← Back to search
GINER, INC.
AUBURNDALE, MA, 02466
UnclaimedClaim this profile (free)
Prime contracting experience
18 records from government sources. Past participation is not evidence of current teaming interest.
| Role | Agency | Description | Vehicle | Obligated | Action date | Period |
|---|---|---|---|---|---|---|
| Prime | National Aeronautics and Space Administration National Aeronautics and Space Administration | FY25 SBIR PHASE III - REGENERATIVE FUEL CELL (RFC) 2 KW FUEL CELL PROJECT | — | $931,318 | Aug 3, 2026 | Aug 27, 2025 – Jun 7, 2027 |
| Prime | National Aeronautics and Space Administration National Aeronautics and Space Administration | PHASE II SBIR 80NSSC25C0004 HIGH ENERGY DENSITY, FAST DISCHARGE LI-S BATTERIES FOR ELECTRIFIED AIRCRAFT PROPULSION | — | $899,860 | Jun 24, 2026 | Jul 3, 2025 – Jul 2, 2027 |
| Prime | Department of Health and Human Services National Institutes of Health | SBIR FAST-TRACK AWARD (PHASE I STUDY BASE REQUIREMENT WITH OPTION FOR PHASE II STUDY) CONTINUOUS MONITORING OF ALCOHOL USE BY WEARABLE BIOSENSORS | — | $2,499,714 | Apr 17, 2026 | Sep 9, 2020 – Aug 31, 2026 |
| Prime | Department of Transportation Immediate Office of the Secretary of Transportation | SBIR PH2 FOR NHTSA TOPIC 171-NH1 ON DETECTION OF THC USE IN DRIVERS | — | $359,908 | Dec 15, 2025 | Jun 18, 2018 – Jun 17, 2020 |
| Prime | Department of Defense Defense Health Agency | MEDICAL & RESEARCH DEVELOPMENT CONTRACT FOR DHA STTR PHASE II A2- 9499 PROPOSAL TITLED "RAPID AND REPROGRAMMABLE ASSAY FOR MULTIPLEXED GENE DETECTION" | — | $1,099,889 | Jun 25, 2025 | Jul 14, 2023 – Aug 13, 2026 |
| Prime | National Aeronautics and Space Administration National Aeronautics and Space Administration | E014042 SBIR PHASE III STATIC VAPOR FEED ELECTROLYSIS CELL STACK REDESIGN | — | $403,019 | Feb 18, 2025 | Jan 27, 2023 – Sep 30, 2025 |
| Prime | National Aeronautics and Space Administration National Aeronautics and Space Administration | REGENERATIVE FUEL CELL ELECTROLYZER | — | $1,033,311 | Dec 5, 2024 | Feb 20, 2020 – Dec 31, 2024 |
| Prime | Department of Health and Human Services National Institutes of Health | NIMH SBIR PHASE I TOPIC 001- POINT-OF-CARE HIV VIRAL LOAD AND DRUG ADHERENCE ASSAYS | — | $306,499 | Sep 12, 2024 | Sep 16, 2024 – Sep 15, 2025 |
| Prime | Department of Health and Human Services National Institutes of Health | POINT-OF-CARE MONITORING OF ADHERENCE TO ANTIRETROVIRAL HIV THERAPY | — | $299,966 | Jul 2, 2024 | Aug 1, 2023 – Dec 31, 2024 |
| Prime | Department of Defense Department of the Air Force | LITHIUM-SULFUR BATTERIES FOR AIR FORCE APPLICATIONS | — | $750,000 | Feb 16, 2024 | Mar 11, 2022 – Sep 12, 2024 |
| Prime | Department of Defense Department of the Navy | IGF::OT::IGF SBIR PHASE II RESEARCH AND DEVELOPMENT | — | $1,941,862 | Nov 21, 2023 | Jan 2, 2019 – Dec 31, 2023 |
| Prime | Department of Health and Human Services National Institutes of Health | A RAPID, POINT-OF-CARE SENSOR FOR DETECTION OF HEPATITIS C VIRUS INFECTIONS | — | $299,979 | Nov 14, 2023 | Aug 27, 2021 – May 31, 2023 |
| Prime | National Aeronautics and Space Administration National Aeronautics and Space Administration | NASA'S EXTRAVEHICULAR MOBILITY UNIT, OR EMU, IS A PERSONAL MINI-SPACECRAFT THAT COMPRISES THE SPACE SUIT ASSEMBLY AND LIFE SUPPORT SYSTEMS. THE CURRENT EMU HAS A MANUALLY OPERATED EXTRAVEHICULAR VISOR ASSEMBLY (EVVA) THAT PROVIDES PROTECTION FROM MICROMETEOROIDS AND FROM SOLAR ULTRAVIOLET AND INFRARED RADIATION. FOR THE INTEGRATION OF EVVA WITH NASA S NEXT GENERATION SPACE SUITS HELMET BUBBLE, DYNAMICALLY SWITCHING TECHNOLOGIES ARE NEEDED TO PROVIDE TINT-ABILITY, RADIATION PROTECTION, AND OPTIMIZED TRANSMITTANCE. GINER PROPOSES TO DEVELOP AN ELECTROCHROMIC SPACE SUIT HELMET BUBBLE THAT WOULD PROVIDE HIGH OPTICAL CONTRAST BETWEEN ITS CLEAR (TRANSPARENT) AND DARK (OPAQUE) STATES, TUNABLE SWITCHING, AND A CONTROL MODULE THAT WOULD ALLOW FOR BOTH USER AND AMBIENT LIGHT CONTROL. THIS ELECTROCHROMIC VISOR WILL PROVIDE>55% CONTRAST AT 550 NM, RAPID (~ 1 SEC) SWITCHING, AND LOW POWER REQUIREMENTS. TAKING ADVANTAGE OF FLEXIBLE TRANSPARENT ELECTRODES, A NEW GENERATION OF SOLUTION PROCESSABLE ELECTROCHROMIC POLYMERS, AND ROBOTIC COATING ON DOUBLY-CURVED SURFACES, GINER WILL DEVELOP AND THOROUGHLY TEST A PROTOTYPE VISOR THAT MEETS OR EXCEEDS THE PERFORMANCE AND DURABILITY REQUIREMENTS LISTED BY NASA. AT THE END OF THE PROGRAM, A FULL SIZE (10 13 HEMI-ELLIPSOID DOME), SELF-POWERED PROTOTYPE VISOR WILL BE DELIVERED. | — | $749,899 | Jul 27, 2023 | Aug 8, 2019 – Dec 31, 2023 |
| Prime | National Aeronautics and Space Administration National Aeronautics and Space Administration | THIS STATEMENT OF WORK (SOW) ADDRESSES THE REDESIGN OF THE GINER 3,600 PSI HIGH PRESSURE CELL STACK TO RESOLVE VOLTAGE STABILITY ISSUES. PREVIOUSLY, UNDER CONTRACT NNM15AA09C, GINER DESIGNED, ASSEMBLED AND TESTED A HIGH PRESSURE CELL STACK. THE EFFORT INVOLVED MODIFYING AN EARLIER DESIGN TO INCORPORATE DESIGN IMPROVEMENTS TO RESOLVE LEAKAGE ISSUES. GINER SUCCESSFULLY DEMONSTRATED ~5,000 HOURS OF OPERATION, WITH NO LEAKAGE ISSUES. HOWEVER, THIS DESIGN EXHIBITED A HIGHER VOLTAGE THAN EXPECTED. EARLIER EFFORTS DEMONSTRATED A STABLE, FLAT VOLTAGE OF ~1.8 V, WHILE THIS CELL STACK EXHIBITED RISING VOLTAGE UP TO ~2.0 V. A FAULT TREE WAS DEVELOPED TO IDENTIFY THE POSSIBLE CAUSES. THE LIKELY CAUSE WAS IDENTIFIED TO BE LACK OF COMPLIANCE IN THE CELLS, WHICH LIKELY RESULTED IN OVER COMPRESSING AND DEHYDRATING OF THE MEMBRANES. IN ADDITION, THE CATHODE SCREENS EXPERIENCED A HEIGHT REDUCTION, RESULTING IN INCREASED RESISTANCE. THIS SBIR PHASE III EFFORT SHALL REQUIRE GINER TO REDESIGN SPECIFIC COMPONENTS OF THE STACK HARDWARE TO ENHANCE COMPLIANCE TO RESOLVE THE HIGH RESISTANCE AND VOLTAGE ISSUES. GINER WILL INCORPORATE A PRESSURE PAD INTO THE CATHODE COMPARTMENT OF THE CELLS TO MINIMIZE OVER COMPRESSION OF THE SCREEN AND MEMBRANE. A FOUR CELL STACK WILL BE ASSEMBLED AND PRE-TEST HEALTH CHECKS WILL BE PERFORMED. ENDURANCE TESTING WILL BE CONDUCTED TO VERIFY PERFORMANCE AND LIFE. THE STACK SHALL BE OPERATED CONTINUOUSLY AT 3600 PSI. AT THE COMPLETION OF ENDURANCE TESTING, POST-TEST HEALTH CHECKS SHALL BE PERFORMED. GINER SHALL ALSO BE REQUIRED TO ANALYZE THE DATA AND WRITE A FINAL REPORT. GINER SHALL BE REQUIRED TO DELIVER THE CELL STACK AND FINAL REPORT TO MSFC. | — | $274,145 | Jul 25, 2023 | Sep 27, 2018 – Nov 30, 2020 |
| Prime | Department of Transportation Immediate Office of the Secretary of Transportation | SBIR PH2B UNDER TOPIC 17.1-NH1 THC DETECTION IN DRIVERS | — | $999,989 | May 2, 2023 | May 5, 2021 – May 3, 2024 |
| Prime | National Aeronautics and Space Administration National Aeronautics and Space Administration | HIGH ENERGY DENSITY LITHIUM-SULFUR BATTERY WITH IMPROVED CYCLE LIFE | — | $749,953 | May 10, 2022 | Aug 13, 2019 – Feb 28, 2023 |
| Prime | National Aeronautics and Space Administration National Aeronautics and Space Administration | HIGH ENERGY DENSITY AND HIGH CYCLE LIFE LITHIUM-SULFUR BATTERY FOR ELECTRIFIED AIRCRAFT PROPULSION | — | $749,997 | Apr 26, 2022 | Jun 18, 2020 – Feb 28, 2023 |
| Prime | Environmental Protection Agency Environmental Protection Agency | GINER, INC. - INEXPENSIVE FORMALDEHYDE SENSORS FOR INDOOR AIR QUALITY (IAQ) APPLICATIONS | — | $299,743 | Mar 4, 2022 | Dec 1, 2018 – May 31, 2021 |
Contract vehicles are shown only when present in the source record. Linked award numbers and vehicles open the authoritative record on USAspending.gov.
Agencies supported
- Department of TransportationGov-sourced
- Department of Health and Human ServicesGov-sourced
- National Aeronautics and Space AdministrationGov-sourced
- Department of DefenseGov-sourced
- Environmental Protection AgencyGov-sourced
Government-sourced data comes from SAM.gov, SBA and USAspending.gov and is attributed to its source. Items marked company-reported were provided by the company and are verified by FedSub only where labeled. FedSub is a private company and is not affiliated with SBA, GSA/SAM.gov, or any government agency.