← Back to search

HGL CONSTRUCTION INC

OKLAHOMA CITY, OK, 73103

Small BusinessMinority OwnedSmall Disadvantaged

Prime contracting experience

29 records from government sources. Past participation is not evidence of current teaming interest.

RoleAgencyDescriptionVehicleObligatedAction datePeriod
Prime
Department of Defense
Department of the Air Force
REPLACE COOLING TOWER WWYK190199 B821FA813721G0023USAspending$1,654,969Jul 16, 2026Sep 27, 2024 – Feb 12, 2026
Prime
Department of Defense
Department of the Air Force
THIS PROJECT WILL REQUIRE THE ROOF STRUCTURE TO BE REMOVED. RENOVATION WILL INCLUDE A HVAC REPLACEMENT AND USE OF EXISTING DUCT WORK. INTERIOR REPAIR WILL BE LIMITED TO AREAS THAT HAD WATER DAMAGE OR AREAS THAT NEEDED MODIFIED FOR HVAC REPAIR ACCESS.FA446022D0003USAspending$8,263,385Jul 1, 2026Jul 1, 2026 – Mar 13, 2028
Prime
Department of Defense
Department of the Air Force
TO DESIGN, RENOVATE, AND CONSTRUCT ADDITIONS TO BUILDING 854 (APPROXIMATELY 37120 SQUARE FEET) TO PROVIDE A RENOVATED THREE STORY RESIDENTIAL HOUSING FACILITY TERMED AN AIRMEN DORMITORY.FA446022D0003USAspending$17,102,376Jun 30, 2026Dec 15, 2022 – Jul 1, 2026
Prime
Department of Defense
Department of the Air Force
THE PROJECT ENCOMPASSES THE DESIGN AND CONSTRUCTION SERVICES FOR THE RENOVATION OF HANGAR 12 AT JBSA-RANDOLPH, INCLUDING ASSOCIATED INCIDENTAL WORK. THE APPROXIMATELY 30,000 SF FACILITY WILL UNDERGO A TWO-PHASE RENOVATION.FA301622D0022USAspending$6,324,857Apr 23, 2026Sep 25, 2024 – Jul 13, 2026
Prime
Department of Defense
Department of the Air Force
THIS PROJECT IS TO REPAIR BY DESIGN AND DEMO/INSTALL OF NEW ARCHITECTURAL SHINGLE ROOF AND REPAIR OF THE FIRE ALARM SYSTEM AT B528.FA446022D0003USAspending$925,959Apr 14, 2026Sep 10, 2024 – May 20, 2026
Prime
Department of Defense
Department of the Air Force
THIS IS A DESIGN-BUILD REQUIREMENT FOR THE RENOVATION OF EX-SERVER FARM ROOMS 217 AND 219 INTO ADMINISTRATIVE OFFICE SPACE. WORK SHALL BE ACCOMPLISHED IN ACCORDANCE WITH SOW/SPECIFICATIONS DATED, 18 SEP 2024.FA301622D0022USAspending$645,903Mar 27, 2026Oct 1, 2024 – Apr 10, 2026
Prime
Department of Defense
Department of the Air Force
CONTRACTOR TO PERFORM RENOVATION (APPROXIMATELY 3,500 SQUARE FEET) OF THE LEAN-TO ON THE EAST SIDE OF HANGAR 5 ON JOINT BASE SAN ANTONIO (JBSA)-RANDOLPH.FA301622D0022USAspending$2,485,030Mar 17, 2026Sep 23, 2022 – Jul 10, 2026
Prime
Department of Defense
Department of the Air Force
DEMO 23,120 SF OF B210 AND REPAIR 4,411 SF OF EXISTING STRUCTURE TO STORE FARP AND ABFDS EQUIPMENT AND MEET MISSION REQUIREMENTS. REPLACE HVAC AND INSTALL WALL INFILL TO CREATE STORAGE SPACE FROM FORMER OFFICE/TRAINING SPACE.FA446022D0003USAspending$2,107,639Feb 26, 2026Sep 20, 2024 – Mar 31, 2026
Prime
Department of Defense
Department of the Air Force
DEMO 2,269 SM B1020. DEMO FOUNDATIONS, SLABS, STRUCTURES, ROOF, WINDOWS, DOORS, EQUIPMENT, FIXTURES, INTERIOR FINISHES/WALLS/SLAB, EXTERIOR FINISHES/CONCRETE/PAVING, LANDSCAPING, AND CAP UTILITIES. DEMO CONCRETE BETWEEN B1020/B1024, GRADE/INSTALL SODFA446022D0003USAspending$549,238Feb 23, 2026May 15, 2025 – Mar 30, 2026
Prime
Department of Defense
Department of the Air Force
DEMOLISH/CONSOLIDATE 19 OPERATIONS SUPPORT SQUADRON (OSS) FUNCTION IN B-216FA446022D0003USAspending$12,495,554Sep 17, 2025Sep 23, 2022 – Jan 20, 2026
Prime
Department of Defense
Department of the Army
LOWER HILLSIDE STABILIZATION AND PARKING REMEDIATION.—$18,091,607Jun 18, 2025Mar 26, 2021 – Dec 9, 2023
Prime
Department of Defense
Department of the Air Force
REPAIR (SUSTAIN) AIR TRAFFIC CONTROL TOWER HEATING, VENTILATION, AND AIR CONDITIONING (HVAC) B-214FA446017D0005USAspending$656,000Apr 23, 2025May 21, 2020 – Mar 26, 2021
Prime
Department of Defense
Department of the Air Force
REPAIR WARFIT SPORTS FIELD ARTIFICIAL TURF REPAIR ATHLETIC FIELD TRACK AND REPAIR WALKING TRACKFA446022D0003USAspending$3,951,416Mar 28, 2025Aug 30, 2023 – Nov 4, 2025
Prime
Department of Defense
Department of the Air Force
REPAIR AND MAINTENANCE PROPELLER MAINTENANCE B466FA446022D0003USAspending$1,957,190Jan 8, 2025Nov 28, 2022 – Jan 24, 2025
Prime
Department of Defense
Department of the Air Force
REMOVE EXISTING OFFICE TO DESIGN AND EXPAND THE DISPATCH AREA TO ACCOMMODATE NEW FURNITURE AND EQUIPMENT LAYOUT TO IMPROVE PERSONNEL CIRCULATION AND WORKFLOW.FA446022D0003USAspending$387,800Sep 20, 2024Sep 20, 2024 – Jul 30, 2025
Prime
Department of Defense
Department of the Air Force
LIGHTING IN B266 HAS EXCEEDED ITS LIFECYCLE AND NEEDS REPAIR BY REPLACEMENT. REPAIR BY REPLACEMENT OF THE LIGHTING WILL ENABLE THE USERS OF THE FACILITY TO FULLY UTILIZE ALL OF THE ROOMS IN THE BUILDING AND TO BE ABLE TO SEE ADEQUATELY.FA446022D0003USAspending$318,000Sep 16, 2024Sep 16, 2024 – May 29, 2025
Prime
Department of Defense
Department of the Air Force
REPAIR (SUSTAIN) BASE PAVEMENTS - ARNOLD DRIVEFA446022D0003USAspending$1,397,859Aug 23, 2024Nov 30, 2023 – Mar 10, 2025
Prime
Department of Defense
Department of the Air Force
REPAIR LEAKS AND VALVES AT THE WATER TREATMENT PLANT.FA462521D0004USAspending$909,000Apr 30, 2024Jul 21, 2022 – Jun 20, 2024
Prime
Department of Defense
Department of the Air Force
MAINTAIN (SUSTAIN) FIRE SUPPRESSION WATER STORAGE TANKS 293, 252, 223FA446017D0005USAspending$1,236,483Dec 1, 2023Nov 4, 2021 – Nov 25, 2023
Prime
Department of Defense
Department of the Air Force
REPAIR SUSTAIN HEATING, VENTILATION, AIR CONDITIONING (HVAC) IN B-370FA446017D0005USAspending$1,723,606Sep 25, 2023Oct 15, 2021 – Jan 2, 2024
Prime
Department of Defense
Department of the Air Force
RENOVATE RESTROOMS AT 2AH65A BUILDING 3001FA813721G0023USAspending$551,640Sep 7, 2023Aug 12, 2022 – Nov 2, 2023
Prime
Department of Defense
Department of the Air Force
ACTIVE VEHICLE BARRIER REPLACEMENTFA446022D0003USAspending$791,500Aug 9, 2023Jun 21, 2022 – Mar 20, 2023
Prime
Department of Defense
Department of the Air Force
TO CONSTRUCT VANDENBERG VISITOR CONTROL CENTER B-1508FA446017D0005USAspending$1,658,477May 8, 2023Oct 21, 2021 – Jun 26, 2023
Prime
Department of Defense
Department of the Air Force
REPAIR BACKUP GENERATORS MULTIPLE FACILITIESFA446017D0005USAspending$605,401Apr 14, 2023Sep 24, 2021 – Jul 24, 2023
Prime
Department of Defense
Department of the Air Force
DEMOLISH BUILDINGS - B710, B850FA446022D0003USAspending$788,000Mar 27, 2023Nov 28, 2022 – Jul 5, 2023
Prime
Department of Defense
Department of the Air Force
REPAIR (STORM) WEAPONS SQUADRON B-288 AND REPAIR HVAC B-288FA446017D0005USAspending$2,586,882Jan 27, 2023Jul 22, 2021 – Mar 1, 2023
Prime
Department of Defense
Department of the Air Force
REPAIR/INSTALL MULTI-FACILITY LIGHTNING PROTECTIONFA446017D0005USAspending$293,000Apr 26, 2022Jul 13, 2021 – May 2, 2022
Prime
Department of Defense
Department of the Army
FIRE STATION REMODEL—$1,702,737Feb 14, 2022Oct 5, 2020 – Dec 20, 2022
Prime
Department of Defense
Department of the Air Force
REPAIR SUSTAIN FIRE SUPPRESSION / HEATING, VENTILATION, AIR CONDITIONING (HVAC) HANGAR 282FA446017D0005USAspending$4,350,953Dec 20, 2021Oct 13, 2020 – Jun 13, 2022

Contract vehicles are shown only when present in the source record. Linked award numbers and vehicles open the authoritative record on USAspending.gov.

Agencies supported

  • Department of DefenseGov-sourced

Government-sourced data comes from SAM.gov, SBA and USAspending.gov and is attributed to its source. Items marked company-reported were provided by the company and are verified by FedSub only where labeled. FedSub is a private company and is not affiliated with SBA, GSA/SAM.gov, or any government agency.

HGL CONSTRUCTION INC – Oklahoma City, OK | UEI WC7YV2FLQEK5 | FedSub