← Back to search

REDSTONE DEFENSE SYSTEMS

HUNTSVILLE, AL, 35808

UnclaimedClaim this profile (free)

Prime contracting experience

Showing the 50 most recent of 177 records from government sources. Past participation is not evidence of current teaming interest.

RoleAgencyDescriptionVehicleObligatedAction datePeriod
Prime
Department of Defense
Department of the Army
PROVIDE AVIATION GROUND SUPPORT EQUIPMENT (AGSE) IDENTIFIED IN APPENDIX C IN SUPPORT OF FOREIGN MILITARY SALES (FMS) CASES TURKEY (TK-B-VCQ), SOUTH KOREA (KS-B-ZDF, KS-B-ZCF), AND CROATIA (HR-B-IAB).W58RGZ12D0089USAspending$6,496,683Jun 29, 2026Aug 9, 2018 – Jan 14, 2022
Prime
Department of Defense
Department of the Army
SOF/PR TECHNICAL AND LOGISTICAL SUPPORTW58RGZ12D0089USAspending$3,548,204May 21, 2026Sep 25, 2014 – Jul 31, 2016
Prime
Department of Defense
Department of the Army
IGF::OT::IGF CHINOOK 47F/G ITAB AND LIGHT WEIGHT TRANS BAFFLE DOORS AND DRIP PANS (OEP 15595)W58RGZ12D0089USAspending$2,022,426May 14, 2026Dec 11, 2013 – Nov 30, 2016
Prime
Department of Defense
Department of the Army
THE CONTRACTOR SHALL PROVIDE 315 ARC-231 ADAPTER CABLES IN ACCORDANCE WITH GOVERNMENT FURNISHED DRAWING NUMBER 9877561020. THE CONTRACTOR SHALL CONFIGURATION UPGRADE THIRTY (30) CVDR, PART NUMBER 2500-1302-01. THE CONTRACTOR SHALL CONFIGURATION UPGRADE FIFTEEN (15) PUMPS, PART NUMBER 3032171-001 THE CONTRACTOR SHALL PROVIDE THIRTY (30) EPUSHA PUMPS, PART NUMBER 3032171-001, AND THIRTY (30) CONTROL BOXES, PART NUMBER SX7EG23 . THE CONTRACTOR SHALL CONDUCT A PRODUCIBILITY REVIEW OF ALL GOVERNMENT FURNISHED DRAWINGS. A PRODUCIBILITY REVIEW SHALL BE CONDUCTED ON ALL CUSTOMER SUPPLIED DRAWINGS IN ACCORDANCE WITH TECHNICAL DATA PACKAGE (TDP) CHANGE MANAGEMENT, POP 730-02. AFTER THE PRODUCIBILITY REVIEW THE DRAWING WILL BE SUBMITTED TO DOCUMENT CONTROL. THE CONTRACTOR SHALL PREPARE POWER POINT SLIDES TO SUPPORT IPT MEETINGS AS REQUIRED TO DISCUSS THE UPDATED STATUS, PERFORMANCE AND COST FOR THE PROJECT.W58RGZ12D0089USAspending$3,435,881May 13, 2026Feb 6, 2013 – Nov 30, 2015
Prime
Department of Defense
Department of the Army
ORDER 0404 FOR UH-60LW58RGZ12D0089USAspending$1,828,783Apr 15, 2026Sep 16, 2014 – Apr 30, 2017
Prime
Department of Defense
Department of the Army
IGF::OT::IGF: OEP 16105W58RGZ12D0089USAspending$11,234,363Apr 1, 2026Jul 8, 2014 – Mar 31, 2016
Prime
Department of Defense
Department of the Army
TASK ORDER 0131W58RGZ12D0089USAspending$9,696,148Mar 31, 2026Jun 11, 2013 – Oct 31, 2017
Prime
Department of Defense
Department of the Army
OEP 14078 CH-47 ENGINE CONTROL UNIT (ECU) SOFTWARE REPROGRAM KITW58RGZ12D0089USAspending$759,022Mar 24, 2026Mar 5, 2013 – Dec 31, 2015
Prime
Department of Defense
Department of the Army
IGF::OT::IGF FMS PROGRAM - CASE SR-B-VXA AVIATION GROUND SUPPORT EQUIPMENT OEP 14569W58RGZ12D0089USAspending$2,007,295Mar 12, 2026May 3, 2013 – Aug 31, 2015
Prime
Department of Defense
Department of the Army
IGF::CL,CT::IGFW58RGZ12D0089USAspending$2,506,593Mar 12, 2026Apr 2, 2015 – Apr 30, 2017
Prime
Department of Defense
Department of the Army
TO 0166W58RGZ12D0089USAspending$1,112,561Mar 12, 2026Jul 23, 2013 – Sep 30, 2016
Prime
Department of Defense
Department of the Army
IGF::CL,CT::IGFW58RGZ12D0089USAspending$2,114,990Mar 11, 2026Nov 19, 2013 – May 30, 2015
Prime
Department of Defense
Department of the Army
LCS MISSION SYSTEMS SUPPORT AND FLEET INTRODUCTION REVISION DW58RGZ12D0089USAspending$6,005,585Mar 10, 2026Sep 10, 2014 – Sep 30, 2019
Prime
Department of Defense
Department of the Army
TASK ORDERW58RGZ12D0089USAspending$4,565,237Mar 10, 2026Feb 12, 2013 – Dec 31, 2014
Prime
Department of Defense
Department of the Army
THIS SOW DEFINES THE EFFORT REQUIRED TO PROVIDE 100 AVENGER W303 CABLES ASSEMBLIES.W58RGZ12D0089USAspending$894,985Dec 15, 2025Dec 22, 2017 – Jul 31, 2019
Prime
Department of Defense
Department of the Army
IGF::OT::IGFW58RGZ12D0089USAspending$831,334Aug 6, 2025Sep 27, 2013 – Sep 30, 2014
Prime
Department of Defense
Department of the Army
IGF::OT::IGF THIS SOW DEFINES THE EFFORT REQUIRED TO PROVIDE THIRTY (30) PATRIOT DUAL TELEMETRY KITS.W58RGZ12D0089USAspending$3,134,106Aug 5, 2025Sep 28, 2017 – Aug 2, 2023
Prime
Department of Defense
Department of the Army
IGF::OT::IGF NEW ORDER 0653 (INCREMENTALLY FUNDED) THIS STATEMENT OF WORK (SOW) DEFINES THE REQUIREMENTS FOR THE DEVELOPMENT OF THE A-KIT NECESSARY FOR ADAPTING THE COMMON INFRARED COUNTERMEASURE SYSTEM ONTO THE H-60 ROTARY WING AIRCRAFT WHICH HAVE HAD THE Q-24 SYSTEM INSTALLED AS PART OF A JOINT OPERATIONAL NEEDS STATEMENT (JUONS) EFFORT AND TO ACHIEVE A SAFETY OF FLIGHT (SOF) AIRWORTHINESS RELEASE (AWR) FOR A LIMITED NUMBER OF AIRCRAFT TO BE FIELDED. THE COMMON INFRARED COUNTERMEASURE (CIRCM) SYSTEM WILL REPLACE THE GUARDIAN LASER TRACKER ASSEMBLY (GLTA) FROM THE JUONS MODIFIED AIRCRAFT.W58RGZ12D0089USAspending$17,852,305Jul 21, 2025Mar 27, 2017 – Sep 30, 2023
Prime
Department of Defense
Department of the Army
IGF::OT::IGF FMS ORDER 0642 FOR TUNISIA. THIS STATEMENT OF WORK (SOW) DEFINES THE EFFORT REQUIRED TO PROVIDE PROCUREMENT, MANUFACTURING , KITTING, EXECUTION, AND DELIVERY OF THE TUNISIA FMS CASE TU-B-USS H60M INITIAL ACCEPTANCE SUPPORT PACKAGE. INCLUDED ARE THE ASSOCIATED PROGRAM MANAGEMENT AND LOGISTICS SUPPORT PLANNING REQUIREMENTS.W58RGZ12D0089USAspending$846,029Jul 17, 2025Mar 13, 2017 – Aug 31, 2019
Prime
Department of Defense
Department of the Army
IGF::OT::IGF V-22 OSPREY MISSION COMPUTER OBSOLESCENCE THIS EFFORT IS REQUIRED TO SUPPORT PMA-275 FOR THE PROCUREMENT, MANUFACTURING, INTEGRATION, KITTING, DELIVERY, AND INSTALLATION OF MISSION COMPUTER OBSOLESCENCE INITIATIVE (MCOI) RETROFIT KITS AND COMMON AIRCRAFT PORTABLE REPROGRAMMING EQUIPMENT (CAPRE) GBE FILLPORT KITS. INCLUDED ARE THE ASSOCIATED PROGRAM MANAGEMENT AND LOGISTICS SUPPORT PLANNING REQUIREMENTS.W58RGZ12D0089USAspending$9,271,694Jun 3, 2025Mar 22, 2017 – Mar 31, 2022
Prime
Department of Defense
Department of the Army
UPPORT THE THAAD PROJECT OFFICE (TPO) IN THE DESIGN AND DEVELOPMENT OF THE THAAD ASSURED POSITION, NAVIGATION, AND TIMING (PNT). THE THAAD PNT INCLUDES 1PPS ELECTROMAGNETIC INTERFERENCE (EMI) FILTER, 1RIGB 127 EMI FILTER, +28VDC EMI FILTER, ANTI-JAM (AJ) ANTENNA ENCLOSURE, NETWORK TIME SERVERS AND CABLES.W58RGZ12D0089USAspending$1,601,257May 29, 2025Nov 30, 2018 – Sep 30, 2020
Prime
Department of Defense
Department of the Army
IGF::OT::IGF THE CONTRACTOR SHALL PROVIDE TWO (2) AIRFIELD PROTECTION TEST ASSETS IAW THE GOVERNMENT FURNISHED PRELIMINARY TDP.W58RGZ12D0089USAspending$4,515,175May 20, 2025Aug 7, 2017 – Feb 28, 2020
Prime
Department of Defense
Department of the Army
TASK ORDER 0016 FOR THE W58RGZ-12-D-0089W58RGZ12D0089USAspending$1,472,000May 15, 2025Sep 27, 2012 – Sep 30, 2015
Prime
Department of Defense
Department of the Army
IGF::OT::IGF CPFF - REMUS - NAVY- INDUSTRIAL WORKING CAPITAL OSD, NAVY O&M,W58RGZ12D0089USAspending$5,114,487May 7, 2025Sep 26, 2012 – Jul 30, 2014
Prime
Department of Defense
Department of the Army
SPECIAL OPERATION FORCES ENGINEERING AND INTEGRATION SUPPORT (OEP 15361)W58RGZ12D0089USAspending$1,329,408May 1, 2025Sep 20, 2013 – Sep 10, 2014
Prime
Department of Defense
Department of the Army
IGF::OT::IGF PROVIDE 760 AN/ARC-186 SEARCH AND RESCUE (SAR) ANTENNA KITS FOR USE ON THE UH-60A/LW58RGZ12D0089USAspending$2,147,180Apr 29, 2025Jul 16, 2015 – Jun 30, 2017
Prime
Department of Defense
Department of the Army
OEP 14746W58RGZ12D0089USAspending$11,348,424Apr 28, 2025May 13, 2013 – Aug 24, 2023
Prime
Department of Defense
Department of the Army
IGF::OT::IGF ORDER 0345.W58RGZ12D0089USAspending$1,014,157Apr 8, 2025Jul 31, 2014 – Sep 30, 2015
Prime
Department of Defense
Department of the Army
ORDER 0349.W58RGZ12D0089USAspending$855,505Apr 3, 2025Sep 30, 2014 – Dec 21, 2017
Prime
Department of Defense
Department of the Army
TASK ORDERW58RGZ12D0089USAspending$297,365Mar 11, 2025Nov 7, 2012 – Jun 30, 2015
Prime
Department of Defense
Department of the Army
OEP 14460W58RGZ12D0089USAspending$666,432Mar 11, 2025Apr 19, 2013 – May 30, 2014
Prime
Department of Defense
Department of the Army
IGF::OT::IGF THIS STATEMENT OF WORK (SOW) DEFINES THE EFFORT REQUIRED TO PROVIDE ONE-HUNDRED AND TWENTY-SEVEN (127) TWINAX TOOL KITS. THE KITS WILL BE USED TO SUPPORT CRITICAL GROUND MAINTENANCE TASKS. INCLUDED ARE THE ASSOCIATED PROGRAM MANAGEMENT AND LOGISTICS SUPPORT PLANNING REQUIREMENTS.W58RGZ12D0089USAspending$285,540Mar 6, 2025Jun 7, 2017 – May 4, 2018
Prime
Department of Defense
Department of the Army
TASK ORDER 0216.W58RGZ12D0089USAspending$255,933Mar 6, 2025Aug 29, 2013 – Oct 30, 2014
Prime
Department of Defense
Department of the Army
IGF::OT::IGF ENGINEERING SUPPORT INCLUDES DRAWING UPDATES, ENGINEERING CHANGES PROPOSALS (ECPS), ACCEPTANCE TEST SUPPORT, TROUBLESHOOTING/RESOLVING ISSUES THAT ARISE DURING ACCEPTANCE TESTING, BI-WEEKLY MEETING SUPPORT, REQUEST FOR VARIANCE (RFV) REVIEWS, AND UPDATES/INPUT FOR FORM 2028 IN SUPPORT OF LOGISTIC PRODUCT CHANGES.W58RGZ12D0089USAspending$945,832Mar 4, 2025Jun 8, 2016 – Apr 30, 2020
Prime
Department of Defense
Department of the Army
IGF::OT::IGFW58RGZ12D0089USAspending$279,286Mar 3, 2025Oct 1, 2014 – Sep 30, 2015
Prime
Department of Defense
Department of the Army
IGF::OT::IGF ORDER 0587, OEP 18470W58RGZ12D0089USAspending$580,241Mar 3, 2025Aug 2, 2016 – Dec 31, 2018
Prime
Department of Defense
Department of the Army
IGF::OT::IGF: OEP 15947 AVIATION INTERMEDIATE MAINTENANCE FMS CASE SR-B-WABW58RGZ12D0089USAspending$719,749Mar 3, 2025Apr 23, 2014 – Aug 31, 2015
Prime
Department of Defense
Department of the Army
IGF::OT::IGF HH-60L STUDYW58RGZ12D0089USAspending$5,458,359Mar 3, 2025Jun 19, 2014 – Sep 30, 2016
Prime
Department of Defense
Department of the Army
IGF::OT::IGF: OEP 15401 SPECIAL OPERATIONS FORCES FIXED WING TECHNICAL SUPPORTW58RGZ12D0089USAspending$2,355,881Mar 3, 2025Sep 23, 2013 – Sep 30, 2014
Prime
Department of Defense
Department of the Army
IGF::OT::IGF TASK ORDER 0196.W58RGZ12D0089USAspending$436,392Mar 3, 2025Oct 24, 2013 – Dec 31, 2014
Prime
Department of Defense
Department of the Army
IGF::CL,CT::IGFW58RGZ12D0089USAspending$1,737,323Feb 25, 2025Sep 24, 2013 – Sep 30, 2015
Prime
Department of Defense
Department of the Army
TASK ORDER 0057.W58RGZ12D0089USAspending$674,415Feb 25, 2025Jan 16, 2013 – Apr 26, 2014
Prime
Department of Defense
Department of the Army
IGF::OT::IGF: OEP 17696 PATRIOT LOGISTICS SUPPORTW58RGZ12D0089USAspending$1,073,183Feb 25, 2025Sep 1, 2015 – Apr 30, 2019
Prime
Department of Defense
Department of the Army
H-60L DIGITAL PERFORMANCE PLANW58RGZ12D0089USAspending$1,723,261Feb 25, 2025Aug 30, 2013 – Jun 30, 2014
Prime
Department of Defense
Department of the Army
IGF::OT::IGF PM ATC TACTICAL TERMINAL CONTROL SYSTEM BFT II INTEGRATION PHASE II (OEP 15297 DO 0264)W58RGZ12D0089USAspending$1,094,970Feb 25, 2025Dec 19, 2013 – Aug 31, 2015
Prime
Department of Defense
Department of the Army
IGF::OT::IGF, TO 439, OEP 17130.W58RGZ12D0089USAspending$349,672Feb 24, 2025Apr 24, 2015 – Apr 30, 2016
Prime
Department of Defense
Department of the Army
TASK ORDER 0094.W58RGZ12D0089USAspending$295,994Feb 24, 2025Mar 6, 2013 – Sep 30, 2014
Prime
Department of Defense
Department of the Army
IGF::OT::IGF: OEP 16423 EAWIS-EDM2 AIRCRAFT INSTALLSW58RGZ12D0089USAspending$2,870,329Feb 18, 2025May 1, 2014 – Jun 30, 2019
Prime
Department of Defense
Department of the Army
OEP 14072 - AH-64D APACHE BLOCK III SUPPORTW58RGZ12D0089USAspending$2,471,226Feb 18, 2025Jan 22, 2013 – Sep 30, 2015
Prime
Department of Defense
Department of the Army
OEP 14766W58RGZ12D0089USAspending$578,098Feb 11, 2025May 6, 2013 – Mar 30, 2014

Contract vehicles are shown only when present in the source record. Linked award numbers and vehicles open the authoritative record on USAspending.gov.

Agencies supported

  • Department of DefenseGov-sourced

Government-sourced data comes from SAM.gov, SBA and USAspending.gov and is attributed to its source. Items marked company-reported were provided by the company and are verified by FedSub only where labeled. FedSub is a private company and is not affiliated with SBA, GSA/SAM.gov, or any government agency.

REDSTONE DEFENSE SYSTEMS – Huntsville, AL | UEI SQVHYKHN43H5 | FedSub