WSP USA INC
TACOMA, WA, 98402
Prime contracting experience
Showing the 50 most recent of 57 records from government sources. Past participation is not evidence of current teaming interest.
| Role | Agency | Description | Vehicle | Obligated | Action date | Period |
|---|---|---|---|---|---|---|
| Prime | Department of Defense Department of the Navy | BPA PRELIMINARY DESIGN FOR FY 26 MCON PROJECT P-472 PIER 2, NBK BANGOR, SILVERDALE, WA | N4425520D0001USAspending | $27,800,204 | Jul 22, 2026 | Sep 30, 2023 – Dec 31, 2027 |
| Prime | Department of Defense Department of the Navy | DRY DOCK 1 & 2 TRF SEISMIC STUDIES PSNS | N4425520D0001USAspending | $13,948,403 | May 4, 2026 | Jun 26, 2024 – Oct 31, 2026 |
| Prime | Department of Defense Department of the Navy | AE PCAS SERVICES SUPPORTING P400 | N4425515D0011USAspending | $538,829 | Mar 27, 2026 | Sep 26, 2019 – Mar 31, 2026 |
| Prime | Department of Defense Department of the Navy | CONDUCT A STUDY OF THE BANGOR-7420 DELTA DRYDOCK TO INVESTIGATE AND DETERMINE CORRECTIVE ACTIONS TO THE CAUSE OF SINKHOLES AND UNDERMINING OF FILL MATERIAL SURROUNDING ENTIRE DRYDOCK | N4425520D0001USAspending | $1,253,236 | Feb 11, 2026 | Aug 28, 2025 – Jun 26, 2026 |
| Prime | Department of Defense Department of the Navy | MSR #21618236_1738764 -- (AE-DBB_21618236) INSTALL PERIMETER SECU | N4425520D0001USAspending | $529,577 | Feb 2, 2026 | Mar 5, 2024 – Sep 22, 2027 |
| Prime | Department of Defense Department of the Navy | AE DESIGN REPLACE CRITICAL STRUCTURE PILES B7501 | N4425520D0001USAspending | $765,651 | Jan 20, 2026 | May 20, 2025 – Apr 13, 2026 |
| Prime | Department of Defense Department of the Navy | P826 - ACOUSTIC RESEARCH DETACHMENT SMALL CRAFT BERTHING CONCEPT STUDY | N4425520D0001USAspending | $612,249 | Dec 22, 2025 | Sep 3, 2025 – May 22, 2026 |
| Prime | Department of Defense Department of the Navy | AE DESIGN SERVICES, RE-ROUTE TANG ROAD AND REPAIR WATERFRONT, NBK-BANGOR WA | N4425520D0001USAspending | $2,213,252 | Oct 9, 2025 | Feb 24, 2022 – Oct 31, 2025 |
| Prime | Department of Defense Department of the Navy | FY30, AE STUDY, FEASIBILITY ENGINEERING STUDY TO VALIDATE LOCATIONS FOR P947 AND P932, NBK(BANGOR), WA | N4425520D0001USAspending | $1,484,581 | Oct 3, 2025 | Sep 12, 2025 – Aug 15, 2026 |
| Prime | Department of Defense Department of the Navy | FY27 RM23-1151 AE SEISMIC REPAIR DRY DOCK 4, B704, PUGET SOUND NA | N4425520D0001USAspending | $10,606,876 | Sep 24, 2025 | Sep 24, 2024 – Oct 12, 2027 |
| Prime | Department of Defense Department of the Navy | POST CONSTRUCTION AWARD SERVICES (PCAS) TO FOLLOW-ON EXPIRED TASK ORDER N4425522F8009. | N4425520D0001USAspending | $314,834 | Sep 23, 2025 | Sep 23, 2025 – Sep 13, 2027 |
| Prime | Department of Defense Department of the Navy | AE-DBB)(M2) REPAIR RAILROAD BRIDGES RB 644 | N4425520D0001USAspending | $651,686 | Sep 22, 2025 | Jul 20, 2022 – Oct 28, 2026 |
| Prime | Department of Defense Department of the Navy | DESIGN AND INSTALL CLOSED LOOP CHILL WATER SYSTEM FOR DELTA DRY DOCK PUMPROOM, BUILDING 7420, BANGOR | N4425520D0001USAspending | $839,564 | Aug 14, 2025 | Aug 14, 2025 – Sep 8, 2026 |
| Prime | Department of Defense Department of the Navy | REPAIR RAILROAD CULVERTS (PHASE 2 OF 9) MP31.55 DESIGN | N4425515D0011USAspending | $998,251 | Jul 24, 2025 | Sep 29, 2020 – Jul 31, 2025 |
| Prime | Department of Defense Department of the Navy | REDESIGN REFUEL FACILITY NBK-BANGOR | N4425520D0001USAspending | $824,181 | Jun 10, 2025 | Jan 17, 2024 – Jul 30, 2027 |
| Prime | Department of Defense Department of the Navy | DESIGN/BID/BUILD A/E DESIGN FOR FOUNDATION FOR DRYDOCK #2 DEFUELING COMPLEX | N4425520D0001USAspending | $2,441,926 | May 5, 2025 | Sep 8, 2021 – Nov 16, 2025 |
| Prime | Department of Defense Department of the Navy | MSR #23207094_1787796 -- (23207821) REPAIR CRANE TRACK AND TUNNEL ARCH SUPPORT DRY DOCK 1 PSNS | N4425520D0001USAspending | $625,817 | Mar 13, 2025 | Jul 16, 2024 – Jun 30, 2025 |
| Prime | Department of Defense Department of the Navy | EHW1 PCAS | N4425520D0001USAspending | $542,726 | Feb 11, 2025 | Dec 27, 2024 – Feb 24, 2028 |
| Prime | Department of Defense Department of the Navy | DRY DOCK 4 AND DRY DOCK 5 SEISMIC VULNERABILITY ANALYSIS | N4425520D0001USAspending | $3,260,236 | Jan 30, 2025 | Jul 6, 2023 – Jul 31, 2025 |
| Prime | Department of Defense Department of the Navy | AE DESIGN AMMUNITION WHARF STRUCTURAL REPAIRS, PHASE 1-2 OF 9 | N4425520D0001USAspending | $867,870 | Dec 20, 2024 | Sep 3, 2024 – Aug 8, 2025 |
| Prime | Department of Defense Department of the Navy | MSR #21878819_1742457 -- (21261608) REPLACE TIMBER PILES AND WATE | N4425520D0001USAspending | $363,978 | Nov 25, 2024 | Jun 14, 2024 – Feb 19, 2025 |
| Prime | Department of Defense Department of the Navy | FLOATING DRY DOCK/SHIP-LIFT STUDY_PSNS | N4425520D0001USAspending | $6,925,358 | Nov 14, 2024 | Jul 25, 2024 – Oct 19, 2025 |
| Prime | Department of Defense Department of the Navy | AE DESIGN REPLACE CRITICAL STRUCTURE PILES AT EHW1, PHASE 7 OF 9 | N4425520D0001USAspending | $508,537 | Sep 23, 2024 | Sep 23, 2024 – May 16, 2025 |
| Prime | Department of Defense Department of the Navy | FY24 AE DESIGN RM18-1806 (PHASE 4 OF 9) REPAIR RAILROAD CULVERTS | N4425520D0001USAspending | $1,358,838 | Sep 20, 2024 | Jul 17, 2024 – Jan 3, 2027 |
| Prime | Department of Defense Department of the Navy | SEAWALL REPAIRS AND ENV MITIGATION PHASE 1-4 NMII | N4425520D0001USAspending | $362,580 | Sep 16, 2024 | Sep 11, 2024 – May 19, 2025 |
| Prime | Department of Defense Department of the Navy | RM20-0478 AE SERVICES RM20-0478 FARRAGUT TUNNEL, PSNS, NBK, BREME | N4425520D0001USAspending | $1,397,275 | Sep 13, 2024 | Sep 11, 2023 – Apr 10, 2026 |
| Prime | Department of Defense Department of the Navy | AE DESIGN REPAIR AND INCREASE CAPACITY OF SOD SYSTEM FOR OLYMPIC PIER AT B7042 AND B7113, | N4425520D0001USAspending | $301,773 | Sep 5, 2024 | Mar 21, 2025 – Mar 21, 2025 |
| Prime | Department of Defense Department of the Navy | SIOP AE STUDY AOA FOR RCD, SUB AND RECYCLING, PSNS, BREMERTON, WA | N4425520D0001USAspending | $844,626 | Jun 7, 2024 | Jun 7, 2024 – Oct 11, 2024 |
| Prime | Department of Defense Department of the Navy | P932 A-E SERVICES, TRANSIT PROTECTION SMALL CRAFT BERTHING & FUEL FACILITIES, NBK BANGOR, SILVERDALE, WA | N4425520D0001USAspending | $2,123,036 | May 23, 2024 | Sep 14, 2023 – Sep 3, 2026 |
| Prime | Department of Defense Department of the Navy | X5930264 FY26 MCON P-197 FFG-62 SHIP PIER UTILITY UPGRADES, NAVAL | N4425520D0001USAspending | $339,941 | May 15, 2024 | May 15, 2024 – Nov 11, 2025 |
| Prime | Department of Defense Department of the Navy | X060 [CIMAR] AE PCAS IDIQ TO P596 HANGAR 95 RENOVATION&ADDIT | N4425515D0011USAspending | $641,049 | Feb 28, 2024 | Jun 16, 2020 – Jul 19, 2024 |
| Prime | Department of Defense Department of the Navy | AE DESIGN TO REPLACE CRITICAL STRUCTURE PILES, EHW-1, B/7501, NBK-BANGOR WA | N4425520D0001USAspending | $519,435 | Feb 20, 2024 | Aug 11, 2021 – Oct 11, 2024 |
| Prime | Department of Defense Department of the Navy | PCAS MCON P612 VMX-1 HANGAR AT MCAS YUMA, ARIZONA | N4425515D0011USAspending | $870,423 | Jan 25, 2024 | Mar 17, 2021 – Feb 26, 2024 |
| Prime | Department of Defense Department of the Navy | AE: DESIGN FOR CONSTRUCTION OF STORM WATER FILTRATION SYSTEMS | N4425515D0011USAspending | $403,409 | Jan 22, 2024 | Sep 16, 2020 – Oct 30, 2022 |
| Prime | Department of Defense Department of the Navy | AE STUDY DEMO AND REMOVE ROLLING DRY-DOCK COVER, BLDG. 7420-S, NB | N4425520D0001USAspending | $442,598 | Dec 15, 2023 | Sep 25, 2023 – Jul 17, 2024 |
| Prime | Department of Defense Department of the Army | VA AL SEISMIC NRM | W912DW18D1013USAspending | $1,808,617 | Nov 28, 2023 | Sep 30, 2022 – Mar 18, 2025 |
| Prime | Department of Defense Department of the Navy | P260 - P-8A AIRCRAFT AIRFIELD PAVEMENT IMPROVEMENTS 35-50% AND 50% - FINAL DESIGN SERVICES | N4425520D0001USAspending | $1,997,233 | Sep 29, 2023 | Apr 22, 2022 – Jan 21, 2027 |
| Prime | Department of Defense Department of the Navy | RM21-0787 AE SERVICES REPAIR EHW-1 COMPONENT DETERIORATION PHASES | N4425520D0001USAspending | $1,265,400 | Sep 29, 2023 | Sep 29, 2023 – Jun 17, 2024 |
| Prime | Department of Defense Department of the Navy | *EO14042* AE DBB (M2) RR BRIDGES 642-643 | N4425520D0001USAspending | $669,763 | Sep 14, 2023 | May 26, 2022 – Mar 2, 2026 |
| Prime | Department of Defense Department of the Navy | DD4/5 COMPREHENSIVE SEISMIC VULNERABILITY ASSESSMENT | N4425520D0001USAspending | $6,002,540 | Sep 5, 2023 | Sep 5, 2023 – Jun 2, 2025 |
| Prime | Department of Defense Department of the Navy | EMERGENCY DRY DOCK REPAIRS ENGINEERING SUPPORT, PUGET SOUND, WA. | N4425520D0001USAspending | $1,624,758 | Aug 28, 2023 | Feb 1, 2023 – Jan 23, 2024 |
| Prime | Department of Defense Department of the Navy | *EO14042* 18784362 (18758534 AE-DBB)(M3B) REPAIR/REPLACE FUEL PI | N4425520D0001USAspending | $901,982 | Aug 8, 2023 | Aug 26, 2022 – Nov 2, 2023 |
| Prime | Department of Defense Department of the Navy | *EO14042* MSR#14083792_1726887 -- (14083792) MHE STORAGE YARD SPI | N4425520D0001USAspending | $271,900 | Aug 1, 2023 | Sep 20, 2022 – Sep 4, 2024 |
| Prime | Department of Defense Department of the Navy | X5857636 *EO14042* 20095395, (19679354 AE-DBB) REPAIR GROUNDWATER | N4425520D0001USAspending | $475,655 | Jun 29, 2023 | Mar 31, 2022 – Apr 1, 2024 |
| Prime | Department of Defense Department of the Navy | 19581476, (19579215 AE-DBB)(M2A) REPAIR CONCRETE AND SETTLEMENT M | N4425520D0001USAspending | $1,525,817 | May 25, 2023 | Apr 30, 2021 – Jul 31, 2023 |
| Prime | Department of Defense Department of the Navy | WHEELER MOUNTAIN GROUND MOVEMENT STUDY PHASE 2 | N4425515D0011USAspending | $716,280 | Apr 10, 2023 | Jul 17, 2020 – May 26, 2023 |
| Prime | Department of Defense Department of the Navy | AE: DESIGN TO REPLACE AND EXTEND OUTFALL PIPE OF OWS-8 | N4425520D0001USAspending | $533,264 | Mar 24, 2023 | Sep 29, 2020 – Jun 15, 2022 |
| Prime | Department of Defense Department of the Navy | PSNS DRY DOCK #6 SEISMIC VULNERABILITY ANALYSIS | N4425520D0001USAspending | $3,707,747 | Feb 17, 2023 | Sep 14, 2021 – Aug 18, 2023 |
| Prime | Department of Defense Department of the Navy | IGF::OT::IGF X043 AE TASK ORDER FOR BID SUPPORT AND PCAS SERVICES | N4425515D0011USAspending | $1,740,794 | Jan 26, 2023 | Apr 12, 2019 – Jun 30, 2023 |
| Prime | Department of Defense Department of the Navy | THIS TASK ORDER IS TO PROVIDE A SEISMIC RISK STUDY WHITE PAPERS FOR PUGET SOUND NAVAL SHIPYARD (PSNS) GRAVING DRY DOCKS 1, 2, 3, 4, AND 5, TO INCLUDE DESCRIBING RISKS TO SHIP AND LIFE SAFETY DUE TO SEISMIC VULNERABILITIES FOR THE DRY DOCKS. | N4425520D0001USAspending | $1,064,579 | Jan 26, 2023 | Jun 1, 2022 – Jun 15, 2023 |
Contract vehicles are shown only when present in the source record. Linked award numbers and vehicles open the authoritative record on USAspending.gov.
Subcontracting experience
2 records from government sources. Past participation is not evidence of current teaming interest.
| Role | Agency | Description | Vehicle | Obligated | Action date | Period |
|---|---|---|---|---|---|---|
| Subcontractor | Department of Defense | DOCK ENGINEERING/DESIGN-STRUCTURAL/CIVIL DESIGN AND / OR ENGINEERING SERVICES FOR POST CONSTRUCTION AWARD SERVICES (PCAS) INCLUDING REVIEW OF SUBMITTALS, AND PROVIDE DESIGN CONSULTATION SUPPORT
ORIGINAL AGREEMENT AMT = $266,428
AMD01 = $200,451
AMD02 = $-9,651
AMD03 = $709,825 FOR A TOTAL AMT OF $1,166,753. POP EXTENSION TO 7-18-2026. 11104-01B Parent award context Parent award agency: Department of Defense · Department of the Navy Parent award NAICS: 541330 Parent award performance state: HI Parent award description: P209 AE PCAS - PHASE 1. POST CONSTRUCTION AWARD SERVICES FOR FY23 MCON PROJECT P-209 DRY DOCK REPLACEMENT, JOINT BASE PEARL HARBOR-HICKAM, HAWAII. View parent award on USAspending | N6274220D0004USAspending | $1,166,753 | Jun 27, 2023 | — – — |
| Subcontractor | Department of Defense | ENGINEERING SERVICES 11104-01A AMD02 Parent award context Parent award agency: Department of Defense · Department of the Navy Parent award NAICS: 541330 Parent award performance state: HI Parent award description: X004 P-209 DRY DOCK #3 REPLACEMENT - PHASE 1 DESIGN AWARD. AE TASK ORDER. View parent award on USAspending | N6274220D0004USAspending | $8,687,069 | Dec 30, 2021 | — – — |
Contract vehicles are shown only when present in the source record. Linked award numbers and vehicles open the authoritative record on USAspending.gov.
Agencies supported
- Department of DefenseGov-sourced
Government-sourced data comes from SAM.gov, SBA and USAspending.gov and is attributed to its source. Items marked company-reported were provided by the company and are verified by FedSub only where labeled. FedSub is a private company and is not affiliated with SBA, GSA/SAM.gov, or any government agency.