linked award numbers and vehicles open the authoritative record on USAspending.gov.

Subcontracting experience

2 records from government sources. Past participation is not evidence of current teaming interest.

RoleAgencyDescriptionVehicleObligatedAction datePeriod
Subcontractor
Department of Defense
HIGH-TEMPERATURE SIC CHARACTERIZATION
1125401
Parent award context
Parent award agency: Department of Defense · Defense Microelectronics Activity
Parent award NAICS: 541330
Parent award performance state: NH
Parent award description: THE PURPOSE OF THIS EFFORT IS ANALYZE, DESIGN, FABRICATE AND TEST A HIGH TEMPERATURE SIC DEVICE.
View parent award on USAspending
HQ072716D0002USAspending$88,680Feb 12, 2024— – —
Subcontractor
National Aeronautics and Space Administration
CONSULTING AND TESTING TO SUPPORT WINDSPEED SENSOR FOR PLANETARY SCIENCE APPLICATIONS
650-000-0224
Parent award context
Parent award agency: National Aeronautics and Space Administration · National Aeronautics and Space Administration
Parent award NAICS: 541715
Parent award performance state: CO
Parent award description: E014042 SBIR PHASE II - WINDSPEED SENSOR FOR PLANETARY SCIENCE APPLICATIONS
View parent award on USAspending
—$147,600Oct 26, 2023— – —

Contract vehicles are shown only when present in the source record. Linked award numbers and vehicles open the authoritative record on USAspending.gov.

Agencies supported

  • Department of DefenseGov-sourced
  • National Aeronautics and Space AdministrationGov-sourced

Government-sourced data comes from SAM.gov, SBA and USAspending.gov and is attributed to its source. Items marked company-reported were provided by the company and are verified by FedSub only where labeled. FedSub is a private company and is not affiliated with SBA, GSA/SAM.gov, or any government agency.

OZARK INTEGRATED CIRCUITS INC – Fayetteville, AR | UEI C3JNF19C7DK8 | FedSub