← Back to search

CENTRAL SOUTHERN CONSTRUCTION CORP.

Doing business as CENTRAL SOUTHERN CONSTRUCTION CORP

JACKSONVILLE, FL, 32204

HUBZone

Prime contracting experience

31 records from government sources. Past participation is not evidence of current teaming interest.

RoleAgencyDescriptionVehicleObligatedAction datePeriod
Prime
Department of Transportation
Federal Highway Administration
PROJECT DC NP ROCR 503(1), 24(2) THE PROJECT CONSISTS OF ROADWAY REPAIRS ON WATERSIDE DRIVE FROM THE SOUTHERN INTERSECTION WITH ROCK CREEK AND POTOMAC PARKWAY TO MASSACHUSETTS AVENUE NW, AND PINEY BRANCH PARKWAY FROM ARKANSAS AVENUE TO BEACH DRIVE—$7,927,036Sep 16, 2026Jul 23, 2025 – Feb 16, 2027
Prime
Department of Transportation
Federal Highway Administration
MS NP GUIS 15(4) THIS PROJECT CONSISTS OF THE CONSTRUCTION OF PAVED SHOULDERS, BOARDWALKS, CULVERT REPLACEMENT, AND GUARDRAIL REPLACEMENT. THE WORK INCLUDES THE INSTALLATION OF A BOTTOMLESS BOX CULVERT, GRADING, PAVING SHOULDERS, MICROSURFACING AND—$9,271,935Aug 28, 2026May 1, 2025 – Jan 14, 2028
Prime
Department of Transportation
Federal Highway Administration
NC ERFO NP BLRI 2024-1(2): THE PROJECT CONSISTS OF STABILIZING DAMAGE TO THE BLUE RIDGE PARKWAY CAUSED BY HURRICANE HELENE. THE WORK INCLUDES STABILIZING AN EMBANKMENT WITH NC DOT SHOT ROCK, INSTALLING GEOMEMBRANE WITH SANDBAGS, PLACING BARRIERS TO693C7320D000015USAspending$2,279,350Aug 10, 2026Dec 23, 2024 – Oct 31, 2027
Prime
Department of Transportation
Federal Highway Administration
PROJECT NC ERFO NP BLRI 2024-1(3): THE PROJECT CONSISTS OF REPAIRING DAMAGE TO THE BLUE RIDGE PARKWAY CAUSED BY HURRICANE HELENE. THE WORK INCLUDES A SLIDE REPAIR WITH REINFORCED SOIL SLOPE (RSS), MINIMAL TREE REMOVAL FOR ACCESS, DITCH RECONDITIONIN693C7320D000015USAspending$4,866,161Aug 6, 2026Dec 31, 2024 – Nov 30, 2027
Prime
Department of Transportation
Federal Highway Administration
PROJECT NC ERFO NP BLRI 2024-1(5) THE PROJECT CONSISTS OF SLIDE REPAIRS, CULVERT REPLACEMENT, STONE MASONRY HEADWALL REPAIR, PAVEMENT RECONSTRUCTION, PAVEMENT MARKINGS AND OTHER MISCELLANEOUS WORK.693C7320D000015USAspending$6,637,924Jun 3, 2026May 27, 2025 – Jul 31, 2028
Prime
Department of Transportation
Federal Highway Administration
PROJECT NC ERFO NP BLRI 2024-1(6) THE PROJECT CONSISTS OF SLIDE REPAIRS, GUARDRAIL REPLACEMENT, REPLACEMENT AND/OR CLEANING OF CULVERTS, PAVEMENT RECONSTRUCTION, PAVEMENT MARKINGS AND OTHER MISCELLANEOUS WORK.693C7320D000015USAspending$4,309,500Jun 2, 2026Jul 1, 2025 – Jun 30, 2028
Prime
Department of Transportation
Federal Highway Administration
PROJECT MS ERFO NPS VICK 2020-1(2) THE PROJECT CONSISTS OF SLIDE REPAIRS ON GRANT AVENUE AND UNION AVENUE. THE WORK INCLUDES CLEARING AND GRUBBING, ROADWAY EXCAVATION AND EMBANKMENT CONSTRUCTION, GEOGRID, GABIONS, AGGREGATE BASE, MECHANICALLY COMPAC—$8,933,610May 22, 2026Jan 9, 2025 – Mar 31, 2028
Prime
Department of Transportation
Federal Highway Administration
PROJECT NP SER PMS FY24(3): THE PROJECT CONSISTS OF THE PAVEMENT PRESERVATION OF IDENTIFIED ROADWAYS INCLUDING PARKING AREAS. THE WORK INCLUDES THIN LIFT OVERLAY OF ASPHALT CONCRETE PAVEMENT, SAMI, FULL DEPTH PATCHING, AND OTHER MISCELLANEOUS WORK.693C7320D000015USAspending$1,703,080Mar 11, 2026Jan 3, 2025 – Mar 31, 2028
Prime
Department of Transportation
Federal Highway Administration
PROJECT NC ERFO NP BLRI 2024-1(7) THE PROJECT CONSISTS OF SLIDE REPAIRS, GUARDRAIL REPLACEMENT, REPLACEMENT AND/OR CLEANING OF CULVERTS, PAVEMENT RECONSTRUCTION, PAVEMENT MARKINGS AND OTHER MISCELLANEOUS WORK.693C7320D000015USAspending$477,370Mar 11, 2026Jul 1, 2025 – May 31, 2027
Prime
Department of Transportation
Federal Highway Administration
GA NP CHCH MULTI (2): THE PROJECT CONSISTS OF THE REHABILITATION OF 0.44 MILES OF SNODGRASS ROAD AND 0.76 MILES OF DYER ROAD, INCLUDING PARKING AREAS AND PULL-OFFS. THE WORK INCLUDES ASPHALT PAVEMENT REMOVAL, ROADBED RECONDITIONING, GRADING, AGGREG693C7320D000015USAspending$1,843,125Mar 5, 2026Jul 18, 2025 – May 31, 2028
Prime
Department of Transportation
Federal Highway Administration
FL ERFO NPS GUIS 2020-1(1) THE PROJECT CONSISTS OF THE REPAIR STORM DAMAGE ON J. EARLE BOWDEN WAY, FORT PICKENS ROAD, JOHNSON BEACH ROAD, AND BEACH PARKING #6 WITHIN THE GULF ISLANDS NATIONAL SEASHORE, FLORIDA DISTRICT. THE WORK INCLUDES ASPHALT PA693C7320D000015USAspending$2,534,156Feb 23, 2026Jul 28, 2021 – Sep 30, 2023
Prime
Department of Transportation
Federal Highway Administration
SOEN: EMERGENCY REPAIR STORM-DAMAGED ON FORT PICKERNS ROAD AND J.E. BOWDEN WAY LOCATED IN GULF ISLAND NATIONAL SEASHORE AND ESCAMBIA COUNTY, FLORIDA.—$910,000Feb 20, 2026Nov 5, 2018 – Jun 22, 2020
Prime
Department of Transportation
Federal Highway Administration
CONSTRUCTION SERVICES FOR PROJECT IN NP INDU PMS(1), PAVEMENT PRESERVATION INDIANA DUNES. THIS WORK CONSISTS OF CRACK SEALING, PATCHING, APPLICATION OF CHIP SEAL AND MICRO SURFACE TREATMENTS AND PAVEMENT MARKING.69056724D000006USAspending$4,775,722Feb 13, 2026Feb 13, 2026 – Jul 24, 2026
Prime
Department of Transportation
Federal Highway Administration
FUNDS CONSTRUCTION PROJECT TX NP MULTI PMS(1) ), PAVEMENT PRESERVATION TEXAS. THIS WORK CONSISTS OF CRACK SEALING, PATCHING, APPLICATION OF CHIP SEAL AND MICRO SURFACE TREATMENTS AND PAVEMENT MARKING.69056724D000006USAspending$10,492,605Jan 22, 2026Dec 8, 2025 – Sep 3, 2026
Prime
Department of Transportation
Federal Highway Administration
PROJECT NP SER PMS FY24(2): THE PROJECT CONSISTS OF THE PAVEMENT PRESERVATION OF IDENTIFIED ROADWAYS INCLUDING PARKING AREAS. THE WORK INCLUDES THIN LIFT OVERLAY OF ASPHALT CONCRETE PAVEMENT, SAMI, FULL DEPTH PATCHING, AND OTHER MISCELLANEOUS WORK.693C7320D000015USAspending$1,582,756Jan 20, 2026Nov 22, 2024 – Jan 31, 2028
Prime
Department of Transportation
Federal Highway Administration
PROJECT NC ERFO FS NFNC811 2020-1(1): THE PROJECT CONSISTS OF THE REPAIR OF A FILL SLOPE FAILURE ON TUNI GAP ROAD (RTE 440). THE WORK INCLUDES GRADING, DRAINAGE, GEOFOAM LIGHTWEIGHT FILL EMBANKMENT, AGGREGATE SURFACE COURSE, AND OTHER MISCELLANEOU693C7320D000015USAspending$662,370Jan 7, 2026Apr 25, 2025 – Feb 28, 2027
Prime
Department of Transportation
Federal Highway Administration
PROJECT NP SLBE 5109(1): THE PROJECT CONSISTS OF CONSTRUCTING LEFT AND RIGHT TURNING LANES ON SOUTH DUNE HIGHWAY (M-109) AT DUNE CLIMB PARKING AREA (ROUTE 920). THE WORK INCLUDES GRADING; AGGREGATE BASE; ASPHALT PAVEMENT MILLING; CONCRETE PAVING; MS693C7320D000022USAspending$2,592,163Dec 2, 2025Mar 25, 2024 – Dec 2, 2025
Prime
Department of Transportation
Federal Highway Administration
PROJECT NC ERFO NP BLRI 2024-1(1): THE PROJECT CONSISTS OF REPAIRING DAMAGE TO THE BLUE RIDGE PARKWAY CAUSED BY HURRICANE HELENE. THE WORK INCLUDES TWO SLIDE REPAIRS WITH REINFORCED SOIL SLOPE (RSS), DEEP PATCH, MINIMAL TREE REMOVAL FOR ACCESS, DITC693C7320D000015USAspending$14,661,421Nov 17, 2025Dec 26, 2024 – Dec 31, 2027
Prime
Department of Transportation
Federal Highway Administration
THIS PROJECT CONSISTS OF RESURFACING THE NATCHEZ TRACE PARKWAY, INCLUDING RAMPS, BRIDGES, INTERSECTIONS, VARIOUS ACCESS ROADS, AND PARKING/PULL-OFF AREAS. THE WORK WILL INCLUDE ASPHALT OVERLAY, SIDESLOPE REPAIRS, WEDGE AND LEVELING, SPOT PATCHING, AN—$19,430,502Aug 22, 2025Jun 29, 2023 – Mar 31, 2027
Prime
Department of the Interior
National Park Service
CONSTRUCTION, REPAIR COLLAPSED STORM DRAIN AT CASTILLO DE SAN MARCOS—$775,675Aug 13, 2025Aug 23, 2024 – Aug 15, 2025
Prime
Department of Transportation
Federal Highway Administration
MI NP MUILTI PMS(1), PAVEMENT PRESERVATION MICHIGAN. WORK CONSISTS OF PATCHING, CRACK SEALING, AND RESURFACING OF ASPHALT SURFACES THROUGH PICTURED ROCKS NATIONAL LAKESHORE AND SLEEPING BEAR FUNES NATIONAL LAKESHORE.69056724D000006USAspending$4,569,517May 21, 2025Feb 26, 2024 – Oct 25, 2024
Prime
Department of Transportation
Federal Highway Administration
PROJECT NP-EVER 219(1), 222(1): THE PROJECT CONSISTS OF THE ASPHALT PAVEMENT MILLING AND OVERLAY, ASPHALT PAVEMENT PATCHING, PAVEMENT MARKING, RAISED PAVEMENT MARKER, CULVERT AND MANHOLE REPLACEMENT, REMOVE AND REST INLET FRAME AND GRATE, REPLACEMEN693C7320D000015USAspending$2,276,875Mar 12, 2025Sep 16, 2021 – Mar 31, 2024
Prime
Department of Transportation
Federal Highway Administration
PROJECT IL ERFO COE 2019-1(1) THE PROJECT CONSISTS OF THE REMOVAL AND REPLACEMENT OF FIVE DAMAGED PEDESTRIAN TIMBER BRIDGES. THE WORK INCLUDES CONCRETE ABUTMENTS WITH HELICAL PILE FOUNDATION, REPAIR OF WOODEN TRAIL STEPS, STABILIZATION OF ERODED ARE693C7320D000022USAspending$3,495,405Feb 26, 2025Feb 26, 2025 – May 18, 2027
Prime
Department of Transportation
Federal Highway Administration
NP-VICK 12(5), 20(2) THE PROJECT CONSISTS OF PAVEMENT REPAIR ON CONFEDERATE AVENUE (ROUTE 12) AND SLIDE REPAIR ON UNION AVENUE (ROUTE 20). THE WORK INCLUDES EARTHWORK, GABION WALL, AGGREGATE BASE, ASPHALT PAVING, CONCRETE PAVING, DRAINAGE, AND OTHER MISCELLANEOUS WORK.—$471,902Nov 21, 2024Nov 14, 2018 – Jun 22, 2020
Prime
Department of Transportation
Federal Highway Administration
PROJECT NP SER PMS FY21(2): THE PROJECT CONSISTS OF PAVEMENT PRESERVATION (MICRO SURFACING) OF ROADS AND PARKING AREAS IN BIG CYPRESS NATIONAL PRESERVE. THE WORK INCLUDES CRACK CLEANING AND SEALING, ASPHALT CONCRETE PAVEMENT PATCHING, PAVEMENT MA—$2,555,354Nov 14, 2024May 12, 2022 – Nov 14, 2024
Prime
Department of Transportation
Federal Highway Administration
PROJECT FW-EDFO 104(1), 906(1) THE PROJECT CONSISTS OF THE REHABILITATION AND WIDENING OF SCOTTS LANDING ROAD AND SCOTTS LANDING PARKING AREA WITHIN THE EDWIN B. FORSYTHE NATIONAL WILDLIFE REFUGE. THE WORK INCLUDES GRADING, AGGREGATE BASE, ALUMINUM693C7320D000018USAspending$489,380Oct 24, 2024Mar 4, 2021 – Jun 30, 2023
Prime
Department of Transportation
Federal Highway Administration
PROJECT NP-DEWA 14(18) 121(1) CONSISTS OF THE REHABILITATION AND PREVENTATIVE MAINTENANCE OF BRIDGES IN THE DELAWARE WATER GAP NATIONAL RECREATION AREA. THE WORK INCLUDES ROADWAY EXCAVATION, RIPRAP PLACEMENT, ASPHALT CONCRETE PATCHING, CONCRETE REPAI693C7320D000018USAspending$1,543,004Aug 5, 2024Sep 25, 2020 – Aug 2, 2024
Prime
Department of Transportation
Federal Highway Administration
PROJECT NP SER PMS FY21(1) THE PROJECT CONSISTS OF PAVEMENT PRESERVATION (MICRO SURFACING) OF ROADS AND PARKING AREAS IN EVERGLADES NATIONAL PARK. THE WORK INCLUDES CRACK CLEANING AND SEALING, ASPHALT CONCRETE PAVEMENT PATCHING, PAVEMENT MARKING INS—$6,330,501Jul 31, 2024Jun 2, 2022 – Jun 18, 2024
Prime
Department of Transportation
Federal Highway Administration
PROJECT NP-SER PMS FY22(1) THE PROJECT CONSISTS OF THE PAVEMENT PRESERVATION OF 29.57 MILES OF MAIN PARK ROAD INCLUDING PULL-OFF AREAS. THE WORK INCLUDES MICRO SURFACING, PAVEMENT MARKINGS, AND OTHER MISCELLANEOUS WORK.—$4,483,496Feb 29, 2024Aug 5, 2022 – Jul 31, 2025
Prime
Department of Transportation
Federal Highway Administration
PROJECT FIIS BURMA ROUTE: THE PROJECT CONSISTS OF THE RECONSTRUCTION OF AN APPROXIMATE 0.59 MILE SEGMENT OF BURMA ROUTE (ROUTE 0100). THE WORK INCLUDES EMBANKMENT CONSTRUCTION, RESURFACING WITH AGGREGATE BASE, SEPARATION-STABILIZATION GEOTEXTILE PL693C7320D000018USAspending$710,526Sep 22, 2022Apr 29, 2021 – Jun 28, 2022
Prime
Department of Defense
Department of the Navy
WIDEN SEVERAL INTERSECTIONS, NWC NAS JAX—$936,952Apr 2, 2022Apr 2, 2022 – Aug 22, 2022

Contract vehicles are shown only when present in the source record. Linked award numbers and vehicles open the authoritative record on USAspending.gov.

Agencies supported

  • Department of TransportationGov-sourced
  • Department of the InteriorGov-sourced
  • Department of DefenseGov-sourced

Government-sourced data comes from SAM.gov, SBA and USAspending.gov and is attributed to its source. Items marked company-reported were provided by the company and are verified by FedSub only where labeled. FedSub is a private company and is not affiliated with SBA, GSA/SAM.gov, or any government agency.

CENTRAL SOUTHERN CONSTRUCTION CORP. – Jacksonville, FL | UEI GKU1XRD7BCX7 | FedSub