← Back to search
VOXTEL, LLC
BEAVERTON, OR, 97006
UnclaimedClaim this profile (free)
Prime contracting experience
9 records from government sources. Past participation is not evidence of current teaming interest.
| Role | Agency | Description | Vehicle | Obligated | Action date | Period |
|---|---|---|---|---|---|---|
| Prime | Department of Defense Defense Advanced Research Projects Agency | IGF::OT::IGF ATOMS TO PRODUCT(A2P)PROGRAM | — | $5,956,641 | May 13, 2026 | Jun 22, 2015 – Oct 21, 2019 |
| Prime | Department of Defense Department of the Army | SMALL BUSINESS INNOVATION RESEARCH PHASE II EFFORT FOR 28 MONTHS, ENTITLED ASYNCHRONOUS DAY-NIGHT NIR-SWIR SEE-SPOT SENSOR DEVELOPMENT, PHASE ONE FFP FOR FOUR MONTHS FOR PHASE II INTERIM TASKS AND SBIR PHASE TWO, A COST PLUS FIXED FEE FOR TWENTY-FOUR MONTHS TO BE AWARDED TO VOXTEL, INC. USING THE RESULTS FROM SBIR PHASE I THE CONTRACTOR SHALL CONTINUE TO DEVELOP AN IMAGING SENSOR THAT IS SENSITIVE TO SHORTWAVE INFRARED LIGHT AND IS CAPABLE OF DETECTING A PULSED LASER AND READ AN ENCODED NUMBER FROM THE DETECTED LASER PULSE. THE TOTAL TASK ORDER CEILING FOR THIS EFFORT IS $1,049,995.91. | — | $356,645 | Sep 17, 2024 | Feb 26, 2018 – Dec 24, 2020 |
| Prime | Department of Defense Defense Contract Management Agency | INGAAS FOCAL PLANE ARRAYS FOR COHERENT LADAR | — | $692,944 | Sep 11, 2024 | Sep 27, 2018 – Dec 31, 2020 |
| Prime | Department of Defense Department of the Air Force | MWIR APD RECEIVERS | — | $534,466 | Sep 10, 2024 | Apr 5, 2019 – Jul 1, 2022 |
| Prime | Department of Defense Department of the Army | IGF::OT::IGF VOXTEL SBIR PHASE II | — | $975,601 | Mar 10, 2023 | Jun 2, 2017 – Sep 5, 2019 |
| Prime | Department of Defense Defense Threat Reduction Agency | IGF::OT::IGF SBIR PHASE II | — | $1,488,960 | Mar 9, 2023 | Jan 5, 2015 – Jul 5, 2018 |
| Prime | National Aeronautics and Space Administration National Aeronautics and Space Administration | IGF::OT::IGF A LANDER MISSION TO EUROPA?EUROPA CLIPPER MISSION?IS PLANNED TO LAUNCH IN THE MID-2020S BY NASA JPL. THE MISSION PRESENTS MULTIPLE CHALLENGES, SUCH AS: UBIQUITOUS PRESENCE OF HAZARDS AT ALL SCALES, INCLUDING CRATERS, CREVASSES, BOULDERS, ETC.; ULTRA-HIGH RADIATION ENVIRONMENTS DUE TO PROXIMITY TO JUPITER; AND EXTREMELY LIMITED LANDER RESOURCES FOR MASS AND VOLUME AND, HENCE, THE AMOUNT OF SHIELDING THAT CAN BE CARRIED. THEREFORE, THE CRITICAL PHASES OF THIS MISSION REQUIRE THE ABILITY TO PERFORM TERRAIN-RELATIVE NAVIGATION (TRN) AND SURFACEHAZARD DETECTION IN SHORT TIME. TO SATISFY THESE REQUIREMENTS, A DUAL-FUNCTIONALITY (ALTIMETRY AND HAZARD MAPPING), LARGE-FORMAT, MONOLITHIC, LOW-NOISE, HIGHLY SENSITIVE, SILICON SINGLE-PHOTON AVALANCHE PHOTODIODE (SPAD) LIDAR IMAGER WILL BE DEVELOPED. THE SPAD IMAGER WILL BE ROBUST, RADIATION-HARDENED, AND LOW IN SIZE, WEIGHT, AND POWER, AND IT WILL PROVIDE ALTITUDE MEASUREMENTS TO THE GROUND BEGINNING AT AN ALTITUDE OF 8 KM AND ALL THE WAY TO TOUCHDOWN (10 M ALTITUDE). AT AN ALTITUDE OF 500 METERS, IT WILL PROVIDE A DENSE 3D TERRAIN MAP COVERING A 100 M X 100 M LANDING AREA WITH 5 CM GROUND SAMPLE DISTANCE AND RANGE ERRORS OF LESS THAN 5 CM (3-SIGMA) IN LESS THAN 1 SECOND. THE DEVELOPED SPAD IMAGER WILL BE DEMONSTRATED IN A BENCHTOP LIDAR TESTBED. | — | $750,000 | Jun 9, 2022 | Apr 25, 2017 – Apr 30, 2022 |
| Prime | National Aeronautics and Space Administration National Aeronautics and Space Administration | SENSORS FOR SPACEBORNE AEROSOL, CLOUD, AND OCEAN (ACO) LIDAR MUST POSSESS VERY WIDE DYNAMIC RANGE TO COVER THE WEAKEST STRATOSPHERIC RETURNS FROM THE RAYLEIGH REGION... | — | $749,999 | May 27, 2022 | Aug 12, 2019 – Dec 11, 2022 |
| Prime | Department of Defense Department of the Navy | RESEARCH AND DEVELOPMENT | — | $1,499,997 | Jan 19, 2022 | Nov 29, 2018 – Nov 26, 2022 |
Contract vehicles are shown only when present in the source record. Linked award numbers and vehicles open the authoritative record on USAspending.gov.
Agencies supported
- Department of DefenseGov-sourced
- National Aeronautics and Space AdministrationGov-sourced
Government-sourced data comes from SAM.gov, SBA and USAspending.gov and is attributed to its source. Items marked company-reported were provided by the company and are verified by FedSub only where labeled. FedSub is a private company and is not affiliated with SBA, GSA/SAM.gov, or any government agency.