MOUNTAIN BARGE SERVICES LLC
CHELAN, WA, 98816
Prime contracting experience
3 records from government sources. Past participation is not evidence of current teaming interest.
| Role | Agency | Description | Vehicle | Obligated | Action date | Period |
|---|---|---|---|---|---|---|
| Prime | Department of the Interior National Park Service | EO 14398 RIPRAP SUPPLY, NORTH CASCADES NATIONAL PARK (NOCA). | — | $306,400 | Sep 24, 2026 | Sep 24, 2026 – Jun 25, 2027 |
| Prime | Department of the Interior National Park Service | FABRICATION/CONSTRUCTION OF A STEEL TRUSS BRIDGE | — | $857,488 | Apr 28, 2025 | Jul 3, 2024 – Jun 28, 2025 |
| Prime | Department of Agriculture Forest Service | E37, PIONEER, WASES000173, TBOT, TRANSPORTATION, BOAT; | — | $423,074 | Aug 9, 2024 | Jun 9, 2024 – Oct 22, 2024 |
Contract vehicles are shown only when present in the source record. Linked award numbers and vehicles open the authoritative record on USAspending.gov.
Subcontracting experience
1 record from government sources. Past participation is not evidence of current teaming interest.
| Role | Agency | Description | Vehicle | Obligated | Action date | Period |
|---|---|---|---|---|---|---|
| Subcontractor | Department of Transportation | 1. MOBILIZATION
2. SCHEDULING ALL MBS EQUIPMENT, MATERIALS, AND INCIDENTALS AND PROVIDING MONTHLY
SCHEDULE UPDATES AS REQUIRED BY THE SPECIAL CONTRACT REQUIREMENTS.
3. WATERING FOR DUST CONTROL AS PROVIDED IN THE PROJECT PLANS AND SPECIFICATIONS.
4. CLEARING AND GRUBBING AS PROVIDED IN THE PROJECT PLANS AND SPECIFICATIONS. CLEARING
AND GRUBBING ALSO INCLUDES THE MOBILIZATION AND INSTALLATION OF THE GATE AS PROVIDED IN THE PROJECT PLANS AND SPECIFICATIONS. KRCI WILL PURCHASE THE GATE AND DELIVER IT TO A LOCATION CHOSEN BY MBS.
5. REMOVAL OF BOULDER AS PROVIDED IN THE PROJECT PLANS AND SPECIFICATIONS.
6. ROADWAY EXCAVATION AS PROVIDED IN THE PROJECT PLANS AND SPECIFICATIONS. ROADWAY EXCAVATION ALSO INCLUDES EXCAVATING, BEDDING, INSTALLING, AND BACKFILLING CULVERTS AND END SECTIONS AS PROVIDED BY THE PROJECT PLANS AND SPECIFICATIONS.
7. UNCLASSIFIED BORROW IMPORT AS PROVIDED IN THE PROJECT PLANS AND SPECIFICATIONS. PROVIDED, HOWEVER, THAT KRCI SHALL BUY AND DELIVER ALL UNCLASSIFIED BORROW TO MOONLIGHT BAY IN CHELAN AND SHALL PROVIDE A LOADER AT THE MOONLIGHT BAY LOADING SITE. SUBCONTRACTOR SHALL LOAD THE DELIVERED MATERIAL ONTO THE BARGE, BARGE THE MATERIAL, UNLOAD THE MATERIAL IN STEHEKIN, STOCKPILE THE MATERIAL, AND INSTALL THE MATERIAL PER THE PROJECT PLANS AND SPECIFICATIONS.
8. CONSERVE AND STOCKPILE TOPSOIL AS PROVIDED IN THE PROJECT PLANS AND SPECIFICATIONS.
9. ROADWAY OBLITERATION METHOD 1 AS PROVIDED IN THE PROJECT PLANS AND SPECIFICATIONS.
10. PLACED RIPRAP METHOD A, CLASS 2 AS PROVIDED IN THE PROJECT PLANS AND SPECIFICATIONS.
PROVIDED, HOWEVER, THAT KRCI SHALL BUY AND DELIVER ALL RIPRAP TO MOONLIGHT BAY IN CHELAN AND SHALL PROVIDE A
LOADER AT THE MOONLIGHT BAY LOADING SITE. SUBCONTRACTOR SHALL LOAD THE DELIVERED MATERIAL ONTO THE BARGE, BARGE
THE MATERIAL, UNLOAD THE MATERIAL IN STEHEKIN, STOCKPILE THE MATERIAL, AND INSTALL THE MATERIAL PER THE PROJECT
PLANS AND SPECIFICATIONS.
11. ROADWAY AGGREGATE, METHOD 2 SURFACE COURSE AS PROVIDED IN THE PROJECT PLANS AND
SPECIFICATIONS. PROVIDED, HOWEVER, THAT KRCI SHALL BUY AND DELIVER ALL ROADWAY AGGREGATE TO MOONLIGHT BAY IN
CHELAN AND SHALL PROVIDE A LOADER AT THE MOONLIGHT BAY LOADING SITE. SUBCONTRACTOR SHALL LOAD THE DELIVERED
MATERIAL ONTO THE BARGE, BARGE THE MATERIAL, UNLOAD THE MATERIAL IN STEHEKIN, STOCKPILE THE MATERIAL, AND INSTALL THE MATERIAL PER THE PROJECT PLANS AND SPECIFICATIONS. ROADWAY AGGREGATE SHALL INCLUDE THE UNLOADING OF CHIP SEAL
AGGREGATE. IT SHALL INCLUDE THE STOCKPILING OF CHIP SEAL AGGREGATE ONLY IF NECESSARY. THE PARTIES SHALL MAKE EVERY EFFORT TO CAUSE CHIP SEAL AGGREGATE TO BE DELIVERED ON OR NEAR THE DATE OF PLACEMENT SO IT CAN BE PLACED DIRECTLY ON SITE BY CWA. LOADING CHIP SEAL AGGREGATE AND BARGING CHIP SEAL AGGREGATE SHALL BE PAID SEPARATELY.
12. DITCH RECONDITIONING AS PROVIDED IN THE PROJECT PLANS AND SPECIFICATIONS.
13. CLEANING CULVERT IN PLACE AS PROVIDED IN THE PROJECT PLANS AND SPECIFICATIONS.
14. 10 YARD DUMP TRUCK, 10 CUBIC YARD MINIMUM CAPACITY AS PROVIDED IN THE PROJECT PLANS
AND SPECIFICATIONS.
15. BACKHOE LOADER 4 CUBIC FOOT MINIMUM RATED CAPACITY BUCKET, 18-INCH WIDTH AS PROVIDED
IN THE PROJECT PLANS AND SPECIFICATIONS.
16. MOTOR GRADER 8 FOOT MINIMUM BLADE AS PROVIDED IN THE PROJECT PLANS AND SPECIFICATIONS.
17. HYDRAULIC EXCAVATOR 1 CUBIC YARD MINIMUM CAPACITY WITH THUMB ATTACHMENT AS
PROVIDED IN THE PROJECT PLANS AND SPECIFICATIONS.
18. GENERAL LABOR AS PROVIDED BY THE PROJECT PLANS AND SPECIFICATIONS.
19. PLACING CONSERVED TOPSOIL 4€Ͽ½ DEPTH AS PROVIDED BY THE PROJECT PLANS AND SPECIFICATIONS.
20. MULCHING DRY METHOD AS PROVIDED BY THE PROJECT PLANS AND SPECIFICATIONS.
21. BARGE SERVICES FOR KRCI AND CWA MOBILIZATION AND DEMOBILIZATION.
22. FURNISH ALL MATERIALS AND LABOR REQUIRED TO COMPLETE THE WORK MENTIONED ABOVE, EXCEPT AS EXCEPTED ABOVE.
23. FURNISH ALL SUBMITTALS, QUALIFICATIONS, AND PLANS TO COMPLETE THE WORK MENTIONED ABOVE. P360-02 · Prime awardUSAspending | — | $464,321 | Jul 6, 2022 | — – — |
Contract vehicles are shown only when present in the source record. Linked award numbers and vehicles open the authoritative record on USAspending.gov.
Agencies supported
- Department of the InteriorGov-sourced
- Department of AgricultureGov-sourced
Government-sourced data comes from SAM.gov, SBA and USAspending.gov and is attributed to its source. Items marked company-reported were provided by the company and are verified by FedSub only where labeled. FedSub is a private company and is not affiliated with SBA, GSA/SAM.gov, or any government agency.