← Back to search
TAFT ELECTRIC COMPANY
Doing business as TAFT ELECTRIC CO
VENTURA, CA, 93003
UnclaimedClaim this profile (free)
Subcontracting experience
5 records from government sources. Past participation is not evidence of current teaming interest.
| Role | Agency | Description | Vehicle | Obligated | Action date | Period |
|---|---|---|---|---|---|---|
| Subcontractor | National Aeronautics and Space Administration | LEAP MPK ASSY AT SLC-3 4500107410 Parent award context Parent award agency: National Aeronautics and Space Administration · National Aeronautics and Space Administration Parent award NAICS: 541715 Parent award performance state: CO Parent award description: CRYOGENIC (H2-O2) SMART PROPULSION FLIGHT DEMONSTRATION View parent award on USAspending | — | $26,837 | Dec 9, 2025 | — – — |
| Subcontractor | Department of Defense | INSTALLATION:
€¢ DEMO OF EXISTING LIGHTING AND WIRING. (CONDUIT TO REMAIN)
€¢ INSTALL OF NEW LIGHTING (34 FIXTURES 6 OF WHICH ARE EMERGENCY) AND WIRING PER PHOTOMETRIC DRAWINGS.
€¢ INSTALLATION OF 3 NEW EXIT SIGNS WITH EMERGENCY LIGHTING.
€¢ REMOVAL AND HAUL OFF OF DEMOED LIGHTING AND WIRE.
€¢ INSTALLATION OF TEMPORARY TASK SPECIFIC LIGHTING.
€¢ INSTALL NEW LIGHT SWITCHES INDICATED ON GOVERNMENT SUPPLIED DRAWING. 1914-58 · Prime awardUSAspending | FA461020D0003USAspending | $55,744 | Oct 15, 2024 | — – — |
| Subcontractor | Department of Defense | ELECTRICAL:
BIOLOGICAL, ARCHEOLOGICAL AND NATIVE AMERICAN MONITORING WILL BE PROVIDED DURING DIGGING, TRENCHING
ACTIVITIES AS REQUIRED. ALL MONITORING WILL BE COORDINATED WITH 30CES/CEIEC 6€Ͽ½8 WEEKS PRIOR TO
MOBILIZATION AS REQUIRED BY THE 813. 813 PACKAGES WILL BE KEPT ON SITE FOR THE DURATION OF THE PROJECT.
· TRENCH WILL BE DUG FROM NEW POWER POLE TO LOCATION OF NEW TRANSFORMER PAD TO A DEPTH BETWEEN 24€Ͽ½ AND 36€Ͽ½.
EXISTING CONDUIT AND WIRE WILL BE DEMOLISHED, REMOVED AND DISPOSED OF PROPERLY.
· 2 NEW 4€Ͽ½ CONDUITS WILL BE INSTALLED BETWEEN NEW POWER POLE AND LOCATION OF NEW TRANSFORMER PAD.
· NEW CONDUIT WILL BE INCASED IN CONCRETE. TRENCH WILL BE BACKFILLED, COMPACTED TO 95% AND ASPHALT WILL BE PATCHED
ACROSS THE ROAD. REMAINING TRENCH WILL BE BACKFILLED TO MATCH EXISTING LANDSCAPE. TRENCHING AND BACK FILL TO
INCLUDE RED DYE CONCRETE TO 4€Ͽ½ ABOVE CONDUITS, BACK FILL MINIMUM 12 INCHES (NATIVE SOIL) COMPACTED TO 95% AND
PATCHING ASPHALT.
· ONE NEW 4€Ͽ½INCH CONDUIT WILL BE REDUCED TO 2 INCH AND SWEPT UP THE POLE TO A POWER LINE RISER COMPLETE WITH CROSS
ARMS, CUTOUTS AND HARDWARE NECESSARY TO SUPPLY POWER TO NEW TRANSFORMER. NEW 12KV RISER INCLUDING ALL
NECESSARY CROSSARMS, CUTOUTS, AND HARDWARE WILL BE PROVIDED AND INSTALLED. 2ND CONDUIT WILL BE CAPPED OFF AT BOTH
ENDS FOR LATER USE.
· NEW 7€„¢ X 7€„¢ X 6€Ͽ½ FORM FOR NEW CONCRETE FORM WILL BE INSTALLED WITH 4€Ͽ½ COMPACTED BASE AND #4 REBAR ON 18€Ͽ½ CENTER.
FOUR SCHEDULE 80 STUB OUTS WILL BE INSTALLED IN PAD. (1 TRANSFORMER TO PANEL, 1 TRANSFORMER TO POLE, 2 FOR FUTURE
HVAC.) 1 NEW GROUNDING ROD WILL BE INSTALLED ADJACENT TO FORM PRIOR TO CONCRETE.
· WE WILL PROVIDE AND INSTALL 3000PSI CONCRETE WITH A BROOM FINISH.
· WE WILL PROVIDE AND INSTALL NEW PANEL. PANEL €œA€Ͽ½ WILL BE 225 AMPS€Ͽ½BUS (COPPER), 209Y/120V, 3€Ͽ½PHASE, 4€Ͽ½WIRE WITH
(42) CIRCUIT€Ͽ½BREAKERS. APPROXIMATELY 15€Ͽ½20 FEET OF POWER CABLE FROM THE END OF THE RUN WHICH WILL BE USED FOR FINAL
SWITCHGEAR CONNECTIONS WILL BE INSTALLED. PROPER CONNECTIONS AND REQUIRED GROUNDING INTO THE SECONDARY SIDE OF
THE PAD MOUNT TRANSFORMER WILL BE INSTALLED.
DOCUSIGN ENVELOPE ID: 9F9232D2F91DF55D-D-4D1DB4D--443E2D56-9-A23927-8C-D2E156C2B39D81DF9A58A3C
CONTRACTOR€„¢S INITIALS SUBCONTRACTOR€„¢S PAGE 4 OF 25 INITIALS
· WE WILL PROVIDE AND INSTALL NEW 75KVA PAD MOUNT TRANSFORMER MEETING ALL REQUIREMENTS AS OUTLINED IN
UFGS 33 71 02 AND UFC 3€Ͽ½550€Ͽ½01
· #2 AWG EPR, 220 MILS, 133% INSULATION (MV105) HIGH VOLTAGE WIRING WILL BE PROVIDED AND INSTALLED FROM
OVERHEAD RISER TO HIGH VOLTAGE SIDE OF NEW TRANSFORMER. (FINAL CONNECTION TO BE COORDINATED WITH AND
COMPLETED BY CE). 12 KV WIRE WILL BE TESTED TO INSURE IN MEETS VSFB GUIDELINES, MANUFACTURE
RECOMMENDATIONS OR NETA STANDARDS.
· SECONDARY POWER CABLE WILL BE PROVIDED AND INSTALLED FROM NEW TRANSFORMER TO NEW PANEL IN MECHANICAL
ROOM.
· EXISTING RECEPTACLES, SWITCHES AND LIGHT FIXTURES WILL BE INSPECTED. ANY RECEPTACLES, SWITCHES OR LIGHT
FIXTURES DETERMINED TO BE NONOPERATIONAL WILL BE REPLACED WITH LIKE IN KIND OR EQUAL.
· REPLACE EXISTING MECHANICAL ROOM DOOR WITH LIKE IN KIND OR EQUAL. DOOR TO INCLUDE HARDWARE AND 2€„¢X2€„¢ VENT. 1914-44 Parent award context Parent award agency: Department of Defense · Department of the Air Force Parent award NAICS: 236220 Parent award performance state: CA Parent award description: XUMU23-2209, INSTALL ELECTRICAL POWER AT FACILITY 2002, VANDENBERG SFB, CA View parent award on USAspending | FA461020D0003USAspending | $180,673 | Jun 25, 2024 | — – — |
| Subcontractor | Department of Defense | SITE ELECTRICAL' BUILDING ELECTRICAL 124003-0006 Parent award context Parent award agency: Department of Defense · Department of the Navy Parent award NAICS: 236220 Parent award performance state: CA Parent award description: DBB P525, NRL FACILITY REPLACEMENT? View parent award on USAspending | N6247321D1206USAspending | $16,613,499 | Jun 4, 2024 | — – — |
| Subcontractor | Department of Defense | INSTALL A 240 VOLT 50 AMP RECEPTACLE 230005847 · Prime awardUSAspending | FA461023D0001USAspending | $44,401 | Oct 6, 2023 | — – — |
Contract vehicles are shown only when present in the source record. Linked award numbers and vehicles open the authoritative record on USAspending.gov.
Government-sourced data comes from SAM.gov, SBA and USAspending.gov and is attributed to its source. Items marked company-reported were provided by the company and are verified by FedSub only where labeled. FedSub is a private company and is not affiliated with SBA, GSA/SAM.gov, or any government agency.