← Back to search
ISLAND ROADS CORPORATION
CHARLOTTE AMALIE, VI, 00802
UnclaimedClaim this profile (free)
Prime contracting experience
5 records from government sources. Past participation is not evidence of current teaming interest.
| Role | Agency | Description | Vehicle | Obligated | Action date | Period |
|---|---|---|---|---|---|---|
| Prime | Department of Transportation Federal Highway Administration | THIS REQUEST FOR PROPOSAL (RFP) IS FOR THE VIRGIN ISLANDS DEPARTMENT OF PUBLIC WORKS PROJECT VI ST ER STJ (002), STT (004), LOCATED ON THE ISLAND OF ST. THOMAS AND ST. JOHN, UNITED STATES VIRGIN ISLANDS IN STRICT ACCORDANCE WITH THE SOLICITATION INS | — | $24,290,274 | Jul 31, 2024 | Nov 18, 2020 – Jun 18, 2024 |
| Prime | Department of Transportation Federal Highway Administration | IGF::OT::IGF PROJECT: DESIGN-BUILD PROJECT VI A30(001), TURPENTINE RUN BRIDGE THE TURPENTINE RUN BRIDGE ON ST. THOMAS, US VIRGIN ISLANDS, WAS CONSTRUCTED IN 1996 AS PART OF AN ARMY CORPS OF ENGINEERS (USACE) FLOOD CONTROL PROJECT. HOWEVER, THE BRIDGE APPROACHES AND ASSOCIATED ROADWAY WORK ON BOLONGO BAY ROAD AND TURPENTINE RUN ROAD WERE DELAYED DUE TO ACQUISITION OF RIGHT OF WAY AND WERE NEVER CONSTRUCTED. PROJECT VI A30(001) CONSISTS OF CONSTRUCTION OF BRIDGE APPROACHES TO THE TURPENTINE RUN BRIDGE, INCLUDING REALIGNMENT OF APPROXIMATELY 600 OF BOLONGO BAY ROAD (ROUTE 30) AND REALIGNMENT OF APPROXIMATELY 1200 OF TURPENTINE RUN ROAD (ROUTE 32). PROPOSED IMPROVEMENTS INCLUDE, BUT ARE NOT LIMITED TO, UTILITY RELOCATIONS, SIGNAL INSTALLATION, DRAINAGE IMPROVEMENTS, MINOR BRIDGE REHABILITATION, AND ROADSIDE SAFETY IMPROVEMENTS. | — | $12,817,069 | Nov 21, 2022 | Sep 9, 2016 – Jul 4, 2020 |
| Prime | Department of Transportation Federal Highway Administration | IGF::OT::IGF PROJECT: VI 38(2) CONTRACT 1 THE PROJECT CONSISTS OF WIDENING AND REHABILITATING RAPHUNE HILL ROAD (ROUTE 38), AND CENTERLINE AND RACE TRACK ROADS (ROUTE 313) AT THE RAPHUNE HILL INTERSECTION. THE WORK INCLUDES ASPHALT PAVEMENT RECONSTRUCTION, AGGREGATE BASE, HOT ASPHALT CONCRETE PAVEMENT, CONCRETE SIDEWALK AND CURB AND GUTTER, DRAINAGE, UTILITY RELOCATION, TRAFFIC SIGNAL AND STREET LIGHTING REPLACEMENT, AND OTHER MISCELLANEOUS WORK. | — | $3,062,774 | Nov 21, 2022 | Mar 30, 2016 – Mar 31, 2020 |
| Prime | Department of Transportation Federal Highway Administration | THE WORK INVOLVES EMERGENCY REPAIRS OF DAMAGED TRAFFIC SIGNAL SYSTEMS AT MULTIPLE SITES ON ST. THOMAS, U.S. VIRGIN ISLANDS. | — | $5,033,670 | Nov 30, 2021 | Mar 7, 2018 – Jan 30, 2021 |
| Prime | Department of Transportation Federal Highway Administration | IGF::OT::IGF THE WORK CONSISTS OF THE DESIGN AND CONSTRUCTION OF TRAFFIC SIGNAL SYSTEMS, COMPLETE AND IN PLACE. THE WORK INCLUDES THE REMOVAL OF THE DAMAGED COMPONENTS OF THE EXISTING TRAFFIC SIGNAL SYSTEMS, AND THE INSTALLATION OF FOUNDATIONS, SIGNAL POLES, MAST ARMS, SIGNAL HEADS, CONTROLLER CABINETS, MANHOLES, CONDUITS, WIRING, VEHICLE DETECTORS, ELECTRICAL SERVICE, TRAFFIC SIGNAL COMMUNICATIONS, AND ANY OTHER MISCELLANEOUS ITEMS REQUIRED TO PROVIDE FULLY FUNCTIONAL TRAFFIC SIGNAL SYSTEMS. | — | $4,952,241 | Nov 17, 2021 | Nov 30, 2017 – Jan 30, 2021 |
Contract vehicles are shown only when present in the source record. Linked award numbers and vehicles open the authoritative record on USAspending.gov.
Agencies supported
- Department of TransportationGov-sourced
Government-sourced data comes from SAM.gov, SBA and USAspending.gov and is attributed to its source. Items marked company-reported were provided by the company and are verified by FedSub only where labeled. FedSub is a private company and is not affiliated with SBA, GSA/SAM.gov, or any government agency.