← Back to search

AD ASTRA ROCKET CO

WEBSTER, TX, 77598

UnclaimedClaim this profile (free)
Small BusinessMinority OwnedSmall Disadvantaged

Prime contracting experience

4 records from government sources. Past participation is not evidence of current teaming interest.

RoleAgencyDescriptionVehicleObligatedAction datePeriod
Prime
National Aeronautics and Space Administration
National Aeronautics and Space Administration
PHASE II SEQUENTIAL SBIR 80NSSC25C0436 TECHNOLOGY MATURATION OF THE VASIMR ELECTRIC PROPULSION SYSTEM—$3,999,650Jun 24, 2026Sep 30, 2025 – Sep 29, 2027
Prime
National Aeronautics and Space Administration
National Aeronautics and Space Administration
SBIR PHASE II- IMPROVED DESIGN OF THE VASIMR RADIO FREQUENCY TRANSMISSION LINE—$849,970Apr 22, 2025May 24, 2024 – Dec 23, 2025
Prime
National Aeronautics and Space Administration
National Aeronautics and Space Administration
FY23 SBIR PHASE II - IMPROVED THERMO- MECHANICAL DESIGN OF THE VASIMR RF COUPLER—$848,798Feb 18, 2025May 22, 2023 – Mar 31, 2025
Prime
National Aeronautics and Space Administration
National Aeronautics and Space Administration
IGF::OT::IGF NASA BROAD AGENCY ANNOUNCEMENT AWARD NNH15ZCQ001K. THE OBJECTIVES OF THIS WORK ARE TO DEMONSTRATE AND MEASURE KEY TECHNICAL FUNCTIONS AND PARAMETERS RELEVANT TO NASA. AD ASTRAS WELL DEMONSTRATED EXPERIMENTAL AND ENGINEERING DEVELOPMENT PRACTICES WILL BE FOLLOWED THROUGHOUT THE PROJECT. AD ASTRA WILL DEMONSTRATE THE FOLLOWING POWER. AD ASTRA WILL PERFORM OPERATIONAL THERMAL STEADY STATE TESTS IN A DESIGN THAT IS EFFICIENT AND EXTENSIBLE TO CONTINUOUS OPERATIONS PER THRUSTER. TRL 5 PPUS. AD ASTRA WILL USE EXISTING TRL5 RADIO FREQUENCY GENERATORS (RF PPUS) THAT WERE DEVELOPED AND BUILT BY NAUTEL LTD AND PROVEN IN VX 200 TESTING. THESE PPUS ARE RATED FOR STEADY STATE OPERATION, HAVE ALREADY DEMONSTRATED A COMBINED EFFICIENCY PERCENTAGE AND A SPECIFIC MASS. LIFETIME. AD ASTRA WILL CARRY OUT 100 HOURS CONTINUOUS LIFETIME TESTING FOR THE FULL 100 HOURS AT FULL THERMAL STEADY STATE. AD ASTRA WILL PERFORM EROSION MEASUREMENTS AT THE END OF THE TEST WITH A PRECISION GOAL SUFFICIENT TO EXTRAPOLATE OPERATIONAL (THRUSTING) LIFETIME TO A NUMBER OF HOURS. PERFORMANCE. AD ASTRA WILL MEASURE ROCKET PERFORMANCE USING VX 200 PEER REVIEWED PUBLISHED TECHNIQUES IN EACH PHASE OF THE PROJECT. PERFORMANCE MEASUREMENTS MADE DURING LONG DURATION STEADY STATE OPERATIONS DRIVE COST. EXCLUDING THE LABORATORY SUPERCONDUCTING MAGNET COOLING POWER, AD ASTRA WILL VERIFY A SYSTEM EFFICIENCY GOAL OF GREATER THAN 60 PERCENT, INCLUDING THE RF PPUS, AT A SPECIFIC IMPULSE OF INTEREST USING ARGON PROPELLANT. AD ASTRA WILL ALSO CARRY OUT VARIABLE SPECIFIC IMPULSE TESTING WITHIN A RANGE. THESE TESTS WILL ALLOW TRL 6 DESIGNS THAT WILL ACHIEVE TOTAL SYSTEM EFFICIENCY GREATER THAN 60 PERCENT IN THE SPECIFIC IMPULSE RANGE OF 2000 S TO 5000 S USING HIGH TEMPERATURE SUPERCONDUCTORS WITH ARGON AND KRYPTON PROPELLANTS.—$8,868,091Mar 7, 2023Aug 7, 2015 – Dec 31, 2020

Contract vehicles are shown only when present in the source record. Linked award numbers and vehicles open the authoritative record on USAspending.gov.

Agencies supported

  • National Aeronautics and Space AdministrationGov-sourced

Government-sourced data comes from SAM.gov, SBA and USAspending.gov and is attributed to its source. Items marked company-reported were provided by the company and are verified by FedSub only where labeled. FedSub is a private company and is not affiliated with SBA, GSA/SAM.gov, or any government agency.

AD ASTRA ROCKET CO – Webster, TX | UEI NNFSTQLJUUM9 | FedSub