← Back to search
FUKUNAGA & ASSOCIATES, INC.
HONOLULU, HI, 96814
UnclaimedClaim this profile (free)
Prime contracting experience
26 records from government sources. Past participation is not evidence of current teaming interest.
| Role | Agency | Description | Vehicle | Obligated | Action date | Period |
|---|---|---|---|---|---|---|
| Prime | Department of Defense Department of the Navy | A-E SERVICES TO PROVIDE A DBB CONSTRUCTION PACKAGE FOR FY25 MCON P8002U SUPPLEMENTAL FRESH WATER DEEP WELL AT WAHIAWA ANNEX, WAHIAWA, HI. | N6247820D5037USAspending | $2,020,961 | Jul 17, 2026 | May 21, 2025 – Oct 30, 2027 |
| Prime | Department of Defense Department of the Navy | ARCHITECT ENGINEERING SERVICE FOR DESIGN-BID-BUILD, PLANS AND SPECIFICATIONS FOR PROJECT RM17-1267 REPLACE 24-INCH VALVE, HALAWA GATE, JOINT BASE PEARL HARBOR HICKAM. | N6247820D5037USAspending | $271,997 | Jul 14, 2026 | Aug 15, 2022 – Sep 30, 2028 |
| Prime | Department of Defense Department of the Navy | 1794656 -- RM20-2002 REPAIR MANA WELL, PMRF | N6247820D5037USAspending | $652,020 | Jul 8, 2026 | Sep 9, 2024 – Sep 30, 2028 |
| Prime | Department of Defense Department of the Navy | N62478-20-D-5037-N6274225F0342, FY27 HI2609M REPAIR MID PRESSURE ZONE WATERLINE, CAMP SMITH, AIEA, OAHU, HAWAII | N6247820D5037USAspending | $783,174 | Jun 25, 2026 | Sep 16, 2025 – Mar 31, 2028 |
| Prime | Department of Defense Department of the Navy | TASK ORDER UNDER IDIQ CONTRACT FOR A-E SERVICES FOR PREPARATION OF A DESIGN-BID-BUILD (DBB) CONSTRUCTION CONTRACT REQUEST FOR PROPOSAL (RFP) PACKAGE FOR SPECIAL PROJECT RM 12-0173 FUNCTIONAL UM REPLACE WATERLINE AT OHANA NUI CIRCLE, JBPHH, HAWAII | N6247820D5037USAspending | $480,068 | Feb 26, 2026 | Jun 15, 2021 – Apr 30, 2027 |
| Prime | Department of Defense Department of the Navy | ARCHITECT ENGINEER SERVICE FOR DESIGN-BID-BUILD (35%) FOR PROJECT HI2218M REPAIR WATER RECLAMATION FACILITY SECONDARY CLARIFIER, MARINE CORPS BASE HAWAII, KANEOHE | N6247820D5037USAspending | $969,236 | Dec 31, 2025 | Sep 24, 2021 – Dec 31, 2026 |
| Prime | Department of Defense Department of the Navy | ARCHITECT ENGINEER SERVICE PROVIDE DESIGN-BID-BUILD DOCUMENTS PLANS, SPECIFICATIONS, FOR PROJECT HI2305M REPAIR EAST SIDE INSTALLATION SECURITY FENCE, CAMP SMITH MARINE CORPS BASE HAWAII | N6247820D5037USAspending | $744,450 | Dec 2, 2025 | Jul 20, 2023 – Jul 30, 2027 |
| Prime | Department of Defense Department of the Navy | ARCHITECT ENGINEERING SERVICE FOR DESIGN-BID-BUILD CONSTRUCTION PACKAGE CONSISTING OF FULL PLANS, SPECIFICATION, DETAILED COST ESTIMATE FOR PROJECT RM 15-1542 CONSOLIDATE SUBSTATIONS E12 & E13, JOINT BASE PEARL HARBOR HICKAM, HI. | N6247820D5037USAspending | $1,365,434 | Sep 23, 2025 | May 3, 2022 – Sep 30, 2027 |
| Prime | Department of Defense Department of the Navy | ARCHITECT-ENGINEER SERVICES TO PROVIDE A STUDY FOR THE 36 INCH TRANSMISSION WATERLINE. PROJECT UM - 36 INCH TRANSMISSION WATERLINE, PEARL HARBOR BIKE PATH REPLACEMENT STUDY, JOINT BASE PEARL HARBOR HICKAM, OAHU, HAWAII. | N6247820D5037USAspending | $408,784 | Sep 16, 2025 | Sep 9, 2024 – Nov 30, 2028 |
| Prime | Department of Defense Department of the Navy | AE DESIGN REPAIR PIPING FOR LOAD RACK REPAIRS B1563-1 AND B1563-2 AT MCBH | N6247820D5037USAspending | $304,763 | Sep 11, 2025 | Sep 11, 2025 – Oct 31, 2026 |
| Prime | Department of Defense Department of the Navy | ARCHITECT ENGINEER SERVICE TO PROVIDE DESIGN-BID-BUILD PLANS AND SPECIFICATION, AND COST ESTIMATE FOR PROJECT REPAIR REPAIR WWTP EFFLUENT PUMP STATION BUILDING 1357, JOINT BASE PEARL HARBOR HICKAM. | N6247820D5037USAspending | $1,440,988 | Jun 25, 2025 | Jun 29, 2021 – Dec 31, 2026 |
| Prime | Department of Defense Department of the Navy | A-E SERVICES TO SUPPORT A CHARRETTE FOR RELOCATION OF POL PIPELINES ABOVEGROUND AT KILO, MIKE, BRAVO, AND SIERRA PIERS, JOINT BASE PEARL HARBOR HICKAM, HAWAII. | N6247820D5037USAspending | $707,127 | Jun 12, 2025 | Jun 11, 2025 – Mar 31, 2028 |
| Prime | Department of Defense Department of the Navy | ARCHITECT ENGINEERING SERVICES FOR TOPO SURVEY, GEOTECHNICAL, AND ENVIRONMENTAL FOR PROJECT HI1307M REPAIR FIRESTATION BLDG 4074, MARINE CORPS BASE HAWAII, KANEOHE | N6247820D5037USAspending | $324,288 | Jun 3, 2025 | Sep 21, 2023 – Oct 25, 2027 |
| Prime | Department of Defense Department of the Navy | TASK ORDER TO PROVIDE ARCHITECT-ENGINEER SERVICES FOR PREPARATION OF A DESIGN-BID-BUILD CONSTRUCTION PACKAGE FOR DLA POL HOTEL PIER PIPELINE REPAIRS AND TRENCH COVER REPLACEMENT, JOINT BASE PEARL HARBOR-HICKAM, HAWAII | N6247820D5037USAspending | $529,889 | Apr 24, 2025 | Apr 24, 2025 – Nov 11, 2026 |
| Prime | Department of Defense Department of the Navy | TO UNDER IDIQ FOR A-E SERVICES TO PREPARE DEFENSE LOGISITICS AGENCY'S MILCON PROJECT BROCHURES FOR FY24 DLA-E MILCON PROJECTS PHH-06 AND PHH-012. | N6247820D5037USAspending | $932,586 | Apr 17, 2025 | Apr 17, 2025 – Apr 30, 2026 |
| Prime | Department of Defense Department of the Navy | ARCHITECT-ENGINEERING SERVICES FOR DESIGN BID-BUILD PACKAGE FOR PROJECT RM 20-0590 REPLACE 24-IN TRANSMISSION WATERLINE ALONG LEHUA AVENUE FROM 2ND STREET TO FRANKLIN AVENUE, JOINT BASE PEARL HARBOR-HICKAM | N6247820D5037USAspending | $1,745,636 | Mar 19, 2025 | Sep 14, 2023 – Oct 31, 2027 |
| Prime | Department of Defense Department of the Navy | ARCHITECT ENGINEERING SERVICES TO PROVIDE A STUDY FOR THE SODIUM HYPOCHLORITE GENERATION SYSTEM. PROJECT REPLACE/RE-CONSTRUCT CHLORINATION DISINFECTION SYSTEM AND BLDG AT WAIAWA, HALAWA, NCTAMS, JOINT BASE PEARL HARBOR HICKAM. | N6247820D5037USAspending | $336,486 | Sep 4, 2024 | Sep 4, 2024 – Oct 30, 2027 |
| Prime | Department of Defense Department of the Navy | ARCHITECT ENGINEER SERVICES FOR DESIGN-BID-BUILD PACKAGE FOR DESIGN AND SPECIFICATIONS FOR PROJECT B7474H HK-18 WASTEWATER PUMP STATION - REPLACE GRAVITY SEWER UNDER HICKAM DRAINAGE CANAL, JOINT BASE PEARL HARBOR HICKAM HAWAII. | N6247820D5037USAspending | $498,530 | Apr 25, 2024 | Apr 26, 2024 – Apr 30, 2027 |
| Prime | Department of Defense Department of the Navy | IGF::OT::IGF T.O. UNDER IDIQ CONTRACT FOR A-E SVCS FOR DBB RFP FOR ROCKFALL MITIGATION KAMOKALA CAVES, PMRF, KAUAI, HI | N6247810D5011USAspending | $321,769 | Apr 18, 2024 | Apr 21, 2015 – May 6, 2020 |
| Prime | Department of Defense Department of the Navy | A-E SERVICE FOR DESIGN-BID-BUILD CONSTRUCTION PACKAGE CONSISTING OF FULL PLANS, SPECIFICATION, DETAILED COST ESTIMATE FOR PROJECT FY 2022 INSTALL 500KW COVERED PARKING PV & EV CHARGING STATION AT B479 - IMPACT STUDY AND 50 PERCENT DESIGN | N6247820D5037USAspending | $819,306 | Sep 11, 2023 | Jun 21, 2022 – Feb 24, 2026 |
| Prime | Department of Defense Department of the Navy | ARCHITECT-ENGINEERING SERVICES FOR DESIGN-BID-BUILD PACKAGE FOR PROJECT RM22-0260 REPAIR KP-26 WASTEWATER PUMP STATION FACILITY S268 AND EFFLUENT FORCE MAIN, JOINT BASE PEARL HARBOR-HICKAM, HAWAII | N6247820D5037USAspending | $392,159 | Aug 30, 2023 | Aug 30, 2023 – Oct 25, 2027 |
| Prime | Department of Defense Department of the Navy | REPLACE 24" WATERLINE, JBPHH, HI | N6247820D5037USAspending | $1,151,654 | May 8, 2023 | Jun 11, 2020 – May 31, 2026 |
| Prime | Department of Defense Department of the Navy | ARCHITECT ENGINEER SERVICES TO PROVIDE A ASSESSMENT STUDY FOR PROJECT RED HILL ADIT 3 S312 GROUNDWATER COLLECTION SYSTEM, JOINT BASE PEARL HARBOR HICKAM. | N6247820D5037USAspending | $328,557 | Mar 30, 2023 | Mar 31, 2023 – Dec 20, 2025 |
| Prime | Department of Defense Department of the Navy | ARCHITECT ENGINEERING SERVICES FOR DESIGN-BID-BUILD DESIGN AND SPECS FOR PROJECT RM22-0005 REPAIR 24-INCH UNDERWATER WATERLINE CROSSING FORD ISLAND TO LANDING C, JOINT BASE PEARL HARBOR HICKAM | N6247820D5037USAspending | $555,617 | Mar 23, 2023 | Mar 9, 2022 – Sep 30, 2027 |
| Prime | Department of Defense Department of the Navy | ARCHITECT ENGINEERING SERVICE TO PROVIDE A HYDROGRAPHIC SURVEY OF THE JOINT BASE PEARL HARBOR HICKAM NAVIGATION CHANNELS AND BASIN AREAS. PROJECT IS WATERFRONT-CNIC-ENTIRE HARBOR HYDROGRAPHIC SURVEY, JOINT BASE PEARL HARBOR HICKAM. | N6247820D5037USAspending | $446,333 | Mar 3, 2022 | Mar 3, 2022 – Aug 2, 2024 |
| Prime | Department of Defense Department of the Navy | TASK ORDER FOR ARCHITECT ENGINEERING SERVICES FOR A STUDY TO RELOCATE WATER AND ELECTRICAL DISTRIBUTION SYSTEMS ALONG SALT LAKE BOULEVARD, JOINT BASE PEARL HARBOR HICKAM. | N6247820D5037USAspending | $270,412 | Dec 21, 2021 | Dec 21, 2021 – Dec 23, 2025 |
Contract vehicles are shown only when present in the source record. Linked award numbers and vehicles open the authoritative record on USAspending.gov.
Agencies supported
- Department of DefenseGov-sourced
Government-sourced data comes from SAM.gov, SBA and USAspending.gov and is attributed to its source. Items marked company-reported were provided by the company and are verified by FedSub only where labeled. FedSub is a private company and is not affiliated with SBA, GSA/SAM.gov, or any government agency.