← Back to search
KOVILIC CONSTRUCTION CO INC
FRANKLIN PARK, IL, 60131
UnclaimedClaim this profile (free)
Prime contracting experience
30 records from government sources. Past participation is not evidence of current teaming interest.
| Role | Agency | Description | Vehicle | Obligated | Action date | Period |
|---|---|---|---|---|---|---|
| Prime | Department of Transportation Federal Highway Administration | PROJECT MD NP BAWA 1(12), 2(12) THE PROJECT CONSISTS OF THE REPAIR AND REHABILITATION OF STRUCTURES NO. 3530-003P, 3530-004P, AND 3530-021P WITHIN THE BALTIMORE-WASHINGTON PARKWAY. THE WORK INCLUDES DECK REPAIR, CAPSTONE, JOINTS REPAIRS, RAILING REP | 693C7320D000005USAspending | $4,057,404 | Sep 23, 2026 | Sep 22, 2025 – Feb 3, 2027 |
| Prime | Department of Agriculture Forest Service | COOTER CREEK ROAD BRIDGE (FSR 202, MP 3.1) REPLACEMENT | — | $1,181,115 | Sep 8, 2026 | Sep 8, 2026 – May 31, 2027 |
| Prime | Department of Transportation Federal Highway Administration | PROJECT MD ERFO NPS CHOH 2019-1(1): THE PROJECT CONSISTS OF EMBANKMENT SLOPE REPAIR WITH RIPRAP SLOPE AND ROCKERY WALL CONSTRUCTION, PAVEMENT PATCHING, GUARDRAIL, SHOULDER REPAIRS, DRAINAGE REPLACEMENT, AND OTHER MISCELLANEOUS WORK. THE WORK INCLUDE | 693C7320D000005USAspending | $1,333,895 | Aug 28, 2026 | Dec 8, 2023 – Dec 31, 2027 |
| Prime | Department of Transportation Federal Highway Administration | WV NP NERI 107(2) THE PROJECT CONSISTS OF GRANULAR BACKFILL, MSE WALL CONSTRUCTION, DEEP GEOTECHNICAL PATCHES, PIPE CULVERTS, INLETS, MANHOLES, CURB AND GUTTER, ASPHALT PAVED WATERWAY, AND GUARDRAIL REPLACEMENT. THE WORK INCLUDES ROADWAY EXCAVATION, | — | $10,220,645 | Jul 29, 2026 | Aug 28, 2024 – Oct 31, 2027 |
| Prime | Department of Defense Department of the Army | FRL MACHINERY PLATFORM CONCRETE REHABILITATION | — | $1,272,529 | Jul 20, 2026 | Jul 1, 2025 – Sep 30, 2026 |
| Prime | Department of the Interior U.S. Fish and Wildlife Service | CONSTRUCT NEW WATER CONTROL STRUCTURE (HARRISON LAKE NFH) | — | $295,000 | Jun 30, 2026 | Jun 30, 2026 – Feb 28, 2027 |
| Prime | Department of Agriculture Forest Service | HUNTINGTON RAVINE WAT BRIDGES REPLACEMENT | — | $2,773,205 | Mar 2, 2026 | Apr 1, 2026 – Nov 19, 2027 |
| Prime | Department of Transportation Federal Highway Administration | PROJECT NC NP BLRI 2A16 THE PROJECT CONSISTS OF THE REHABILITATION OF BIG PINE CREEK BRIDGE #6, BIG PINE CREEK BRIDGE #3, AND BRUSH CREEK BRIDGE #1 BETWEEN MM 223.00 AND MM 228.00. THE WORK INCLUDES REHABILITATION OF THE SUBSTRUCTURE AND SUPERSTRUC | — | $13,648,375 | Nov 18, 2025 | Aug 31, 2023 – Dec 31, 2027 |
| Prime | Department of Transportation Federal Highway Administration | ND FLAP 704(1) AND 795(1) MAGPIE &WHITETAIL CROSSINGS | — | $4,614,589 | Nov 12, 2025 | Dec 26, 2023 – Oct 11, 2025 |
| Prime | Department of Transportation Federal Highway Administration | PROJECT VA ERFO FS GWJEF808 2020-2(2) THE PROJECT CONSISTS OF FINALIZING THE DESIGN FOR REPLACING LICK CREEK TRAIL BRIDGE AND CONSTRUCTION OF A TEMPORARY ACCESS TRAIL, TEMPORARY HELICOPTER LANDING PAD, TRAIL BRIDGE REPLACEMENT, AND OTHER MISCELLANEO | 693C7320D000005USAspending | $1,640,000 | Oct 24, 2025 | Oct 24, 2025 – Dec 1, 2027 |
| Prime | Department of Defense Department of the Army | GARRISON PROJECT SPILLWAY BRIDGE CONCRETE REPAIRS | — | $727,000 | Sep 4, 2025 | Nov 29, 2024 – Mar 23, 2026 |
| Prime | Department of the Interior U.S. Fish and Wildlife Service | CO ~ ROCKY MOUNTAIN ARSENAL NATIONAL WILDLIFE REFUGE (NWR) ~ LOW WATER CULVERT YOUR COMPANY WAS SELECTED TO PROVIDE CONSTRUCTION SERVICES AT THE ROCKY MOUNTAIN ARSENAL (RMA) NATIONAL WILDLIFE REFUGE (NWR), 6550 GATEWAY ROAD, COMMERCE CITY, CO 8002 | — | $531,500 | Jul 14, 2025 | Jun 18, 2024 – Aug 22, 2025 |
| Prime | Department of Transportation Federal Highway Administration | PROJECT DC ERFO NPS CHOH 2019-1(1) THE PROJECT CONSISTS OF ASPHALT CONCRETE PAVEMENT RESURFACING; GRAVEL OVERLAY; BRIDGE SCOUR REPAIR; CULVERT REPLACEMENT AND REMOVAL; RIPRAP; MINOR REINFORCED CONCRETE PAVEMENT PATCHING; TEMPORARY DIVERSION BERM; FI | 693C7320D000005USAspending | $549,775 | Mar 11, 2025 | Aug 17, 2023 – Dec 17, 2024 |
| Prime | Department of the Interior National Park Service | GAOA CHOH 241449 RESTORE CANAL PRISM AND STABILIZE HISTORIC DRY LAID STONE WALL | — | $11,126,498 | Mar 3, 2025 | Nov 15, 2022 – Oct 31, 2024 |
| Prime | Department of Transportation Federal Highway Administration | MAMMOTH CAVE NATIONAL PARK - NP-MACA 13(1), 14(2) - THE PROJECT CONSISTS OF THE RECONSTRUCTION OF THE GREEN RIVER FERRY ROAD RAMPS NEAR MP 1.31 AND SHOULDER HARDENING ON MAMMOTH CAVE PARKWAY. THE WORK INCLUDES THE REMOVAL AND RECONSTRUCTION OF A PORTION OF THE EXISTING ROADWAY APPROACHES TO THE FERRY CROSSING, EXTENDING THE RAMPS FURTHER INTO THE RIVER, PROTECTING HISTORIC STONE WALLS ADJACENT TO THE RAMPS, DRAINAGE IMPROVEMENTS, SCOUR PROTECTION, SHOULDER HARDENING, AND OTHER MISCELLANEOUS WORK. | — | $2,310,452 | Aug 1, 2024 | May 3, 2019 – Jun 18, 2024 |
| Prime | Department of Transportation Federal Highway Administration | PROJECT NP-GUIS 15(3) THE PROJECT CONSISTS OF THE RECONSTRUCTION OF PARK ROAD AND THE CONSTRUCTION OF PAVED SHOULDERS. THE WORK INCLUDES RECONSTRUCTION OF THE ONE LANE ENTRANCE PORTION OF PARK ROAD, CONSTRUCTION OF PAVED SHOULDERS, GUARDRAIL REPLACE | — | $4,658,132 | Jul 18, 2024 | Aug 9, 2021 – Jun 18, 2024 |
| Prime | Department of Transportation Federal Highway Administration | PROJECT NP BLRI 1G28, 1N19 THE PROJECT CONSISTS OF PERFORMING MAINTENANCE REPAIRS ON TWO BRIDGES ON THE BLUE RIDGE PARKWAY. THE WORK INCLUDES THE REPLACEMENT OF BRIDGE BEARINGS, AND OTHER MISCELLANEOUS WORK. | 693C7320D000005USAspending | $948,000 | Jul 17, 2024 | Nov 30, 2022 – Jun 21, 2024 |
| Prime | Department of Transportation Federal Highway Administration | ND FLAP 136(1) & 145(1) TEWAUKON STRUCTURES | — | $1,178,009 | Mar 28, 2024 | Jun 14, 2022 – Oct 11, 2023 |
| Prime | Department of Transportation Federal Highway Administration | MT FS ERFO 2018(1)-73(1), HELENA-LEWIS & CLARK 2018 REPAIRS, PHASE 1 INCLUDES EARTHWORK, SUBGRADE AND ROAD BASE CONSTRUCTION, SLOPE CONSTRUCTION, BITUMINOUS SURFACE TREATMENT, AND DRAINAGE INFRASTRUCTURE IN THE LEWIS AND CLARK NATIONAL FOREST | — | $538,638 | Dec 19, 2023 | May 17, 2022 – Sep 9, 2022 |
| Prime | Department of Transportation Federal Highway Administration | SD FTBL BCB(1) HORSE SOLDIER ROAD TO FORT MEADE | — | $3,492,916 | Nov 2, 2023 | Mar 2, 2022 – Jul 12, 2022 |
| Prime | Department of the Interior U.S. Fish and Wildlife Service | ND - VALLEY CITY WETLAND MANAGEMENT DISTRICT-REHAB TOMAHAWK DAM | — | $1,503,370 | Aug 23, 2023 | Sep 20, 2022 – Dec 1, 2023 |
| Prime | Department of the Interior U.S. Fish and Wildlife Service | MULTI-BRIDGE REPAIR AT SENEY NWR | — | $3,428,950 | Jun 7, 2023 | Oct 1, 2021 – Jul 14, 2023 |
| Prime | Department of Defense Department of the Army | JPP GREENWAY MULTI-USE PAVED TRAIL | — | $1,567,900 | Feb 9, 2023 | Oct 14, 2021 – Dec 28, 2022 |
| Prime | Department of Defense Department of the Army | EAST LYNN BRIDGE BEARING REPLACEMENT | — | $358,000 | Sep 25, 2022 | Sep 26, 2022 – Sep 30, 2023 |
| Prime | Department of Defense Department of the Army | JWF SPLLWAY BRIDGE REHABILITATION, HAYSI, VA | — | $3,449,950 | Sep 22, 2022 | Sep 22, 2022 – Sep 30, 2023 |
| Prime | Department of Defense Department of the Army | LOYALL CONSTRUCTION//LOYALL PHASE 1 | — | $1,393,100 | Aug 16, 2022 | Mar 11, 2021 – Sep 23, 2022 |
| Prime | Department of Transportation Federal Highway Administration | PROJECT: FELSENTHAL WILDLIFE NATIONAL REFUGE PROJECT FW FELS-11(1) THE PROJECT CONSISTS OF THE RESURFACING PINE ISLAND ROAD AND SANDY PRAIRIE ROAD WITHIN THE FELSENTHAL NATIONAL WILDLIFE REFUGE. THE WORK INCLUDES RESURFACING WITH AGGREGATE SURFAC | — | $1,697,698 | Jan 6, 2022 | Sep 5, 2019 – May 31, 2022 |
| Prime | Department of Defense Department of the Army | WATER MAIN IN TRENCH, DUCTILE IRON 12" | — | $1,859,434 | Dec 21, 2021 | Oct 1, 2020 – Dec 21, 2021 |
| Prime | Department of the Interior U.S. Fish and Wildlife Service | MO-NEOSHO NFH-DRAIN DITCH REHAB | — | $860,951 | Dec 15, 2021 | Sep 13, 2021 – Jun 1, 2022 |
| Prime | Department of Defense Department of the Army | BASE FY20 VERMILLION EAST PIER REPAIR | — | $2,183,719 | Oct 5, 2021 | Oct 12, 2020 – Oct 29, 2021 |
Contract vehicles are shown only when present in the source record. Linked award numbers and vehicles open the authoritative record on USAspending.gov.
Agencies supported
- Department of TransportationGov-sourced
- Department of DefenseGov-sourced
- Department of AgricultureGov-sourced
- Department of the InteriorGov-sourced
Government-sourced data comes from SAM.gov, SBA and USAspending.gov and is attributed to its source. Items marked company-reported were provided by the company and are verified by FedSub only where labeled. FedSub is a private company and is not affiliated with SBA, GSA/SAM.gov, or any government agency.