← Back to search
AXC INNOVATIONS INC.
LOMPOC, CA, 93436
UnclaimedClaim this profile (free)
Small BusinessEDWOSBHUBZoneWOSBMinority OwnedSmall Disadvantaged
Subcontracting experience
31 records from government sources. Past participation is not evidence of current teaming interest.
| Role | Agency | Description | Vehicle | Obligated | Action date | Period |
|---|---|---|---|---|---|---|
| Subcontractor | Department of Defense | ELECTRICAL CONTRACTORS AND OTHER WIRING INSTALLATION CONTRACTORS 5300182482 Parent award context Parent award agency: Department of Defense · Department of the Air Force Parent award NAICS: 336414 Parent award performance state: UT Parent award description: GROUND-BASED STRATEGIC DETERRENT (GBSD) ENGINEERING AND MANUFACTURING DEVELOPMENT (EMD) AND EARLY PRODUCTION AND DEPLOYMENT (P&D) View parent award on USAspending | — | $1,728,130 | Feb 18, 2026 | — – — |
| Subcontractor | Department of Defense | ELECTRICAL CONTRACTORS AND OTHER WIRING INSTALLATION CONTRACTORS 5300182482 CO 1 Parent award context Parent award agency: Department of Defense · Department of the Air Force Parent award NAICS: 336414 Parent award performance state: UT Parent award description: GROUND-BASED STRATEGIC DETERRENT (GBSD) ENGINEERING AND MANUFACTURING DEVELOPMENT (EMD) AND EARLY PRODUCTION AND DEPLOYMENT (P&D) View parent award on USAspending | — | -$1,728,130 | Feb 18, 2026 | — – — |
| Subcontractor | Department of Defense | ELECTRICAL CONTRACTORS AND OTHER WIRING INSTALLATION CONTRACTORS 5300173679 Parent award context Parent award agency: Department of Defense · Department of the Air Force Parent award NAICS: 336414 Parent award performance state: UT Parent award description: GROUND-BASED STRATEGIC DETERRENT (GBSD) ENGINEERING AND MANUFACTURING DEVELOPMENT (EMD) AND EARLY PRODUCTION AND DEPLOYMENT (P&D) View parent award on USAspending | — | $92,108 | Nov 25, 2025 | — – — |
| Subcontractor | Department of Defense | CLIN 0001
1.
SAFE OFF AND REMOVE RED/BLUE LIGHTS CIRCUITS IN ROOMS 209D. REINSTALLATION NOT REQUIRED.
2.
SAFE OFF POWER CIRCUITS FOR RECEPTACLES TO BE REMOVED IN PROJECT AREA.
3.
INSTALL CONVENIENCE RECEPTACLES ALONG WALLS IN NEW ROOM 209J AND 209K AS REQUIRED BY NEC AND UFC.
4.
EXISTING TELECOM TO BE REWORKED AND REROUTED AS APPLICABLE.
5.
PERFORM TERMINATIONS AND FUNCTIONAL TESTING OF NEWLY INSTALLED POWER AND TELECOM.
CLIN 0003
1.
REMOVE AND REPLACE WITH NEW LED LIGHT FIXTURES IN ROOM 209E. FIXTURE CEILING WIRES PROVIDED AND INSTALLED BY OTHERS.
2.
COORDINATE WITH END USER TO RELOCATE LIGHT SWITCH IN ROOM 209E.
3.
PERFORM FUNCTIONAL TEST OF NEWLY INSTALLED LIGHTING. 25-172-01 Parent award context Parent award agency: Department of Defense · Department of the Air Force Parent award NAICS: 236220 Parent award performance state: CA Parent award description: RENOVATE OFFICES IN BUILDING 10577 View parent award on USAspending | FA461025D0002USAspending | $126,473 | Oct 14, 2025 | — – — |
| Subcontractor | Department of Defense | 1.
DEMO ALL SERVICE DISCONNECTS AND REPLACE WITH NEW, INCLUDING WIRE AND CONDUIT BETWEEN DISCONNECTS AND HVAC UNITS.
2.
REWORK POWER AND INSTALL NEW ELECTRICAL SERVICE DISCONNECTS AS NECESSARY FOR HVAC REPLACEMENT, SIZE AND RATINGS TO MATCH EXISTING.
A.
SOW 3.9 ROOM 12 CRAC AND EXTERIOR CONDENSER UNIT CRAC-3 / COND-3
B.
SOW 3.10 ROOM 41 FAN COIL AND EXTERIOR CONDENSER UNIT FC-1 / CU-1
C.
SOW 3.11 ROOM 32 CRAC AND ROOFTOP CONDENSER UNIT CRAC-1 / COND-1
D.
SOW 3.11 ROOM 32 CRAC AND ROOFTOP CONDENSER UNIT CRAC-2 / COND-2
E.
SOW 3.12 ROOM 35 FAN COIL AND ROOFTOP CONDENSER UNIT FC-4 / CU-4
F.
SOW 3.12 ROOM 35 FAN COIL AND ROOFTOP CONDENSER UNIT FC-5 / CU-5
G.
SOW 3.13 ROOM 28 CRAC AND ROOFTOP CONDENSER UNIT CRAC-8 / COND-8
H.
SOW 3.14 ROOM 31 CRAC AND ROOFTOP CONDENSER UNIT CRAC-7 / COND-7
3.
REWORK EXISTING (LPS) SYSTEM TO ALLOW FOR REPLACEMENT OF ROOF TOP HVAC EQUIPMENT. TEST LPS CONTINUITY ACROSS CONNECTION POINTS ENSURING THEY ARE WITHIN LIMITS. 24-187-02 Parent award context Parent award agency: Department of Defense · Department of the Air Force Parent award NAICS: 236220 Parent award performance state: CA Parent award description: REPAIR HVAC SYSTEMS PHASE 2, BUILDING 23229, VANDENBERG SPACE FORCE BASE, CALIFORNIA View parent award on USAspending | FA461025D0002USAspending | $84,116 | Oct 10, 2025 | — – — |
| Subcontractor | Department of Defense | SAFE OFF ELECTRICAL POWER FROM EXISTING HVAC EQUIPMENT UNITS PRIOR TO REMOVAL BY OTHERS. FURNISH & INSTALL NEMA 1
LOCAL SERVICE DISCONNECT SWITCHES OR COMBINATION MOTOR STARTERS AS REQUIRED. PROVIDE POWER FROM EXISTING ELECTRICAL
POWER SOURCE TO NEW HVAC UNITS FURNISHED/INSTALLED BY OTHERS. 25-160-01 Parent award context Parent award agency: Department of Defense · Department of the Air Force Parent award NAICS: 236220 Parent award performance state: CA Parent award description: REPLACEMENT OF AIR HANDLER UNIT (AHU) IN BLDG. 875 View parent award on USAspending | FA461025D0002USAspending | $30,104 | Sep 3, 2025 | — – — |
| Subcontractor | Department of Defense | ELECTRICAL CONTRACTORS AND OTHER WIRING INSTALLATION CONTRACTORS 5300121141 CO 8 Parent award context Parent award agency: Department of Defense · Department of the Air Force Parent award NAICS: 336414 Parent award performance state: UT Parent award description: GROUND-BASED STRATEGIC DETERRENT (GBSD) ENGINEERING AND MANUFACTURING DEVELOPMENT (EMD) AND EARLY PRODUCTION AND DEPLOYMENT (P&D) View parent award on USAspending | — | $105,441 | Aug 26, 2025 | — – — |
| Subcontractor | Department of Defense | • LOTO HVAC EQUIPMENT UNITS PRIOR TO REMOVAL.
• PROVIDE 480V, 70A, 3PH POWER TO NEW CHILLER UNIT, FURNISHED AND INSTALLED BY OTHERS.
• REMOVE AND REPLACE WITH NEW NEMA 4X DISCONNECT FOR CHILLER.
• PROVIDE 120V, < 12A, 1PH POWER TO NEW GAS BOILER UNIT, FURNISHED AND INSTALLED BY OTHERS.
• REMOVE AND REPLACE WITH NEW NEMA 1 DISCONNECT FOR BOILER.
• REMOVE AND INSTALL NEW COMBO STARTERS W/ HOA FOR PUMPS IN NEMA 1 ENCLOSURE.
• REMOVE AND PROVIDE NEW 3-PHASE POWER TO ASSOCIATED PUMPS
• REMOVE AND INSTALL NEW DISCONNECT AS NECESSARY FOR THE WATER PUMPS.
• REMOVE AND PROVIDE POWER TO (2) NEW FAN UNITS LOCATED ABOVE CEILING OF CLASSROOMS 108A & 108B, FURNISHED AND INSTALLED BY OTHERS.
• REMOVE AND PROVIDE POWER TO (2) NEW EXTERIOR CONDENSER UNITS LOCATED ON EXTERIOR OF BUILDING SUPPORTING CLASSROOMS 108A & 108B, FURNISHED AND INSTALLED BY OTHERS.
• REMOVE AND REPLACE (2) CONDENSER ELECTRICAL DISCONNECTS WITH NEMA 4X ENCLOSURE.
• ENSURE ALL ELECTRICAL INSTALLED ARE PROPERLY UPDATED AND RE-LABELED. 25-113-01 Parent award context Parent award agency: Department of Defense · Department of the Air Force Parent award NAICS: 236220 Parent award performance state: CA Parent award description: REPLACE CHILLER, BUILDING 8195 View parent award on USAspending | FA461025D0002USAspending | $63,978 | Apr 9, 2025 | — – — |
| Subcontractor | Department of Defense | ELECTRICAL CONTRACTORS AND OTHER WIRING INSTALLATION CONTRACTORS 5300121141 Parent award context Parent award agency: Department of Defense · Department of the Air Force Parent award NAICS: 336414 Parent award performance state: UT Parent award description: GROUND-BASED STRATEGIC DETERRENT (GBSD) ENGINEERING AND MANUFACTURING DEVELOPMENT (EMD) AND EARLY PRODUCTION AND DEPLOYMENT (P&D) View parent award on USAspending | — | $4,356,399 | Oct 30, 2024 | — – — |
| Subcontractor | Department of Defense | SCOPE OF WORK INCLUDES BUT IS NOT LIMITED TO:
I. ASSUMPTIONS
1. ACCESS TO FACILITY WILL BE AVAILABLE DURING NORMAL WORKING HOURS MONDAY€Ͽ½FRIDAY, 7:00 AM TO 3:30 PM.
2. A MINIMUM OF 2 ESCORTS WILL BE PROVIDED BY OTHERS TO SUPPORT WORK BEING PERFORMED AS REQUIRED.
3. DISRUPTIONS / WORK STOPPAGES FOR SITE OPERATIONS ARE NOT EXPECTED DURING WORK EFFORT.
4. LOTO WILL BE PROVIDED BY AXC FOR ALL POWER CIRCUITS BEING WORKED.
5. ASBESTOS TESTING AND ABATEMENT BY OTHERS.
6. PANEL REPLACEMENT/UPGRADE IN ROOM 12 IS EXCLUDED FROM THIS PROPOSAL.
7. ALL FURNITURE AND CUSTOMER EQUIPMENT (DESKS, CABINETS, TV€„¢S, ETC) TO BE MOVED OUT OF WORK AREA BY OTHERS PRIOR TO
INSTALLATION.
II. INCLUSIONS
CLIN 01 SWITCHGEAR UNIT TO TRANSFORMER
1. PROVIDE AND INSTALL NEW DRY€Ͽ½TYPE TRANSFORMER ON CONCRETE HOUSEKEEPING PAD, DISCONNECT SWITCH, AND SPD IN B23229 AS
NECESSARY FOR NEW INSTALLATION.
2. PROVIDE AND INSTALL FEEDERS FROM EXISTING POWER SOURCE IN B23225 TO NEW TRANSFORMER IN B23229. UTILIZE EXISTING CONDUIT
AS APPLICABLE. SAWCUT, TRENCH, BACKFILL, COMPACT, AND PATCH AS NECESSARY.
3. PROVIDE AND INSTALL NEW PANELBOARD IN B23229 ROOM 7. ROUTE FEEDER CONDUIT AND CONDUCTORS FROM TRANSFORMER TO NEW
PANEL.
CLIN 02 120 V TECH POWER OUTLETS AND TWIST LOCK OUTLETS ADDITIONS
1. PROVIDE AND INSTALL NEW CONVENIENCE RECEPTACLES IN ROOMS 9 AND 12; TOTAL 9 NEMA 5€Ͽ½20R DUPLEX IN ROOM 9, 1 NEMA 5€Ͽ½20R
DUPLEX AND 1 NEMA L21€Ͽ½30R TWIST LOCK UNDER FLOOR IN ROOM 12. RECEPTACLES TO BE FED FROM NEW PANELBOARD.
III. NOTES
· CAD DRAWINGS INCLUDED
· DAILY CLEAN€Ͽ½UP IS INCLUDED
· SUBCONTRACTOR SHALL SUBMIT WEEKLY SAFETY MEETING MINUTES EVER 1914-65 Parent award context Parent award agency: Department of Defense · Department of the Air Force Parent award NAICS: 236220 Parent award performance state: CA Parent award description: UPGRADE ELECTRICAL POWER View parent award on USAspending | FA461020D0003USAspending | $348,515 | Oct 29, 2024 | — – — |
| Subcontractor | Department of Defense | INSTALL (1) NEW HOUSE KEEPING PAD PER SOO SECTION 3.2
2. INSTALL (2) NEW BOLLARDS MATCHING EXISTING SIZE AND HEIGHT PER RFI-2.
3. INSTALL (1) NEW 500KW, 480V, 3-PHASE, 3-WIRE LOAD BANK WITH STAINLESS STEEL ENCLOSURE AND LOCAL CONTROL
PER SOO SECTION 3.3 AND RFI-9.
4. ALL EXCAVATION SPOILS AND CONCRETE WILL BE HAULED OFF SITE.
5. PRIME AND PAINT NEW BOLLARDS YELLOW TO MATCH EXISTING.
6. PROVIDE ISOLATION SWITCH FOR NEW LOAD BANK PER SOO SECTION 3.3.
7. INSTALL NEW CONDUIT, SUPPORTS, AND WIRE TO NEW LOAD BANK PER SOO SECTION 3.4 AND VSFB ELECTRICAL
GUIDELINES.
8. PERFORM FUNCTIONAL TESTING OF NEW LOAD BANK WITH SUPPORT OF 30CES DURING EXISTING GENERATOR RUN.
9. PROVIDE PORTABLE TOILETS FOR PROJECT DURATION. 2403001 · Prime awardUSAspending | FA461020D0001USAspending | $151,659 | Oct 10, 2024 | — – — |
| Subcontractor | Department of Defense | REPLACE (23) AIRFIELD SIGNS
€¢ REPLACE EXISTING BOUNDARY SIGNS WITH NEW TYPE L-858Y DIRECTION, DESTINATION, AND BOUNDARY SIGNS -
INSCRIPTION IS BLACK LEGEND ON A YELLOW BACKGROUND.
€¢ REPLACE EXISTING INSTRUCTION SIGNS WITH NEW TYPE L-858R MANDATORY INSTRUCTION SIGN €€Œ ¾-INCH (+/-) 1/8-
INCH BLACK OUTLINE ON OUTSIDE EDGE OF WHITE LEGEND ON A RED BACKGROUND.
€¢ REPLACE EXISTING TAXIWAY LOCATION SIGNS WITH TYPE L-858L TAXIWAY LOCATION SIGNS €€Œ YELLOW LEGEND AND BORDER
ON A BLACK BACKGROUND.
€¢ REPLACE ALL RELATED ISOLATION TRANSFORMERS WITH NEW.
€¢ BRUSH CLEAN EXISTING CONCRETE PADS OF STAINS AND DIRT AND APPLY SEAL COAT.
€¢ INSTALL NEW SIGNS WITH STAINLESS STEEL ANCHORS AND TETHER AS REQUIRED.
€¢ INSTALL, TERMINATE, AND VERIFY ALL LOCAL CABLING FOR NEW AIRFIELD SIGNS.
€¢ INSTALL STAINLESS STEEL BIRD DETERRENT SPIKES TO TOP OF SIGNS.
€¢ PROVIDE OPERATIONAL TESTING OF THE NEW AIRFIELD SIGNS WITH SITE PERSONNEL.
€¢ HAUL TO VSFB RECYCLING ALL REMOVED EQUIPMENT AND
CABLING.
RELOCATE (1) ALTIMETER CHECK POINT SIGN
€¢ DEMO EXISTING ALTIMETER CHECK POINT SIGN INCLUDING EXISTING CONCRETE PAD.
€¢ EXTEND INFRASTRUCTURE INCLUDING CONDUIT, TRANSFORMER BOX, AND CABLING 10€„¢ FURTHER FROM RUNWAY.
€¢ INSTALL NEW CONCRETE HOUSEKEEPING PAD.
€¢ APPLY SEAL COAT TO NEW CONCRETE PAD.
€¢ SET NEW ALTIMETER CHECK POINT SIGN WITH STAINLESS STEEL ANCHORS AND TETHER AS REQUIRED.
€¢ INSTALL NEW ISOLATION TRANSFORMER AND EXTEND CABLING AS NECESSARY.
€¢ INSTALL STAINLESS STEEL BIRD DETERRENT SPIKES TO TOP OF SIGNS.
€¢ PROVIDE OPERATIONAL TESTING OF THE NEW ALTIMETER CHECK POINT SIGN WITH SITE PERSONNEL.
€¢ HAUL TO VSFB RECYCLING ALL REMOVED EQUIPMENT AND
CABLING.
INSTALL (2) WIND CONES
€¢ LAYOUT NEW WIND CONES MINIMUM 400€„¢ FROM RUNWAY CENTERLINE.
€¢ AUGER HOLE FOR NEW WIND CONE FOUNDATIONS.
€¢ PROVIDE TRENCHING, CONDUIT, AND CABLING TO POWER NEW WIND CONES.
€¢ INSTALL CONCRETE FOUNDATIONS FOR NEW WIND CONE ASSEMBLIES.
DOCUSIGN ENVELOPE ID: 46589CEC460B5164--5FD1304A--44A6F344--A92D50F5--074E45CA2E43FF0BF1719D17
CONTRACTOR€„¢S INITIALS _______ PAGE 4 OF 24 SUBCONTRACTOR€„¢S INITIALS _______
€¢ INSTALL NEW SINGLE RED LED WITH IR OBSTRUCTION LIGHTING ASSEMBLY, AND WINDSOCK.
€¢ INSTALL, TERMINATE, AND VERIFY NEW CABLING.
€¢ PROVIDE OPERATIONAL TESTING OF THE NEW WIND CONES WITH SITE PERSONNEL.
SHOP DRAWINGS / AS-BUILTS
€¢ PROVIDE SHOP DRAWINGS AND AS-BUILTS. 1914-52 Parent award context Parent award agency: Department of Defense · Department of the Air Force Parent award NAICS: 236220 Parent award performance state: CA Parent award description: REPLACE AIRFIELD RUNWAY SIGNS View parent award on USAspending | FA461020D0003USAspending | $277,080 | Aug 23, 2024 | — – — |
| Subcontractor | Department of Defense | TRAINING AND MOBILIZATION:
€¢ ALL PERSONNEL WILL BE PROPERLY TRAINED ON FLIGHTLINE GUIDANCE AND SAFETY REQUIREMENTS, ENTRY CONTROL
PROCEDURES AND AIRFIELD DRIVER€„¢S CERTIFICATION PRIOR TO MOBILIZATION.
€¢ ALL APPROPRIATE SIGNAGE WILL BE POSTED PRIOR TO MOBILIZATION.
REPLACE (26) RUNWAY DISTANCE REMAINING (RDR) SIGNS:
€¢ TYPE L-858B RUNWAY DISTANCE REMAINING SIGNS €€Œ TYPE L-858B, THAT THE INSCRIPTION IS A WHITE NUMERAL
(LEGEND) ON A BLACK BACKGROUND.
€¢ DEMO RDR SIGNS ONE AT A TIME, CONFIRMING OPERATION PRIOR TO MOVING ON.
€¢ BRUSH CLEAN EXISTING CONCRETE PADS OF STAINS AND DIRT AND APPLY SEAL COAT
€¢ REMOVE AND REPLACE WITH NEW 26 TOTAL ISOLATION TRANSFORMERS.
€¢ PROVIDE AND INSTALL 26 TOTAL NEW COVERS AND HARDWARE AS REQUIRED.
€¢ INSTALL NEW RDR SIGNS WITH STAINLESS STEEL ANCHORS AND TETHER AS REQUIRED.
€¢ INSTALL, TERMINATE, AND VERIFY ALL LOCAL CABLING FOR NEW RDR SIGNS
€¢ INSTALL STAINLESS STEEL BIRD DETERRENT SPIKES TO TOP OF NEW SIGNS.
€¢ PROVIDE OPERATIONAL TESTING OF THE NEW RDR SIGNS WITH SITE PERSONNEL.
€¢ DELIVER OLD ITX TRANSFORMERS TO 30CES ELECTRICAL SHOP
€¢ HAUL TO VSFB RECYCLING ALL REMOVED EQUIPMENT AND CABLING. ANY REMAINING WASTE MATERIAL WILL BE
DISPOSED OF PROPERLY AT A LOCAL LANDFILL.
€¢ PROVIDE SHOP DRAWINGS AND AS-BUILTS 1914-51 · Prime awardUSAspending | FA461020D0003USAspending | $177,487 | Aug 23, 2024 | — – — |
| Subcontractor | Department of Defense | DESIGN 230001.02 Parent award context Parent award agency: Department of Defense · Department of the Air Force Parent award NAICS: 236220 Parent award performance state: CA Parent award description: REHABILITATE BUILDING 15501 ON VANDENBERG SPACE FORCE BASE, CALIFORNIA View parent award on USAspending | FA461020D0009USAspending | $145,500 | Jul 19, 2024 | — – — |
| Subcontractor | Department of Defense | 1. PROVIDE CONSTRUCTION AND AS€Ͽ½BUILT DRAWINGS FOR RELEVANT SCOPE OF WORK.
2. INSTALL (12) NEW ELEVATED TAXIWAY ENTRY/EXIT LED LIGHT FIXTURE ASSEMBLIES TO MATCH EXISTING.
3. REMOVE AND REPLACE (5) LED LIGHT BULBS FOR EXISTING TAXIWAY ENTRY/EXIT LIGHT FIXTURES.
4. REMOVE AND REPLACE (6) EXISTING ISOLATION TRANSFORMERS FOR EXISTING TAXIWAY ENTRY/EXIT LIGHT FIXTURES, AND (6) NEW ISOLATION
TRANSFORMERS FOR NEW ENTRY/EXIT LIGHT FIXTURES; (12) TOTAL ISOLATION TRANSFORMERS. REMOVED ISOLATION TRANSFORMERS WILL BE
TURNED INTO ELECTRICAL SHOP.
5. INSTALL NEW CABLING AND TERMINATIONS AS NECESSARY TO COMPLETE ADDITIONAL TAXIWAY ENTRY/EXIT LIGHTING ADDITIONS.
6. REMOVE OLD FLAKING YELLOW PAINT FROM CONCRETE PADS; (6) TOTAL LOCATIONS.
7. INSTALL NEW REFLECTIVE YELLOW PAINT ON CONCRETE PADS; (6) TOTAL LOCATIONS.
8. REMOVE AND REPLACE (4) DUAL RED LED WITH IR OBSTRUCTION LIGHT FIXTURES PER FAA REQUIREMENTS.
9. DEMOLISH EXISTING CONCRETE BASE, AIRFIELD SINGLE RED OBSTRUCTION LIGHTING ASSEMBLY, AND WINDSOCK.
10. INSTALL (1) NEW CONCRETE BASE, SINGLE RED LED WITH IR OBSTRUCTION LIGHTING ASSEMBLY, AND WINDSOCK.
11. HAUL TO VSFB RECYCLING ALL REMOVED MATERIALS.
12. PROVIDE OPERATIONAL TESTING OF THE NEW LIGHTING WITH SITE PERSONNEL. 1914-43 · Prime awardUSAspending | FA461020D0003USAspending | $109,407 | Apr 9, 2024 | — – — |
| Subcontractor | Department of Defense | ELECTRICAL DESIGN AND INSTALLATION 24-151-01 Parent award context Parent award agency: Department of Defense · Department of the Air Force Parent award NAICS: 236220 Parent award performance state: CA Parent award description: THIS PROJECT IS DESIGN/BUILD CONSTRUCTION REQUIREMENT TO CONSTRUCT NEW MOBILE OPTICS FACILITY AT SANTA YNEZ PEAK FOR VANDENBERG SPACE FORCE BASE (SFB). View parent award on USAspending | — | $445,000 | Oct 27, 2023 | — – — |
| Subcontractor | Department of Defense | PROVIDE TEMPORARY POWER AND TELECOMMUNICATION CABLING FOR TEMPORARY ECP FURNISHED AND INSTALLED BY OTHERS.
INSTALL POWER TO NEW EXHAUST FAN IN RESTROOM FURNISHED AND INSTALLED BY OTHERS. INSTALL POWER TO NEW SPLIT SYSTEM IN MAIN AREA FURNISHED AND INSTALLED BY OTHERS. DEMO AND INSTALL NEW INTERIOR LED LIGHTING AND SWITCHES IN MAIN AREA AND RESTROOM.
5. DEMO AND INSTALL NEW DUPLEX/GFCI RECEPTACLES AS REQUIRED. 23055-01 Parent award context Parent award agency: Department of Defense · Department of the Air Force Parent award NAICS: 236220 Parent award performance state: CA Parent award description: RENOVATE GUARD SHACK RESTROOMS AND REPAIR WINDOW View parent award on USAspending | FA461020D0001USAspending | $50,770 | Oct 3, 2023 | — – — |
| Subcontractor | Department of Defense | MOBILIZATION:
€¢ MOBILIZE TO SITE
€¢ ALL APPROPRIATE SIGNAGE WILL BE POSTED PRIOR TO MOBILIZATION.
ALSF-2 SEQUENCE FLASHING LIGHTS: RUNWAY 30
€¢ DEMO EXISTING SFLS , MCCS, ICCS
€¢ REMOVE AND REPLACE AS NECESSARY ANY VISIBLY DAMAGED CABLING IN SPECIFIC LOCATIONS FOR SFLS
€¢ INSTALL NEW (MCC) MASTER CONTROL CABINETS SS, (1 TOTAL)
€¢ INSTALL NEW (ICC) INDIVIDUAL CONTROL CABINETS SS, (21 TOTAL)
€¢ INSTALL NEW JUNCTION BOXES SS, (21 TOTAL)
€¢ INSTALL NEW ALSF FLASHER HEADS (21 TOTAL)
€¢ INSTALL, TERMINATE AND VERIFY LOCAL CABLING FOR NEW SFLS
€¢ PROVIDE OPERATIONAL TESTING OF THE NEW SFLS WITH SITE PERSONNEL.
€¢ HAUL TO VSFB RECYCLING ALL REMOVED EQUIPMENT AND CABLING
ALSF-2 SEQUENCE FLASHING LIGHTS: RUNWAY 12
€¢ DEMO EXISTING SFLS , MCCS, ICCS
€¢ REMOVE AND REPLACE AS NECESSARY ANY VISIBLY DAMAGED CABLING IN SPECIFIC LOCATIONS FOR SFLS
€¢ INSTALL NEW (MCC) MASTER CONTROL CABINETS SS, (1 TOTAL)
€¢ INSTALL NEW (ICC) INDIVIDUAL CONTROL CABINETS SS, (21 TOTAL)
€¢ INSTALL NEW JUNCTION BOXES SS, (21 TOTAL)
€¢ INSTALL NEW ALSF FLASHER HEADS (21 TOTAL)
€¢ INSTALL, TERMINATE AND VERIFY LOCAL CABLING FOR NEW SFLS
€¢ PROVIDE OPERATIONAL TESTING OF THE NEW SFLS WITH SITE PERSONNEL.
€¢ HAUL TO VSFB RECYCLING ALL REMOVED EQUIPMENT AND CABLING
ALSF-2 ELEVATED STEADY BURN LIGHTS: RUNWAY 30
€¢ DEMO EXISTING ELEVATED STEADY BURN LIGHTS (121 TOTAL)
€¢ DEMO EXISTING ISOLATION TRANSFORMERS (121 TOTAL)
€¢ DEMO EXISTING SUPPORT STANDS AS REQUIRED TO SUPPORT NEW INSTALLATIONS.
€¢ INSTALL NEW STEADY BURN LIGHTS W/ 300W Q20/PAR56/C (121 TOTAL)
€¢ INSTALL NEW ISOLATION TX 300W FOR STEADY BURN LIGHTS (121 TOTAL)
€¢ INSTALL NEW SUPPORT HARDWARE AS NECESSARY TO ACCOMMODATE STEADY BURNS.
€¢ INSTALL, TERMINATE, AND VERIFY LOCAL CABLING FOR NEW STEADY BURN LIGHTS.
€¢ HAUL TO VSFB RECYCLING ALL REMOVED EQUIPMENT AND CABLING.
ALSF-2 ELEVATED STEADY BURN LIGHTS: RUNWAY 12
€¢ DEMO EXISTING ELEVATED STEADY BURN LIGHTS (121 TOTAL)
€¢ DEMO EXISTING ISOLATION TRANSFORMERS (121 TOTAL)
€¢ DEMO EXISTING SUPPORT STANDS AS REQUIRED TO SUPPORT NEW INSTALLATIONS.
€¢ INSTALL NEW STEADY BURN LIGHTS W/ 300W Q20/PAR56/C (121 TOTAL)
€¢ INSTALL NEW ISOLATION TX 300W FOR STEADY BURN LIGHTS (121 TOTAL)
€¢ INSTALL NEW SUPPORT HARDWARE AS NECESSARY TO ACCOMMODATE STEADY BURNS.
€¢ INSTALL, TERMINATE, AND VERIFY LOCAL CABLING FOR NEW STEADY BURN LIGHTS.
€¢ HAUL TO VSFB RECYCLING ALL REMOVED EQUIPMENT AND CABLING.
APPROACH LIGHT CCR REPLACEMENT (2) 70KW AND (3) 50KW: RUNWAY 30 AND RUNWAY 12
€¢ REMOVE AND REPLACE 50KW 20A 480V 5S L829 ACE3+IRMS+ICVM (3 TOTAL)
€¢ REMOVE AND REPLACE S-1 SERIES CUTOUT (5 TOTAL)
€¢ REMOVE AND REPLACE S-1 ENCLOSURE FOR SCO CUTOUT (5 TOTAL) 1914-36 Parent award context Parent award agency: Department of Defense · Department of the Air Force Parent award NAICS: 236220 Parent award performance state: CA Parent award description: REPAIR RUNWAY SEQUENCE FLASHING LIGHTS AT VANDENBERG AIRFIELD. View parent award on USAspending | FA461020D0003USAspending | $2,052,369 | Jul 21, 2023 | — – — |
| Subcontractor | Department of Defense | FACILITY 1974 EQUIPMENT DISCONNECT AND REMOVAL:
· PRIOR TO START OF WORK, ELECTRICAL OUTAGE AND LOCK OUT TAG OUT PROCEDURES WILL BE COORDINATED WITH
30CES MISSION ENGINEERING AND EXTERIOR ELECTRIC.
· SITE PRIMARY POWER OUTAGE TO BE PERFORMED BY CE. (DISCONNECT AND RE€Ͽ½CONNECT OF SITE PRIMARY
POWER) PRIOR TO DEMO AND AFTER COMPLETION OF ATS CHANGE OUT.
· EXISTING ATS, POWER FILTER AND CABINET WILL BE DEMOLISHED AND TURNED INTO VSFB RECYCLE CENTER (RECEIPT
TO BE PROVIDED).
INSTALLATION:
· INSTALL NEW TRYSTAR 400A 208Y/120V ATS DOCKING STATION UL50 LISTED NEMA 4X.
· PROVIDE AND INSTALL GENERATOR POWER RECEPTACLE FOR GENERATOR POWER TIE€Ͽ½IN WITH: €Ͽ½EXTERNAL CAM€Ͽ½LOK
CONNECTORS P/N E0400€Ͽ½1662 A, B, C, N, G.
· PROVIDE AND INSTALL GENERATOR STARTUP CIRCUIT AND A FUSE/BREAKER PROTECTED 30 AMP POWER CIRCUIT FOR
GENERATOR BATTERY CHARGER AND HEATER, WITH 8 AWG INTERNAL CABINET WIRE. EXTERNAL CAM€Ͽ½LOK CONNECTOR
P/N R16SS03N2X1
· PROVIDE AND INSTALL INCOMING SURGE PROTECTION. €Ͽ½ SURGE PROTECTION DEVICE€Ͽ½3 PHASE 208Y €€Œ EATON PART#
SPM800208Y3W.
· PROVIDE AND INSTALL STAINLESS STEEL CABINET SPACE OR MOUNTED BOX SPACE FOR LATER INSTALLATION OF THE ATS
REMOTE ENVIRONMENTAL CONTROL SYSTEM MONITOR (RECM) WHICH WILL BE PROVIDED AND INSTALLED BY OTHERS.
FACILITY 1963 (LF10) EQUIPMENT DISCONNECT AND REMOVAL:
· PRIOR TO START OF WORK, ELECTRICAL OUTAGE AND LOCK OUT TAG OUT PROCEDURES WILL BE COORDINATED WITH
30CES MISSION ENGINEERING AND EXTERIOR ELECTRIC.
· SITE PRIMARY POWER OUTAGE TO BE PERFORMED BY CE. (DISCONNECT AND RE€Ͽ½CONNECT OF SITE PRIMARY
POWER) PRIOR TO DEMO AND AFTER COMPLETION OF ATS CHANGE OUT.
· EXISTING ATS, POWER FILTER AND CABINET WILL BE DEMOLISHED AND TURNED INTO VSFB RECYCLE CENTER (RECEIPT
TO BE PROVIDED).
INSTALLATION:
· INSTALL NEW TRYSTAR 400A 208Y/120V ATS DOCKING STATION UL50 LISTED NEMA 4X.
· PROVIDE AND INSTALL GENERATOR POWER RECEPTACLE FOR GENERATOR POWER TIE€Ͽ½IN WITH: €Ͽ½EXTERNAL CAM€Ͽ½LOK
CONNECTORS P/N E0400€Ͽ½1662 A, B, C, N, G.
· PROVIDE AND INSTALL GENERATOR STARTUP CIRCUIT AND A FUSE/BREAKER PROTECTED 30 AMP POWER CIRCUIT FOR
GENERATOR BATTERY CHARGER AND HEATER, WITH 8 AWG INTERNAL CABINET WIRE. EXTERNAL CAM€Ͽ½LOK CONNECTOR
P/N R16SS03N2X1
· PROVIDE AND INSTALL INCOMING SURGE PROTECTION. €Ͽ½ SURGE PROTECTION DEVICE€Ͽ½3 PHASE 208Y €€Œ EATON PART#
SPM800208Y3W.
· PROVIDE AND INSTALL STAINLESS STEEL CABINET SPACE OR MOUNTED BOX SPACE FOR LATER INSTALLATION OF THE ATS
REMOTE ENVIRONMENTAL CONTROL SYSTEM MONITOR (RECM) WHICH WILL BE PROVIDED AND INSTALLED BY OTHERS. 1914-37 · Prime awardUSAspending | FA461020D0003USAspending | $180,731 | Jul 19, 2023 | — – — |
| Subcontractor | Department of Defense | INSTALL NEW DEDICATED ELECTRICAL SERVICE TO PUMP HOUSE IN ACCORDANCE WITH ELECTRICAL CODE
NFPA70 ARTICLE 695. NEW FIRE PUMP SYSTEM WILL BE CONSTRAINED BY AVAILABLE ELECTRICAL SERVICE
DETERMINED IN DESIGN PROCESS AND APPROVED BY GOVERNMENT AHJ.
B. REMOVE EXISTING 45KVA DRY TYPE TRANSFORMER.
C. REMOVE AND REPLACE EXISTING ELECTRICAL POWER CONDUIT AND WIRE AS NECESSARY IN SUPPORT OF FIRE
PUMP CONTROL CABINET AND PUMP REPLACEMENT.
D. REMOVE AND REPLACE EXISTING ELECTRICAL POWER CONDUIT AND WIRE AS NECESSARY IN SUPPORT OF
JOCKEY PUMP CONTROL CABINET AND PUMP REPLACEMENT.
E. REMOVE AND REPLACE EXISTING FACP CONDUIT ONLY IN PUMP HOUSE ONLY AS NECESSARY IN SUPPORT OF
FIRE PUMP REPLACEMENT.
F. PROVIDE ELECTRICAL POWER TO THE NEW VENTILATION/EXHAUST FAN AS NECESSARY 23006-02 Parent award context Parent award agency: Department of Defense · Department of the Air Force Parent award NAICS: 236220 Parent award performance state: CA Parent award description: INSTALLATION OF FIRE PUMP SYSTEM, VANDENBERG SPACE FORCE BASE, CALIFORNIA View parent award on USAspending | FA461020D0006USAspending | $168,784 | Jun 16, 2023 | — – — |
| Subcontractor | Department of Defense | BAYS 3, 4, AND 5 €€Œ AIR HANDLING, CHILLER, AND BOILER SYSTEMS
A. MODIFY EXISTING FACILITY POWER TO SUPPORT NEW HVAC EQUIPMENT APPROVED DESIGN AND INSTALLATION.
B. PROVIDE POWER TO NEW AIR HANDLING UNITS SUPPORTING B1546 BAY 3, 4, AND 5.
C. PROVIDE POWER TO NEW CHILLER SYSTEM SUPPORTING B1546 BAYS 3, 4, AND 5.
D. PROVIDE POWER TO NEW BOILER SYSTEM SUPPORTING B1546 BAYS 3, 4, AND 5.
E. MODIFY EXISTING FIRE ALARM SYSTEM DUCT DETECTORS AS NECESSARY TO SUPPORT NEW APPROVED HVAC DESIGN. DEMO
EXISTING EQUIPMENT, RACEWAYS, AND COMPONENTS, INSTALL NEW CONDUIT, WIRING, AND COMPONENTS, PROGRAM, AND TEST AS
NECESSARY TO RELOCATE DUCT DETECTORS.
F. REMOVE AND DISPOSE OF ANCILLARY ELECTRICAL WASTE INTO DUMPSTER PROVIDED BY OTHERS.
CLIN 3 €€Œ BAYS 1 AND 2 CHILLER, BOILER SYSTEMS
A. MODIFY EXISTING FACILITY POWER TO SUPPORT NEW HVAC EQUIPMENT APPROVED DESIGN AND INSTALLATION.
B. PROVIDE POWER TO NEW CHILLER SYSTEM SUPPORTING B1546 BAYS 1, 2, AND OFFICE.
C. PROVIDE POWER TO NEW BOILER SYSTEM SUPPORTING B1546 BAYS 1, 2, AND OFFICE.
D. REMOVE AND DISPOSE OF ANCILLARY ELECTRICAL WASTE INTO DUMPSTER PROVIDED BY OTHERS 22085-02 Parent award context Parent award agency: Department of Defense · Department of the Air Force Parent award NAICS: 236220 Parent award performance state: CA Parent award description: XUMU171116B REPAIR HVAC SYSTEM B1546 IN VANDENBERG SPACE FORCE BASE, CALIFORNIA View parent award on USAspending | FA461020D0006USAspending | $766,542 | Apr 26, 2023 | — – — |
| Subcontractor | Department of Defense | BAYS 3, 4, AND 5 €€Œ AIR HANDLING, CHILLER, AND BOILER SYSTEMS
A. MODIFY EXISTING FACILITY POWER TO SUPPORT NEW HVAC EQUIPMENT APPROVED DESIGN AND INSTALLATION.
B. PROVIDE POWER TO NEW AIR HANDLING UNITS SUPPORTING B1546 BAY 3, 4, AND 5.
C. PROVIDE POWER TO NEW CHILLER SYSTEM SUPPORTING B1546 BAYS 3, 4, AND 5.
D. PROVIDE POWER TO NEW BOILER SYSTEM SUPPORTING B1546 BAYS 3, 4, AND 5.
E. MODIFY EXISTING FIRE ALARM SYSTEM DUCT DETECTORS AS NECESSARY TO SUPPORT NEW APPROVED HVAC DESIGN. DEMO
EXISTING EQUIPMENT, RACEWAYS, AND COMPONENTS, INSTALL NEW CONDUIT, WIRING, AND COMPONENTS, PROGRAM, AND TEST AS
NECESSARY TO RELOCATE DUCT DETECTORS.
F. REMOVE AND DISPOSE OF ANCILLARY ELECTRICAL WASTE INTO DUMPSTER PROVIDED BY OTHERS.
CLIN 3 €€Œ BAYS 1 AND 2 CHILLER, BOILER SYSTEMS
A. MODIFY EXISTING FACILITY POWER TO SUPPORT NEW HVAC EQUIPMENT APPROVED DESIGN AND INSTALLATION.
B. PROVIDE POWER TO NEW CHILLER SYSTEM SUPPORTING B1546 BAYS 1, 2, AND OFFICE.
C. PROVIDE POWER TO NEW BOILER SYSTEM SUPPORTING B1546 BAYS 1, 2, AND OFFICE.
D. REMOVE AND DISPOSE OF ANCILLARY ELECTRICAL WASTE INTO DUMPSTER PROVIDED BY OTHERS 22085-02 Parent award context Parent award agency: Department of Defense · Department of the Air Force Parent award NAICS: 236220 Parent award performance state: CA Parent award description: XUMU171116B REPAIR HVAC SYSTEM B1546 IN VANDENBERG SPACE FORCE BASE, CALIFORNIA View parent award on USAspending | FA461020D0006USAspending | $755,487 | Apr 26, 2023 | — – — |
| Subcontractor | Department of Defense | ELECTRICAL/GENERATOR 230001.08 Parent award context Parent award agency: Department of Defense · Department of the Air Force Parent award NAICS: 236220 Parent award performance state: CA Parent award description: REHABILITATE BUILDING 15501 ON VANDENBERG SPACE FORCE BASE, CALIFORNIA View parent award on USAspending | FA461020D0009USAspending | $1,300,390 | Apr 19, 2023 | — – — |
| Subcontractor | Department of Defense | ELECTRICAL/GENERATOR 230001.08 Parent award context Parent award agency: Department of Defense · Department of the Air Force Parent award NAICS: 236220 Parent award performance state: CA Parent award description: REHABILITATE BUILDING 15501 ON VANDENBERG SPACE FORCE BASE, CALIFORNIA View parent award on USAspending | FA461020D0009USAspending | $1,284,050 | Apr 19, 2023 | — – — |
| Subcontractor | Department of Defense | DESIGN 230001.02 Parent award context Parent award agency: Department of Defense · Department of the Air Force Parent award NAICS: 236220 Parent award performance state: CA Parent award description: REHABILITATE BUILDING 15501 ON VANDENBERG SPACE FORCE BASE, CALIFORNIA View parent award on USAspending | FA461020D0009USAspending | $97,500 | Feb 27, 2023 | — – — |
| Subcontractor | Department of Defense | CONSULTATION AND COORDINATION SUPPORT:
€¢ VISIT PROJECT SITE TO ASSIST IN DETERMINING FACILITIES AFFECTED BY PROPOSED POWER OUTAGES.
€¢ CONSULT ON FEASIBILITY OF POWER OUTAGES OR ALTERNATIVE METHODS OF TEMPORARY POWER.
€¢ SUPPORT COORDINATION OF PROPOSED POWER OUTAGES WITH SCL, 30CES, AND TW POWERLINE.
€¢ PROPOSE POINT OF CONNECTION FOR ANY REQUIRED TEMPORARY GENERATOR.
€¢ CONSULT AND SUPPORT COORDINATION OF TEMPORARY GENERATOR RENTAL EQUIPMENT BY SCL.
€¢ TEMPORARY GENERATOR HOOKUPS/REMOVALS.
2. QUALITY ASSURANCE:
€¢ SUPPORT CREATION OF MOP FOR LOW VOLTAGE (<600V) TEMPORARY GENERATOR CONNECTIONS.
€¢ REVIEW MOP FOR ACTIVITIES PERFORMED BY OTHERS (OVER 600V).
€¢ REVIEW PROPOSED B1 LINE POWER OUTAGES ARE WITHIN SCL€„¢S SCOPE OF WORK. 22-0001.06 Parent award context Parent award agency: Department of Defense · Department of the Air Force Parent award NAICS: 236220 Parent award performance state: CA Parent award description: REPAIR OVERHEAD DISTRIBUTION LINE B1 AT VANDENBERG SPACE FORCE BASE View parent award on USAspending | FA461020D0009USAspending | $5,000 | Jan 24, 2023 | — – — |
| Subcontractor | Department of Defense | DEMOLITION: ALL FIVE EXISTING HEATERS AND SUPPORTS WILL BE DEMOLISHED AND DISPOSED OF OFF BASE OR AS REQUIRED.
ON SITE CONSTRUCTION:
€¢ REPLACE EXISTING 5 TOTAL 20€„¢ TRUCK BAY HEATERS WITH INFRARED HEATERS FOR HARSH ENVIRONMENTS, INCLUDING CALORIZED
ALUMINIZED EMITTER TUBES, BURNER BOX, HEAVY DUTY HIGH TEMP GASKETS, 3-MIL EPOXY COATED, AND ASTM B58 TESTED.
€¢ REMOVE AND REPLACE 5 TOTAL 4€Ͽ½ AIR-INTAKE SINGLE WALL ROUND DUCT FROM BAY HEATERS TO 6€Ͽ½ ROOF PENETRATION.
€¢ REMOVE AND REPLACE 5 TOTAL 4€Ͽ½ COMBUSTION EXHAUST SINGLE WALL ROUND DUCT FROM EXISTING BAY HEATERS TO 6€Ͽ½ ROOF
PENETRATION.
€¢ REMOVE AND REPLACE 5 TOTAL 36€Ͽ½GAS FLEX LINES INCLUDING ANY GAS VALVE AND PIPE NECESSARY TO ATTACH TO NEW BAY
HEATERS.
€¢ REMOVE AND REPLACE 5 TOTAL DIGITAL LINE VOLTAGE THERMOSTATS. RELOCATE AS NECESSARY. 1914-30 · Prime awardUSAspending | FA461020D0003USAspending | $37,394 | Oct 3, 2022 | — – — |
| Subcontractor | Department of Defense | FURNISH ALL LABOR, EQUIPMENT, MATERIALS, AND DESIGN-ASSIST SERVICES FOR THE XUMU 17-1121C3, RENOVATE MILITARY WORKING DOG OBEDIENCE COURSE, B6447
PROJECT LOCATED AT THE VANDENBERG SFB, CA 93437. 220006.02 Parent award context Parent award agency: Department of Defense · Department of the Air Force Parent award NAICS: 236220 Parent award performance state: CA Parent award description: RENOVATE MILITARY WORKING DOG OBEDIENCE COURSE, BUILDING 6447 PROJECT NUMBER 17-1121C3 View parent award on USAspending | FA461020D0009USAspending | $217,760 | Aug 18, 2022 | — – — |
| Subcontractor | Department of Defense | FURNISH ALL LABOR, EQUIPMENT, MATERIALS, AND DESIGN-ASSIST SERVICES FOR THE XUMU 17-1121C3, RENOVATE MILITARY WORKING DOG OBEDIENCE COURSE, B6447
PROJECT LOCATED AT THE VANDENBERG SFB, CA 93437. 220006.02 Parent award context Parent award agency: Department of Defense · Department of the Air Force Parent award NAICS: 236220 Parent award performance state: CA Parent award description: RENOVATE MILITARY WORKING DOG OBEDIENCE COURSE, BUILDING 6447 PROJECT NUMBER 17-1121C3 View parent award on USAspending | FA461020D0009USAspending | $215,250 | Aug 18, 2022 | — – — |
| Subcontractor | Department of Defense | MOBILIZE: ALL APPROPRIATE SIGNS WILL BE POSTED. A PORTABLE JOHN WILL BE PROVIDED THROUGHOUT THE CONSTRUCTION PHASE
OF THIS PROJECT.
SELECTIVE DEMOLITION: ISOLATE AND SAFE OFF WATER FROM MAIN TANK (LOCK OUT TAG OUT). ISOLATE AND SAFE OFF WATER TO
MAIN PUMP HOUSE (LOCK OUT TAG OUT). IDENTIFY, ISOLATE AND SAFE OFF ALL POWER TO FUEL TANK, CONTROLLER, MOTOR AND PUMP
(LOCK OUT TAG OUT). FUEL TANK WILL BE DRAINED OF ALL DIESEL. DIESEL FUEL DISPOSAL WILL BE COORDINATED CEPM. FUEL TANK,
FUEL LINES, MOTOR, PUMP CONTROLLER SYSTEM, PIPING AND VALVES WILL BE DEMOED AND REMOVED. DISPOSAL / RECLAMATION OF
ALL DEMOED MATERIAL WILL BE COORDINATED WITH CEPM.
FUEL TANK: PROVIDE AND INSTALL NEW ABOVE GROUND 280-GALLON FUEL TANK WITH FUEL PIPING AND VALVES TO DIESEL
PUMP, GAUGES, AND CONTROLS TO PROVIDE A COMPLETE AND OPERABLE FUEL DELIVERY SYSTEM TO DIESEL PUMP.
MOTOR / PUMP: INSTALL NEW CONCRETE PAD AS REQUIRED FOR NEW TEST HEADER N/W SIDE OF BUILDING. PROVIDE AND INSTALL
NEW 10€Ͽ½ TEST HEADER WITH (8) 2.5€Ͽ½ HOSE VALVES N/W SIDE OF BUILDING. EXISTING EQUIPMENT PAD TO BE MODIFIED AS
NECESSARY TO SUPPORT THE NEW PUMP, MOTOR, AND CONTROLLER. PROVIDE AND INSTALL A NEW 237HP DIESEL 2500 GPM FIRE
PUMP WITH RELATED CONTROLLER, APPURTENANCES, AND TEST HEADER. PROVIDE AND INSTALL NEW EXHAUST SYSTEM FOR DIESEL
PUMP. PROVIDE AND INSTALL AN NFPA 13-2019 COMPLIANT FIRE PUMP REPLACEMENT PER NFPA 20-2019, BID SET DOCUMENTS.
PROVIDE AND INSTALL ABOVE GROUND ALL NEW 10-INCH FIRE LINE PIPE AND VALVES WITHIN THE DIESEL PUMPHOUSE PER SOO BID
DOCUMENTS. (SEE ATTACHMENTS)
MATERIAL:
1. PATTERSON ENVIROFLO HORIZONTAL SPLIT CASE PUMP.
2. CLARKE FIRE PUMP ENGINE
3. FIRETROL MARK III DIESEL ENGINE FIRE PUMP CONTROLLER
4. CLA-VAL FIRE PROTECTION PRESSURE RELIEF VALVE
ELECTRICAL: PROVIDE AND INSTALL NEW DIESEL FIRE PUMP CONTROL PANEL AND ASSOCIATED CONTROLS. PROVIDE ELECTRICAL
CONNECTIONS AS REQUIRED FOR NEW EQUIPMENT. 1914-25 Parent award context Parent award agency: Department of Defense · Department of the Air Force Parent award NAICS: 236220 Parent award performance state: CA Parent award description: REPLACE DIESEL FIRE PUMP MOTOR AND CONTROLS View parent award on USAspending | FA461020D0003USAspending | $239,873 | Jul 26, 2022 | — – — |
| Subcontractor | Department of Defense | SUBCONTRACTOR AGREES TO FURNISH ALL NECESSARY MANAGEMENT, SUPERVISION, LABOR, EQUIPMENT, POWER, SUPPLIES, MATERIALS,
PERMITS, MACHINERY, TOOLS, CARTAGE, INSURANCE, ENGINEERING, TESTING, SERVICES, FACILITIES, AND ANY OTHER ACT OR THING ("LABOR AND
MATERIALS") REQUIRED TO DILIGENTLY AND FULLY PERFORM AND COMPLETE THE WORK DESCRIBED HEREIN IN STRICT COMPLIANCE WITH THE
CONSTRUCTION DRAWINGS AND PROJECT SPECIFICATIONS.
MOBILIZE TO SITE AND SET UP. ALL RELEVANT ELECTRICAL WILL BE MADE SAFE PRIOR TO START OF WORK. SAFE OFF AND DEMO EXISTING 12KV-
240/120V TRANSFORMER. SAFE OFF AND DEMO EXISTING PANEL. INSTALL ONE NEW 100KVA, 12KV-240/120V, SINGLE PHASE
TRANSFORMER WHERE EXISTING TRANSFORMER WAS DEMOED. INSTALL THREE NEW NEMA 3R SERVICE DISCONNECTS, ONE FOR EACH
EXTERIOR 5-TON CONDENSING UNIT, INCLUDING NECESSARY WIRE AND CONDUIT. INSTALL 1 NEW NEMA 3R SERVICE DISCONNECT FOR 1-TON
CONDENSING UNIT, INCLUDING NECESSARY WIRE AND CONDUIT. INSTALL ONE NEW 400A, 240/120V, SINGLE PHASE, NEMA 1, 42 SPACE,
DISTRIBUTION PANEL WITH 400A MAIN BREAKER, INCLUDING NECESSARY CONDUIT AND WIRE WHERE EXISTING PANEL WAS DEMOED. INSTALL
ONE NEW NEMA 1 SERVICE DISCONNECT FOR EACH NEW 5-TON FAN COIL UNITS IN MECHANICAL ROOM (THREE TOTAL), INCLUDING WIRE AND
CONDUIT. INSTALL ELECTRICAL FOR NEW 40-GALLON WATER HEATER WHERE EXISTING WATER HEATER WAS DEMOED. THE SUB PANEL WHICH
COINCIDES WITH THE MAIN PANEL WILL BE UPGRADED AS FOLLOWS TO ALLOW FOR ADDITIONAL POWER DISTRIBUTION TO SITE. EXISTING PANELS
ARE ALREADY AT MAXIMUM AMPERAGE AND DISTRIBUTION CAPACITY. THIS FACILITY IS SINGLE PHASE 120/240V AND CURRENTLY WILL NOT
SUPPORT HVAC MODIFICATIONS.
MAIN PANEL REPLACEMENT WITH SERVICE UPGRADE:
REMOVE EXISTING: 1) 200A 240/120V 1PH 3W PANEL, 10KAIC RATED, 42 SPACE, SURFACE MOUNT, NEMA1
ENCLOSURE
REPLACE WITH: 1) 400A 240/120V 1PH 3W PANEL, 10KAIC RATED, 42 SPACE, SURFACE MOUNT, NEMA1
ENCLOSURE, FEED THROUGH LUGS, W/ (1) 2P-400A MAIN BREAKER, (1) 2P-100A (3) 2P-50A, (3) 2P-45A, (1) 2P-
20A, (26) 1P-20A BREAKERS
SUB PANEL REPLACEMENT:
REMOVE EXISTING: 1) 100A 240/120V 1PH 3W PANEL, 10KAIC RATED, 12 SPACE, SURFACE MOUNT, NEMA1
ENCLOSURE
REPLACE WITH: 1) 200A 240/120V 1PH 3W PANEL, 10KAIC RATED, 42 SPACE, SURFACE MOUNT, NEMA1
ENCLOSURE, MAIN LUGS ONLY, W/ (42) 1P-20A BREAKERS
PAD MOUNT TRANSFORMER REPLACEMENT WITH SERVICE UPGRADE:
REMOVE EXISTING: 1) 37.5KVA 12KV €€Œ 240/120V 1PH 3W, PAD MOUNT TRANSFORMER STEEL CONSTRUCTION
REPLACE WITH: 1) 100KVA 12KV €€Œ 240/120V 1PH 3W, PAD MOUNT TRANSFORMER STAINLESS STEEL (
VSFB STANDARDS ) W/ DGA TESTING.
ALL WORK PERFORMED IN A SINGLE DAY SHALL BE SECURED AT THE END OF THE DAY TO ENSURE FACILITY IS SECURED DURING NON-DUTY HOURS. 1914-22-A · Prime awardUSAspending | FA461020D0003USAspending | $99,644 | Jun 29, 2022 | — – — |
Contract vehicles are shown only when present in the source record. Linked award numbers and vehicles open the authoritative record on USAspending.gov.
Government-sourced data comes from SAM.gov, SBA and USAspending.gov and is attributed to its source. Items marked company-reported were provided by the company and are verified by FedSub only where labeled. FedSub is a private company and is not affiliated with SBA, GSA/SAM.gov, or any government agency.