← Back to search

CHICKASAW DEFENSE LOGISTICS, LLC

NORMAN, OK, 73071

8(a)Minority Owned

Prime contracting experience

Showing the 50 most recent of 72 records from government sources. Past participation is not evidence of current teaming interest.

RoleAgencyDescriptionVehicleObligatedAction datePeriod
Prime
Department of the Interior
Departmental Offices
REPLACEMENT AND INSTALLATION OF ACCESS CONTROL SYSTEM TO THE ANTI-TERRORISM FORCE PROTECTION BUILDING140D0422D0011USAspending$402,543Sep 23, 2026Sep 23, 2026 – Sep 22, 2027
Prime
Department of the Interior
Departmental Offices
FLOOR RESURFACING140D0422D0011USAspending$356,181Sep 18, 2026Jun 4, 2026 – Jun 3, 2027
Prime
Department of the Interior
Departmental Offices
STORMWATER REMEDIATION AND DRAINAGE IMPROVEMENTS140D0422D0011USAspending$345,824Sep 14, 2026Sep 14, 2026 – Sep 13, 2027
Prime
Department of the Interior
Departmental Offices
CCTV SYSTEM UPGRADES INTERNALLY AND EXTERNALLY TO THE ATFP BUILDING140D0422D0011USAspending$377,391Sep 4, 2026Sep 4, 2026 – Mar 4, 2027
Prime
Department of Defense
Department of the Navy
E6B VCT SPIRAL 3N6134022D2006USAspending$1,866,472Jun 30, 2026Jun 22, 2026 – Dec 18, 2027
Prime
Department of Defense
Department of the Navy
MSS RADAR DELIVERY ORDER 08N6134022D2006USAspending$1,611,472Jun 24, 2026Jul 3, 2024 – Jul 31, 2026
Prime
Department of Defense
Department of the Navy
SSMG FAULTSN6134022D2006USAspending$1,863,414Jun 24, 2026Sep 17, 2024 – Sep 30, 2026
Prime
Department of Defense
Department of the Navy
NEW DELIVERY ORDER DO7 SUBSKILLS NETN6134022D2006USAspending$1,658,301Jun 23, 2026May 9, 2024 – Sep 30, 2025
Prime
Department of Defense
Department of the Navy
DELIVERY ORDER ON SSN CONTRACTN6134022D2006USAspending$1,632,341Jun 22, 2026Mar 13, 2025 – Sep 30, 2026
Prime
Department of Defense
Department of the Navy
DUQM AND BREST HARBOR DATABASES (3.2.1)N6134022D2006USAspending$634,202Jun 22, 2026Dec 12, 2023 – Dec 31, 2025
Prime
Department of Defense
Department of the Navy
SUBSKILLS TRAINING NETWORK VIRTUAL INTERACTIVE SHIPBOARD INSTRUCTIONAL TOUR - MEDIA/DATA DELIVERY ORDER 05N6134022D2006USAspending$1,210,590Jun 22, 2026Sep 14, 2023 – Sep 30, 2026
Prime
Department of the Interior
Departmental Offices
E-2176 G6 SIE RENOVATION140D0420D0009USAspending$1,575,471May 21, 2026Sep 12, 2024 – Jun 30, 2026
Prime
Department of Defense
Department of the Navy
SUBSKILLS TRAINING NETWORK VIRTUAL INTERACTIVE SHIPBOARD INSTRUCTIONAL TOUR - MEDIA/DATA DELIVERY ORDER 13N6134022D2006USAspending$823,990Apr 6, 2026Jan 30, 2026 – Dec 31, 2026
Prime
Department of Defense
Department of the Navy
SUBSKILLS TRAINING NETWORK VIRTUAL INTERACTIVE SHIPBOARD INSTRUCTIONAL TOUR - MEDIA/DATE DELIVERY ORDER 12N6134022D2006USAspending$850,609Mar 31, 2026Sep 24, 2025 – Mar 27, 2027
Prime
Department of the Interior
Departmental Offices
ARCHITECT ENGINEER DESIGN SERVICES TO RENOVATE HVAC AND REPLACE ROOF AT D-1307140D0420D0009USAspending$385,503Jan 20, 2026Sep 3, 2024 – Sep 2, 2025
Prime
Department of the Interior
Departmental Offices
E-2431 BLCSE RENOVATION140D0420D0009USAspending$252,376Dec 10, 2025Aug 16, 2024 – Oct 15, 2025
Prime
Department of the Interior
Departmental Offices
TA-3-24 SWCS MAILROOM140D0422D0011USAspending$284,573Sep 23, 2025Sep 23, 2025 – Sep 22, 2026
Prime
Department of the Interior
Departmental Offices
UNDER THIS TASK ORDER THE CONTRACTOR WILL REDESIGN AND BUILD A NEW DATA CENTER IN BUILDING E-1351 AT FORT BRAGG, NC.140D0420D0009USAspending$18,376,830Aug 26, 2025Sep 25, 2020 – May 31, 2025
Prime
Department of Defense
Department of the Air Force
VBS3 MODELING AND SIMULATIONS SPECIALISTS—$3,821,520Aug 19, 2025Aug 8, 2022 – Sep 27, 2026
Prime
Department of the Interior
U.S. Fish and Wildlife Service
AWARD TO DESIGN-BUILD AN ADMINISTRATIVE BUILDING AND SHOP COMPLEX AT WICHITA MOUNTAINS WILDLIFE REFUGE.—$19,498,866May 19, 2025Oct 11, 2021 – Jun 2, 2025
Prime
Department of Defense
Department of the Navy
SUBJECT MATTER EXPERT SERVICES—$3,732,593May 14, 2025Mar 1, 2021 – Feb 27, 2026
Prime
Department of the Interior
Departmental Offices
E-2929 JAG MODERNIZATION140D0420D0009USAspending$1,650,094Feb 21, 2025Sep 14, 2023 – Nov 30, 2024
Prime
Department of Defense
Department of the Air Force
TASK ORDER TO PROVIDE 2 - FTE - TIER II SUPPORT OF MEDICAL INFORMATION SERVICES WITH 4 OPTION YEARS IN SUPPORT OF THE 72D MEDICAL GROUP.—$834,454Feb 21, 2025Jun 8, 2020 – Apr 30, 2025
Prime
Department of the Interior
Departmental Offices
PLAN, PROCURE, AND INSTALL A COMPLETE AND INTEGRATED PACS AT JOINT ARMAMENT FACILITY (JAF) TO INCLUDE DUAL TURNSTILES AT MAIN ENTRANCE.140D0422D0011USAspending$472,858Dec 27, 2024Jul 3, 2023 – Nov 29, 2024
Prime
Department of Defense
Department of the Navy
SUBSKILLS TRAINING NETWORK VIRTUAL INTERACTIVE SHIPBOARD INSTRUCTIONAL TOUR - MEDIA/DATAN6134022D2006USAspending$1,775,095Dec 3, 2024Aug 29, 2023 – Apr 18, 2025
Prime
Department of the Interior
Departmental Offices
H-2313 PEDESTRIAN PAVEMENT140D0420D0009USAspending$506,482Nov 25, 2024Sep 18, 2023 – Sep 17, 2024
Prime
Department of the Interior
Departmental Offices
E2929 FMC HQ AREA REFRESH140D0420D0009USAspending$514,446Nov 15, 2024Sep 19, 2023 – Sep 18, 2024
Prime
Department of the Interior
Departmental Offices
UNDER THIS TASK ORDER FOR BUILDING E-2176 SATELLITE PAD, THE CONTRACTOR WILL CONSTRUCT A SATELLITE PAD WITH AN ELECTRIC AND TELECOM HUB LOCATED IN THE EXISTING 95TH MOTOR POOL COMPOUND AT FT. BRAGG, NC FOR USASOC.140D0420D0009USAspending$992,244Oct 2, 2024Sep 26, 2022 – Sep 25, 2024
Prime
Department of the Interior
Departmental Offices
E-2431 BLCSE RENOVATION140D0420D0009USAspending$904,624Sep 19, 2024Sep 15, 2023 – Sep 14, 2024
Prime
Department of the Interior
Departmental Offices
E-2929 FOIA & MAILROOM REDESIGN140D0420D0009USAspending$454,883Sep 18, 2024Sep 12, 2023 – Sep 11, 2024
Prime
Department of the Interior
Departmental Offices
E-2929 G-2 BASEMENT MODERNIZATION140D0420D0009USAspending$441,709Sep 18, 2024Sep 6, 2023 – Sep 5, 2024
Prime
Department of the Interior
Departmental Offices
E-2929 SINE PARI SOCIAL SITE140D0420D0009USAspending$284,413Sep 18, 2024Sep 11, 2023 – Sep 10, 2024
Prime
Department of the Interior
Departmental Offices
UNDER THIS TASK ORDER THE CONTRACTOR SHALL PROVIDE THE WORK AND ANCILLARY SUPPORT REQUIRED TO PROVIDE THE BREAKER AND POWER SUPPORT TO SUPPORT THE ELECTRICAL TEAM ONSITE IN E2929. WORK WILL BE CONDUCTED IN ACCORDANCE WITH ATTACHMENT (1) SOW E2929 BA140D0420D0009USAspending$1,920,393Sep 17, 2024Aug 5, 2022 – Jun 3, 2024
Prime
Department of Defense
Department of the Navy
MRES CONSTRUCTION EFFORT: TIME & MATERIAL (T&M)/FIRM-FIXED-PRICE (FFP) HYBRID CONTRACT. NAVAL SURFACE WARFARE CENTER INDIAN HEAD DIVISION, INDIAN HEAD, MARYLAND.—$13,238,033Jul 5, 2024Mar 2, 2021 – Mar 1, 2024
Prime
Department of the Interior
Departmental Offices
PROVIDE A GPS FLEET MANAGEMENT SYSTEM FOR MCAAP THAT PROVIDES LOCATION TRACKING SERVICES OF VEHICLES, DRIVER BEHAVIOR REPORTS, INDIVIDUAL DRIVERS OF A RESPECTIVE VEHICLE, VEHICLE USAGE AND MAINTENANCE DETAILS.—$366,871Jun 3, 2024Mar 23, 2021 – Sep 22, 2022
Prime
Department of Health and Human Services
Office of the Assistant Secretary for Administration
MCALESTER NAVY: MEZZANINE FOR NAVY WAREHOUSE 1041HHSP233201800003IUSAspending$290,560May 8, 2024Mar 23, 2018 – Nov 1, 2018
Prime
Department of Health and Human Services
Office of the Assistant Secretary for Administration
BOATSWAIN LOCKERHHSP233201800003IUSAspending$658,657May 7, 2024Sep 8, 2018 – Sep 1, 2019
Prime
Department of Health and Human Services
Office of the Assistant Secretary for Administration
TEMPORARY COVERED STORAGE UNIT ON HHSP23320180003I IDIQHHSP233201800003IUSAspending$314,926May 7, 2024Sep 11, 2018 – May 1, 2019
Prime
Department of Health and Human Services
Office of the Assistant Secretary for Administration
NAVY MCALESTER MISCELLANEOUS ITEMS (BOATSWAIN LOCKER FOR PAINT BOOTH HHSP233201800003IHHSP233201800003IUSAspending$688,419May 7, 2024Feb 6, 2019 – Oct 3, 2019
Prime
Department of Health and Human Services
Office of the Assistant Secretary for Administration
B1042 MACHINE SHOP RELOCATIONHHSP233201800003IUSAspending$561,017May 7, 2024Aug 5, 2018 – Apr 4, 2019
Prime
Department of Defense
Department of the Navy
FFP FOR MCALESTER DB EFFORT—$4,401,737Apr 16, 2024Mar 31, 2022 – May 31, 2024
Prime
Department of Defense
Department of the Navy
SUBMARINE SKILLS TRAINING NETWORK (SUBSKILLSNET) VIRTUAL INTERACTIVE SHIPBOARD INSTRUCTIONAL TOUR (VISIT) MEDIA AND DATAN6134022D2006USAspending$1,458,101Mar 21, 2024Apr 14, 2023 – Sep 30, 2024
Prime
Department of the Interior
Departmental Offices
UNDER THIS TASK ORDER BUILDING E-2929 THE CONTRACTOR WILL UPGRADE ALL EXTERIOR WINDOWS TO MAKE THE SPACE MORE FUNCTIONAL FOR USASOC HQ REQUIREMENTS. DUE TO AGING OF THE BUILDING, THE WINDOW INFRASTRUCTURE NEEDS ENHANCEMENT. ALL EXTERIOR WINDOWS NEED140D0420D0009USAspending$917,096Feb 20, 2024Jul 20, 2022 – Jul 19, 2023
Prime
Department of the Interior
Departmental Offices
UNDER THIS TASK ORDER, THE CONTRACTOR ALL LABOR, MATERIALS, EQUIPMENT, INCIDENTALS, AND SUPERVISION REQUIRED TO PREPARE THE DESIGN DRAWINGS, SPECIFICATIONS, DESIGN ANALYSIS, AND COST ESTIMATE FOR THE PROJECT BUILDING E-2176 RENOVATION. WORK WILL BE140D0420D0009USAspending$285,293Feb 6, 2024Jul 26, 2022 – Sep 30, 2023
Prime
Department of the Interior
Departmental Offices
UNDER THIS TASK ORDER THE CONTRACTOR SHALL PROVIDE A TURNKEY SOLUTION TO MANAGE THE PROCESS OF PROVIDING NEW FURNITURE, DEMOUNTABLE WALLS, LIGHT BUILDING MODIFICATIONS AND SCHEDULING EQUIPMENT BASED ON THE FINAL CUSTOMER APPROVED FLOOR PLANS. PACKIN140D0420D0009USAspending$1,591,882Feb 6, 2024Sep 25, 2020 – Sep 30, 2022
Prime
Department of the Interior
Departmental Offices
EXAMINE PROJECT FUNCTIONS, VALIDATE PROJECT REQUIREMENTS, ANALYZE ALTERNATE DESIGN CONCEPTS BY MEANS OF THE CHARRETTE METHODOLOGY AND PRESENT THESE FINDINGS AND RECOMMENDATIONS TO THE GOVT TO INCLUDE AN ANALYSIS OF HOW CURRENTLY THINGS ARE WORKING (R140D0422D0011USAspending$449,290Jan 29, 2024Sep 21, 2022 – Nov 30, 2023
Prime
Department of the Interior
Departmental Offices
UPGRADE EXTERNAL AND INTERNAL VIDEO SURVEILLANCE SYSTEM FOR BRYANT HALL (D-3206) AND KENNEDY HALL (D-3004)140D0422D0011USAspending$652,875Jan 24, 2024Sep 26, 2022 – Sep 25, 2023
Prime
Department of the Interior
Departmental Offices
UNDER THIS TASK ORDER THE DCSENG SEEKS TO DIRECT WORK IN MULTIPLE SPACES ON FORT BRAGG WITHIN THE ECHO CAMPUS. IN BUILDING E-1733: THE CONTRACTOR WILL REPLACE EXISTING CAMERAS AND ADD 1 NEW WITH 6 MULTI-VIEW UNITS, INCLUDE NECESSARY CONDUIT AND CABLE140D0420D0009USAspending$343,243Jan 24, 2024Jul 28, 2022 – Sep 22, 2023
Prime
Department of the Interior
Departmental Offices
UNDER THIS TASK ORDER, THE CONTRACTOR ALL LABOR, MATERIALS, EQUIPMENT, INCIDENTALS, AND SUPERVISION REQUIRED TO PREPARE THE DESIGN DRAWINGS, SPECIFICATIONS, DESIGN ANALYSIS, AND COST ESTIMATE FOR THE PROJECT BUILDING E-2375 RENOVATION. WORK WILL BE140D0420D0009USAspending$263,857Jan 10, 2024Jul 26, 2022 – Sep 30, 2023
Prime
Department of the Interior
Departmental Offices
UNDER THIS TASK ORDER THE CONTRACTOR WILL BUILD A PRE-ENGINEERED METAL BUILDING IN ORDER TO CREATE FUNCTIONAL WORKSPACES FOR THE SIMULATION TRAININGS CONDUCTED AT THE SPECIAL OPERATIONS MISSION TRAINING CENTER (SOMTC) BUILDING X5486.140D0420D0009USAspending$1,879,336Jan 4, 2024Sep 25, 2020 – Sep 24, 2022

Contract vehicles are shown only when present in the source record. Linked award numbers and vehicles open the authoritative record on USAspending.gov.

Agencies supported

  • Department of the InteriorGov-sourced
  • Department of DefenseGov-sourced
  • Department of Health and Human ServicesGov-sourced

Government-sourced data comes from SAM.gov, SBA and USAspending.gov and is attributed to its source. Items marked company-reported were provided by the company and are verified by FedSub only where labeled. FedSub is a private company and is not affiliated with SBA, GSA/SAM.gov, or any government agency.

CHICKASAW DEFENSE LOGISTICS, LLC – Norman, OK | UEI ZJM6C2MM32W7 | FedSub