SPEES LLC
Kent, WA, 98032
Prime contracting experience
Showing the 50 most recent of 106 records from government sources. Past participation is not evidence of current teaming interest.
| Role | Agency | Description | Vehicle | Obligated | Action date | Period |
|---|---|---|---|---|---|---|
| Prime | Department of Veterans Affairs Department of Veterans Affairs | EHRM INFRASTRUCTURE UPGRADES - CASTLE POINT | — | $2,667,519 | Oct 6, 2026 | Dec 20, 2022 – Sep 29, 2028 |
| Prime | Department of Veterans Affairs Department of Veterans Affairs | AE EHRM INFRASTRUCTURE UPGRADES NEW DATA CENTER, ST. LOUIS, MO | — | $481,769 | Sep 30, 2026 | Sep 19, 2023 – Nov 30, 2026 |
| Prime | Department of Veterans Affairs Department of Veterans Affairs | PROJECT 663-25-112, UPGRADE CAMPUS FIRE ALARM FOR ADMIN-ARCHITECTURE-ENGINEER SERVICES FOR ALL DESIGN AND RELATED SERVICES FOR THE VA PUGET SOUND HEALTH CARE SYSTEM IN SEATTLE, WA. | — | $1,290,643 | Sep 29, 2026 | Sep 11, 2025 – Feb 12, 2028 |
| Prime | Department of Veterans Affairs Department of Veterans Affairs | EHRM DESIGN PERRY POINT | — | $3,516,680 | Sep 29, 2026 | Sep 19, 2023 – Jan 21, 2027 |
| Prime | Department of Veterans Affairs Department of Veterans Affairs | CONTRACTOR WILL PROVIDE ALL DESIGN AND CONSTRUCTION PERIOD SERVICES FOR THE ELECTRONIC HEALTH RECORDS MODERNIZATION INFRASTRUCTURE UPGRADES DESIGN PROJECT AT THE HUNTINGTON WV VAMC | — | $3,782,899 | Sep 28, 2026 | Sep 8, 2022 – Sep 24, 2027 |
| Prime | Department of Veterans Affairs Department of Veterans Affairs | AE DESIGN SERVICES | 36C26225D0168USAspending | $971,095 | Sep 25, 2026 | Oct 15, 2026 – Dec 27, 2027 |
| Prime | Department of Veterans Affairs Department of Veterans Affairs | EHRM INFRASTRUCTURE UPGRADES | — | $2,578,249 | Sep 25, 2026 | Aug 8, 2023 – Sep 25, 2027 |
| Prime | Department of Veterans Affairs Department of Veterans Affairs | THE ARCHITECT-ENGINEER (A-E) IS TO PROVIDE ALL DESIGN AND ENGINEERING SERVICES TO COMPLETE THE EHRM INFRASTRUCTURE UPGRADES TIER 2 DATA CENTER DESIGN PROJECT AT THE WALLA WALLA, WA VA MEDICAL CENTER. | — | $1,344,856 | Sep 25, 2026 | Aug 27, 2025 – Jun 28, 2027 |
| Prime | Department of Veterans Affairs Department of Veterans Affairs | 692-22-104 REPLACE AGED AND DEFICIENT STEAM LINES, A/E SERVICES FOR DESIGN & CONSTRUCTION PERIOD AT THE VA SORCC IN WHITE CITY, OR | 36C26018D0041USAspending | $419,509 | Sep 24, 2026 | Oct 3, 2023 – May 19, 2027 |
| Prime | Department of Veterans Affairs Department of Veterans Affairs | EHRM IU DESIGN-KERRVILLE | — | $1,411,992 | Sep 24, 2026 | Feb 7, 2023 – Oct 17, 2027 |
| Prime | Department of Veterans Affairs Department of Veterans Affairs | HUNTER HOLMES MCGUIRE VA MEDICAL CENTER EHRM IU DESIGN | — | $3,000,149 | Sep 23, 2026 | Sep 28, 2023 – Nov 21, 2026 |
| Prime | Department of Veterans Affairs Department of Veterans Affairs | AE SERVICES FOR WILKES BARRE VAMC FOR EHRM INFRASTRUCTURE UPGRADES | — | $3,315,083 | Sep 15, 2026 | Sep 30, 2022 – Apr 2, 2028 |
| Prime | Department of Veterans Affairs Department of Veterans Affairs | EHRM IU DESIGN-MONTGOMERY | — | $2,760,595 | Sep 15, 2026 | Mar 31, 2022 – Jan 15, 2027 |
| Prime | Department of Veterans Affairs Department of Veterans Affairs | PROFESSIONAL ARCHITECT/ENGINEERING (A/E) FIRMS TO PROVIDE PROFESSIONAL MULTI-DISCIPLINE EXPERT CONSULTING SERVICES TO ALL VISN 22 FACILITIES IN ARIZONA, NEW MEXICO & SOUTHERN CALIFORNIA. | 36C26225D0168USAspending | $668,614 | Sep 15, 2026 | Feb 17, 2026 – Jan 18, 2027 |
| Prime | Department of Veterans Affairs Department of Veterans Affairs | AE SERVICES FOR BUTLER VAMC | — | $1,861,573 | Sep 15, 2026 | Sep 28, 2022 – Apr 27, 2027 |
| Prime | Department of Veterans Affairs Department of Veterans Affairs | AE IDIQ UPDATES | 36C25819D0052USAspending | $645,249 | Sep 14, 2026 | May 15, 2024 – Sep 2, 2027 |
| Prime | Department of Veterans Affairs Department of Veterans Affairs | RENOVATE BUILDING 9A FOR EHRM ADMINISTRATIVE SPACE - DESIGN - CARL VINSON VA MEDICAL CENTER DUBLIN, GA | — | $353,164 | Sep 9, 2026 | Sep 28, 2023 – Apr 17, 2027 |
| Prime | Department of Veterans Affairs Department of Veterans Affairs | EHRM INFRASTRUCTURE UPGRADES DESIGN HAMPTON, VA | — | $3,770,907 | Sep 2, 2026 | Aug 29, 2022 – Oct 29, 2029 |
| Prime | Department of Veterans Affairs Department of Veterans Affairs | MENLO PARK PROJECT 640-114, REPLACE BOILER BUILDING | 36C26123D0036USAspending | $940,142 | Aug 28, 2026 | Aug 1, 2024 – Jun 30, 2027 |
| Prime | Department of Veterans Affairs Department of Veterans Affairs | FUEL MX. SERVICES | — | $563,295 | Aug 19, 2026 | Sep 14, 2022 – Sep 14, 2027 |
| Prime | Department of Veterans Affairs Department of Veterans Affairs | 653-23-100 ARCHITECTURE ENGINEERING NRM PROJECT TO REMOVE AND REPLACE UNDERGROUND FUEL TANKS AT THE VA ROSEBURG HEALTH CARE SYSTEM LOCATED IN ROSEBURG, OR | 36C26018D0041USAspending | $577,798 | Aug 14, 2026 | Jun 13, 2023 – Dec 19, 2026 |
| Prime | Department of Veterans Affairs Department of Veterans Affairs | EHRM DESIGN | — | $2,888,865 | Aug 6, 2026 | Sep 1, 2023 – Jan 18, 2028 |
| Prime | Department of Veterans Affairs Department of Veterans Affairs | EHRM INFRASTRUCTURE UPGRADES - CPS | — | $665,964 | Aug 6, 2026 | Sep 12, 2025 – Mar 9, 2027 |
| Prime | Department of Veterans Affairs Department of Veterans Affairs | AE EHRM INFRASTRUCTURE UPGRADES, WEST HAVEN, CT | — | $4,423,976 | Aug 6, 2026 | Sep 19, 2023 – May 5, 2026 |
| Prime | Department of Veterans Affairs Department of Veterans Affairs | 502-24-102 REPLACE ELEVATORS | — | $977,451 | Aug 4, 2026 | Dec 16, 2024 – Dec 16, 2029 |
| Prime | Department of Veterans Affairs Department of Veterans Affairs | VISN 21 WIDE DESIGN IDIQ - TASK ORDER FOR DESIGN INTERVENTIONAL IMAGING SUITE FOR CATH LAB AT FRESNO VAMC | VA26117D0113USAspending | $641,859 | Jul 29, 2026 | Jun 29, 2021 – Jul 29, 2027 |
| Prime | Department of Veterans Affairs Department of Veterans Affairs | THIS CONTRACT IS TO PROVIDE ALL DESIGN AND ENGINEERING SERVICES TO COMPLETE THE CONSTRUCT NEW POLICE BUILDING DESIGN PROJECT AT THE GREATER LOS ANGELES (GLA) WEST LOS ANGELES VA MEDICAL CENTER (WLAVAMC), LOCATED IN LOS ANGELES, CA. | — | $1,860,306 | Jul 27, 2026 | Jul 26, 2021 – May 23, 2027 |
| Prime | Department of Veterans Affairs Department of Veterans Affairs | DESIGN FOR VA PACIFIC ISLANDS HEALTH CARE SYSTEM IN HONOLULU, HI FOR CHIEF OF STAFF RENOVATION | 36C26123D0036USAspending | $469,215 | Jul 24, 2026 | Aug 10, 2026 – Mar 11, 2027 |
| Prime | Department of Veterans Affairs Department of Veterans Affairs | EXPAND RADIOLOGY SERVICES AT BLDG. 19 | 36C24824D0033USAspending | $881,080 | Jul 23, 2026 | May 11, 2026 – Jan 7, 2029 |
| Prime | Department of Veterans Affairs Department of Veterans Affairs | THE ARCHITECT-ENGINEER IS TO PROVIDE AL DESIGN AND ENGINEERING SERVICES FOR THE ELECTRONIC HEALTH RECORD MODERNIZATION (EHRM) INFRASTRUCTURE UPGRADES DESIGN AT THE JEFFERSON BARRACKS DIVISION - ST. LOUIS VETERANS AFFAIRS MEDICAL CENTER (VAMC) | — | $2,712,857 | Jul 23, 2026 | Sep 29, 2021 – Aug 30, 2026 |
| Prime | Department of Veterans Affairs Department of Veterans Affairs | AE MATOC FOR VISN 8. | 36C24824D0026USAspending | $454,414 | Jul 20, 2026 | Sep 24, 2025 – Jan 23, 2027 |
| Prime | Department of Veterans Affairs Department of Veterans Affairs | AE IDIQ MATOC TVHS | 36C24924D0096USAspending | $571,055 | Jul 16, 2026 | Apr 15, 2026 – Mar 10, 2027 |
| Prime | Department of Veterans Affairs Department of Veterans Affairs | 589A7-24-400 FCA REPLACE FIRE ALARM INFRASTRUCTURE - A/E DESIGN AND CONSTRUCTION PERIOD SERVICES | — | $718,317 | Jul 13, 2026 | Aug 8, 2024 – Aug 31, 2028 |
| Prime | Department of Veterans Affairs Department of Veterans Affairs | REMODELING OF EP LAB OPERATING ROOM 4A122 AND THE AREAS DIRECTLY ASSOCIATED WITH IT. | 36C24523D0105USAspending | $463,407 | Jul 9, 2026 | Jul 12, 2024 – Jul 11, 2029 |
| Prime | Department of Veterans Affairs Department of Veterans Affairs | CONTRACTOR WILL PROVIDE ALL DESIGN AND CONSTRUCTION PERIOD SERVICES FOR THE ELECTRONIC HEALTH RECORDS MODERNIZATION INFRASTRUCTURE UPGRADES DESIGN PROJECT AT THE BROOKLYN NY VA MEDICAL CENTER | — | $4,095,668 | Jul 8, 2026 | Sep 26, 2023 – May 29, 2028 |
| Prime | Department of Veterans Affairs Department of Veterans Affairs | DURHAM H/VAC AE SATOC REPLACE SURGERY AHU 5 & 25 | 36C24626D0053USAspending | $333,057 | Jul 7, 2026 | Jul 7, 2026 – Feb 24, 2027 |
| Prime | Department of Veterans Affairs Department of Veterans Affairs | DURHAM H/VAC AE SATOC - REPLACE AUXILIARY CHILLERS | 36C24626D0053USAspending | $283,865 | Jul 6, 2026 | Jul 7, 2026 – Jun 7, 2027 |
| Prime | Department of Veterans Affairs Department of Veterans Affairs | GREASE TRAP MAINTENANCE | — | $989,647 | Jul 6, 2026 | Jun 3, 2022 – Jan 2, 2027 |
| Prime | Department of Veterans Affairs Department of Veterans Affairs | AE DESIGN EHRM INFRASTRUCTURE UPGRADES WHITE RIVER JUNCTION | — | $3,435,195 | Jul 2, 2026 | Sep 27, 2023 – Dec 31, 2026 |
| Prime | Department of Veterans Affairs Department of Veterans Affairs | IDIQ MATOC FOR A/E AND RELATED PROFESSIONAL SERVICES FOR VA FACILITIES IN VISN 20. VISN 20 FACILITIES ARE LOCATED IN ALASKA, IDAHO, OREGON, AND WASHINGTON. MOD P02: ADD SUBCONSULTANTS | 36C26018D0041USAspending | $1,649,981 | Jul 1, 2026 | Sep 30, 2019 – Jun 27, 2027 |
| Prime | Department of Veterans Affairs Department of Veterans Affairs | DESIGN TO REPLACE STERILE PROCESSING SUITE FLOORING LAS VEGAS | 36C26123D0036USAspending | $728,323 | Jun 30, 2026 | Aug 18, 2025 – Sep 1, 2026 |
| Prime | Department of Veterans Affairs Department of Veterans Affairs | ARCHITECT-ENGINEERING FIRM TO COMPLETE THE CONSTRUCTION PERIOD SERVICES ONLY, PROJECT 663A4-23-200, MODERNIZE ELEVATORS BLDG. 2 AT AMERICAN LAKE VA MEDICAL CENTER, TACOMA, WASHINGTON. | 36C26018D0041USAspending | $274,111 | Jun 24, 2026 | Jun 26, 2023 – Sep 30, 2025 |
| Prime | Department of Veterans Affairs Department of Veterans Affairs | 618-25-200, AE UPGRADE BUILDING 222 HVAC, MINNEAPOLIS, MINNESOTA. | — | $489,745 | Jun 23, 2026 | Sep 16, 2025 – Aug 5, 2026 |
| Prime | Department of Veterans Affairs Department of Veterans Affairs | 561-26-101 IMPROVE AND UPGRADE ELECTRIC SYSTEM AT THE VA NEW JERSEY HEALTHCARE SYSTEM EAST ORANGE | — | $1,443,358 | Jun 9, 2026 | Jun 9, 2026 – Jul 19, 2027 |
| Prime | Department of Veterans Affairs Department of Veterans Affairs | 589-24-450, UPGRADE BUILDING 26 CHILLERS (A/E DESIGN) FOR KANSAS CITY VETERANS ADMINISTRATION MEDICAL CENTER | — | $1,505,788 | Jun 8, 2026 | Sep 20, 2024 – Sep 19, 2029 |
| Prime | Department of Veterans Affairs Department of Veterans Affairs | INSTALL SPS AHU | — | $301,808 | Jun 5, 2026 | Feb 17, 2026 – Nov 24, 2026 |
| Prime | Department of Veterans Affairs Department of Veterans Affairs | 657-24-106JB MECHANICAL SYSTEMS BLDG 52 | — | $657,814 | Jun 4, 2026 | Oct 11, 2024 – Oct 11, 2029 |
| Prime | Department of Veterans Affairs Department of Veterans Affairs | 762-302 CONSTRUCT EMERGENCY PHARMACY BLDG MINOR DESIGN AT TUCSON CONSOLIDATED MAIL ORDER PHARMACY (CMOP) AT TUCSON, AZ | — | $1,521,782 | May 28, 2026 | Feb 20, 2026 – Feb 20, 2027 |
| Prime | Department of Veterans Affairs Department of Veterans Affairs | PROJECT 561A4-23-103 WATER PIPING SURVEY | — | $584,451 | May 28, 2026 | Jun 11, 2026 – Dec 23, 2026 |
| Prime | Department of Veterans Affairs Department of Veterans Affairs | AE MATOC FOR VISN 8. FAIR OPPORTUNITY WILL BE GIVEN TO ALL VENDORS WITHIN THE POOL OF VENDORS FOR EITHER THE NORTH OR THE SOUTH REGION DEPENDING ON THE PROJECT LOCATION. | 36C24824D0026USAspending | $1,522,464 | May 26, 2026 | Jun 26, 2025 – May 5, 2027 |
Contract vehicles are shown only when present in the source record. Linked award numbers and vehicles open the authoritative record on USAspending.gov.
Subcontracting experience
4 records from government sources. Past participation is not evidence of current teaming interest.
| Role | Agency | Description | Vehicle | Obligated | Action date | Period |
|---|---|---|---|---|---|---|
| Subcontractor | Department of Defense | DESIGN TEAM SITE VISITS. ENGINEERING FIELD TESTING AND SITE INVESTIGATIONS. EVALUATE AND DOCUMENT EXISTING CONDITIONS. CONDUCT DESIGN RESOLUTION CONFERENCE FOR SUBMITTALS. PERFORM ALL DESIGN AND ENGINEERING SERVICES NECESSARY TO ACCOMMODATE THE RELOCATABLE FACILITY. 25072-0001_REV3 Parent award context Parent award agency: Department of Defense · Department of the Army Parent award NAICS: 332311 Parent award description: RELOCATABLE FACILITY View parent award on USAspending | — | $744,341 | Aug 12, 2026 | — – — |
| Subcontractor | Department of Defense | PROVIDE MECHANICAL & ELECTRICAL ENGINEERING SERVICES. SPEES N4425525F0192 Parent award context Parent award agency: Department of Defense · Department of the Navy Parent award NAICS: 541330 Parent award performance state: WA Parent award description: AE TASK ORDER AWARD View parent award on USAspending | N4425522D1500USAspending | $30,156 | Aug 6, 2025 | — – — |
| Subcontractor | Department of Defense | PROVIDE MECHANICAL AND ELECTRICAL ENGINEERING SERVICES. SPEEDS N4425525F0090 Parent award context Parent award agency: Department of Defense · Department of the Navy Parent award NAICS: 541330 Parent award performance state: WA Parent award description: PROVIDE A COMPREHENSIVE EVALUATION OF B873 AND B1109S EXISTING SUMPS AND B873S EXISTING UTILITY TUNNEL. PROVIDE RECOMMENDED OPTIONS FOR REMEDIATION. View parent award on USAspending | N4425522D1500USAspending | $35,756 | Jun 6, 2025 | — – — |
| Subcontractor | Department of Defense | PROVIDE MECHANICAL & ELECTRICAL ENGINEERING SERVICES. SPEES N4425525F4070 Parent award context Parent award agency: Department of Defense · Department of the Navy Parent award NAICS: 541330 Parent award performance state: WA Parent award description: CIVIL AND STRUCTURAL AE SERVICES DESIGN TO REPAIR STRUCTURAL COLUMN J13 B873 PSNS View parent award on USAspending | N4425522D1500USAspending | $71,254 | Mar 21, 2025 | — – — |
Contract vehicles are shown only when present in the source record. Linked award numbers and vehicles open the authoritative record on USAspending.gov.
Agencies supported
- Department of Veterans AffairsGov-sourced
- Department of DefenseGov-sourced
Government-sourced data comes from SAM.gov, SBA and USAspending.gov and is attributed to its source. Items marked company-reported were provided by the company and are verified by FedSub only where labeled. FedSub is a private company and is not affiliated with SBA, GSA/SAM.gov, or any government agency.