PARAGON SPACE DEVELOPMENT CORPORATION
TUCSON, AZ, 85706
Prime contracting experience
26 records from government sources. Past participation is not evidence of current teaming interest.
| Role | Agency | Description | Vehicle | Obligated | Action date | Period |
|---|---|---|---|---|---|---|
| Prime | National Aeronautics and Space Administration National Aeronautics and Space Administration | THE PURPOSE OF THIS TASK ORDER IS TO ORDER CLIN 0001 AND 0002 SERVICES AND SUPPLIES FOR FISCAL YEAR (FY) 27. SEE PARENT CONTRACT IN BLOCK 2 FOR SCHEDULE AND DESCRIPTION OF SERVICES AND SUPPLIES. | 80JSC026D0006USAspending | $371,221 | Sep 28, 2026 | Oct 1, 2026 – Sep 30, 2031 |
| Prime | National Aeronautics and Space Administration National Aeronautics and Space Administration | SBIR PHASE II MULTISTAGE UMBILICAL DISCONNECT (MUD) SYSTEM | — | $1,274,833 | Sep 18, 2026 | Sep 21, 2026 – Sep 20, 2028 |
| Prime | National Aeronautics and Space Administration National Aeronautics and Space Administration | IGF::OT::IGF RECOVERY OF POTABLE WATER FROM WASTEWATER IS ESSENTIAL TO THE SUCCESS OF LONG-DURATION HUMAN SPACEFLIGHT. FOR HUMAN MISSIONS TO MARS, THE TECHNOLOGY MATURATION (TA 207) OBJECTIVE IS TO RECOVER GREATER THAN 98 PERCENT OF THE WATER FROM WASTEWATER SOURCES (URINE, HUMIDITY CONDENSATE, ETC.). THIS CONTRACT IS FOR THE DEVELOPMENT OF IONOMER-MEMBRANE WATER PROCESSOR (IWP) BRINE PROCESSOR FOR FLIGHT DEMONSTRATION ON THE INTERNATIONAL SPACE STATION (ISS). REQUIREMENTS FOR THE BRINE PROCESSOR WILL BE BASELINED BY NASA AND AGREED TO BY THE CONTRACTOR UNDER THE PHASE III SBIR NNX16CJ02C. AN ISS FLIGHT DEMONSTRATION IS NEEDED TO VALIDATE AND FULLY CHARACTERIZE BRINE PROCESSOR SYSTEM PERFORMANCE IN A RELEVANT ENVIRONMENT FOR FUTURE EXPLORATION MISSIONS. THE RELEVANT ENVIRONMENT IN THIS CASE INCLUDES BOTH MICRO-GRAVITY AND LONG-DURATION EXPOSURE TO MICRO-G CREW-PRODUCED BRINE VIA THE URINE PROCESSOR. THE BRINE PROCESSOR WILL BE FLOWN AS A CLASS 1E PIECE OF HARDWARE. TASKS INCLUDE 1) COMPLETE TECHNOLOGY MATURATION OF KEY COMPONENT SUBSYSTEMS OF THE IWP FROM THE PHASE III SBIR INCLUDING BLADDER HEAT SEALING, LOW-PROFILE SIDE-MOUNTED FILL PORT, DETRUSOR AND SYSTEM COMPATIBILITY WITH INADVERTENT EXPOSURE TO 14.7 PSIG DURING BRINE FILL; 2) SYSTEM DESIGN CYCLE INCLUDING HEATER AND ENERGY MANAGEMENT TRADE; 3) INTEGRATED SYSTEM AND COMPONENT PRELIMINARY DESIGN; 4) INTEGRATED SYSTEM AND COMPONENT FINAL DESIGN AND REVIEW; 5) MANUFACTURING OF ONE COMPLETE IWP ASSEMBLY, 42 BLADDERS (18 FOR QUALIFICATION TESTING AND 24 FOR FLIGHT), ONE NON-OPERATING TRAINING UNIT WITH SPARES; 6) PROTOFLIGHT QUALIFICATION TESTING AND BLADDER ACCEPTANCE TESTING; 7) HARDWARE ACCEPTANCE REVIEW AND DELIVERY OF A BRINE PROCESSOR AND ASSOCIATED CONSUMABLES, FOR AN ISS TECHNOLOGY DEMONSTRATION; 8) POST-DELIVERY AND ON-ORBIT SUPPORT WHICH INCLUDES GENERATION OF OPERATIONS AND MAINTENANCE HANDBOOK FOR USE BY NASA IN SUPPORT OF CREW TRAINING AND THE DEVELOPMENT OF ON-ORBIT OPERATIONS AND MAINTENANCE, CREW TRAINING SUPPORT, AND ON-ORBIT OPERATIONS SUPPORT AND SUPPORT WITH NASA ON-ORBIT ANOMALY RESOLUTION AND GENERATION OF AN ON-ORBIT TEST REPORT WITH LESSONS LEARNED AND RECOMMENDATIONS FOR IMPROVEMENTS. | — | $13,888,745 | Sep 11, 2026 | Jun 27, 2016 – Jan 31, 2022 |
| Prime | National Aeronautics and Space Administration National Aeronautics and Space Administration | FY24 SBIR PHASE II - SOFTGOODS WEBBING INTEGRATED STRAIN SENSOR FOR INFLATABLE | — | $849,795 | Jun 30, 2026 | Jun 10, 2024 – Jul 24, 2026 |
| Prime | National Aeronautics and Space Administration National Aeronautics and Space Administration | THE BUILD, TEST, AND DELIVERY OF 60 BPA BLADDERS. | 80JSC021D0007USAspending | $1,834,655 | Apr 2, 2026 | May 22, 2025 – Mar 18, 2027 |
| Prime | National Aeronautics and Space Administration National Aeronautics and Space Administration | STTR PHASE II - SPACESUIT COVER AGAINST THE ABRASIVE LUNAR ENVIRONMENT (SCALE) & EXPLORATION TEXTILE FOR HIGH OXYGEN ENVIRONMENTS | — | $849,999 | Mar 30, 2026 | Feb 1, 2024 – Jul 31, 2026 |
| Prime | Department of Defense Department of the Navy | RESEARCH AND DEVELOPMENT | — | $979,091 | Jul 22, 2025 | Jul 22, 2025 – Dec 31, 2026 |
| Prime | Department of Defense Department of the Army | PHASE II AWARD | — | $1,699,533 | Jun 12, 2025 | Sep 20, 2024 – Sep 20, 2026 |
| Prime | National Aeronautics and Space Administration National Aeronautics and Space Administration | THE PURPOSE OF THIS TASK ORDER (TO) IS TO UPDATE THE EXISTING BPA DETRUSOR DESIGN AND DELIVER THE UPDATED DETRUSOR HARDWARE TO NASA THAT WILL REPLACE THE EXISTING BPA DETRUSOR ABOARD THE INTERNATIONAL SPACE STATION (ISS). | 80JSC021D0007USAspending | $1,109,796 | Apr 3, 2025 | Apr 3, 2025 – May 31, 2026 |
| Prime | National Aeronautics and Space Administration National Aeronautics and Space Administration | SUSTAINING SERVICES FOR THE BRINE PROCESSOR ASSEMBLY (BPA) ON ISS (CLIN 0001 & 0002) FOR CALENDAR YEAR (CY) 2024 | 80JSC021D0007USAspending | $366,958 | Sep 27, 2024 | Oct 1, 2024 – Sep 30, 2025 |
| Prime | National Aeronautics and Space Administration National Aeronautics and Space Administration | BUILD, TEST, AND DELIVERY OF BRINE PROCESSOR ASSEMBLIES (BPA) BLADDERS.857124-221 | 80JSC021D0007USAspending | $993,557 | Apr 10, 2024 | Aug 16, 2023 – Jul 13, 2024 |
| Prime | National Aeronautics and Space Administration National Aeronautics and Space Administration | SUSTAINING SERVICES FOR THE BRINE PROCESSOR ASSEMBLY (BPA) ON ISS | 80JSC021D0007USAspending | $288,689 | Apr 9, 2024 | Oct 1, 2023 – Sep 30, 2024 |
| Prime | National Aeronautics and Space Administration National Aeronautics and Space Administration | ISRU COLLECTOR OF ICE IN A COLD LUNAR ENVIRONMENT (ICICLE) | — | $759,455 | Oct 24, 2023 | Aug 5, 2021 – Apr 4, 2024 |
| Prime | National Aeronautics and Space Administration National Aeronautics and Space Administration | SUSTAINING SERVICES FOR THE BRINE PROCESSOR ASSEMBLY (BPA) ON THE INTERNATIONAL SPACE STATION (ISS) | 80JSC021D0007USAspending | $966,384 | Oct 16, 2023 | Jan 30, 2023 – Nov 30, 2023 |
| Prime | National Aeronautics and Space Administration National Aeronautics and Space Administration | IGF:OT:IGF ISRU-DERIVED WATER PURIFICATION AND HYDROGEN OXYGEN PRODUCTION (IHOP) COMPONENT DEVELOPMENT | — | $1,499,638 | Aug 16, 2023 | May 6, 2019 – Feb 16, 2024 |
| Prime | National Aeronautics and Space Administration National Aeronautics and Space Administration | CRYOGENIC ENCAPSULATING LAUNCH SHROUD AND INSULATED UPPER STAGE (CELSIUS) TO ENABLE EFFICIENT AND SAFE TRANSPORTATION INTO AND THROUGH SPACE | — | $1,501,656 | Jun 26, 2023 | May 30, 2019 – Oct 31, 2022 |
| Prime | National Aeronautics and Space Administration National Aeronautics and Space Administration | MECHANICAL-COMPRESSION AEROBOT FOR EXTENDED RANGE VENUS.EXPLORATION (MARVEL) | — | $759,983 | May 1, 2023 | Jul 16, 2021 – Jul 15, 2023 |
| Prime | National Aeronautics and Space Administration National Aeronautics and Space Administration | TASK ORDER 2 FOR 28 ADDITIONAL BRINE PROCESSOR ASSEMBLY (BPA) BLADDERS | 80JSC021D0007USAspending | $884,001 | Jan 13, 2023 | Feb 16, 2022 – Oct 3, 2022 |
| Prime | National Aeronautics and Space Administration National Aeronautics and Space Administration | SEPARATION TECHNOLOGY OF ON-ORBIT LIQUID AND EXCREMENT (STOOLE) | — | $746,704 | Aug 11, 2022 | Jul 21, 2020 – Sep 29, 2022 |
| Prime | Department of Defense Defense Contract Management Agency | RESEARCH AND DEVELOPMENT | — | $1,465,319 | May 13, 2022 | Apr 5, 2019 – Mar 24, 2022 |
| Prime | Department of Defense Defense Contract Management Agency | IGF::OT::IGF BASE | — | $1,001,271 | May 13, 2022 | Mar 13, 2014 – Feb 28, 2017 |
| Prime | Department of Defense Defense Contract Management Agency | IGF::OT::IGF SBIR PHASE II AWARD TOPIC N152-099 | — | $973,765 | May 13, 2022 | Mar 24, 2017 – Jan 17, 2020 |
| Prime | Department of Defense Department of the Army | SBIR PHASE I TOPIC A214-012-0941 | — | $259,554 | Apr 6, 2022 | Apr 4, 2022 – Sep 23, 2022 |
| Prime | National Aeronautics and Space Administration National Aeronautics and Space Administration | THE PARAGON/BOEING/TEXAS A&M TEAM WILL DEVELOP AN INTEGRATED, FULLY PASSIVE, THERMAL CONTROL SYSTEM (TCS) THAT WILL BE CAPABLE OF MAINTAINING SUPPORTED VEHICLE OR HABITAT TCS TEMPERATURES CONSISTENT. | — | $1,527,182 | Feb 16, 2022 | Feb 28, 2020 – Mar 27, 2022 |
| Prime | National Aeronautics and Space Administration National Aeronautics and Space Administration | ELLIPSOIDAL PROPELLANT TANK (EPT) | — | $749,995 | Feb 10, 2022 | Jul 10, 2020 – Jul 9, 2022 |
| Prime | National Aeronautics and Space Administration National Aeronautics and Space Administration | THE PARAGON CONDENSATE SEPARATOR FOR MICROGRAVITY CONDITIONS (COSMIC) IS A FULL FLOW DEVICE THAT SEPARATES LIQUID CONDENSATE FROM AIR USING AN INERTIAL PROCESS WITH LOW POWER DRAW, NEGLIGIBLE PRESSURE DROP, AND EFFICIENT CONDENSATE COLLECTION. COSMIC, AND ASSOCIATED SYSTEMS IN DEVELOPMENT BY PARAGON, FORM A DROP-IN SOLUTION TO REPLACE THE ISS COMMON CABIN AIR ASSEMBLY (CCAA) COMPACT HEAT EXCHANGER SLURPER AND WATER SEPARATOR. ON ISS, THE SLURPER BAR SUFFERS CONTINUED SILOXANE CHEMICAL DEGRADATION THAT MODIFIES SURFACE HYDROPHOBICITY, RESULTING IN INADEQUATE PERFORMANCE. IN PHASE I PARAGON USED ADDITIVE MANUFACTURING AND AN ADAPTABLE TEST FIXTURE TO EVALUATE COMPETING DESIGNS AND DEMONSTRATE SUCCESSFUL LIQUID/AIR SEPARATION FAR IN EXCESS OF NASA PERFORMANCE REQUIREMENTS WITH THE MOST FAVORABLE SOLUTION. IN PHASE II, PARAGON WILL OPTIMIZE THE DESIGN FOR ON-ORBIT USE AND PRODUCE AN INTEGRATED, LOW-WEIGHT, SOLUTION INCLUDING OPTIMIZED PRODUCT WATER COLLECTION AND DELIVERY TO THE WATER PROCESSING ASSEMBLY. | — | $749,860 | Oct 14, 2021 | Jun 24, 2019 – Nov 1, 2021 |
Contract vehicles are shown only when present in the source record. Linked award numbers and vehicles open the authoritative record on USAspending.gov.
Subcontracting experience
14 records from government sources. Past participation is not evidence of current teaming interest.
| Role | Agency | Description | Vehicle | Obligated | Action date | Period |
|---|---|---|---|---|---|---|
| Subcontractor | Department of Defense | 2.2 SCOPE OF WORK: HMMC AND PEBB CONGRESSIONAL ADD PSDC FY24 SOW AND RFP 4500173490 Parent award context Parent award agency: Department of Defense · Department of the Navy Parent award NAICS: 541714 Parent award performance state: PA Parent award description: THE PURPOSE OF THIS EFFORT IS TO DEVELOP, TEST, AND VALIDATE AN 8MW HYBRID MODULAR MULTILEVEL CONVERTER (HMMC) PROTOTYPE DEMONSTRATOR TARGETED FOR NAVY / MARINE PROPULSION APPLICATIONS. View parent award on USAspending | — | $2,997,652 | Jul 31, 2025 | — – — |
| Subcontractor | National Aeronautics and Space Administration | ENGINEERING SERVICES 3022000003 CO854 Parent award context Parent award agency: National Aeronautics and Space Administration · National Aeronautics and Space Administration Parent award NAICS: 541712 Parent award performance state: VA Parent award description: IGF::OT::IGF NEXTSTEP NRA AWARD. THIS NEXTSTEP CONTRACT BUILDS UPON THE SUCCESS OF COMMERCIAL ORBITAL TRANSPORTATION SERVICES SPACE ACT AGREEMENT DEVELOPMENT PROGRAM AND AN EXISTING INTERNATIONAL SPACE STATION (ISS) COMMERCIAL RESUPPLY SERVICES (CRS) CONTRACT. ORBITAL HAS SUCCESSFULLY TRANSITIONED FROM COTS TO THE CRS PROGRAM, FLYING THREE VERY SUCCESSFUL PRESSURIZED CARGO RESUPPLY MISSIONS TO THE ISS, USING THE CYGNUS SPACECRAFT. ORBITAL ALSO SUCCESSFULLY DEVELOPED SPACECRAFT FOR SOLAR SYSTEM EXPLORATION TO INCLUDE THE CURRENTLY OPERATIONAL DAWN MISSION. THIS MISSION WAS LAUNCHED IN SEPTEMBER 2007, COMPLETED ITS RENDEZVOUS MISSION AT VESTA IN JULY 2012 AND IS EN ROUTE TO CERES IN EARLY 2015. WITH SPACE AGENCY BUDGETS CONTINUING TO BE TIGHT, EXPLORATION PLANS NEED TO EMPHASIZE EVOLUTION OF EXISTING SYSTEMS, WHERE COST AND SCHEDULE IS BETTER CONTROLLED, AND DEVELOPMENT RISK REDUCED. SPECIFICALLY, ELEMENTS OF THE CURRENT ISS, INCLUDING CYGNUS, CAN BE EVOLVED TO SUPPORT MORE DISTANT SPACE DESTINATIONS. TO SUPPORT THESE ENDEAVORS, ORBITAL CONTRIBUTES TO THE DEVELOPMENT AND PRODUCT IMPROVEMENT OF CYGNUS AND TO NEXTSTEP ACTIVITIES AND HAVE INVESTED IN THE COTS CRS PUBLIC-PRIVATE PARTNERSHIP ENDEAVOR. ORBITAL'S EXPLORATION AUGMENTATION MODULE (BAM) ARCHITECTURE USES A MODULAR, BUILDING BLOCK APPROACH THAT LEVERAGES THE CYGNUS SPACECRAFT TO EXPAND CISLUNAR AND LONG DURATION DEEP SPACE TRANSIT HABITATION CAPABILITIES AND TECHNOLOGIES CRITICAL TO NASAS LONG-TERM EXPLORATION GOALS. ORBITALS ARCHITECTURE CONCEPT BLENDS IN-PRODUCTION HARDWARE WITH ADAPTATION, EVOLUTION, PLANNING, AND FORWARD THINKING. CYGNUS WILL SERVE AS A MODULAR HABITAT AND TEST PLATFORM FOR QUALIFYING TECHNOLOGIES IN A DISTANT RETROGRADE ORBIT (DRO) OR IN A LOW EARTH ORBIT (LEO), EITHER WHILE ATTACHED TO THE ISS OR AS A FREE-FLYER. USING THE EXISTING, OPERATIONAL CYGNUS TO PERFORM THESE MISSIONS HAS THE ADVANTAGE OF DECREASING OVERALL DEVELOPMENT TIME AND COSTS, AND FREEING UP RESOURCES THAT WOULD BE SPENT ON DEVELOPING A SPACECRAFT TO FOCUS ON CULTIVATING MISSION ENABLING TECHNOLOGIES. THE GOAL IS TO HAVE A CYGNUS DERIVED EAM DEPLOYED IN CISLUNAR SPACE BEFORE 2020. THIS SPACECRAFT WILL BE THE FIRST BUILDING BLOCK IN SUPPORTING BOTH COMMERCIAL MARKETS AND GOVERNMENT OBJECTIVES. THE PROPOSED EFFORT FOR THIS NEXTSTEP BAA PHASE I, INVOLVES DEFINING AN EAM ARCHITECTURE AND CONCEPT OF OPERATIONS (CONOPS) THAT ADDRESSES COMMERCIAL MARKETS AND NASA EXPLORATION OBJECTIVES, TECHNOLOGY MATURATION PLANNING AND INFRASTRUCTURE DEVELOPMENT, AND TO IDENTIFY TECHNOLOGIES THAT CAN BE IMPLEMENTED AND DEMONSTRATED IN THE ISSILEO ENVIRONMENT WITHIN THE NEXT THREE YEARS. TO MATURE HABITATION TECHNOLOGIES, THE CONTRACTOR WILL IDENTIFY STATE OF THE ART (SOA) TECHNOLOGIES ACROSS NASA TECHNOLOGY AREAS (TAS) DEFINED IN THE NASA TECHNOLOGY ROADMAP. FOCUS WILL BE ON MATURATION OF THE FOLLOWING TECHNOLOGIES ENVIRONMENTAL CONTROL AND LIFE SUPPORT SYSTEMS ENVIRONMENTAL MONITORING SAFETY AND EMERGENCY RESPONSE AND HABITATION THERMAL CONTROL SYSTEMS AUTONOMOUS HABITATION SYSTEMS NAVIGATION SYSTEMS MANAGEMENT DOCKING AND CAPTURE MECHANISMS AND DEPLOYABLE HABITATION ELEMENTS View parent award on USAspending | — | $180,737,408 | May 8, 2025 | — – — |
| Subcontractor | National Aeronautics and Space Administration | ENGINEERING SERVICES 3022000003 Parent award context Parent award agency: National Aeronautics and Space Administration · National Aeronautics and Space Administration Parent award NAICS: 541712 Parent award performance state: VA Parent award description: IGF::OT::IGF NEXTSTEP NRA AWARD. THIS NEXTSTEP CONTRACT BUILDS UPON THE SUCCESS OF COMMERCIAL ORBITAL TRANSPORTATION SERVICES SPACE ACT AGREEMENT DEVELOPMENT PROGRAM AND AN EXISTING INTERNATIONAL SPACE STATION (ISS) COMMERCIAL RESUPPLY SERVICES (CRS) CONTRACT. ORBITAL HAS SUCCESSFULLY TRANSITIONED FROM COTS TO THE CRS PROGRAM, FLYING THREE VERY SUCCESSFUL PRESSURIZED CARGO RESUPPLY MISSIONS TO THE ISS, USING THE CYGNUS SPACECRAFT. ORBITAL ALSO SUCCESSFULLY DEVELOPED SPACECRAFT FOR SOLAR SYSTEM EXPLORATION TO INCLUDE THE CURRENTLY OPERATIONAL DAWN MISSION. THIS MISSION WAS LAUNCHED IN SEPTEMBER 2007, COMPLETED ITS RENDEZVOUS MISSION AT VESTA IN JULY 2012 AND IS EN ROUTE TO CERES IN EARLY 2015. WITH SPACE AGENCY BUDGETS CONTINUING TO BE TIGHT, EXPLORATION PLANS NEED TO EMPHASIZE EVOLUTION OF EXISTING SYSTEMS, WHERE COST AND SCHEDULE IS BETTER CONTROLLED, AND DEVELOPMENT RISK REDUCED. SPECIFICALLY, ELEMENTS OF THE CURRENT ISS, INCLUDING CYGNUS, CAN BE EVOLVED TO SUPPORT MORE DISTANT SPACE DESTINATIONS. TO SUPPORT THESE ENDEAVORS, ORBITAL CONTRIBUTES TO THE DEVELOPMENT AND PRODUCT IMPROVEMENT OF CYGNUS AND TO NEXTSTEP ACTIVITIES AND HAVE INVESTED IN THE COTS CRS PUBLIC-PRIVATE PARTNERSHIP ENDEAVOR. ORBITAL'S EXPLORATION AUGMENTATION MODULE (BAM) ARCHITECTURE USES A MODULAR, BUILDING BLOCK APPROACH THAT LEVERAGES THE CYGNUS SPACECRAFT TO EXPAND CISLUNAR AND LONG DURATION DEEP SPACE TRANSIT HABITATION CAPABILITIES AND TECHNOLOGIES CRITICAL TO NASAS LONG-TERM EXPLORATION GOALS. ORBITALS ARCHITECTURE CONCEPT BLENDS IN-PRODUCTION HARDWARE WITH ADAPTATION, EVOLUTION, PLANNING, AND FORWARD THINKING. CYGNUS WILL SERVE AS A MODULAR HABITAT AND TEST PLATFORM FOR QUALIFYING TECHNOLOGIES IN A DISTANT RETROGRADE ORBIT (DRO) OR IN A LOW EARTH ORBIT (LEO), EITHER WHILE ATTACHED TO THE ISS OR AS A FREE-FLYER. USING THE EXISTING, OPERATIONAL CYGNUS TO PERFORM THESE MISSIONS HAS THE ADVANTAGE OF DECREASING OVERALL DEVELOPMENT TIME AND COSTS, AND FREEING UP RESOURCES THAT WOULD BE SPENT ON DEVELOPING A SPACECRAFT TO FOCUS ON CULTIVATING MISSION ENABLING TECHNOLOGIES. THE GOAL IS TO HAVE A CYGNUS DERIVED EAM DEPLOYED IN CISLUNAR SPACE BEFORE 2020. THIS SPACECRAFT WILL BE THE FIRST BUILDING BLOCK IN SUPPORTING BOTH COMMERCIAL MARKETS AND GOVERNMENT OBJECTIVES. THE PROPOSED EFFORT FOR THIS NEXTSTEP BAA PHASE I, INVOLVES DEFINING AN EAM ARCHITECTURE AND CONCEPT OF OPERATIONS (CONOPS) THAT ADDRESSES COMMERCIAL MARKETS AND NASA EXPLORATION OBJECTIVES, TECHNOLOGY MATURATION PLANNING AND INFRASTRUCTURE DEVELOPMENT, AND TO IDENTIFY TECHNOLOGIES THAT CAN BE IMPLEMENTED AND DEMONSTRATED IN THE ISSILEO ENVIRONMENT WITHIN THE NEXT THREE YEARS. TO MATURE HABITATION TECHNOLOGIES, THE CONTRACTOR WILL IDENTIFY STATE OF THE ART (SOA) TECHNOLOGIES ACROSS NASA TECHNOLOGY AREAS (TAS) DEFINED IN THE NASA TECHNOLOGY ROADMAP. FOCUS WILL BE ON MATURATION OF THE FOLLOWING TECHNOLOGIES ENVIRONMENTAL CONTROL AND LIFE SUPPORT SYSTEMS ENVIRONMENTAL MONITORING SAFETY AND EMERGENCY RESPONSE AND HABITATION THERMAL CONTROL SYSTEMS AUTONOMOUS HABITATION SYSTEMS NAVIGATION SYSTEMS MANAGEMENT DOCKING AND CAPTURE MECHANISMS AND DEPLOYABLE HABITATION ELEMENTS View parent award on USAspending | — | -$18,300,760 | Mar 11, 2025 | — – — |
| Subcontractor | Department of Defense | THERMAL MANAGEMENT SOW PERFORMANCE 4500153205 Parent award context Parent award agency: Department of Defense · Department of the Navy Parent award NAICS: 541714 Parent award performance state: PA Parent award description: THE PURPOSE OF THIS EFFORT IS TO DEVELOP, TEST, AND VALIDATE AN 8MW HYBRID MODULAR MULTILEVEL CONVERTER (HMMC) PROTOTYPE DEMONSTRATOR TARGETED FOR NAVY / MARINE PROPULSION APPLICATIONS. View parent award on USAspending | — | $1,235,097 | Oct 9, 2024 | — – — |
| Subcontractor | Department of Defense | RADIATOR PANEL PAINT SERVICE 4500007022 Parent award context Parent award agency: Department of Defense · Department of the Air Force Parent award NAICS: 541715 Parent award performance state: CO Parent award description: SMALL BUSINESS INNOVATIVE RESEARCH (SBIR) PH III MATURATION OF THE VR35K-A ADVANCED UPPER STAGE ENGINE View parent award on USAspending | — | $43,100 | Sep 20, 2024 | — – — |
| Subcontractor | National Aeronautics and Space Administration | MOD 9 TO INCORPORATE GDRD REV D AND INCREASE SUBCONTRACT BY $14,189,194.05. 3022000003 Parent award context Parent award agency: National Aeronautics and Space Administration · National Aeronautics and Space Administration Parent award NAICS: 541712 Parent award performance state: VA Parent award description: IGF::OT::IGF NEXTSTEP NRA AWARD. THIS NEXTSTEP CONTRACT BUILDS UPON THE SUCCESS OF COMMERCIAL ORBITAL TRANSPORTATION SERVICES SPACE ACT AGREEMENT DEVELOPMENT PROGRAM AND AN EXISTING INTERNATIONAL SPACE STATION (ISS) COMMERCIAL RESUPPLY SERVICES (CRS) CONTRACT. ORBITAL HAS SUCCESSFULLY TRANSITIONED FROM COTS TO THE CRS PROGRAM, FLYING THREE VERY SUCCESSFUL PRESSURIZED CARGO RESUPPLY MISSIONS TO THE ISS, USING THE CYGNUS SPACECRAFT. ORBITAL ALSO SUCCESSFULLY DEVELOPED SPACECRAFT FOR SOLAR SYSTEM EXPLORATION TO INCLUDE THE CURRENTLY OPERATIONAL DAWN MISSION. THIS MISSION WAS LAUNCHED IN SEPTEMBER 2007, COMPLETED ITS RENDEZVOUS MISSION AT VESTA IN JULY 2012 AND IS EN ROUTE TO CERES IN EARLY 2015. WITH SPACE AGENCY BUDGETS CONTINUING TO BE TIGHT, EXPLORATION PLANS NEED TO EMPHASIZE EVOLUTION OF EXISTING SYSTEMS, WHERE COST AND SCHEDULE IS BETTER CONTROLLED, AND DEVELOPMENT RISK REDUCED. SPECIFICALLY, ELEMENTS OF THE CURRENT ISS, INCLUDING CYGNUS, CAN BE EVOLVED TO SUPPORT MORE DISTANT SPACE DESTINATIONS. TO SUPPORT THESE ENDEAVORS, ORBITAL CONTRIBUTES TO THE DEVELOPMENT AND PRODUCT IMPROVEMENT OF CYGNUS AND TO NEXTSTEP ACTIVITIES AND HAVE INVESTED IN THE COTS CRS PUBLIC-PRIVATE PARTNERSHIP ENDEAVOR. ORBITAL'S EXPLORATION AUGMENTATION MODULE (BAM) ARCHITECTURE USES A MODULAR, BUILDING BLOCK APPROACH THAT LEVERAGES THE CYGNUS SPACECRAFT TO EXPAND CISLUNAR AND LONG DURATION DEEP SPACE TRANSIT HABITATION CAPABILITIES AND TECHNOLOGIES CRITICAL TO NASAS LONG-TERM EXPLORATION GOALS. ORBITALS ARCHITECTURE CONCEPT BLENDS IN-PRODUCTION HARDWARE WITH ADAPTATION, EVOLUTION, PLANNING, AND FORWARD THINKING. CYGNUS WILL SERVE AS A MODULAR HABITAT AND TEST PLATFORM FOR QUALIFYING TECHNOLOGIES IN A DISTANT RETROGRADE ORBIT (DRO) OR IN A LOW EARTH ORBIT (LEO), EITHER WHILE ATTACHED TO THE ISS OR AS A FREE-FLYER. USING THE EXISTING, OPERATIONAL CYGNUS TO PERFORM THESE MISSIONS HAS THE ADVANTAGE OF DECREASING OVERALL DEVELOPMENT TIME AND COSTS, AND FREEING UP RESOURCES THAT WOULD BE SPENT ON DEVELOPING A SPACECRAFT TO FOCUS ON CULTIVATING MISSION ENABLING TECHNOLOGIES. THE GOAL IS TO HAVE A CYGNUS DERIVED EAM DEPLOYED IN CISLUNAR SPACE BEFORE 2020. THIS SPACECRAFT WILL BE THE FIRST BUILDING BLOCK IN SUPPORTING BOTH COMMERCIAL MARKETS AND GOVERNMENT OBJECTIVES. THE PROPOSED EFFORT FOR THIS NEXTSTEP BAA PHASE I, INVOLVES DEFINING AN EAM ARCHITECTURE AND CONCEPT OF OPERATIONS (CONOPS) THAT ADDRESSES COMMERCIAL MARKETS AND NASA EXPLORATION OBJECTIVES, TECHNOLOGY MATURATION PLANNING AND INFRASTRUCTURE DEVELOPMENT, AND TO IDENTIFY TECHNOLOGIES THAT CAN BE IMPLEMENTED AND DEMONSTRATED IN THE ISSILEO ENVIRONMENT WITHIN THE NEXT THREE YEARS. TO MATURE HABITATION TECHNOLOGIES, THE CONTRACTOR WILL IDENTIFY STATE OF THE ART (SOA) TECHNOLOGIES ACROSS NASA TECHNOLOGY AREAS (TAS) DEFINED IN THE NASA TECHNOLOGY ROADMAP. FOCUS WILL BE ON MATURATION OF THE FOLLOWING TECHNOLOGIES ENVIRONMENTAL CONTROL AND LIFE SUPPORT SYSTEMS ENVIRONMENTAL MONITORING SAFETY AND EMERGENCY RESPONSE AND HABITATION THERMAL CONTROL SYSTEMS AUTONOMOUS HABITATION SYSTEMS NAVIGATION SYSTEMS MANAGEMENT DOCKING AND CAPTURE MECHANISMS AND DEPLOYABLE HABITATION ELEMENTS View parent award on USAspending | — | $14,189,194 | Nov 3, 2023 | — – — |
| Subcontractor | National Aeronautics and Space Administration | MODIFICATION #7 TO INCREASE FUNDING BY $2,120,022.04. 3022000003 Parent award context Parent award agency: National Aeronautics and Space Administration · National Aeronautics and Space Administration Parent award NAICS: 541712 Parent award performance state: VA Parent award description: IGF::OT::IGF NEXTSTEP NRA AWARD. THIS NEXTSTEP CONTRACT BUILDS UPON THE SUCCESS OF COMMERCIAL ORBITAL TRANSPORTATION SERVICES SPACE ACT AGREEMENT DEVELOPMENT PROGRAM AND AN EXISTING INTERNATIONAL SPACE STATION (ISS) COMMERCIAL RESUPPLY SERVICES (CRS) CONTRACT. ORBITAL HAS SUCCESSFULLY TRANSITIONED FROM COTS TO THE CRS PROGRAM, FLYING THREE VERY SUCCESSFUL PRESSURIZED CARGO RESUPPLY MISSIONS TO THE ISS, USING THE CYGNUS SPACECRAFT. ORBITAL ALSO SUCCESSFULLY DEVELOPED SPACECRAFT FOR SOLAR SYSTEM EXPLORATION TO INCLUDE THE CURRENTLY OPERATIONAL DAWN MISSION. THIS MISSION WAS LAUNCHED IN SEPTEMBER 2007, COMPLETED ITS RENDEZVOUS MISSION AT VESTA IN JULY 2012 AND IS EN ROUTE TO CERES IN EARLY 2015. WITH SPACE AGENCY BUDGETS CONTINUING TO BE TIGHT, EXPLORATION PLANS NEED TO EMPHASIZE EVOLUTION OF EXISTING SYSTEMS, WHERE COST AND SCHEDULE IS BETTER CONTROLLED, AND DEVELOPMENT RISK REDUCED. SPECIFICALLY, ELEMENTS OF THE CURRENT ISS, INCLUDING CYGNUS, CAN BE EVOLVED TO SUPPORT MORE DISTANT SPACE DESTINATIONS. TO SUPPORT THESE ENDEAVORS, ORBITAL CONTRIBUTES TO THE DEVELOPMENT AND PRODUCT IMPROVEMENT OF CYGNUS AND TO NEXTSTEP ACTIVITIES AND HAVE INVESTED IN THE COTS CRS PUBLIC-PRIVATE PARTNERSHIP ENDEAVOR. ORBITAL'S EXPLORATION AUGMENTATION MODULE (BAM) ARCHITECTURE USES A MODULAR, BUILDING BLOCK APPROACH THAT LEVERAGES THE CYGNUS SPACECRAFT TO EXPAND CISLUNAR AND LONG DURATION DEEP SPACE TRANSIT HABITATION CAPABILITIES AND TECHNOLOGIES CRITICAL TO NASAS LONG-TERM EXPLORATION GOALS. ORBITALS ARCHITECTURE CONCEPT BLENDS IN-PRODUCTION HARDWARE WITH ADAPTATION, EVOLUTION, PLANNING, AND FORWARD THINKING. CYGNUS WILL SERVE AS A MODULAR HABITAT AND TEST PLATFORM FOR QUALIFYING TECHNOLOGIES IN A DISTANT RETROGRADE ORBIT (DRO) OR IN A LOW EARTH ORBIT (LEO), EITHER WHILE ATTACHED TO THE ISS OR AS A FREE-FLYER. USING THE EXISTING, OPERATIONAL CYGNUS TO PERFORM THESE MISSIONS HAS THE ADVANTAGE OF DECREASING OVERALL DEVELOPMENT TIME AND COSTS, AND FREEING UP RESOURCES THAT WOULD BE SPENT ON DEVELOPING A SPACECRAFT TO FOCUS ON CULTIVATING MISSION ENABLING TECHNOLOGIES. THE GOAL IS TO HAVE A CYGNUS DERIVED EAM DEPLOYED IN CISLUNAR SPACE BEFORE 2020. THIS SPACECRAFT WILL BE THE FIRST BUILDING BLOCK IN SUPPORTING BOTH COMMERCIAL MARKETS AND GOVERNMENT OBJECTIVES. THE PROPOSED EFFORT FOR THIS NEXTSTEP BAA PHASE I, INVOLVES DEFINING AN EAM ARCHITECTURE AND CONCEPT OF OPERATIONS (CONOPS) THAT ADDRESSES COMMERCIAL MARKETS AND NASA EXPLORATION OBJECTIVES, TECHNOLOGY MATURATION PLANNING AND INFRASTRUCTURE DEVELOPMENT, AND TO IDENTIFY TECHNOLOGIES THAT CAN BE IMPLEMENTED AND DEMONSTRATED IN THE ISSILEO ENVIRONMENT WITHIN THE NEXT THREE YEARS. TO MATURE HABITATION TECHNOLOGIES, THE CONTRACTOR WILL IDENTIFY STATE OF THE ART (SOA) TECHNOLOGIES ACROSS NASA TECHNOLOGY AREAS (TAS) DEFINED IN THE NASA TECHNOLOGY ROADMAP. FOCUS WILL BE ON MATURATION OF THE FOLLOWING TECHNOLOGIES ENVIRONMENTAL CONTROL AND LIFE SUPPORT SYSTEMS ENVIRONMENTAL MONITORING SAFETY AND EMERGENCY RESPONSE AND HABITATION THERMAL CONTROL SYSTEMS AUTONOMOUS HABITATION SYSTEMS NAVIGATION SYSTEMS MANAGEMENT DOCKING AND CAPTURE MECHANISMS AND DEPLOYABLE HABITATION ELEMENTS View parent award on USAspending | — | $2,120,022 | May 10, 2023 | — – — |
| Subcontractor | National Aeronautics and Space Administration | SUPPORT OF NG ECLSS EQSRS (LABOR ONLY) 3022300069 Parent award context Parent award agency: National Aeronautics and Space Administration · National Aeronautics and Space Administration Parent award NAICS: 541712 Parent award performance state: VA Parent award description: IGF::OT::IGF NEXTSTEP NRA AWARD. THIS NEXTSTEP CONTRACT BUILDS UPON THE SUCCESS OF COMMERCIAL ORBITAL TRANSPORTATION SERVICES SPACE ACT AGREEMENT DEVELOPMENT PROGRAM AND AN EXISTING INTERNATIONAL SPACE STATION (ISS) COMMERCIAL RESUPPLY SERVICES (CRS) CONTRACT. ORBITAL HAS SUCCESSFULLY TRANSITIONED FROM COTS TO THE CRS PROGRAM, FLYING THREE VERY SUCCESSFUL PRESSURIZED CARGO RESUPPLY MISSIONS TO THE ISS, USING THE CYGNUS SPACECRAFT. ORBITAL ALSO SUCCESSFULLY DEVELOPED SPACECRAFT FOR SOLAR SYSTEM EXPLORATION TO INCLUDE THE CURRENTLY OPERATIONAL DAWN MISSION. THIS MISSION WAS LAUNCHED IN SEPTEMBER 2007, COMPLETED ITS RENDEZVOUS MISSION AT VESTA IN JULY 2012 AND IS EN ROUTE TO CERES IN EARLY 2015. WITH SPACE AGENCY BUDGETS CONTINUING TO BE TIGHT, EXPLORATION PLANS NEED TO EMPHASIZE EVOLUTION OF EXISTING SYSTEMS, WHERE COST AND SCHEDULE IS BETTER CONTROLLED, AND DEVELOPMENT RISK REDUCED. SPECIFICALLY, ELEMENTS OF THE CURRENT ISS, INCLUDING CYGNUS, CAN BE EVOLVED TO SUPPORT MORE DISTANT SPACE DESTINATIONS. TO SUPPORT THESE ENDEAVORS, ORBITAL CONTRIBUTES TO THE DEVELOPMENT AND PRODUCT IMPROVEMENT OF CYGNUS AND TO NEXTSTEP ACTIVITIES AND HAVE INVESTED IN THE COTS CRS PUBLIC-PRIVATE PARTNERSHIP ENDEAVOR. ORBITAL'S EXPLORATION AUGMENTATION MODULE (BAM) ARCHITECTURE USES A MODULAR, BUILDING BLOCK APPROACH THAT LEVERAGES THE CYGNUS SPACECRAFT TO EXPAND CISLUNAR AND LONG DURATION DEEP SPACE TRANSIT HABITATION CAPABILITIES AND TECHNOLOGIES CRITICAL TO NASAS LONG-TERM EXPLORATION GOALS. ORBITALS ARCHITECTURE CONCEPT BLENDS IN-PRODUCTION HARDWARE WITH ADAPTATION, EVOLUTION, PLANNING, AND FORWARD THINKING. CYGNUS WILL SERVE AS A MODULAR HABITAT AND TEST PLATFORM FOR QUALIFYING TECHNOLOGIES IN A DISTANT RETROGRADE ORBIT (DRO) OR IN A LOW EARTH ORBIT (LEO), EITHER WHILE ATTACHED TO THE ISS OR AS A FREE-FLYER. USING THE EXISTING, OPERATIONAL CYGNUS TO PERFORM THESE MISSIONS HAS THE ADVANTAGE OF DECREASING OVERALL DEVELOPMENT TIME AND COSTS, AND FREEING UP RESOURCES THAT WOULD BE SPENT ON DEVELOPING A SPACECRAFT TO FOCUS ON CULTIVATING MISSION ENABLING TECHNOLOGIES. THE GOAL IS TO HAVE A CYGNUS DERIVED EAM DEPLOYED IN CISLUNAR SPACE BEFORE 2020. THIS SPACECRAFT WILL BE THE FIRST BUILDING BLOCK IN SUPPORTING BOTH COMMERCIAL MARKETS AND GOVERNMENT OBJECTIVES. THE PROPOSED EFFORT FOR THIS NEXTSTEP BAA PHASE I, INVOLVES DEFINING AN EAM ARCHITECTURE AND CONCEPT OF OPERATIONS (CONOPS) THAT ADDRESSES COMMERCIAL MARKETS AND NASA EXPLORATION OBJECTIVES, TECHNOLOGY MATURATION PLANNING AND INFRASTRUCTURE DEVELOPMENT, AND TO IDENTIFY TECHNOLOGIES THAT CAN BE IMPLEMENTED AND DEMONSTRATED IN THE ISSILEO ENVIRONMENT WITHIN THE NEXT THREE YEARS. TO MATURE HABITATION TECHNOLOGIES, THE CONTRACTOR WILL IDENTIFY STATE OF THE ART (SOA) TECHNOLOGIES ACROSS NASA TECHNOLOGY AREAS (TAS) DEFINED IN THE NASA TECHNOLOGY ROADMAP. FOCUS WILL BE ON MATURATION OF THE FOLLOWING TECHNOLOGIES ENVIRONMENTAL CONTROL AND LIFE SUPPORT SYSTEMS ENVIRONMENTAL MONITORING SAFETY AND EMERGENCY RESPONSE AND HABITATION THERMAL CONTROL SYSTEMS AUTONOMOUS HABITATION SYSTEMS NAVIGATION SYSTEMS MANAGEMENT DOCKING AND CAPTURE MECHANISMS AND DEPLOYABLE HABITATION ELEMENTS View parent award on USAspending | — | $76,593 | Apr 25, 2023 | — – — |
| Subcontractor | Department of Defense | DEVELOP AND BUILD PROTOTYPE ALARMS FOR STORAGE OF LIION BATTERIES P010273127 Parent award context Parent award agency: Department of Defense · Department of the Air Force Parent award NAICS: 541715 Parent award performance state: IN Parent award description: RESEARCH AND DEVELOPMENT OF EXPEDITIONARY WEAPON SYSTEMS FOR NAVAL SEA SYSTEMS COMMAND NAVAL SURFACE WARFARE CENTER CRANE WEAPON SYSTEMS DIVISION AND PROGRAM EXECUTIVE OFFICE, UNMANNED AND SMALL COMBATANTS NAVAL SPECIAL WARFARE View parent award on USAspending | FA807518D0007USAspending | $272,000 | Apr 12, 2023 | — – — |
| Subcontractor | Department of Defense | DEVELOP AND BUILD PROTOTYPE ALARMS FOR STORAGE OF LI-ION BATTERIES P010273127 Parent award context Parent award agency: Department of Defense · Department of the Air Force Parent award NAICS: 541715 Parent award performance state: IN Parent award description: RESEARCH AND DEVELOPMENT OF EXPEDITIONARY WEAPON SYSTEMS FOR NAVAL SEA SYSTEMS COMMAND NAVAL SURFACE WARFARE CENTER CRANE WEAPON SYSTEMS DIVISION AND PROGRAM EXECUTIVE OFFICE, UNMANNED AND SMALL COMBATANTS NAVAL SPECIAL WARFARE View parent award on USAspending | FA807518D0007USAspending | $669,314 | Apr 12, 2023 | — – — |
| Subcontractor | Department of Defense | DEVELOP AND BUILD PROTOTYPE ALARMS FOR STORAGE OF LI-ION BATTERIES P010273127 Parent award context Parent award agency: Department of Defense · Department of the Air Force Parent award NAICS: 541715 Parent award performance state: VA Parent award description: ABMS CBC2 SW INTEGRATOR View parent award on USAspending | FA861220D0043USAspending | $64,000 | Apr 12, 2023 | — – — |
| Subcontractor | National Aeronautics and Space Administration | MODIFICATION TO ADD SPARE WORK AND INCREASE FUNDING. 3022000003 Parent award context Parent award agency: National Aeronautics and Space Administration · National Aeronautics and Space Administration Parent award NAICS: 541712 Parent award performance state: VA Parent award description: IGF::OT::IGF NEXTSTEP NRA AWARD. THIS NEXTSTEP CONTRACT BUILDS UPON THE SUCCESS OF COMMERCIAL ORBITAL TRANSPORTATION SERVICES SPACE ACT AGREEMENT DEVELOPMENT PROGRAM AND AN EXISTING INTERNATIONAL SPACE STATION (ISS) COMMERCIAL RESUPPLY SERVICES (CRS) CONTRACT. ORBITAL HAS SUCCESSFULLY TRANSITIONED FROM COTS TO THE CRS PROGRAM, FLYING THREE VERY SUCCESSFUL PRESSURIZED CARGO RESUPPLY MISSIONS TO THE ISS, USING THE CYGNUS SPACECRAFT. ORBITAL ALSO SUCCESSFULLY DEVELOPED SPACECRAFT FOR SOLAR SYSTEM EXPLORATION TO INCLUDE THE CURRENTLY OPERATIONAL DAWN MISSION. THIS MISSION WAS LAUNCHED IN SEPTEMBER 2007, COMPLETED ITS RENDEZVOUS MISSION AT VESTA IN JULY 2012 AND IS EN ROUTE TO CERES IN EARLY 2015. WITH SPACE AGENCY BUDGETS CONTINUING TO BE TIGHT, EXPLORATION PLANS NEED TO EMPHASIZE EVOLUTION OF EXISTING SYSTEMS, WHERE COST AND SCHEDULE IS BETTER CONTROLLED, AND DEVELOPMENT RISK REDUCED. SPECIFICALLY, ELEMENTS OF THE CURRENT ISS, INCLUDING CYGNUS, CAN BE EVOLVED TO SUPPORT MORE DISTANT SPACE DESTINATIONS. TO SUPPORT THESE ENDEAVORS, ORBITAL CONTRIBUTES TO THE DEVELOPMENT AND PRODUCT IMPROVEMENT OF CYGNUS AND TO NEXTSTEP ACTIVITIES AND HAVE INVESTED IN THE COTS CRS PUBLIC-PRIVATE PARTNERSHIP ENDEAVOR. ORBITAL'S EXPLORATION AUGMENTATION MODULE (BAM) ARCHITECTURE USES A MODULAR, BUILDING BLOCK APPROACH THAT LEVERAGES THE CYGNUS SPACECRAFT TO EXPAND CISLUNAR AND LONG DURATION DEEP SPACE TRANSIT HABITATION CAPABILITIES AND TECHNOLOGIES CRITICAL TO NASAS LONG-TERM EXPLORATION GOALS. ORBITALS ARCHITECTURE CONCEPT BLENDS IN-PRODUCTION HARDWARE WITH ADAPTATION, EVOLUTION, PLANNING, AND FORWARD THINKING. CYGNUS WILL SERVE AS A MODULAR HABITAT AND TEST PLATFORM FOR QUALIFYING TECHNOLOGIES IN A DISTANT RETROGRADE ORBIT (DRO) OR IN A LOW EARTH ORBIT (LEO), EITHER WHILE ATTACHED TO THE ISS OR AS A FREE-FLYER. USING THE EXISTING, OPERATIONAL CYGNUS TO PERFORM THESE MISSIONS HAS THE ADVANTAGE OF DECREASING OVERALL DEVELOPMENT TIME AND COSTS, AND FREEING UP RESOURCES THAT WOULD BE SPENT ON DEVELOPING A SPACECRAFT TO FOCUS ON CULTIVATING MISSION ENABLING TECHNOLOGIES. THE GOAL IS TO HAVE A CYGNUS DERIVED EAM DEPLOYED IN CISLUNAR SPACE BEFORE 2020. THIS SPACECRAFT WILL BE THE FIRST BUILDING BLOCK IN SUPPORTING BOTH COMMERCIAL MARKETS AND GOVERNMENT OBJECTIVES. THE PROPOSED EFFORT FOR THIS NEXTSTEP BAA PHASE I, INVOLVES DEFINING AN EAM ARCHITECTURE AND CONCEPT OF OPERATIONS (CONOPS) THAT ADDRESSES COMMERCIAL MARKETS AND NASA EXPLORATION OBJECTIVES, TECHNOLOGY MATURATION PLANNING AND INFRASTRUCTURE DEVELOPMENT, AND TO IDENTIFY TECHNOLOGIES THAT CAN BE IMPLEMENTED AND DEMONSTRATED IN THE ISSILEO ENVIRONMENT WITHIN THE NEXT THREE YEARS. TO MATURE HABITATION TECHNOLOGIES, THE CONTRACTOR WILL IDENTIFY STATE OF THE ART (SOA) TECHNOLOGIES ACROSS NASA TECHNOLOGY AREAS (TAS) DEFINED IN THE NASA TECHNOLOGY ROADMAP. FOCUS WILL BE ON MATURATION OF THE FOLLOWING TECHNOLOGIES ENVIRONMENTAL CONTROL AND LIFE SUPPORT SYSTEMS ENVIRONMENTAL MONITORING SAFETY AND EMERGENCY RESPONSE AND HABITATION THERMAL CONTROL SYSTEMS AUTONOMOUS HABITATION SYSTEMS NAVIGATION SYSTEMS MANAGEMENT DOCKING AND CAPTURE MECHANISMS AND DEPLOYABLE HABITATION ELEMENTS View parent award on USAspending | — | $1,955,421 | Jun 15, 2022 | — – — |
| Subcontractor | National Aeronautics and Space Administration | DEFINITIZATION OF LETTER SUBCONTRACT AND PROVIDE ADDITIONAL FUNDING. 3022000003 Parent award context Parent award agency: National Aeronautics and Space Administration · National Aeronautics and Space Administration Parent award NAICS: 541712 Parent award performance state: VA Parent award description: IGF::OT::IGF NEXTSTEP NRA AWARD. THIS NEXTSTEP CONTRACT BUILDS UPON THE SUCCESS OF COMMERCIAL ORBITAL TRANSPORTATION SERVICES SPACE ACT AGREEMENT DEVELOPMENT PROGRAM AND AN EXISTING INTERNATIONAL SPACE STATION (ISS) COMMERCIAL RESUPPLY SERVICES (CRS) CONTRACT. ORBITAL HAS SUCCESSFULLY TRANSITIONED FROM COTS TO THE CRS PROGRAM, FLYING THREE VERY SUCCESSFUL PRESSURIZED CARGO RESUPPLY MISSIONS TO THE ISS, USING THE CYGNUS SPACECRAFT. ORBITAL ALSO SUCCESSFULLY DEVELOPED SPACECRAFT FOR SOLAR SYSTEM EXPLORATION TO INCLUDE THE CURRENTLY OPERATIONAL DAWN MISSION. THIS MISSION WAS LAUNCHED IN SEPTEMBER 2007, COMPLETED ITS RENDEZVOUS MISSION AT VESTA IN JULY 2012 AND IS EN ROUTE TO CERES IN EARLY 2015. WITH SPACE AGENCY BUDGETS CONTINUING TO BE TIGHT, EXPLORATION PLANS NEED TO EMPHASIZE EVOLUTION OF EXISTING SYSTEMS, WHERE COST AND SCHEDULE IS BETTER CONTROLLED, AND DEVELOPMENT RISK REDUCED. SPECIFICALLY, ELEMENTS OF THE CURRENT ISS, INCLUDING CYGNUS, CAN BE EVOLVED TO SUPPORT MORE DISTANT SPACE DESTINATIONS. TO SUPPORT THESE ENDEAVORS, ORBITAL CONTRIBUTES TO THE DEVELOPMENT AND PRODUCT IMPROVEMENT OF CYGNUS AND TO NEXTSTEP ACTIVITIES AND HAVE INVESTED IN THE COTS CRS PUBLIC-PRIVATE PARTNERSHIP ENDEAVOR. ORBITAL'S EXPLORATION AUGMENTATION MODULE (BAM) ARCHITECTURE USES A MODULAR, BUILDING BLOCK APPROACH THAT LEVERAGES THE CYGNUS SPACECRAFT TO EXPAND CISLUNAR AND LONG DURATION DEEP SPACE TRANSIT HABITATION CAPABILITIES AND TECHNOLOGIES CRITICAL TO NASAS LONG-TERM EXPLORATION GOALS. ORBITALS ARCHITECTURE CONCEPT BLENDS IN-PRODUCTION HARDWARE WITH ADAPTATION, EVOLUTION, PLANNING, AND FORWARD THINKING. CYGNUS WILL SERVE AS A MODULAR HABITAT AND TEST PLATFORM FOR QUALIFYING TECHNOLOGIES IN A DISTANT RETROGRADE ORBIT (DRO) OR IN A LOW EARTH ORBIT (LEO), EITHER WHILE ATTACHED TO THE ISS OR AS A FREE-FLYER. USING THE EXISTING, OPERATIONAL CYGNUS TO PERFORM THESE MISSIONS HAS THE ADVANTAGE OF DECREASING OVERALL DEVELOPMENT TIME AND COSTS, AND FREEING UP RESOURCES THAT WOULD BE SPENT ON DEVELOPING A SPACECRAFT TO FOCUS ON CULTIVATING MISSION ENABLING TECHNOLOGIES. THE GOAL IS TO HAVE A CYGNUS DERIVED EAM DEPLOYED IN CISLUNAR SPACE BEFORE 2020. THIS SPACECRAFT WILL BE THE FIRST BUILDING BLOCK IN SUPPORTING BOTH COMMERCIAL MARKETS AND GOVERNMENT OBJECTIVES. THE PROPOSED EFFORT FOR THIS NEXTSTEP BAA PHASE I, INVOLVES DEFINING AN EAM ARCHITECTURE AND CONCEPT OF OPERATIONS (CONOPS) THAT ADDRESSES COMMERCIAL MARKETS AND NASA EXPLORATION OBJECTIVES, TECHNOLOGY MATURATION PLANNING AND INFRASTRUCTURE DEVELOPMENT, AND TO IDENTIFY TECHNOLOGIES THAT CAN BE IMPLEMENTED AND DEMONSTRATED IN THE ISSILEO ENVIRONMENT WITHIN THE NEXT THREE YEARS. TO MATURE HABITATION TECHNOLOGIES, THE CONTRACTOR WILL IDENTIFY STATE OF THE ART (SOA) TECHNOLOGIES ACROSS NASA TECHNOLOGY AREAS (TAS) DEFINED IN THE NASA TECHNOLOGY ROADMAP. FOCUS WILL BE ON MATURATION OF THE FOLLOWING TECHNOLOGIES ENVIRONMENTAL CONTROL AND LIFE SUPPORT SYSTEMS ENVIRONMENTAL MONITORING SAFETY AND EMERGENCY RESPONSE AND HABITATION THERMAL CONTROL SYSTEMS AUTONOMOUS HABITATION SYSTEMS NAVIGATION SYSTEMS MANAGEMENT DOCKING AND CAPTURE MECHANISMS AND DEPLOYABLE HABITATION ELEMENTS View parent award on USAspending | — | $741,472 | Apr 20, 2022 | — – — |
| Subcontractor | National Aeronautics and Space Administration | DEFINITIZATION OF SUBCONTRACT. 3022000003 Parent award context Parent award agency: National Aeronautics and Space Administration · National Aeronautics and Space Administration Parent award NAICS: 541712 Parent award performance state: VA Parent award description: IGF::OT::IGF NEXTSTEP NRA AWARD. THIS NEXTSTEP CONTRACT BUILDS UPON THE SUCCESS OF COMMERCIAL ORBITAL TRANSPORTATION SERVICES SPACE ACT AGREEMENT DEVELOPMENT PROGRAM AND AN EXISTING INTERNATIONAL SPACE STATION (ISS) COMMERCIAL RESUPPLY SERVICES (CRS) CONTRACT. ORBITAL HAS SUCCESSFULLY TRANSITIONED FROM COTS TO THE CRS PROGRAM, FLYING THREE VERY SUCCESSFUL PRESSURIZED CARGO RESUPPLY MISSIONS TO THE ISS, USING THE CYGNUS SPACECRAFT. ORBITAL ALSO SUCCESSFULLY DEVELOPED SPACECRAFT FOR SOLAR SYSTEM EXPLORATION TO INCLUDE THE CURRENTLY OPERATIONAL DAWN MISSION. THIS MISSION WAS LAUNCHED IN SEPTEMBER 2007, COMPLETED ITS RENDEZVOUS MISSION AT VESTA IN JULY 2012 AND IS EN ROUTE TO CERES IN EARLY 2015. WITH SPACE AGENCY BUDGETS CONTINUING TO BE TIGHT, EXPLORATION PLANS NEED TO EMPHASIZE EVOLUTION OF EXISTING SYSTEMS, WHERE COST AND SCHEDULE IS BETTER CONTROLLED, AND DEVELOPMENT RISK REDUCED. SPECIFICALLY, ELEMENTS OF THE CURRENT ISS, INCLUDING CYGNUS, CAN BE EVOLVED TO SUPPORT MORE DISTANT SPACE DESTINATIONS. TO SUPPORT THESE ENDEAVORS, ORBITAL CONTRIBUTES TO THE DEVELOPMENT AND PRODUCT IMPROVEMENT OF CYGNUS AND TO NEXTSTEP ACTIVITIES AND HAVE INVESTED IN THE COTS CRS PUBLIC-PRIVATE PARTNERSHIP ENDEAVOR. ORBITAL'S EXPLORATION AUGMENTATION MODULE (BAM) ARCHITECTURE USES A MODULAR, BUILDING BLOCK APPROACH THAT LEVERAGES THE CYGNUS SPACECRAFT TO EXPAND CISLUNAR AND LONG DURATION DEEP SPACE TRANSIT HABITATION CAPABILITIES AND TECHNOLOGIES CRITICAL TO NASAS LONG-TERM EXPLORATION GOALS. ORBITALS ARCHITECTURE CONCEPT BLENDS IN-PRODUCTION HARDWARE WITH ADAPTATION, EVOLUTION, PLANNING, AND FORWARD THINKING. CYGNUS WILL SERVE AS A MODULAR HABITAT AND TEST PLATFORM FOR QUALIFYING TECHNOLOGIES IN A DISTANT RETROGRADE ORBIT (DRO) OR IN A LOW EARTH ORBIT (LEO), EITHER WHILE ATTACHED TO THE ISS OR AS A FREE-FLYER. USING THE EXISTING, OPERATIONAL CYGNUS TO PERFORM THESE MISSIONS HAS THE ADVANTAGE OF DECREASING OVERALL DEVELOPMENT TIME AND COSTS, AND FREEING UP RESOURCES THAT WOULD BE SPENT ON DEVELOPING A SPACECRAFT TO FOCUS ON CULTIVATING MISSION ENABLING TECHNOLOGIES. THE GOAL IS TO HAVE A CYGNUS DERIVED EAM DEPLOYED IN CISLUNAR SPACE BEFORE 2020. THIS SPACECRAFT WILL BE THE FIRST BUILDING BLOCK IN SUPPORTING BOTH COMMERCIAL MARKETS AND GOVERNMENT OBJECTIVES. THE PROPOSED EFFORT FOR THIS NEXTSTEP BAA PHASE I, INVOLVES DEFINING AN EAM ARCHITECTURE AND CONCEPT OF OPERATIONS (CONOPS) THAT ADDRESSES COMMERCIAL MARKETS AND NASA EXPLORATION OBJECTIVES, TECHNOLOGY MATURATION PLANNING AND INFRASTRUCTURE DEVELOPMENT, AND TO IDENTIFY TECHNOLOGIES THAT CAN BE IMPLEMENTED AND DEMONSTRATED IN THE ISSILEO ENVIRONMENT WITHIN THE NEXT THREE YEARS. TO MATURE HABITATION TECHNOLOGIES, THE CONTRACTOR WILL IDENTIFY STATE OF THE ART (SOA) TECHNOLOGIES ACROSS NASA TECHNOLOGY AREAS (TAS) DEFINED IN THE NASA TECHNOLOGY ROADMAP. FOCUS WILL BE ON MATURATION OF THE FOLLOWING TECHNOLOGIES ENVIRONMENTAL CONTROL AND LIFE SUPPORT SYSTEMS ENVIRONMENTAL MONITORING SAFETY AND EMERGENCY RESPONSE AND HABITATION THERMAL CONTROL SYSTEMS AUTONOMOUS HABITATION SYSTEMS NAVIGATION SYSTEMS MANAGEMENT DOCKING AND CAPTURE MECHANISMS AND DEPLOYABLE HABITATION ELEMENTS View parent award on USAspending | — | $116,200,000 | Dec 13, 2021 | — – — |
Contract vehicles are shown only when present in the source record. Linked award numbers and vehicles open the authoritative record on USAspending.gov.
Agencies supported
- National Aeronautics and Space AdministrationGov-sourced
- Department of DefenseGov-sourced
Government-sourced data comes from SAM.gov, SBA and USAspending.gov and is attributed to its source. Items marked company-reported were provided by the company and are verified by FedSub only where labeled. FedSub is a private company and is not affiliated with SBA, GSA/SAM.gov, or any government agency.