THE BOEING COMPANY
SAINT LOUIS, MO, 63134
Prime contracting experience
Showing the 50 most recent of 82 records from government sources. Past participation is not evidence of current teaming interest.
| Role | Agency | Description | Vehicle | Obligated | Action date | Period |
|---|---|---|---|---|---|---|
| Prime | Department of Commerce National Oceanic and Atmospheric Administration | PROVIDES ENGINEERING SUPPORT FOR CONTINUED OPERATION OF THE GOES-NOP SERIES SPACECRAFT: GOES-13 (EWS-G1), GOES-14, AND GOES-15 (EWS-G2) IAW WITH THE STATEMENT OF WORK FOR A FIVE YEAR PERFORMANCE PERIOD. | — | $319,572 | Sep 25, 2026 | Sep 25, 2026 – Sep 24, 2031 |
| Prime | National Aeronautics and Space Administration National Aeronautics and Space Administration | PROPULSION AIRFRAME AEROACOUSTICS AND AIRCRAFT SYSTEM NOISE FLIGHT TEST ON THE ECODEMONSTRATOR 2019 BOEING 787 TESTBED AIRCRAFT. THE SCOPE OF THIS TASK ORDER IS TO PERFORM A TEST FLIGHT CAMPAIGN TO ACQUIRE ACOUSTIC FLIGHT DATA FOR THE PURPOSES OF PAA EFFECTS AND AIRCRAFT SYSTEM NOISE OBJECTIVES WITH THE CONTRACTOR PROVIDING FLIGHT SERVICES, AIRCRAFT DATA AND INFORMATION, ACOUSTIC INSTRUMENTATION, AND DATA PROCESSING SERVICES. | NNL16AA04BUSAspending | $4,814,888 | Sep 14, 2026 | May 22, 2019 – Jun 30, 2021 |
| Prime | National Aeronautics and Space Administration National Aeronautics and Space Administration | IGF::OT::IGF ARC JET TEST IN SUPPORT OF FLEXIBLE THERMAL PROTECTION SYSTEM EVALUATION AND DEVELOPMENT THE SCOPE OF THIS TASK ORDER IS TO EVALUATE FTPS LAYUPS AND MATERIALS AT COMPARABLE OR HARSHER SIMULATED ATMOSPHERIC REENTRY FLIGHT CONDITIONS. FTPS MATERIALS AND SYSTEMS WILL BE TESTED UTILIZING THE TEST FACILITY FOR UP TO 10 WEEKS OF TOTAL TEST TIME AT THREE SPECIFIC TEST CONDITIONS THAT SIMULATE RELEVANT TEST ENVIRONMENTS.THE OBJECTIVES FOR THIS TASK ORDER ARE AS FOLLOWS: OBJECTIVE ONE: EVALUATION OF FTPS LAYUPS AND MATERIALS AT FLIGHT-LIKE CONDITIONS SIMULATING A HEAT FLUX ENTRY CONDITION (SQUARE PULSE OR MISSION PROFILE IN STAGNATION OR SHEAR) OF 50 W/CM2 (HEAT FLUX BETWEEN 17 AND 50 W/CM2, PRESSURE BETWEEN 1.7 AND 10KPA). OBJECTIVE TWO: EVALUATION OF FTPS LAYUPS AND MATERIALS AT FLIGHT-LIKE CONDITIONS SIMULATING A HEAT FLUX ENTRY CONDITION (SQUARE PULSE OR MISSION PROFILE IN STAGNATION OR SHEAR) OF 50-75 W/CM2 (HEAT FLUX BETWEEN 50 AND 75 W/CM2, PRESSURE BETWEEN 3 AND 6KPA). OBJECTIVE THREE: EVALUATION OF FTPS LAYUPS AND MATERIALS AT FLIGHT-LIKE CONDITIONS SIMULATING A HEAT FLUX ENTRY CONDITION (SQUARE PULSE OR MISSION PROFILE IN STAGNATION OR SHEAR) OF 75-130 W/CM2 (HEAT FLUX BETWEEN 75 AND 130 W/CM2, PRESSURE BETWEEN 3 AND 10 KPA). | NNL16AA04BUSAspending | $538,852 | Aug 13, 2026 | Jun 19, 2017 – Oct 31, 2020 |
| Prime | Department of Defense Department of the Navy | BOEING PROPOSES SYNERGISTIC CHARACTERIZATION OF CORROSION PROTECTION, MECHANICAL CHARACTERISTICS, AND E3 PERFORMANCE OF ECC. A DATABASE WILL BE ESTABLISHED TO ACCURATELYPREDICT THE IMPACT OF MATERIAL CHANGES, CORROSION, AND FATIGUE ON E3 PERFORMANCE | — | $1,530,480 | Jul 20, 2026 | Sep 22, 2025 – Sep 21, 2029 |
| Prime | Department of Defense Department of the Air Force | CONCEPTUAL DESIGN FOR RESPONSIVE STRIKE AIRCRAFT (CORSAIR) | FA239123D0002USAspending | $1,725,000 | Jul 15, 2026 | May 11, 2026 – May 11, 2027 |
| Prime | Department of Defense Department of the Air Force | INTEGRATED POWER AND THERMAL MANAGEMENT SYSTEM (IPTMS) GROUND DEMONSTRATION | — | $5,852,183 | Jul 9, 2026 | May 12, 2023 – Jan 30, 2026 |
| Prime | Department of Defense Department of the Navy | LAB ANALYSIS SEVICES | — | $688,884 | Jul 8, 2026 | Feb 2, 2024 – Feb 1, 2027 |
| Prime | Department of Defense Department of the Navy | THIS EFFORT WILL GENERATE A DATABASE OF INLET DYNAMIC DISTORTION IN A HIGHLY OFFSET DIFFUSER. IN ADDITION TO TOTAL-PRESSURE DATA COLLECTED AT THE AERODYNAMIC INTERFACE PLANE, PARTICLE IMAGE VELOCIMETRY DATA WILL BE COLLECTED THROUGHOUT THE DUCT. | — | $716,432 | Jul 8, 2026 | Jul 8, 2026 – Jan 7, 2028 |
| Prime | Department of Transportation Federal Aviation Administration | THE BOEING COMPANY CONTRACT TBD TO FUND FUTURE AIR NAVIGATION SYSTEM FANS SUPPORT CLIN 1000 FANS 1A PROBLEM EVALUATION BASE YEAR | — | $2,274,472 | Jul 1, 2026 | Jul 14, 2021 – Sep 30, 2026 |
| Prime | Department of Defense Department of the Air Force | DISTRIBUTED METADATA MANAGER SERVICE/NETWORK MODELING PORTAL - DEVELOP, ANALYZE, DEMONSTRATE DIGITAL MODELS, SW/HW COMPONENTS ENABLING ADAPTIVE QOS MANAGED INFO SHARING ACROSS MULTIPLE SECURITY DOMAINS AND BLACK NETWORKS FOR TACTICAL EDGE ENVIRONMENT | — | $3,809,490 | Jun 29, 2026 | Sep 23, 2024 – Nov 22, 2027 |
| Prime | Department of Defense Department of the Air Force | ADVANCED CORE AND TERMINATION ANALYSIS (ACTA) TASK ORDER UNDER THE ADVANCED AEROSPACE SYSTEMS TECHNOLOGY RESEARCH (AASTR) IDIQ CONTRACT. | FA239123D0002USAspending | $536,512 | Jun 17, 2026 | Jun 17, 2026 – Sep 17, 2027 |
| Prime | Department of Defense Department of the Air Force | FORSEE | — | $11,047,737 | Jun 5, 2026 | Feb 14, 2024 – Feb 7, 2027 |
| Prime | Department of Defense Department of the Navy | PREDICTABLE COMMUNICATION SERVICE | — | $1,423,395 | May 13, 2026 | Aug 11, 2023 – Nov 24, 2026 |
| Prime | National Aeronautics and Space Administration National Aeronautics and Space Administration | THIS CONTRACT IS FOR THE DESIGN AND FABRICATION OF RADIATION HARDENED CHIPLET DEVICES | — | $30,517,691 | Apr 29, 2026 | Mar 31, 2017 – Feb 28, 2021 |
| Prime | National Aeronautics and Space Administration National Aeronautics and Space Administration | IGF::OT::IGF FUELEAP (FOSTERING ULTRA-EFFICIENT, LOW-EMITTING AVIATION POWER) POWER SYSTEM DESIGN, ANALYSIS, AND TESTING THE SCOPE OF THIS TASK ORDER IS TO DEVELOP ENGINEERING DATA TO SUPPORT THE DESIGN AND DEVELOPMENT OF A HEAVY-FUEL, HYBRID-ELECTRIC SOFC POWER SYSTEM (SOFC POWER SYSTEM) FOR AN AIRBORNE FLIGHT DEMONSTRATOR. THIS INCLUDES IDENTIFYING SYSTEM-LEVEL TRADEOFFS, IDENTIFYING PERFORMANCE, COST AND RISK OF DESIGN ALTERNATIVES, SELECTING COMPONENTS, AND QUANTIFYING SYSTEM PERFORMANCE THROUGH INTEGRATED ANALYSIS AND TESTING. THIS TASK ORDER SHALL GENERATE PRELIMINARY DESIGN DATA, TEST PLANS, AND SHALL EXECUTE COMPONENT-LEVEL AND INTEGRATED TESTED FOR SELECTED HIGH-RISK COMPONENTS, INCLUDING THE SOFC STACK AND FUEL REFORMER. | NNL16AA04BUSAspending | $2,211,184 | Apr 28, 2026 | Dec 16, 2016 – Apr 30, 2019 |
| Prime | National Aeronautics and Space Administration National Aeronautics and Space Administration | IGF::OT::IGF DFM SIMULATION THE SCOPE OF THIS TASK ORDER IS TO UPGRADE THE CAPABILITIES OF AN AFP PSS PACKAGE SO THAT IT BETTER INFORMS THE PART DESIGNER AND ANALYST OF MANUFACTURING CONSTRAINTS AND IMPACTS OF DESIGN DECISIONS ON PART PERFORMANCE AND QUALITY. THE CONTRACTOR SHALL VALIDATE THESE NEW SOFTWARE CAPABILITIES AS PART OF THIS TASK ORDER. THE UPGRADED SOFTWARE WILL ALLOW NASA TO BETTER DESIGN AND ANALYZE COMPOSITE PARTS MADE ON THE INTEGRATED STRUCTURAL ASSEMBLY OF ADVANCED COMPOSITES ISAAC AFP SYSTEM IN SUPPORT OF THE ACP AND OTHER NASA PROJECTS. | NNL16AA04BUSAspending | $590,771 | Apr 15, 2026 | Mar 16, 2017 – Jul 31, 2019 |
| Prime | Department of Defense Defense Microelectronics Activity | THE ADVANCED TECHNOLOGY SUPPORT PROGRAM (ATSP) CONTRACT ACQUIRES PROGRESSIVE MICROELECTRONIC CAPABILITY SOLUTIONS FOR THE SEA SWARMING PLATFORMS FOR INSTRUMENTATION AND DESTRUCT RELAY (SEASPIDR) WIDOW 2.0 SYSTEM. | HQ072716D0007USAspending | $2,631,768 | Apr 2, 2026 | Dec 18, 2025 – Oct 7, 2027 |
| Prime | Department of Defense Department of the Navy | SUPERSONIC INLET BLEED FLOW CHARACTERIZATION EXPERIMENTATION | — | $1,243,500 | Mar 31, 2026 | Apr 3, 2023 – Jan 15, 2027 |
| Prime | Department of Defense Defense Microelectronics Activity | THE ADVANCED TECHNOLOGY SUPPORT PROGRAM (ATSP) CONTRACT ACQUIRES PROGRESSIVE MICROELECTRONIC CAPABILITY SOLUTIONS FOR THE AN/ALE-47 SYSTEM AS INSTALLED ON THE P-8A POSEIDON AIRCRAFT. | HQ072716D0007USAspending | $1,377,469 | Mar 4, 2026 | Mar 4, 2026 – Nov 30, 2026 |
| Prime | Department of Defense Department of the Navy | DESIGN AND ANALYSIS OF STIFFENER TERMINATIONS FOR TACTICAL AIRCRAFT (DASTTA) | — | $1,355,000 | Jan 8, 2026 | Jul 10, 2024 – Jan 9, 2027 |
| Prime | Department of Defense Department of the Air Force | SYNTACTIC METAL MATRIX COMPOSITES FOR MULTIFUNCTIONAL AND TUNABLE HYPERSONIC AIRFRAME HOT STRUCTURES | — | $2,419,641 | Dec 3, 2025 | Mar 11, 2020 – Dec 31, 2025 |
| Prime | Department of Defense Department of the Air Force | IGF::OT::IGF BOEING LOCKHEED OR NORTHROP DEMONSTRATION INCLUDING ENGINE | FA865017D2401USAspending | $14,700,000 | Dec 1, 2025 | Jan 30, 2019 – Dec 1, 2025 |
| Prime | Department of Defense Department of the Navy | VALUE SELF-SEALING MATERIALS FOR FUEL BLADDERS | — | $1,149,907 | Nov 14, 2025 | Jun 29, 2022 – Jun 30, 2026 |
| Prime | Department of Defense Defense Contract Management Agency | LONG RANGE BROAD AGENCY ANNOUNCEMENT (BAA) FOR NAVY AND MARINE CORPS SCIENCE AND TECHNOLOGY IGF::CT::IGF | — | $1,166,832 | Sep 24, 2025 | May 26, 2016 – Apr 30, 2019 |
| Prime | Department of Defense Defense Contract Management Agency | IGF::CL::IGF ROBUST ROUTING IN DYNAMIC NETWORKS (R2DN) | — | $1,007,815 | Sep 15, 2025 | Nov 7, 2016 – Nov 9, 2019 |
| Prime | Department of Defense Defense Advanced Research Projects Agency | DARPA RESEARCH PROJECT | — | $13,740,410 | Aug 26, 2025 | Sep 23, 2021 – Jul 7, 2026 |
| Prime | Department of Defense Department of the Army | SERDP WP21-1188 APPLICATION OF SCHIFF BASE CHEMISTRY TO SURFACE PASSIVATION AND SEALING OF PLATED STEELS, ANODIZED ALUMINUM AND IVD COATINGS | — | $1,705,812 | Aug 25, 2025 | Sep 30, 2021 – Sep 29, 2026 |
| Prime | National Aeronautics and Space Administration National Aeronautics and Space Administration | THE PRIMARY OBJECTIVE FOR THIS TASK IS TO EVALUATE COATED C/C AT FLIGHT-LIKE CONDITIONS FOR THE PURPOSE OF DETERMINING SURVIVABILITY AND APPLICABILITY OF STATED MATERIAL SYSTEMS FOR FLIGHT APPLICATIONS. | NNL16AA04BUSAspending | $269,748 | Jul 22, 2025 | Nov 21, 2019 – Apr 9, 2021 |
| Prime | Department of Defense Department of the Navy | THE PURPOSE OF THIS EFFORT IS TO DEVELOP AND DELIVER AN ENGINEERING TOOL THAT INCORPORATES THE INTERACTION OF MECHANICAL, ENVIRONMENTAL AND GALVANIC STRESSES WHEN PREDICTING SERVICE LIFE OF NAVY AIRCRAFT STRUCTURES AND COMPONENTS. | — | $5,632,677 | Jul 17, 2025 | Aug 24, 2020 – Oct 31, 2025 |
| Prime | Department of Defense Defense Contract Management Agency | IGF::OT::IGF - NEAR NET SHAPE INLET FOR AN EXPENDABLE HIGH SPEED CRUISE MISSILE | — | $2,594,829 | Jul 15, 2025 | Feb 28, 2017 – Nov 11, 2021 |
| Prime | Department of Defense Department of the Navy | BOEING AND NOTRE DAME PROPOSE AI ENABLED ANALOG ACCELERATOR WHICH IS COMPRISED OF A HYBRID CUSTOM CMOS ANALOG ACCELERATOR AND ADAPTIVE CONTROL AI ALGORITHMS ON A COMMERCIAL FPGA. | — | $346,198 | Jul 15, 2025 | Mar 6, 2025 – Mar 6, 2026 |
| Prime | Department of Defense Department of the Air Force | GENESIS | FA865017D2401USAspending | $21,301,661 | Jun 26, 2025 | Apr 12, 2019 – Sep 26, 2025 |
| Prime | Department of Defense Department of the Air Force | IDENTIFICATION OF TECHNOLOGY & SUBSYSTEM/ARCHITECTURE GAPS FOR ACP PROPULSION POWER & THERMAL (ITSAGAPPT) | FA865017D2401USAspending | $442,763 | May 27, 2025 | Dec 15, 2023 – Sep 16, 2024 |
| Prime | Department of Defense Department of the Army | WP22-3281 BOEING RESEARCH AND TECHNOLOGY METAL ORGANIC FRAMEWORK INHIBITED SEALANTS | — | $1,346,836 | May 16, 2025 | Sep 30, 2022 – Sep 29, 2026 |
| Prime | Department of Defense Department of the Navy | BASE YEAR LABOR&MATERIAL | — | $866,217 | May 5, 2025 | Sep 25, 2018 – Dec 30, 2023 |
| Prime | Department of Defense Department of the Navy | EQUAL-P: PHASE 1 | — | $2,653,193 | Apr 1, 2025 | Sep 27, 2022 – Jun 26, 2025 |
| Prime | National Aeronautics and Space Administration National Aeronautics and Space Administration | NASA MODEL-BASED SYSTEMS ANALYSIS AND ENGINEERING (MBSA&E) FOR THE SUSTAINABLE FLIGHT NATIONAL PARTNERSHIP (SFNP) PHASE 1 | — | $2,234,269 | Mar 26, 2025 | Oct 1, 2023 – May 1, 2025 |
| Prime | Department of Defense Department of the Navy | THIS EFFORT WILL PROVIDE A COMPREHENSIVE APPROACH TO FULLY DEVELOP AND VALIDATE A BONDED BMI TO BMI REPAIR CAPABILITY. THIS WILL PROVIDE THE FLEET READINESS CENTER EAST (FRCE) AND NAVY WITH A BONDED, FLUSH REPAIR FOR BMI STRUCTURE THAT RESTORES BOTH | — | $1,732,691 | Mar 19, 2025 | Sep 13, 2022 – Oct 10, 2025 |
| Prime | Department of Homeland Security Office of Procurement Operations | NEW CONTRACT $809,781.15 FOR BLAST EFFECTS ANALYSIS TOOLS DEVELOPMENT FOR COMMERCIAL COMPOSITE AIRCRAFT | — | $1,006,361 | Feb 12, 2025 | Mar 4, 2020 – Mar 8, 2024 |
| Prime | Department of Defense Department of the Navy | FAST RE-ROUTING USING MACHINE LEARNING | — | $1,150,989 | Jan 13, 2025 | Jul 26, 2022 – Jul 31, 2026 |
| Prime | Department of Defense Department of the Air Force | LARGE ADDITIVELY MANUFACTURED INTEGRATED FLOWPATH FOR AIRBREATHING HYPERSONICS (LAMIFAH) | FA865124DB013USAspending | $519,000 | Nov 7, 2024 | Sep 5, 2024 – Dec 28, 2026 |
| Prime | Department of Defense Defense Advanced Research Projects Agency | IGF::OT::IGF INTEGRITY AND RELIABILITY OF INTEGRATED CIRCUITS (IRIS) PHASE 3. PROGRAM WILL INVESTIGATE THE EFFECTS OF EXTREME PHYSICAL STRESSES ON WEAR-OUT AND AGING MECHANISMS IN CMOS COMPONENTS FABRICATED IN TECHNOLOGIES AT THE 28NM AND/OR 14NM LITHOGRAPHY NODE. PERFORMERS WILL EXPLORE EFFECTS IN BOTH FRONT END OF LINE (FEOL) AND/OR BACK END OF LINE (BEOL) TO CREATE PREDICTIVE MODELS AND TO TEST HOW PRECISELY SPECIFIC WEAR-OUT MECHANISMS CAN BE ASSERTED. | — | $4,351,239 | Sep 30, 2024 | Mar 3, 2016 – Dec 26, 2018 |
| Prime | Department of Defense Defense Advanced Research Projects Agency | IGF::OT::IGF DARPA RESEARCH PROJECT. | — | $6,979,281 | Sep 29, 2024 | May 26, 2016 – May 29, 2019 |
| Prime | Department of Defense Department of the Air Force | CERAMIC MATRIX COMPOSITE WINDOWS FOR HYPERSONICS | — | $1,166,967 | Sep 26, 2024 | Jul 27, 2023 – Oct 31, 2025 |
| Prime | Department of Defense Defense Contract Management Agency | IGF::OT::IGF THE OBJECTIVE OF THE CIRCUIT REALIZATION AT FASTER TIMESCALES (CRAFT) PROGRAM IS TO DEVELOP TOOLS TO REVOLUTIONIZE THE DESIGN AND FABRICATION OF CUSTOM INTEGRATED CIRCUITS MORE EFFICIENTLY TO ENABLE HIGH-PERFORMANCE ELECTRONIC SOLUTIONS FASTER AND WITH MORE FLEXIBILITY. | — | $5,337,175 | Sep 20, 2024 | Mar 18, 2016 – Sep 30, 2019 |
| Prime | Department of Defense Defense Microelectronics Activity | IGF::OT::IGF F/A-18 AESA BIT/STABILITY/SYSTEM H14 AND H16 ANOMALY REPORTS AND CORRECTIONS OF DEFICIENCIES IMPROVEMENT SYSTEMS INTEGRATION PROGRAM. | HQ072716D0007USAspending | $1,955,348 | Sep 18, 2024 | Nov 16, 2017 – Nov 30, 2018 |
| Prime | Department of Defense Defense Contract Management Agency | IGF::OT::IGF SIGNAL PROCESSING AT RF (SPAR) - DARPA SEEKS TO TRANSFORM RADIO FREQUENCY (RF) SYSTEMS BY DEVELOPING RF ANALOG SIGNAL PROCESSING AND NONRECIPROCAL TECHNOLOGIES THAT PERFORM UNPRECEDENTED LEVELS OF IN-BAND INTERFERENCE SUPPRESSION. THE SIGNAL PROCESSING AT RF (SPAR) TECHNOLOGY AIMS TO MITIGATE BOTH SELF AND EXTERNALLY GENERATED INTERFERING SIGNALS OF KNOWN AND UNKNOWN CHARACTERISTICS. THE GOAL OF SPAR IS TO DEMONSTRATE NOVEL IN-BAND SIGNAL INTERFERENCE MITIGATION TECHNOLOGIES USING ANALOG SIGNAL PROCESSING TECHNIQUES AS WELL AS NOVEL CHIP-SCALE CIRCULATOR APPROACHES. | — | $2,021,950 | Sep 18, 2024 | Nov 13, 2016 – Apr 17, 2020 |
| Prime | Department of Defense Defense Contract Management Agency | THE TIFAB PROGRAM SEEKS TO DEVELOP A NEXT-GENERATION MANUFACTURING STRATEGY FOR ENERGYEFFICIENT AND LOW COST FABRICATION OF TITANIUM COMPONENTS WITH MORE PREDICTABLE PERFORMANCE. | — | $9,528,362 | Sep 12, 2024 | Jun 30, 2012 – Dec 31, 2018 |
| Prime | Department of Defense Defense Contract Management Agency | IGF::OT::IGF MECHANISM-BASED OPAQUE ARMOR DEVELOPMENT | — | $552,693 | Sep 11, 2024 | Jun 8, 2017 – Nov 30, 2019 |
| Prime | Department of Defense Defense Contract Management Agency | IGF::OT::IGF - DIRECTED ENERGY THREAT TO A HYPERSONIC CRUISE MISSILE | — | $427,716 | Aug 20, 2024 | Sep 30, 2016 – Jul 29, 2019 |
Contract vehicles are shown only when present in the source record. Linked award numbers and vehicles open the authoritative record on USAspending.gov.
Subcontracting experience
37 records from government sources. Past participation is not evidence of current teaming interest.
| Role | Agency | Description | Vehicle | Obligated | Action date | Period |
|---|---|---|---|---|---|---|
| Subcontractor | Department of Defense | INDUSTRIAL VALVE MANUFACTURING 5300158736 Parent award context Parent award agency: Department of Defense · Defense Logistics Agency Parent award NAICS: 332911 Parent award performance state: OK Parent award description: 8511425359!VALVE,SAFETY RELIEF View parent award on USAspending | — | $299,412 | Aug 27, 2025 | — – — |
| Subcontractor | Department of Defense | ENGINEERING SERVICES 5300156341 Parent award context Parent award agency: Department of Defense · Department of the Air Force Parent award NAICS: 541715 Parent award performance state: CA Parent award description: NEXT GENERATION OVERHEAD PERSISTENT INFRARED POLAR SPACE VEHICLES 1 AND 2 STUDY. View parent award on USAspending | — | $39,905 | Jul 17, 2025 | — – — |
| Subcontractor | Department of Defense | THE BOEING COMPANY SHALL BE A SUBCONTRACTOR TO HRL LABORATORIES, LLC ON THE DARPA SURGE PROGRAM. SURGE SEEKS TO REVOLUTIONIZE THE QUALIFICATION OF ADDITIVELY MANUFACTURED PARTS BY EMPLOYING IN-SITU MONITORING AND PHYSICAL PROCESS MODELLING TO INFORM MICROSTRUCTURE BASED FATIGUE LIFE ESTIMATES UNIQUE TO SPECIFIC PRINTED PARTS. THE BOEING COMPANY SHALL LEAD THE DEFECT INFERENCE MODELLING AS WELL AS THE CHALLENGE COMPONENT TESTING SUBTASKS ON THIS PROGRAM. SURGE Parent award context Parent award agency: Department of Defense · Defense Advanced Research Projects Agency Parent award NAICS: 541715 Parent award performance state: CA Parent award description: STRUCTURES UNIQUELY RESOLVED TO GUARANTEE ENDURANCE(SURGE) PHASE 1 View parent award on USAspending | — | $1,343,429 | Jun 11, 2025 | — – — |
| Subcontractor | Department of Defense | CURRENT-CARRYING WIRING DEVICE MANUFACTURING 5300144354 · Prime awardUSAspending | — | $58,463 | Apr 7, 2025 | — – — |
| Subcontractor | Department of Defense | GOODS AND OR SERVICES 02P193645 Parent award context Parent award agency: Department of Defense · Department of the Air Force Parent award NAICS: 541330 Parent award performance state: AZ Parent award description: MUOS GROUND SYSTEM SUSTAINMENT View parent award on USAspending | N0003920D0146USAspending | $33,519 | Jan 20, 2025 | — – — |
| Subcontractor | Department of Defense | SEARCH, DETECTION, NAVIGATION, GUIDANCE, AERONAUTICAL, AND NAUTICAL SYSTEM AND INSTRUMENT MANUFACTURING 1012410949 Parent award context Parent award agency: Department of Defense · Missile Defense Agency Parent award NAICS: 336414 Parent award performance state: AZ Parent award description: IRBM TARGETS View parent award on USAspending | — | $687,000 | Dec 16, 2024 | — – — |
| Subcontractor | Department of Defense | MMRS ANNUAL MAINTENANCE RENEWAL 228510 Parent award context Parent award agency: Department of Defense · Department of the Navy Parent award NAICS: 336413 Parent award performance state: MD Parent award description: NEW TASK ORDER View parent award on USAspending | N0042120D0008USAspending | $45,000 | Nov 12, 2024 | — – — |
| Subcontractor | Department of Defense | OTHER AIRCRAFT PART AND AUXILIARY EQUIPMENT MANUFACTURING 5300117420 · Prime awardUSAspending | — | $47,615 | Oct 2, 2024 | — – — |
| Subcontractor | Department of Defense | PROVIDE SUPPORT SERVICES A57007 Parent award context Parent award agency: Department of Defense · Department of the Air Force Parent award NAICS: 541715 Parent award performance state: NJ Parent award description: DIRECTIONAL AIRBORNE NETWORKS FOR CONTESTED ENVIRONMENTS (DANCE) View parent award on USAspending | — | $381,255 | Sep 4, 2024 | — – — |
| Subcontractor | Department of Defense | MMRS ANNUAL MAINTENANCE 227855 Parent award context Parent award agency: Department of Defense · Department of the Navy Parent award NAICS: 336413 Parent award performance state: MD Parent award description: NEW TASK ORDER View parent award on USAspending | N0042120D0008USAspending | $30,000 | Aug 29, 2024 | — – — |
| Subcontractor | General Services Administration | PROVIDE SUPPORT SERVICES P173442-21 Parent award context Parent award agency: General Services Administration · Federal Acquisition Service Parent award NAICS: 541330 Parent award performance state: VA Parent award description: TASK ORDER AWARD View parent award on USAspending | GS00Q14OADU108USAspending | $20,367,224 | Apr 3, 2024 | — – — |
| Subcontractor | Department of Defense | GOODS AND OR SERVICES 02P162425 Parent award context Parent award agency: Department of Defense · Department of the Air Force Parent award NAICS: 541330 Parent award performance state: AZ Parent award description: MUOS GROUND SYSTEM SUSTAINMENT View parent award on USAspending | N0003920D0146USAspending | $31,483 | Mar 21, 2024 | — – — |
| Subcontractor | Department of Defense | SOFTWARE LICENSES 225545 Parent award context Parent award agency: Department of Defense · Department of the Navy Parent award NAICS: 336413 Parent award performance state: MD Parent award description: NEW TASK ORDER View parent award on USAspending | N0042120D0008USAspending | $130,000 | Nov 15, 2023 | — – — |
| Subcontractor | Department of Defense | MMRS ANNUAL MAINTENANCE RENEWAL 225547 Parent award context Parent award agency: Department of Defense · Department of the Navy Parent award NAICS: 336413 Parent award performance state: MD Parent award description: NEW TASK ORDER View parent award on USAspending | N0042120D0008USAspending | $45,000 | Nov 15, 2023 | — – — |
| Subcontractor | Department of Defense | MMRS ANNUAL MAINTENANCE 225361 Parent award context Parent award agency: Department of Defense · Department of the Navy Parent award NAICS: 336413 Parent award performance state: MD Parent award description: NEW TASK ORDER View parent award on USAspending | N0042120D0008USAspending | $30,000 | Oct 26, 2023 | — – — |
| Subcontractor | Department of Defense | GOODS AND OR SERVICES 02P149032 Parent award context Parent award agency: Department of Defense · Department of the Air Force Parent award NAICS: 541330 Parent award performance state: AZ Parent award description: MUOS GROUND SYSTEM SUSTAINMENT View parent award on USAspending | N0003920D0146USAspending | $84,724 | Oct 25, 2023 | — – — |
| Subcontractor | Department of Defense | ENGINEERING SERVICES IN SUPPORT OF THE PRIME RSC22081 Parent award context Parent award agency: Department of Defense · Department of the Air Force Parent award NAICS: 541715 Parent award performance state: OH Parent award description: ADVANCED MATERIALS AND PROCESSES View parent award on USAspending | — | $64,875 | Jul 27, 2023 | — – — |
| Subcontractor | Department of Defense | PROCURED GOODS AND/OR SERVICES BETWEEN 01-MAR-23 AND 31-MAR-23 IN SUPPORT OF CONTRACT SOW. P010286030-1 Parent award context Parent award agency: Department of Defense · Defense Contract Management Agency Parent award NAICS: 541715 Parent award performance state: VA Parent award description: ENABLING TECHNOLOGIES FOR HIGH-SPEED OPERABLE SYSTEMS (ETHOS) View parent award on USAspending | FA865023D2400USAspending | $500,000 | Mar 28, 2023 | — – — |
| Subcontractor | Department of Defense | PHASE I: MATERIAL AND PART SELECTION (YEAR 1)
TASK 1 ATTEND PROJECT KICK OFF (TRIP).
TASK 2 REVIEW AND COMMENT ON THE STANDARDS OF COMPARISON FOR CORRELATION BETWEEN MATERIAL REQUIREMENTS, PART PROCESSES, AND QUALITY.
TASK 3 PROVIDE TOOL AND PART MODELS/DRAWINGS FOR UP TO THREE EXISTING REPRESENTATIVE DESIGNS TO BE USED BY THE PROJECT PARTNERS FOR CREATING A MANUFACTURING EQUIVALENT PART TO TEST WITH THE TUFF MATERIAL. THIS WILL INCLUDE EXISTING CAD MODELS AND ANY DRAWINGS IN PDF FORM. MODELS/DRAWINGS SHOULD INCLUDE PART LAYUP WITH CURRENT MATERIAL, GEOMETRY, GD&T (IF AVAILABLE), AND ANY SPECIAL NOTES. RELEASE OF PART DESIGNS REQUIRE INTERNAL APPROVAL FROM THE APPROPRIATE BOEING PROGRAM REPRESENTATIVE.
TASK 4 PROVIDE APPROVAL TO USE EXISTING BOEING-OWNED TOOLS CURRENTLY RESIDING AT ATC MANUFACTURING FOR FABRICATING PARTS FROM THE TUFF MATERIAL. USAGE OF ANY TOOLS CURRENTLY USED FOR PRODUCTION PARTS MAY REQUIRE THE RESPECTIVE PRODUCTION PROGRAM APPROVAL FOR USE.
PHASE II: PROCESS TRIALS (YEARS 1, 2, AND 3)
TASK 1 ATTEND MID-PROGRAM REVIEW WITH THE CUSTOMER (TRIP).
TASK 2 REVIEW AND COMMENT ON THE PARTS PRODUCIBILITY
PROVIDE INPUT FOR TYPICAL AEROSPACE REQUIREMENTS FOR MANUFACTURING EQUIVALENCY.
PROVIDE INPUT FOR TYPICAL AEROSPACE QUALITY INSPECTION REQUIREMENTS AND KEY PART CHARACTERISTICS WHICH MAY AFFECT PART PERFORMANCE.
REVIEW AND PROVIDE FEEDBACK ON QUALITY PLANS AND INSPECTION CRITERIA.
REVIEW AND PROVIDE FEEDBACK ON PER PART TRIAL RESULTS AT ATC MANUFACTURING FROM THE TUFF MATERIAL.
TASK 3 ATTEND PART PROCESS TRIALS AT ATC, YEAR 1 (TRIP).
TASK 4 ATTEND PART PROCESS TRIALS AT ATC, YEAR 2 (TRIP).
PHASE III: FINAL PROCESS AND DEMONSTRATOR PARTS (YEAR 3)
TASK 1 ATTEND FINAL DEMONSTRATOR FABRICATION AT ATC AFTER FINAL MATERIAL/PROCESS SELECTION - (TRIP)
TASK 2 ATTEND FINAL REVIEW WITH THE CUSTOMER (TRIP)
TASK 3 REVIEW AND COMMENT ON FINAL PART(S) PLANS AND ASSOCIATED COST, RATE AND QUALITY.
TASK 4 REVIEW AND PROVIDE FEEDBACK ON FINAL PART(S) RESULTS PRODUCED AT ATC MANUFACTURING FROM THE TUFF MATERIAL. UDR0000258 Parent award context Parent award agency: Department of Defense · Department of the Navy Parent award NAICS: 541715 Parent award performance state: DE Parent award description: THE PROPOSED EFFORT IS A COLLABORATION WITH ARKEMA, BOEING AND ATC MANUFACTURING. KEY GOALS OF THIS EFFORT DEVELOPMENT OF 0 DEGREE ALIGNED TUFF AND PREPREG, PEKK FORMULATIONS TO MINIMIZE CRYSTALLIZATION EFFECTS, MECHANICAL PROPERTIES AND PART FORMIN View parent award on USAspending | — | $147,744 | Dec 20, 2022 | — – — |
| Subcontractor | Department of Defense | GOODS AND OR SERVICES 02P76617 Parent award context Parent award agency: Department of Defense · Department of the Air Force Parent award NAICS: 334290 Parent award performance state: AZ Parent award description: MEDIUM/LARGESAT COMMON SOLUTIONS END CRYPTOGRAPHIC UNITS View parent award on USAspending | FA830717D0006USAspending | $122,758 | Nov 15, 2022 | — – — |
| Subcontractor | Department of Defense | DEFENSE, SPACE & SECURITY (BDS) IS A DIVERSIFIED, GLOBAL ORGANIZATION PROVIDING LEADING SOLUTIONS FOR THE DESIGN, PRODUCTION, MODIFICATION, SERVICE AND SUPPORT OF COMMERCIAL DERIVATIVES, MILITARY ROTORCRAFT, SATELLITES, HUMAN SPACE EXPLORATION AND AUTONOMOUS SYSTEMS. P13268-4 Parent award context Parent award agency: Department of Defense · Department of the Air Force Parent award NAICS: 541715 Parent award performance state: VA Parent award description: TECHNOLOGY PROTECTION (TP) FOR NAVAL AIR WARFARE CENTER (NAWC) CHINA LAKE View parent award on USAspending | FA807518D0004USAspending | $2,380,594 | Nov 15, 2022 | — – — |
| Subcontractor | Department of Defense | PERFORM SUFFICIENT TESTING OF A CORROSION INHIBITED AC-131 IN APPROX THE FIRST 12 MONTHS. ASSIST ES3 IN THE PREPERATION OF THE TEST PLANS TO EVALUATE THE PERFORMANCE OF CORROSION INHIBITED BOE GEL. 17466 Parent award context Parent award agency: Department of Defense · Department of the Air Force Parent award NAICS: 541715 Parent award performance state: CA Parent award description: CORROSION INHIBITED PRETREATMENT FOR ENHANCED CORROSION RESISTANCE ON AEROSPACE ALLOYS View parent award on USAspending | — | $504,504 | Aug 25, 2022 | — – — |
| Subcontractor | Department of Defense | DEFINE DESIGN REQUIREMENTS, DEVELOP PROCESSES, TESTING, REPORTING. 2019-635-002 Parent award context Parent award agency: Department of Defense · Department of the Navy Parent award NAICS: 541712 Parent award performance state: SC Parent award description: IGF::CT::IGF MANUFACTURING TECHNOLOGY (MANTECH) COMPOSITES MANUFACTURING TECHNOLOGY CENTER (CMTC) MEGA RAPID RESPONSE TASK ORDER View parent award on USAspending | N0001417D4003USAspending | $3,719,983 | Jul 26, 2022 | — – — |
| Subcontractor | Department of Defense | MANUFACTURING TECHNOLOGY DEVELOPMENT. INSPECTION SYSTEM. 2019-635-003 Parent award context Parent award agency: Department of Defense · Department of the Navy Parent award NAICS: 541712 Parent award performance state: SC Parent award description: IGF::CT::IGF MANUFACTURING TECHNOLOGY (MANTECH) COMPOSITES MANUFACTURING TECHNOLOGY CENTER (CMTC) MEGA RAPID RESPONSE TASK ORDER View parent award on USAspending | N0001417D4003USAspending | $3,505,630 | Jul 26, 2022 | — – — |
| Subcontractor | General Services Administration | ARC-JET TESTING ON PANELS AT BOEING LCAT FACILITY P22-24045-BOE-01 Parent award context Parent award agency: General Services Administration · Federal Acquisition Service Parent award NAICS: 541712 Parent award performance state: DC Parent award description: TO TO PROVIDE THE RSC-NCR WITH HIGH-QUALITY, RAPID RESPONSE, ENGINEERING, R&D, T&E, COLLECTION&ANALYSIS, LOGISTICS, TRAINING,&INTEGRATED PROF. SERV. TO DEVELOP&ANALYZE ADVANCED AIR WARFARE ISR COLLECTION&ADVANCED WEAPON SYSTEMS AND METHODS. View parent award on USAspending | GS00Q14OADS721USAspending | $300,000 | Jun 24, 2022 | — – — |
| Subcontractor | Department of Defense | — 911265-04 Parent award context Parent award agency: Department of Defense · Department of the Navy Parent award NAICS: 541712 Parent award performance state: MA Parent award description: IGF::OT::IGF 81-2009-17 SYSTEM DEVELOPMENT, SUPPORT AND INTEGRATION (OPTICAL AND RF PAYLOADS) View parent award on USAspending | GS00Q14OADS402USAspending | $639,063 | Apr 4, 2022 | — – — |
| Subcontractor | Department of Defense | — 911265 Parent award context Parent award agency: Department of Defense · Department of the Navy Parent award NAICS: 541712 Parent award performance state: MA Parent award description: IGF::OT::IGF 81-2009-17 SYSTEM DEVELOPMENT, SUPPORT AND INTEGRATION (OPTICAL AND RF PAYLOADS) View parent award on USAspending | GS00Q14OADS402USAspending | $320,000 | Apr 4, 2022 | — – — |
| Subcontractor | Department of Defense | — 911265-01 Parent award context Parent award agency: Department of Defense · Department of the Navy Parent award NAICS: 541712 Parent award performance state: MA Parent award description: IGF::OT::IGF 81-2009-17 SYSTEM DEVELOPMENT, SUPPORT AND INTEGRATION (OPTICAL AND RF PAYLOADS) View parent award on USAspending | GS00Q14OADS402USAspending | $520,000 | Apr 4, 2022 | — – — |
| Subcontractor | Department of Defense | — 911265-02 Parent award context Parent award agency: Department of Defense · Department of the Navy Parent award NAICS: 541712 Parent award performance state: MA Parent award description: IGF::OT::IGF 81-2009-17 SYSTEM DEVELOPMENT, SUPPORT AND INTEGRATION (OPTICAL AND RF PAYLOADS) View parent award on USAspending | GS00Q14OADS402USAspending | $520,000 | Apr 4, 2022 | — – — |
| Subcontractor | Department of Transportation | SUPPORT THE FAA IN THE DEFINITION OF IPS STANDARDS IN VARIOUS INDUSTRY FORUMS, NAMELY ICAO WG-I, RTCA SPECIAL COMMITTEE (SC) 223 AND AEEC. 1052-201604 Parent award context Parent award agency: Department of Transportation · Federal Aviation Administration Parent award NAICS: 541330 Parent award performance state: VA Parent award description: OTHER FUNCTIONS View parent award on USAspending | DTFAWA15D00030USAspending | $218,801 | Apr 1, 2022 | — – — |
| Subcontractor | Department of Defense | SERVICES 5300037616 Parent award context Parent award agency: Department of Defense · Defense Contract Management Agency Parent award NAICS: 541330 Parent award performance state: UT Parent award description: DEVELOPMENT EFFORT FOR THE GUIDED MISSILE LAUNCHER ELECTRICAL CIRCUIT (GMLEC) TEST SET MODIFICATION PROGRAM TO INTERFACE WITH THE INTERCONTINENTAL BALLISTIC MISSLE (ICBM) CRYPTOGRAPHIC UNIT (ICU) II A4 DRAWER View parent award on USAspending | FA821415D0001USAspending | $30,000 | Mar 3, 2022 | — – — |
| Subcontractor | Department of Defense | SERVICES 5300037616 Parent award context Parent award agency: Department of Defense · Defense Contract Management Agency Parent award NAICS: 541330 Parent award performance state: UT Parent award description: DEVELOPMENT EFFORT FOR THE GUIDED MISSILE LAUNCHER ELECTRICAL CIRCUIT (GMLEC) TEST SET MODIFICATION PROGRAM TO INTERFACE WITH THE INTERCONTINENTAL BALLISTIC MISSLE (ICBM) CRYPTOGRAPHIC UNIT (ICU) II A4 DRAWER View parent award on USAspending | FA821415D0001USAspending | $36,000 | Mar 3, 2022 | — – — |
| Subcontractor | Department of Defense | MMRS ANNUAL MAINTENANCE RENEWAL 220579 Parent award context Parent award agency: Department of Defense · Department of the Navy Parent award NAICS: 336413 Parent award performance state: MD Parent award description: NEW TASK ORDER View parent award on USAspending | N0042120D0008USAspending | $45,000 | Feb 15, 2022 | — – — |
| Subcontractor | National Aeronautics and Space Administration | R&D HARDWARE 14B02057 Parent award context Parent award agency: National Aeronautics and Space Administration · National Aeronautics and Space Administration Parent award NAICS: 541715 Parent award performance state: OH Parent award description: THE REQUIREMENT IS TO ASSIST NASA IN ACCELERATING THE INTRODUCTION OF MEGAWATT CLASS EAP SYSTEMS INTO FUTURE AIRCRAFT PRODUCTS BY U.S. INDUSTRY. THIS EFFORT HELPS TO IDENTIFY CERTIFICATION GAPS, AND ADDRESS GAPS THROUGH GROUND TEST AND FLIGHT TESTS. View parent award on USAspending | — | $65,511,622 | Jan 26, 2022 | — – — |
| Subcontractor | Department of Defense | CONDUCT TESTS AND PROVIDE RECOMMENDATIONS. 3694.02/BOEING Parent award context Parent award agency: Department of Defense · Department of the Air Force Parent award NAICS: 541715 Parent award performance state: VA Parent award description: SBIR II - CORROSION MONITORING FOR CRH SUSTAINMENT View parent award on USAspending | — | $100,000 | Dec 21, 2021 | — – — |
| Subcontractor | Department of Defense | SUBCONTRACTOR SUPPORT ON MOC3HA TO2-4, C/C STITCHING 0000832414 Parent award context Parent award agency: Department of Defense · Defense Contract Management Agency Parent award NAICS: 541715 Parent award performance state: OH Parent award description: MOC3HA TO#2 ACCELERATED PROCESSING OF C/C WITH APPLICATION T View parent award on USAspending | FA865020D5703USAspending | $521,815 | Dec 17, 2021 | — – — |
| Subcontractor | Department of Defense | MMRS SOFTWARE LICENSE MAINTENANCE 6574055872 Parent award context Parent award agency: Department of Defense · Department of the Air Force Parent award NAICS: 336411 Parent award performance state: TX Parent award description: F-22 IN-A-BOX View parent award on USAspending | FA861113D2850USAspending | $105,000 | Dec 1, 2021 | — – — |
Contract vehicles are shown only when present in the source record. Linked award numbers and vehicles open the authoritative record on USAspending.gov.
Agencies supported
- Department of TransportationGov-sourced
- National Aeronautics and Space AdministrationGov-sourced
- Department of DefenseGov-sourced
- Department of CommerceGov-sourced
- Department of Homeland SecurityGov-sourced
Government-sourced data comes from SAM.gov, SBA and USAspending.gov and is attributed to its source. Items marked company-reported were provided by the company and are verified by FedSub only where labeled. FedSub is a private company and is not affiliated with SBA, GSA/SAM.gov, or any government agency.