← Back to search

HEALTH, EDUCATION AND RESEARCH ASSOCIATES, INC.

SAINT LOUIS, MO, 63119

UnclaimedClaim this profile (free)
Small BusinessMinority Owned

Prime contracting experience

12 records from government sources. Past participation is not evidence of current teaming interest.

RoleAgencyDescriptionVehicleObligatedAction datePeriod
Prime
Department of Health and Human Services
National Institutes of Health
C105885 - TASK ORDER - A/E SERVICES- BLDG. 49. - KITCHENETTES, PUBLIC BATHROOMS & OPTIONS, EARL JOHNSON; BETHESDA, MD.HHSN292201400002IUSAspending$610,377Sep 8, 2026Jul 2, 2019 – Dec 8, 2026
Prime
Department of Health and Human Services
National Institutes of Health
IGF::OT::IGF - ("OTHER FUNCTIONS") C105883 - DESIGN SERVICES FOR BUILDING 10 CRC SUITE B2-3701 - ELECTRON MICROSCOPY CORE, NHLBI, NIH CAMPUS, BETHESDA, MD - ARCHANA BHASIN THE CONTRACTOR SHALL PROVIDE THE LABOR, MATERIALS, EQUIPMENT, AND SUPERVISION TO ACCOMPLISH THE FOLLOWING: BASE: DESIGN SERVICES FOR BUILDING 10 CRC SUITE B2-3701 - ELECTRON MICROSCOPY CORE, NHLBI, NIH CAMPUS, BETHESDA, MD: BASE: $329,098.22 ACCEPTED OPTIONS: D. CHANGE ORDER REVIEW DURING POST-DESIGN AS PROPOSED BY HERA $1,452.50 AWARDED WITH BASE OPTIONS NOT REQUESTED, AND PROVIDED BY CONTRACTOR: OPTION 1 (ALTERNATE 1) - ADDITIONAL ON-BOARD DESIGN REVIEW. EXPECTED AWARD DATE IS 120 DAYS AFTER ISSUING NTP. $3,496.34 OPTION 2 (ALTERNATE 2) - ADDITIONAL POST-DESIGN CONFERENCE CALLS. EXPECTED EXERCISE DATE IS 330 DAYS AFTER ISSUING NTP. $10,505.86 OPTIONS NOT ACCEPTED: A. COST ESTIMATE AT 65% CONSTRUCTION DOCUMENTS. $9,662.28 B. CREDIT TO 100% CD COST ESTIMATE IF 65% COST ESTIMATE IS ACCEPTED. -$2,690.60 C. COST ESTIMATE AT FINAL CDS. $4,136.98 OPTIONS TO THIS TASK ORDER WILL ONLY BE EXECUTED IF NIH DETERMINES THAT THE WORK IS NEEDED. THE GOVERNMENT RESERVES THE RIGHT TO EXERCISE THE OPTIONS THROUGH A UNILATERAL MODIFICATION AT ITS OWN DISCRETION. POP: WORK TO BE PERFORMED: 08/03/2018 - 11/30/2019 TASK ORDER: 08/03/2018 - 02/28/2020 PRICE: BASE: $329,098.22 OPTION D: $1,452.50 TOTAL: $330,550.72 DELIVER TO: NIH CAMPUS, BLDG. 10, BETHMC PRODUCT SERVICE CODE: C1JZ PRODUCT/SERVICE DESCRIPTION: ARCHITECT AND ENGINEERING- CONSTRUCTION: MISCELLAN CAN # 8034167, NHLBI TAS::75 8 0872::TAS 08027220181DA0 DUNS # 176126324 ALL OTHER TERMS&CONDITIONS REMAIN IN EFFECT.HHSN292201400002IUSAspending$547,319Apr 28, 2025Aug 2, 2018 – May 31, 2025
Prime
Department of Health and Human Services
National Institutes of Health
IGF::OT::IGF - TAS::75 0838::TAS - C104856 - TASK ORDER - AE SERVICES - DFOM OFFICE RENOVATION, BUILDING 13, SUITES G325, G924, G14, AND BASEMENT; HAKAN BARDAKCI; SEE ATTACHED SOW. THIS PROJECT WILL ACCOMMODATE 2700 SQUARE FEET OF OFFICE SPACE. THIS AREA SHALL BE DESIGNED TO INCLUDE 10 OFFICE SPACES, 1 CONFERENCE ROOM, 1 UNIFORM AND TOOL STORAGE ROOM, 1 OFFICE STORAGE AREA, 1 WAREHOUSE FRONT DESK KIOSK AREA, AND 1 BREAK ROOM. THE FACILITY SHALL BE DESIGNED TO FACILITATE INTERACTION BETWEEN MAINTENANCE AND SUPPORT STAFF. THE FACILITY SHALL EMPLOY SUSTAINABLE DESIGN FEATURES TO ACHIEVE FLEXIBILITY, ENERGY EFFICIENCY, AND QUALITY WORK ENVIRONMENT. THE FACILITY WILL HOUSE SCIENTIFIC EQUIPMENT WITH SPECIAL REQUIREMENTS. 1. REVIEW OF AS-BUILT DRAWINGS. A. BEFORE DESIGN, THE A/E SHALL COMPILE AND REVIEW THE NECESSARY AS-BUILT DRAWINGS. THE A/E SHALL THEN FIELD VERIFY THE EXISTING CONDITIONS. 2. SUBMITTALS AND DELIVERABLE. A. THE A/E SHALL MAKE FIVE (5) DESIGN SUBMITTALS AT THE FOLLOWING STAGES: DRAFT PRELIMINARY REPORT (15%), FINAL PRELIMINARY REPORT (15%), CONSTRUCTION DOCUMENTS (65%), CONSTRUCTION DOCUMENTS (100%) AND CONSTRUCTION DOCUMENTS (FINAL). B. PROVIDE AN UPDATED CONSTRUCTION SCHEDULE WITH EACH SUBMISSION. C. SEE NIH DRM FOR DETAILED REQUIREMENTS. 3. ATTEND PROGRESS/REVIEW/USER MEETINGS. 4. SURVEY ALL EXISTING CONDITIONS NECESSARY TO ACCOMPLISH THE PROJECT. A. THE A/E SHALL PERFORM FIELD SURVEYS THAT IDENTIFY EXISTING CONDITIONS TO ASCERTAIN ITEMS NECESSARY TO ACCOMPLISH THE PROJECT. THIS MAY INCLUDE MEASUREMENTS AND METERING OF THE EXISTING UTILITIES WITHIN THE SCOPE OF WORK PRIOR TO DEMOLITION, TO VERIFY THE DESIGN CONDITIONS WILL BE OBTAINABLE. I. ELECTRICAL METERING (FOR MINIMUM OF 5 DAYS). II. ENGINEERING ANALYSIS. III. CHILLED WATER SUPPLY ANALYSIS. IV. PRE-DEMOLITION READINGS OF SUPPLY AND EXHAUST AIR ARE SPECIFICALLY REQUIRED. 5. PROVIDE AN UPDATED ESTIMATED CONSTRUCTION CONTRACT PRICE PER DESIGN DOCUMENT REVIEW SUBMISSION. 6. PROVIDE POST DESIGN CONSTRUCTION ADMINISTRATIVE SERVICES. A. CONSTRUCTION CONTRACTOR BID WALK ASSISTANCE. B. CONSTRUCTION INSPECTION. C. ATTEND PROGRESS MEETINGS. D. RESPONSES TO REQUEST FOR INFORMATION (RFIS). E. CONSTRUCTION SUBMITTAL REVIEW. F. REVIEW, TRACK, AND MAKE RECOMMENDATION FOR CONSTRUCTION CHANGE ORDERS. G. COMMISSIONING. THE PERIOD OF PERFORMANCE TO COMPLETE THE SCOPE OF WORK IS FROM 04/02/2018 TO 10/24/2019. OPTION 1 AS PROPOSED IS NOT REQUIRED, THEREFORE REJECTED BY THE GOVERNMENT AND WILL NOT BE EXERCISED. OPTION 1: PROVIDE COMMISSIONING SPECIFICATIONS FOR USE BY A THIRD PARTY COMMISSIONING AGENT. DELIVER TO: NIH CAMPUS, BUILDING 13 PRODUCT SERVICE CODE: C1JZ PRODUCT/SERVICE DESCRIPTION: ARCHITECT AND ENGINEERING- CONSTRUCTION: MISCELLANEOUS CAN # 8032185, ORF TAS::75 0838::TAS; 08023820185DB0 DUNS # 176126324 ALL OTHER TERMS&CONDITIONS REMAIN IN EFFECT.HHSN292201400002IUSAspending$267,221May 28, 2024Mar 30, 2018 – Sep 15, 2024
Prime
Department of Health and Human Services
National Institutes of Health
IGF::OT::IGF C105112 - AE SERVICES - BLDG. 35 - REPLACE WATER PIPING, BETHESDA, MD.HHSN292201400002IUSAspending$461,095Feb 1, 2024Aug 15, 2018 – Apr 30, 2024
Prime
Department of Health and Human Services
National Institutes of Health
IGF::OT::IGF - TAS::75 0838::TAS - C102574 - TASK ORDER - AE SERVICES - NINDS RENOVATION, BUILDING 13, SUITES G2406, G0408,G355, G363B, G363C, G363D, G363F, G6; HAKAN BARDAKCI; SEE ATTACHED SOW. BASE - PROVIDE PROFESSIONAL SERVICES FOR ALL ARCHITECTURAL AND ENGINEERING DISCIPLINES; MATERIAL AND LABOR NECESSARY TO PROVIDE A SET OF CONSTRUCTION DOCUMENTS TO FACILITATE THE CONSTRUCTION OF THE SUBJECT PROJECT. BASE IS PROPOSED FOR THE TOTAL AMOUNT OF $193,637.26. 1. REVIEW OF AS-BUILT DRAWINGS. A. BEFORE DESIGN, THE A/E SHALL COMPILE AND REVIEW THE NECESSARY AS-BUILT DRAWINGS. THE A/E SHALL THEN FIELD VERIFY THE EXISTING CONDITIONS. 2. SUBMITTALS AND DELIVERABLE. A. THE A/E SHALL MAKE SIX (6) DESIGN SUBMITTALS AT THE FOLLOWING STAGES: DRAFT PRELIMINARY REPORT (15%), FINAL PRELIMINARY REPORT (15%), DESIGN DEVELOPMENT (35%), CONSTRUCTION DOCUMENTS (65%), CONSTRUCTION DOCUMENTS (100%) AND CONSTRUCTION DOCUMENTS (FINAL). ALL CHANGES MADE BETWEEN THE 65% TO 100% SUBMISSION AND THE 100% TO THE FINAL SUBMISSIONS SHALL BE INDICATED BY THE A/E WITH A CLOUDED BUBBLE. B. SEE NIH DRM FOR DETAILED REQUIREMENTS. 3. ATTEND PROGRESS/REVIEW/USER MEETINGS. 4. SURVEY ALL EXISTING CONDITIONS NECESSARY TO ACCOMPLISH THE PROJECT. A. THE A/E SHALL PERFORM FIELD SURVEYS THAT IDENTIFY EXISTING CONDITIONS TO ASCERTAIN ITEMS NECESSARY TO ACCOMPLISH THE PROJECT. THIS MAY INCLUDE MEASUREMENTS AND METERING OF THE EXISTING UTILITIES WITHIN THE SCOPE OF WORK PRIOR TO DEMOLITION, TO VERIFY THE DESIGN CONDITIONS WILL BE OBTAINABLE. THIS SOW SPECIFICALLY INCLUDES MINIMUM OF (5) DAYS OF I. ELECTRICAL METERING. II. ENGINEERING ANALYSIS. III. CHILLED WATER SUPPLY ANALYSIS. IV. PRE-DEMOLITION READINGS OF SUPPLY AND EXHAUST AIR ARE SPECIFICALLY REQUIRED. 5. PROVIDE A PROFESSIONAL COST ESTIMATE AT THE 65% SUBMISSION, AND UPDATED COST ESTIMATE AT THE 100% AND FINAL SUBMISSIONS. OPTION 1 IS DEEMED NOT NECESSARY BY THE GOVERNMENT AND WILL NOT BE EXERCISED AT THIS TIME. PER THE SCOPE DISCUSSION WITH PO, IT IS DETERMINED THAT TASK IS NOT RELATED TO THE BASE AND THEREFORE IT IS A SEPARATE TASK. OPTION 1 IS PROPOSED FOR THE TOTAL AMOUNT OF $31,674.44. OPTION 1 - PROVIDE A/E SERVICES TO DESIGN A COMMON CORRIDOR THAT WILL BE CONNECTING TO ROOM G327 AND WILL CONNECT THIS NEW ARE TO THE OTHER COMMON CORRIDORS AND EXITS. OPTION 2 WILL BE EXERCISED IF AND WHEN THE NEED IS DETERMINED BY THE GOVERNMENT, AND FUNDS BECOME AVAILABLE. OPTION 2 IS PROPOSED FOR THE TOTAL AMOUNT OF $46,227.62. OPTION 2 - PROVIDE POST DESIGN CONSTRUCTION ADMINISTRATIVE SERVICES TO DESIGN A COMMON CORRIDOR THAT WILL BE CONNECTING TO ROOM G327 AND WILL CONNECT THIS NEW ARE TO THE OTHER COMMON CORRIDORS AND EXITS. A. CONSTRUCTION CONTRACTOR BID WALK ASSISTANCE. B. CONSTRUCTION INSPECTION. C. ATTEND PROGRESS MEETINGS. D. RESPONSES TO REQUEST FOR INFORMATION (RFIS). E. CONSTRUCTION SUBMITTAL REVIEW. F. REVIEW, TRACK, AND MAKE RECOMMENDATION FOR CONSTRUCTION CHANGE ORDERS. G. COMMISSIONING. OPTION 3 IS NOT ON THE SOW BUT PROPOSED BY THE CONTRACTOR, AND IT IS DEEMED NOT NECESSARY AT THIS TIME BY THE GOVERNMENT; THEREFORE IT IS NOT ACCEPTED. OPTION 3 IS PROPOSED FOR THE TOTAL AMOUNT OF $22,527.91. OPTION 3 - PROVIDE A/E SERVICES TO CONVERT THE STORAGE ROOM TO MECHANICAL SPACE. NOTE: SINCE OPTION 1 PER SOW IS REJECTED AND WILL NOT BE EXERCISED, OPTION 2 PER SOW WILL BECOME OPTION 1 ON THIS TASK ORDER. THE PERIOD OF PERFORMANCE TO COMPLETE THE SCOPE OF WORK IS FROM 09/25/2017 TO 01/27/2019. DELIVER TO: NIH CAMPUS, BUILDING 6B PRODUCT SERVICE CODE: C1JZ PRODUCT/SERVICE DESCRIPTION: ARCHITECT AND ENGINEERING- CONSTRUCTION: MISCELLANEOUS CAN # 8029709, ORF TAS::75 0838::TAS; 08023820175DB0 DUNS # 176126324 ALL OTHER TERMS&CONDITIONS REMAIN IN EFFECT.HHSN292201400002IUSAspending$289,330Jan 12, 2024Sep 21, 2017 – Jun 30, 2023
Prime
Department of Health and Human Services
National Institutes of Health
IGF::OT::IGF - TAS::75 0838::TAS - C104673 - TASK ORDER - AE SERVICES - MECHANICAL ROOMS ADDITION/UPGRADE, BUILDING 13, SUITES G2414A, G363A, G327,&B2 BASEMENT; HAKAN BARDAKCI; SEE ATTACHED SOW. BASE - PROVIDE PROFESSIONAL SERVICES FOR ALL ARCHITECTURAL AND ENGINEERING DISCIPLINES, MATERIAL AND LABOR NECESSARY TO PROVIDE A SET OF CONSTRUCTION DOCUMENTS TO FACILITATE THE CONSTRUCTION OF THE SUBJECT PROJECT. THIS PROJECT WILL ACCOMMODATE 4000 SF MECHANICAL ROOM SPACE WHICH WILL SUPPORT GENERAL PURPOSE LABORATORIES, BIO-SAFETY LEVEL LABORATORIES, SHARED ANALYTICAL LABORATORIES, AND SUPPORT SPACES. THE AE TEAM WILL NEED TO REVIEW ALL PROJECT'S HOT WATER, CHILLED WATER, DHW AND OTHER UTILITIES AND AIR DISTRIBUTION REQUIREMENTS AND WILL NEED TO PROPOSE A DESIGN TO ENSURE ALL PROJECT HAVE SUFFICIENT UTILITIES. BASE IS PROPOSED FOR THE TOTAL AMOUNT OF $427,787.99. 1. REVIEW OF AS-BUILT DRAWINGS. A. BEFORE DESIGN, THE A/E SHALL COMPILE AND REVIEW THE NECESSARY AS-BUILT DRAWINGS. THE A/E SHALL THEN FIELD VERIFY THE EXISTING CONDITIONS. 2. SUBMITTALS AND DELIVERABLE. A. THE A/E SHALL MAKE FOUR (5) DESIGN SUBMITTALS AT THE FOLLOWING STAGES: DESIGN DEVELOPMENT (35%), REVISED DESIGN DEVELOPMENT (35%), CONSTRUCTION DOCUMENTS (65%), CONSTRUCTION DOCUMENTS (100%), AND CONSTRUCTION DOCUMENTS (FINAL). B. PROVIDE AN UPDATED CONSTRUCTION SCHEDULE WITH EACH SUBMISSION. C. SEE NIH DRM FOR DETAILED REQUIREMENTS. 3. ATTEND PROGRESS/REVIEW/USER MEETINGS. 4. SURVEY ALL EXISTING CONDITIONS NECESSARY TO ACCOMPLISH THE PROJECT. A. THE A/E SHALL PERFORM FIELD SURVEYS THAT IDENTIFY EXISTING CONDITIONS TO ASCERTAIN ITEMS NECESSARY TO ACCOMPLISH THE PROJECT. THIS MAY INCLUDE MEASUREMENTS AND METERING OF THE EXISTING UTILITIES WITHIN THE SCOPE OF WORK PRIOR TO DEMOLITION, TO VERIFY THE DESIGN CONDITIONS WILL BE OBTAINABLE. THIS SOW SPECIFICALLY INCLUDES MINIMUM OF (5) DAYS OF I. ELECTRICAL METERING. II. ENGINEERING ANALYSIS. III. CHILLED WATER SUPPLY ANALYSIS. IV. PRE-DEMOLITION READINGS OF SUPPLY AND EXHAUST AIR ARE SPECIFICALLY REQUIRED. 5. PROVIDE AN UPDATED ESTIMATED CONSTRUCTION CONTRACT PRICE PER DESIGN DOCUMENT REVIEW SUBMISSION. 6. PROVIDE POST DESIGN CONSTRUCTION ADMINISTRATIVE SERVICES. A. CONSTRUCTION CONTRACTOR BID WALK ASSISTANCE. B. CONSTRUCTION INSPECTION. C. ATTEND PROGRESS MEETINGS. D. RESPONSES TO REQUEST FOR INFORMATION (RFIS). E. CONSTRUCTION SUBMITTAL REVIEW. F. REVIEW, TRACK, AND MAKE RECOMMENDATION FOR CONSTRUCTION CHANGE ORDERS. G. COMMISSIONING. THE PERIOD OF PERFORMANCE TO COMPLETE THE SCOPE OF WORK IS FROM 09/27/2017 TO 03/15/2019. DELIVER TO: NIH CAMPUS, BUILDING 13 PRODUCT SERVICE CODE: C1JZ PRODUCT/SERVICE DESCRIPTION: ARCHITECT AND ENGINEERING- CONSTRUCTION: MISCELLANEOUS CAN # 8030643, ORF TAS::75 0838::TAS; 08023820175DB0 DUNS # 176126324 ALL OTHER TERMS&CONDITIONS REMAIN IN EFFECT.HHSN292201400002IUSAspending$1,363,336Jan 12, 2024Sep 25, 2017 – Aug 31, 2024
Prime
Department of Health and Human Services
National Institutes of Health
IGF::OT:: C105081 - TASK ORDER - A/E SERVICES - CATHETER FABRICATION LAB RENOVATION; BLDG. 13, SUITE G348, G348A, G348B, G356A1, G36A, G356, G360, G360A, G3302, BETHESDA, MD.HHSN292201400002IUSAspending$290,001Jan 12, 2024Jul 26, 2018 – Dec 29, 2023
Prime
Department of Health and Human Services
National Institutes of Health
IGF::OT::IGF - ("OTHER FUNCTIONS") C105008 - ARTICA TEMS INSTALLATION, BUILDING 13 SUITE G327, NIH, BETHESDA, MD. - HAKAN BARDAKCI THE CONTRACTOR SHALL PROVIDE THE LABOR, MATERIALS, EQUIPMENT, AND SUPERVISION TO ACCOMPLISH THE FOLLOWING: BASE: DESIGN SERVICES FOR ARTICA TRANS ELECTRON MICROSCOPE, BUILDING 13 SUITE G327 $354.369.44 OPTION 1: COMMISSIONING $2,750.00 OPTION 2: FMS SHIELDING VERIFICATION AND TESTING $15,191.00 OPTION 3: SUPPLEMENTAL STRUCTURAL DESIGN $32,221.28 OPTIONS WILL NOT BE AWARDED WITH THE BASE TASK ORDER. OPTIONS 2 AND 3 WERE NOT REQUESTED BUT WERE PROVIDED BY THE CONTRACTOR IN THEIR PROPOSAL. OPTIONS TO THIS TASK ORDER WILL ONLY BE EXECUTED IF NIH DETERMINES THAT THE WORK IS NEEDED. THE GOVERNMENT RESERVES THE RIGHT TO EXERCISE THE OPTIONS THROUGH A UNILATERAL MODIFICATION AT ITS OWN DISCRETION. POP: WORK TO BE PERFORMED: 09/28/2017 - 01/27/2019 TASK ORDER: 09/28/2017 - 04/27/2019 PRICE: BASE TASK ORDER: $354,369.44 DELIVER TO: NIH CAMPUS, BLDG. 13, PRODUCT SERVICE CODE: C219 PRODUCT/SERVICE DESCRIPTION: ARCHITECT AND ENGINEERING- GENERAL: OTHER CAN # 8029985, ORF TAS::75 7/1 0838::TAS 08023820175DB0 DUNS # 176126324 ALL OTHER TERMS&CONDITIONS REMAIN IN EFFECT.HHSN292201400002IUSAspending$535,360Jan 12, 2024Sep 26, 2017 – Mar 31, 2023
Prime
Department of Health and Human Services
National Institutes of Health
C107125 - TASK ORDER - AE SERVICES - NINDS RENOVATION FOR CRYOGENIC ELECTRON MICROSCOPE, BUILDING 35; REGINALD TAYLOR; SEE ATTACHED SOW.HHSN292201400002IUSAspending$338,065Sep 25, 2023Aug 1, 2019 – Aug 31, 2023
Prime
Department of Health and Human Services
National Institutes of Health
IGF::OT::IGF - ("OTHER FUNCTIONS") - HHSN292201400002I - HHSN29200022 - C100252; DESIGN SERVICES FOR ACRF B2 LEVEL HVAC UPGRADE, BUILDING 10 ACRF, NIH CAMPUS, BETHESDA, MD - GIAS AHMAD; 1. PROVIDE ARCHITECTURAL AND ENGINEERING DESIGN SERVICES FOR THE REPLACEMENT OF EXISTING AIR-HANDLING UNITS AND RETURN FANS. PROVIDE DESIGN FOR THE HVAC SYSTEMS IN THE ACRF B2 LEVEL SERVED BY THE EQUIPMENT TO PROVIDE ADEQUATE CONDITIONED SUPPLY AIR AND AIR EXHAUST CAPABILITY&CAPACITY TO COMPLY WITH NIH DESIGN REQUIREMENTS MANUAL. PROVIDE COST ESTIMATES BASED UPON DESIGN DOCUMENTS. 2. THE ARCHITECT-ENGINEER SHALL UTILIZE THE BRIDGING DOCUMENTS DEVELOPED FOR THE PROJECT. THE BRIDGING DOCUMENTS SHALL NOT BE JUDGED AS THE FINAL ARBITER. USE BEST PROFESSIONAL JUDGMENT AND EXPERIENCE TO DEVELOP DESIGN FOR THE PROJECT. COORDINATE WITH ALL OTHER CURRENT PROJECTS AND ACTIVITIES THAT MAY AFFECT THE DESIGN OF THIS PROJECT. DELIVER TO: NIH CAMPUS, BLDG. 10, BETHMC PRODUCT SERVICE CODE: C219 PRODUCT/SERVICE DESCRIPTION: ARCHITECT AND ENGINEERING- GENERAL: OTHER CAN # 8028071, ORF TAS::75 7/10838::TAS 08023820175DB0 DUNS # 176126324 POP: WORK 03/03/2017 - 07/31/2017 POP: TASK ORDER 03/03/2017 - 10/31/2017 ALL OTHER TERMS&CONDITIONS REMAIN IN EFFECT.HHSN292201400002IUSAspending$268,418Dec 29, 2022Feb 28, 2017 – Dec 1, 2019
Prime
Department of Health and Human Services
National Institutes of Health
C105044 - AE PROFESSIONAL SERVICES TO SUPPORT NLM PLANNING, ACTIVATION, AND OCCUPANCY, NIH, BETHESDA, MD PERFORMANCE CONSTITUTES ACCEPTANCE.HHSN292201400002IUSAspending$1,485,841Aug 22, 2022Aug 2, 2019 – Jun 30, 2023
Prime
Department of Health and Human Services
National Institutes of Health
IGF::OT::IGF C104603 COMMISSIONING, QUALIFICATION,&VALIDATION SERVICES (CQV) FOR STERILITY LAB RENOVATION, BLDG. 10; GIAS AHMADHHSN292201400002IUSAspending$618,769Mar 7, 2022Mar 14, 2018 – May 31, 2022

Contract vehicles are shown only when present in the source record. Linked award numbers and vehicles open the authoritative record on USAspending.gov.

Subcontracting experience

6 records from government sources. Past participation is not evidence of current teaming interest.

RoleAgencyDescriptionVehicleObligatedAction datePeriod
Subcontractor
Department of Defense
LUMP SUM FEE
261970
Parent award context
Parent award agency: Department of Defense · Department of the Army
Parent award NAICS: 541330
Parent award performance state: GA
Parent award description: FORENSIC LABORATORY GILLEM
View parent award on USAspending
W912HN24D2003USAspending$828,070Aug 29, 2025— – —
Subcontractor
National Aeronautics and Space Administration
EQUIPMENT SURVEY/ COORDINATION
24S32401RL03
Parent award context
Parent award agency: National Aeronautics and Space Administration · National Aeronautics and Space Administration
Parent award NAICS: 541330
Parent award performance state: AL
Parent award description: MSFC ENGINEERING & SCIENCES LABORATORY BUILDING 4603
View parent award on USAspending
80KSC022DA117USAspending$176,040Nov 14, 2024— – —
Subcontractor
National Aeronautics and Space Administration
ARCHITECTURAL LABORATORY PLANNING SERVICES
23S30232RL03 · Prime awardUSAspending
80KSC022DA117USAspending$42,075Mar 4, 2024— – —
Subcontractor
Department of Defense
FORENSIC EVIDENCE PLANNING AND DESIGN CONSULTING
24000129
Parent award context
Parent award agency: Department of Defense · Department of the Army
Parent award NAICS: 541330
Parent award performance state: IL
Parent award description: ARCHITECT-ENGINEER SUPPORT SERVICES FOR DOD LAW ENFORCEMENT EVIDENCE AND DATA REPOSITORY (LEEDR) AT GILLEM ENCLAVE, GA
View parent award on USAspending
W912HN21D2000USAspending$251,300Jan 16, 2024— – —
Subcontractor
Department of Agriculture
ARCHITECTURE/LAB PLANNING SERVICES IN SUPPORT OF: FEASIBILITY STUDY TO REDESIGN THE EXISTING MYCOBACTERIOLOGY (MB) LABORATORY RELOCATION PROJECT (BUILDING 21) AND MYCOBACTERIOLOGY (MB) LABORATORY (BUILDING 401) ASSESSMENT, AT USDA, NCAH, 1920 DAYTON AVENUE, AMES, IA 50010
TO-30300.05-HERA
Parent award context
Parent award agency: Department of Agriculture · Animal and Plant Health Inspection Service
Parent award NAICS: 541330
Parent award performance state: IA
Parent award description: FEASIBILITY STUDY AND ASSESSMENT TO REDESIGN MYCOBACTERIOLOGY LABORATORY, AMES
View parent award on USAspending
12639521D0055USAspending$151,872Sep 28, 2022— – —
Subcontractor
National Aeronautics and Space Administration
ARCHITECTURAL ASSESSMENT AND STUDY FOR MARS SAMPLE FACILITY, NASA JOHNSON SPACE CENTER
146284
Parent award context
Parent award agency: National Aeronautics and Space Administration · National Aeronautics and Space Administration
Parent award NAICS: 541330
Parent award performance state: TX
Parent award description: ARCHITECT AND ENGINEERING MARS SAMPLE RETURN FACILITY ASSESSMENT
View parent award on USAspending
80KSC022DA117USAspending$633,052Jul 16, 2022— – —

Contract vehicles are shown only when present in the source record. Linked award numbers and vehicles open the authoritative record on USAspending.gov.

Agencies supported

  • Department of Health and Human ServicesGov-sourced

Government-sourced data comes from SAM.gov, SBA and USAspending.gov and is attributed to its source. Items marked company-reported were provided by the company and are verified by FedSub only where labeled. FedSub is a private company and is not affiliated with SBA, GSA/SAM.gov, or any government agency.

HEALTH, EDUCATION AND RESEARCH ASSOCIATES, INC. – Saint Louis, MO | UEI CNRUY7QK1FN4 | FedSub