← Back to search
ASTROBOTIC TECHNOLOGY INC
Doing business as VOYAGER LUNAR SYSTEMS INC
PITTSBURGH, PA, 15233
UnclaimedClaim this profile (free)
Prime contracting experience
47 records from government sources. Past participation is not evidence of current teaming interest.
| Role | Agency | Description | Vehicle | Obligated | Action date | Period |
|---|---|---|---|---|---|---|
| Prime | National Aeronautics and Space Administration National Aeronautics and Space Administration | FINALIZE THE MISSION DESIGN, EXECUTE LONG LEAD PROCUREMENTS TO SUPPORT THE AGGRESSIVE SCHEDULE, AND DELIVER ALL BASE MILESTONES AND PRODUCTS. | 80HQTR19D0005USAspending | $24,149,999 | Sep 22, 2026 | Jun 30, 2026 – Aug 30, 2027 |
| Prime | National Aeronautics and Space Administration National Aeronautics and Space Administration | SBIR PHASE II IGNITE - PHOTON COUNTING SENSOR FOR IN-SPACE DEBRIS DETECTION | — | $849,673 | Sep 15, 2026 | Oct 8, 2024 – Mar 8, 2027 |
| Prime | National Aeronautics and Space Administration National Aeronautics and Space Administration | FINALIZE THE MISSION DESIGN, EXECUTE LONG LEAD PROCUREMENTS TO SUPPORT THE AGGRESSIVE SCHEDULE, AND DELIVER ALL BASE MILESTONES AND PRODUCTS. | 80HQTR19D0005USAspending | $24,149,998 | Sep 9, 2026 | Jun 30, 2026 – Aug 30, 2027 |
| Prime | Department of Defense Department of the Air Force | F2D-14761 ASTROBOTIC TECHNOLOGY INC. THE OBJECTIVE OF THE PHASE II SCOPE IS TO DEMONSTRATE PROPULSION CAPABILITIES (E.G., THRUST, THROTTLING, ISP) NECESSARY TO PERFORM THE DRM AND ADVANCE THE OVERALL SYSTEM TO A POINT WHERE THE INTEGRATED SOLUTION. | — | $2,999,998 | Jul 22, 2026 | Jul 15, 2025 – Jul 14, 2027 |
| Prime | National Aeronautics and Space Administration National Aeronautics and Space Administration | SBIR PHASE III XOGDOR VEHICLE ENHANCEMENTS | — | $14,000,000 | Jul 9, 2026 | Sep 30, 2025 – Aug 31, 2029 |
| Prime | National Aeronautics and Space Administration National Aeronautics and Space Administration | SBIR PHASE III XODIAC-C VEHICLE ENHANCEMENTS | — | $1,600,000 | Jul 9, 2026 | Oct 1, 2025 – Apr 30, 2027 |
| Prime | National Aeronautics and Space Administration National Aeronautics and Space Administration | T9.03-1004 RASTR A" ULTRA-FAST SMART LIDAR SENSOR FOR TERRAIN MAPPING | — | $849,996 | Jun 26, 2026 | Jul 2, 2026 – Jul 1, 2028 |
| Prime | National Aeronautics and Space Administration National Aeronautics and Space Administration | OT HIGH POWER NEAR-FIELD WIRELESS TRANSFER FOR DUST INTENSIVE APPLICATIONS | — | $1,118,199 | Jun 24, 2026 | Sep 8, 2021 – Nov 15, 2026 |
| Prime | National Aeronautics and Space Administration National Aeronautics and Space Administration | SBIR PHASE II - ASICS - ADAPTABLE, SCALABLE, INTELLIGENT COMPUTING FOR SPACE | — | $840,300 | Jun 23, 2026 | Feb 2, 2026 – Feb 1, 2028 |
| Prime | Department of Defense Department of the Air Force | SBIR II RESEARCH AND DEVELOPMENT | — | $1,899,998 | Jun 23, 2026 | Aug 15, 2025 – Apr 15, 2027 |
| Prime | National Aeronautics and Space Administration National Aeronautics and Space Administration | PHASE II SEQ 80NSSC25C0435 LASERNAV - LIDAR-BASED DARK NAVIGATION FOR SAFE AND PRECISE LUNAR LANDING | — | $3,999,590 | Jun 23, 2026 | Sep 9, 2025 – Sep 8, 2027 |
| Prime | National Aeronautics and Space Administration National Aeronautics and Space Administration | THE CONTRACTOR SHALL FABRICATE LONG LEAD HARDWARE FOR PRIMARY MOONRANGER COMPONENTS, CREATE MISSION PLAN, REVISE ARCHITECTURES FOR NAVIGATION AND AUTONOMY, RELEASE BETA VERSION OF MISSION NAVIGATION AND AUTONOMY SOFTWARE MODULES. | — | $8,011,640 | Jun 22, 2026 | Nov 19, 2019 – Apr 7, 2028 |
| Prime | National Aeronautics and Space Administration National Aeronautics and Space Administration | PHASE II SBIR - EXTRA LARGE VERTICAL SOLAR ARRAY TECHNOLOGY (VSAT-XL) | — | $849,694 | Jun 22, 2026 | Jun 5, 2025 – Jun 5, 2027 |
| Prime | National Aeronautics and Space Administration National Aeronautics and Space Administration | VOLATILES INVESTIGATING POLAR EXPLORATION ROVER (VIPER) DELIVERY | 80HQTR19D0005USAspending | $314,011,569 | Jun 17, 2026 | Jun 11, 2020 – Aug 31, 2027 |
| Prime | National Aeronautics and Space Administration National Aeronautics and Space Administration | FLIGHT DEMONSTRATION OF A REUSABLE SUBORBITAL VEHICLE FOR TERRESTRIAL TESTING OF LANDING TECHNOLOGIES | — | $7,324,630 | Jun 16, 2026 | Jun 20, 2023 – Nov 30, 2028 |
| Prime | National Aeronautics and Space Administration National Aeronautics and Space Administration | SBIR CCRPP - CUBEROVER FOR LUNAR SCIENCE AND EXPLORATION | — | $1,556,600 | Jun 16, 2026 | Jun 5, 2025 – Jun 4, 2027 |
| Prime | National Aeronautics and Space Administration National Aeronautics and Space Administration | EO14042 - SBIR PHASE II SEQUENTIAL - LUNAR NIGHT SURVIVAL AND LONG-RANGE COMMUNICATIONS FOR DISTRIBUTED ROBOTICS ASSETS. | — | $4,997,014 | Jun 10, 2026 | Sep 30, 2022 – Mar 31, 2027 |
| Prime | National Aeronautics and Space Administration National Aeronautics and Space Administration | SBIR PHASE III VERTICAL SOLAR ARRAY TECHNOLOGY (VSAT) AND LUNARAY TESTING | — | $1,097,137 | May 26, 2026 | Jun 1, 2026 – May 31, 2027 |
| Prime | National Aeronautics and Space Administration National Aeronautics and Space Administration | FY24 SBIR PHASE II - LOW MASS, HIGH VOLTAGE CABLES FOR LONG DISTANCE LUNAR POWER DISTRIBUTION | — | $849,880 | May 13, 2026 | Jun 17, 2024 – Jul 31, 2026 |
| Prime | National Aeronautics and Space Administration National Aeronautics and Space Administration | ROTATING DETONATION ENGINE NOVEL INJECTOR DESIGN | — | $849,560 | Apr 20, 2026 | Jul 20, 2023 – Mar 31, 2026 |
| Prime | National Aeronautics and Space Administration National Aeronautics and Space Administration | E014042 STTR PHASE II LOW-ENERGY ADDITIVE CONSTRUCTION FOR THE MOON AND MARS | — | $749,318 | Mar 23, 2026 | Sep 25, 2023 – Feb 27, 2026 |
| Prime | Department of Defense Department of the Air Force | MOBILE MODULAR PAYLOAD PROCESSING DEMONSTRATOR | — | $3,160,483 | Mar 9, 2026 | Sep 30, 2024 – Dec 30, 2026 |
| Prime | National Aeronautics and Space Administration National Aeronautics and Space Administration | FLIGHT TESTING AND MATURATION OF THE TOUCHAND- GO (TAG) GUIDANCE SYSTEM (TGS) FOR SMALL-BODY AND INTERPLANETARY SAMPLE COLLECTION | 80AFRC23DA003USAspending | $787,081 | Feb 13, 2026 | Oct 23, 2023 – Sep 30, 2027 |
| Prime | National Aeronautics and Space Administration National Aeronautics and Space Administration | FY24 SBIR PHASE II - FLOATINATOR: A LOW GRAVITY SIMULATOR TO STUDY PLUME-SURFACE INTERACTIONS | — | $849,919 | Feb 11, 2026 | Jul 18, 2024 – Dec 31, 2026 |
| Prime | National Aeronautics and Space Administration National Aeronautics and Space Administration | STTR PHASE II - EFFICIENT DISTRIBUTED STATE ESTIMATION FOR SWARM ROBOTICS | — | $848,525 | Jan 5, 2026 | Jan 17, 2024 – Jan 16, 2026 |
| Prime | National Aeronautics and Space Administration National Aeronautics and Space Administration | ISRU PILOT EXCAVATOR | — | $1,186,194 | Dec 12, 2025 | May 10, 2021 – Feb 27, 2026 |
| Prime | National Aeronautics and Space Administration National Aeronautics and Space Administration | CX-1 CLPS TRADE STUDY MID-SIZED LANDER CAPABILITY ASSESSMENT ASTROBOTIC BASE AWARD | 80HQTR19D0005USAspending | $588,058 | Sep 15, 2025 | Jul 16, 2025 – Sep 30, 2025 |
| Prime | National Aeronautics and Space Administration National Aeronautics and Space Administration | ULTRA-FAST PROXIMITY CHARGING FOR CRITICAL SPACE APPLICATIONS. WIBOTIC, BOSCH, THE UNIVERSITY OF WASHINGTON, NASA GLENN WILL DEVELOP A SPACE QUALIFIED PROXIMITY CHARGING PRODUCT LINE TO SUPPORT A VARIETY OF FUTURE COMMERCIAL AND GOVERNMENT MISSIONS | — | $5,643,998 | Dec 2, 2024 | Jun 29, 2021 – Mar 29, 2025 |
| Prime | National Aeronautics and Space Administration National Aeronautics and Space Administration | METAL OXIDATION WARMING SYSTEM FUEL CELL DEVELOPMENT AND TESTING | — | $3,126,286 | Nov 22, 2024 | Jun 26, 2023 – Jan 31, 2025 |
| Prime | National Aeronautics and Space Administration National Aeronautics and Space Administration | DESIGN, PROTOTYPE, AND TEST LUNAR VERTICAL SOLAR ARRAY TECHNOLOGY (LVSAT), A SOLAR PANEL SYSTEM DESIGNED TO PROVIDE 10 KILOWATTS OF ELECTRICAL POWER AND BE ROBOTICALLY DEPLOYABLE AT THE SOUTH POLE OF THE LUNAR SURFACE. | — | $6,564,200 | Sep 27, 2024 | Sep 22, 2021 – Nov 15, 2024 |
| Prime | National Aeronautics and Space Administration National Aeronautics and Space Administration | PAYLOAD-TO-LANDER INTEGRATION PROCESS, PAYLOAD HANDLING AND OFFLOADING FOR LEARNING HOW TO DESIGN AUTONOMY SYSTEM INTEGRATION WITH COMMERCIAL LUNAR PAYLOAD SERVICES. GUIDANCE ON THE CONTROL SYSTEM LEVERAGE AND INGEST RELEVANT SENSOR DATA | — | $475,000 | Aug 1, 2024 | Aug 3, 2022 – Sep 16, 2024 |
| Prime | National Aeronautics and Space Administration National Aeronautics and Space Administration | LUNAR SURFACE TRANSPORTATION SERVICES - NASA-PROVIDED LUNAR PAYLOAD (NPLP) DELIVERY | 80HQTR19D0005USAspending | $100,175,089 | May 28, 2024 | May 30, 2019 – Nov 30, 2024 |
| Prime | National Aeronautics and Space Administration National Aeronautics and Space Administration | FLIGHT AND PAYLOAD INTEGRATION SERVICES | 80AFRC23DA003USAspending | $1,816,080 | May 23, 2024 | Jun 20, 2023 – Oct 31, 2024 |
| Prime | National Aeronautics and Space Administration National Aeronautics and Space Administration | NOVATION OF 80AFRC21F0024 TO 80AFRC23FA062 - TECHLEAP LUNAR SURFACE TEST FIELD VALIDATION FLIGHT | 80AFRC23DA003USAspending | $1,704,017 | May 23, 2024 | Jun 20, 2023 – Oct 31, 2024 |
| Prime | National Aeronautics and Space Administration National Aeronautics and Space Administration | E014042 SBIR PHASE II LIDAR-BASED NAVIGATION AND MAPPING FOR RENDEZVOUS, PROXIMITY OPERATIONS, DOCKING | — | $749,999 | Apr 5, 2024 | Jun 1, 2022 – Aug 30, 2024 |
| Prime | National Aeronautics and Space Administration National Aeronautics and Space Administration | NASA FLIGHT OPPORTUNITIES TECHRISE 2023-2024 EDUCATION STUDENT COMPETITION, 30 PAYLOADS, MID DATED JULY 5, 2023. | 80AFRC23DA003USAspending | $968,176 | Jan 5, 2024 | Jun 1, 2024 – Aug 31, 2024 |
| Prime | National Aeronautics and Space Administration National Aeronautics and Space Administration | E014042 SBIR PHASE II REAL-TIME HAZARD DETECTION VIA DEEP LEARNING | — | $749,904 | Dec 19, 2023 | Jun 13, 2022 – Jun 12, 2024 |
| Prime | National Aeronautics and Space Administration National Aeronautics and Space Administration | UNDER-ROVER ULTRA-WIDE BAND NON-CONTACT GROUND PENETRATING RADAR ANTENNA | — | $1,116,206 | Dec 13, 2023 | Jul 30, 2020 – Aug 31, 2024 |
| Prime | National Aeronautics and Space Administration National Aeronautics and Space Administration | WORK DELIVERS A TRL 9 TERRAIN RELATIVE NAVIGATION AND VISUAL VELOCIMETRY SENSOR TRN SENSOR PRODUCT BY DEMONSTRATING THE TRN SENSOR OPERATION ON A LUNAR LANDER MISSION. SPECIFICALLY THE WORKS SEEKS TO DEVELOP A COMMERCIAL TERRAIN RELATIVE NAVIGATION (TRN) SYSTEM FOR LUNAR AND PLANETARY LANDERS. THIS SYSTEM CONSISTS OF A HIGH PERFORMANCE STAND-ALONE TRN AND VISUAL VELOCIMETRY VV SENSOR OR TRN SENSOR AND TWO CRITICAL TOOLS NEEDED TO PROVIDE TRN AS A MULTI-MISSION COMMERCIAL PRODUCT: A FAST, HIGH FIDELITY LUNAR SIMULATOR, AND AN ACCURATE LUNAR MAP GENERATOR. THE LOW SWAP 2 U, 2.5 KG, 15 W PEAK PASSIVE OPTICAL TRN SENSOR WILL ENABLE SPACECRAFT TO LAND PRECISELY WITHIN 100 METERS OF ANY ILLUMINATED DESTINATION ON MAPPED PLANETARY SURFACES, ENABLING A BROAD RANGE OF HIGH IMPACT SCIENCE AND COMMERCIAL MISSIONS. | — | $7,973,959 | Sep 27, 2023 | May 20, 2019 – Jul 31, 2024 |
| Prime | Department of Defense Department of the Air Force | CLAVIUS SPACE DOMAIN AWARENESS | — | $1,729,937 | Aug 1, 2023 | May 1, 2023 – Aug 1, 2024 |
| Prime | Department of Defense Department of the Air Force | SKYMAGE: LUNAR POSITIONING AND NAVIGATION NETWORK | — | $749,978 | Jun 29, 2023 | Mar 24, 2021 – Apr 28, 2023 |
| Prime | National Aeronautics and Space Administration National Aeronautics and Space Administration | THIS STATEMENT OF WORK FURTHERS THE DEVELOPMENT OF A COMMERCIAL LUNAR ROVER CALLED CUBEROVER, SPECIFICALLY BY MATURING THE PAYLOAD INTERFACES AND INCREASING THE CAPABILITIES SUCH AS SOLAR RECHARGING, A MORE COST EFFECTIVE DRIVETRAIN. | — | $1,981,488 | Dec 8, 2022 | Mar 2, 2020 – Oct 21, 2022 |
| Prime | National Aeronautics and Space Administration National Aeronautics and Space Administration | ULTRA-COMPACT STANDALONE VISUAL RELATIVE NAVIGATION | — | $749,997 | Sep 1, 2022 | Sep 8, 2020 – Oct 21, 2022 |
| Prime | National Aeronautics and Space Administration National Aeronautics and Space Administration | EARLY CAREER INITIATIVE IN PARTNERSHIP WITH LUNAR THERMAL REGULATION FOR MISSION SUSTAINABILITY (LUNAR THERMIS) | — | $350,000 | Jun 21, 2022 | Sep 25, 2020 – Sep 30, 2021 |
| Prime | Department of Defense Department of the Air Force | ASTROBOTIC TECHNOLOGY INCORPORATED, SPACE PITCH DAY 2021 | — | $1,698,019 | May 6, 2022 | Oct 1, 2021 – Mar 30, 2023 |
| Prime | National Aeronautics and Space Administration National Aeronautics and Space Administration | CUBEROVER IS A ROBUST MINIATURIZED ROVER FOR BUILT FOR LUNAR SCIENCE AND EXPLORATION. WITH ITS 2-KG MASS, THE ROBOT WOULD BE THE SMALLEST (AND LIKELY THE LEAST COSTLY) PLANETARY ROVER EVER DEPLOYED. CUBEROVER S MOBILITY, POWER AND SENSING ENABLE 0.5 KM TRAVERSES, OR GREATER, EVEN OVER CHALLENGING LUNAR TERRAIN. THE ROVER IS BASED ON A HIGHLY-INTEGRATED SINGLE BOARD COMPUTER (ROVER-ON-A-BOARD) WITH RELIABLE FLIGHT SOFTWARE, HAS INTEGRATED LANDER STOWAGE AND DEPLOYMENT CAPABILITY, AND USES WIFI FOR TELEOPERATION AND SHARED COMPUTATION BETWEEN ROVER AND LANDER. THE SYSTEM INCORPORATES A FLEXIBLE THERMAL DESIGN AND INCLUDES MASS AND POWER ALLOCATION FOR SMALL SCIENCE INSTRUMENTS, OPENING UP A RANGE OF NOVEL APPLICATIONS, LANDING SITES, AND MISSION CONCEPTS. FINALLY, THE DESIGN OFFERS AN APPROACH TOWARD STANDARDIZATION AND COMMERCIALIZATION OF CUBEROVER PARTS AND DESIGNS. THIS PROPOSAL DESCRIBES A DETAILED PLAN FOR THE DEVELOPMENT, TESTING, AND DELIVERY OF FLIGHT HARDWARE BY THE END OF THE CONTRACT IN 2020. PHASE II WORK WILL MATURE THE PHASE I DESIGN AND RETIRE RISKS IN PURSUIT OF DEVELOPING AND DELIVERING A FLIGHT-READY CUBEROVER. THE PROPOSED PROGRAM CONSISTS OF FIVE TECHNICAL OBJECTIVES THAT ADDRESS THE KEY CHALLENGES OF SMALL SIZE AND MASS, THE HARSH LUNAR ENVIRONMENT, AND BROAD APPLICABILITY AND FLEXIBILITY FOR FUTURE MISSIONS AND PAYLOADS. WORK WILL MATURE SUBSYSTEMS TO DEVELOP THE FINAL FLIGHT CONFIGURATION TO ENVIRONMENTAL SPECIFICATIONS, BUILD FLIGHT HARDWARE, AND PERFORM QUALIFICATION AND ACCEPTANCE TESTING. THE KEY ARTIFACTS THAT WILL RESULT INCLUDE: A FLIGHT-QUALIFIED VERSION OF THE SINGLE BOARD COMPUTER, SEVERAL PROTOTYPE ROVERS FOR TESTING, AND A FLIGHT-QUALIFIED CUBEROVER THAT CAN SURVIVE THE TRIP TO THE MOON AND PERFORM ITS MISSION. | — | $1,124,485 | Feb 23, 2022 | May 1, 2018 – May 9, 2022 |
| Prime | National Aeronautics and Space Administration National Aeronautics and Space Administration | CO-LOCALIZATION FOR PLANETARY ROVER TEAMS | — | $745,623 | Jan 4, 2022 | Jan 13, 2020 – Jul 29, 2022 |
Contract vehicles are shown only when present in the source record. Linked award numbers and vehicles open the authoritative record on USAspending.gov.
Agencies supported
- National Aeronautics and Space AdministrationGov-sourced
- Department of DefenseGov-sourced
Government-sourced data comes from SAM.gov, SBA and USAspending.gov and is attributed to its source. Items marked company-reported were provided by the company and are verified by FedSub only where labeled. FedSub is a private company and is not affiliated with SBA, GSA/SAM.gov, or any government agency.