SANCON TECHNOLOGIES, INC.
HUNTINGTON BEACH, CA, 92649
UnclaimedClaim this profile (free)
Subcontracting experience
1 record from government sources. Past participation is not evidence of current teaming interest.
| Role | Agency | Description | Vehicle | Obligated | Action date | Period |
|---|---|---|---|---|---|---|
| Subcontractor | Department of Defense | LINER MATERIAL STORAGE: THE LINER TUBE AND RESINS WILL BE KEPT IN STORAGE AT SANCON€„¢S PLANT UNTIL THE TUBE IS RESINIMPREGNATED
USING THE SPECIFIED RESIN AND CATALYST SYSTEM.
WET OUT / RESIN-IMPREGNATION: THE SPECIFIED RESIN AND CATALYST SYSTEM RESIN WILL BE MIXED AND INSERTED INTO THE LINER TUBE
DURING THE WET-OUT PROCEDURE. THE RESIN WILL BE DISTRIBUTED EVENLY THROUGHOUT THE LINER TUBE USING VACUUM IMPREGNATION
AND A CALIBRATED ROLLER SYSTEM TO ACHIEVE THE SPECIFIED THICKNESS.
TRANSPORTATION: THE RESIN-IMPREGNATED LINER WILL BE TRANSPORTED FROM THE WET-OUT LOCATION TO THE INSTALLATION SITE IN A
REFRIGERATED TRUCK OR OTHER MEANS, WHICH WILL MAINTAIN THE LINER AT A TEMPERATURE OF APPROXIMATELY 20° TO 30° FAHRENHEIT.
HANDLING: THE RESIN-IMPREGNATED LINER WILL BE HANDLED IN A MANNER AS TO ENSURE THAT THE LINER IS NOT TORN, CUT OR OTHERWISE
DAMAGED BEFORE OR DURING INSTALLATION. THE RESIN WITHIN THE LINER SHALL NOT BE SUBJECTED TO IMPROPER TEMPERATURES OR UV
EXPOSURE.
FLOW BYPASS OR DIVERSION: THE FLOW WILL BE DIVERTED, PLUGGED, AND OR BYPASSED AS REQUIRED TO PROVIDE A DRY LINE FOR THE PRE-
CCTV INSPECTION AND LINING AND WILL REMAIN IN PLACE UNTIL THE LINING IS COMPLETED AND THE LATERALS HAVE BEEN RECONNECTED.
PRE-CLEANING CCTV INSPECTION: PRIOR TO CCTV INSPECTION, HIGH-POWERED FLASHLIGHTS WILL BE USED TO INSPECT THE CULVERT. PRE
CLEANING WILL BE COORDINATED WITH CIVIL ENGINEERING ENVIRONMENTAL. 30 CES/CEIEA BIOLOGICAL SCIENTIST WILL BE ON SITE TO
OBSERVE PRE CLEANING CCTV SCAN FOR APPROVAL.
PRE-LINING FLUSH CLEANING: FLUSH CLEANING WILL BE COORDINATED WITH CIVIL ENGINEERING ENVIRONMENTAL NO LESS THAN 72 HOURS
PRIOR. A COMPETENT PERSON WILL BE ON HAND AT ALL TIMES DURING THE CLEANING. IF A CALIFORNIA RED-LEGGED FROG IS OBSERVED WORK
WILL BE STOPPED IMMEDIATELY AND APPROPRIATE ACTION WILL BE TAKEN. THE LINE WILL BE FLUSH CLEANED SHORTLY BEFORE INSTALLATION OF
THE LINER. FLUSH CLEANING IS DEFINED AS TWO TO THREE PASSES WITH JET CLEANER. FIRST PASS WITH CLEANER WILL BE LOW VOLUME AND
LOW PRESSURE TO RELOCATE ANY CLRF TO AREA DESIGNATED BY CE ENVIRONMENTAL. SUBSEQUENT PASSES WILL BE SLOWLY INCREASED IN
PRESSURE TO ENSURE PROPER CLEANING. THE DOWNSTREAM SECTION WILL BE DAMNED WITH SAND BAGS AND SCREENS WILL BE ADDED TO
COLLECT ANY SEDIMENT FROM THE CLEANING PROCESS. A VACUUM TRUCK WILL BE USED TO REMOVE ANY DEBRIS AND PREVENT POOLING.
PRE LINING CCTV INSPECTION: THE CLEANED PIPE IS INSPECTED AND VIDEO RECORDED.
INSTALLATION: THE RESIN-IMPREGNATED LINER WILL BE INSTALLED BY PULLING OR INVERTING IT INTO THE HOST PIPE IN COMPLIANCE WITH
ASTM F1743, ASTM F2019, F1216 AND/OR GREENBOOK SECTION 500-4 AS APPLICABLE. THE TUBE WILL BE PULLED OR INVERTED
THROUGH THE ENTIRE LENGTH OF THE PIPE TO ENSURE A CONTINUOUS TUBE FROM THE ACCESS MANHOLE TO THE TERMINATION MANHOLE.
THE RESIN-IMPREGNATED TUBE WILL BE EXPANDED TO THE HOST PIPE WALL USING AIR OR WATER PRESSURE INSIDE A TUBE WITH AN INTEGRAL
INNER COATING MANUFACTURED WITHIN THE TUBE. THIS COATING REMAINS IN PLACE AFTER THE CURE IS COMPLETED.
CURING OF THE CIPP RESIN: AFTER THE RESIN-IMPREGNATED LINER TUBE IS PULLED OR INVERTED INTO THE HOST PIPE AND EXPANDED TO
THE HOST PIPE WALL BY USING AIR OR WATER PRESSURE DURING THE INSTALLATION PHASE. THE TEMPERATURE OF THE AIR OR WATER OR AIR
INSIDE THE LINER TUBE WILL BE ELEVATED USING STEAM, OR RE-CIRCULATING HOT WATER TO ELEVATE THE TEMPERATURE INSIDE THE TUBE.
THE RESIN WILL BE HEATED TO THE RESIN CURE TEMPERATURE RECOMMENDED BY THE RESIN MANUFACTURER AND SANCON, USUALLY 180°
TO 200° + TO ACHIEVE PROPER CURING OF THE CIPP LINER. AFTER THE RESINS HAVE CURED THE TEMPERATURE WILL BE DECREASED USING
COOL AIR OR RE-CIRCULATING COOL WATER AS RECOMMENDED BY THE RESIN MANUFACTURER AND SANCON TO LESS THAN 100 DEGREES
USUALLY AT A RATE OF 20° PER EVERY 10 MINUTES UNTIL THE CURED LINER HAS GONE BELOW THE 100-DEGREE MARK. IF WATER IS USED TO
ASSIST THE CURING , THE WATER WILL BE DISPOSED OF IN ACCORDANCE WITH FEDERAL, STATE, LOCAL AND AIR F 1914-21-A · Prime awardUSAspending | FA461020D0003USAspending | $58,550 | May 20, 2022 | — – — |
Contract vehicles are shown only when present in the source record. Linked award numbers and vehicles open the authoritative record on USAspending.gov.
Government-sourced data comes from SAM.gov, SBA and USAspending.gov and is attributed to its source. Items marked company-reported were provided by the company and are verified by FedSub only where labeled. FedSub is a private company and is not affiliated with SBA, GSA/SAM.gov, or any government agency.