← Back to search
UNIVERSITY OF CALIFORNIA, BERKELEY
BERKELEY, CA, 94720
UnclaimedClaim this profile (free)
Subcontracting experience
1 record from government sources. Past participation is not evidence of current teaming interest.
| Role | Agency | Description | Vehicle | Obligated | Action date | Period |
|---|---|---|---|---|---|---|
| Subcontractor | National Aeronautics and Space Administration | UNDER THE DIRECTION OF THE TRACERS PI, UNIVERSITY OF CALIFORNIA BERKELEY WILL PERFORM THE ACTIVITIES LISTED BELOW DURING THE PHASE A CONCEPT STUDY. 1SUPPORT TEAM WEEKLY TELECONS.2RESPOND TO REQUESTS FROM THE PI IN RESOLVING QUESTIONS RELATED TO THE DESIGN AND OPERATING OF THE TRACERS INSTRUMENT.3ASSIST THE PI TEAM IN DEVELOPING THE CONCEPT STUDY REPORT. THIS INCLUDES PROVIDING INFORMATION ON THE ACCOMMODATIONS OF THE INSTRUMENT ON THE TRACERS SPACECRAFT.4PERFORM INSTRUMENT SYSTEMS ENGINEERING ACTIVITIES AS NEEDED TO DEVELOP PERFORMANCE, DESIGN ENVIRONMENTAL, AND QUALITY REQUIREMENTS.5PERFORM TRADE STUDIES TO FURTHER REFINE THE INSTRUMENT CONCEPT.6PROVIDE DESIGN CONCEPT INFORMATION TO ASSESS THE COMPATIBILITY RISKS (MAGNETIC, EMI, ETC) POSED BY EACH SYSTEM INCLUDING POWER, PROPULSION, ATTITUDE CONTROL, AND OTHER SPACECRAFT STRUCTURES.7BEGIN THE PROCESS OF DEVELOPING A DRAFT SPECIFICATION FOR THE EFI MAG BOOMS INSTRUMENT.8PREPARE AND SUBMIT INFORMAL MONTHLY TECHNICAL PROGRESS REPORT AND COST REPORT. 9PREPARE AND SUBMIT A DETAILED COST ESTIMATE/PROPOSAL FOR THE EFI MAG BOOMS INSTRUMENT TO THE SUBSYSTEM LEVEL FOR PHASE B IAW WITH CSR REQUIREMENT CS-68, 10PREPARE AND SUBMIT A DETAILED PHASE C/D COST ESTIMATE DESCRIBED AT THE INSTRUMENT LEVEL IAW CSR REQUIREMENT CS-69.11PREPARE AND SUBMIT A DETAILED PHASE E/F COST ESTIMATED IAW REQUIREMENT CS-70 AND CS-71 OF THE CSR.12ATTEND THE SITE VISIT THAT NASA MAY USE AS A PART OF THE SELECTION PROCESS AT THE END OF PHASE A. 1002081198 Parent award context Parent award agency: National Aeronautics and Space Administration · National Aeronautics and Space Administration Parent award NAICS: 541713 Parent award performance state: IA Parent award description: THE TANDEM RECONNECTION AND CUSP ELECTRODYNAMICS RECONNAISSANCE SATELLITE (TRACERS) IS PROPOSED BY THE CONTRACTOR IN RESPONSE TO THE NATIONAL AERONAUTIC AND SPACE ADMINSTRATION'S (NASA) 2016 HELIOPHYSICS SMALL EXPLORER (SMEX) ANNOUNCEMENT OF OPPORTUNITY (AO). THIS STATEMENT OF WORK (SOW) DESCRIBES THE WORK TO BE CONDUCTED BY THE CONTRACTOR DURING THE PHASE A (TRACERS) PROJECT. THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, MATERIALS, EQUIPMENT, AND FACILITIES TO PRODUCE THE TRACERS PHASE A CONCEPT STUDY REPORT (CSR) THAT ENCOMPASSES: 1. PRINCIPAL INVESTIGATOR PROGRAM OFFICE (PIPO). 2. INSTRUMENT SYSTEM ENGINEERING, INCLUDING INSTRUMENT MISSION ASSURANCE. 3. DESIGN OF A FLIGHT QUALIFIED TRACERS INSTRUMENT MEETING MISSION AND SCIENCE REQUIREMENTS. 4. DEVELOP PLANS IN SUPPORT OF INTEGRATION AND TEST OF THE TRACERS INSTRUMENT FLIGHT SYSTEM. 5. DEVELOP PLANS IN SUPPORT OF ESSENTIAL FIELD OPERATIONS. 6. DEVELOP PLANS IN SUPPORT OF LAUNCH OPERATIONS, FLIGHT OPERATIONS. 7. DEVELOP PLANS FOR AND LEAD THE TRACERS SCIENCE INVESTIGATION, AS WELL AS THE GENERATION OF RESULTING DATA PRODUCTS. THE CONTRACTOR SHALL PROVIDE A BRIEFING ON THE TRACERS SCIENCE AND SCIENCE IMPLEMENTATION PLAN AT THE PHASE A SITE VISIT. THE CONTRACTOR SHALL PROVIDE AN ORGANIZATION CHART DEFINING THE CONTRACTOR ROLES AND RESPONSIBILITIES, REPORTING PROCEDURES, AND LINES OF AUTHORITY. PARTICIPATE IN DEFINING THE RELATIONSHIPS BETWEEN THE CONTRACTOR PIPO AND THE NASA EXPLORERS PROGRAM OFFICE. THE CONTRACTOR SHALL DEVELOP A TRACERS INSTRUMENT SYSTEMS REQUIREMENTS DOCUMENT AND A TRACERS MISSION SYSTEMS REQUIREMENTS DOCUMENT. THE CONTRACTOR SHALL DEVELOP DETAILED BLOCK DIAGRAMS AND TECHNICAL DESCRIPTIONS OF ALL INSTRUMENT SYSTEMS. THE CONTRACTOR SHALL CONDUCT IN-DEPTH INSTRUMENT-LEVEL REVIEWS OF THE PROPOSED INSTRUMENT DESIGN. CONDUCT ESSENTIAL TRADE STUDIES, ANALYSES, MODELING AND SIMULATIONS TO ASSURE COMPLIANCE WITH INSTRUMENT REQUIREMENTS. THE CONTRACTOR SHALL LEAD THE SCIENCE TEAM. THE CONTRACTOR SHALL DEVELOP AN INSTRUMENT-LEVEL TEST PLAN AND PARTICIPATE IN PLANNING FOR INTEGRATION AND TEST. THE CONTRACTOR SHALL PREPARE A DETAILED INSTRUMENT DEVELOPMENT SCHEDULE COVERING ALL MISSION PHASES, LISTING MAJOR MILESTONES AND INCLUDING A DEFINED CRITICAL PATH AND SCHEDULE RESERVES. THE CONTRACTOR SHALL PREPARE UPDATED INSTRUMENT BUDGETS AND REVIEW AND APPROVE THE OVERALL TRACERS BUDGET. THE CONTRACTOR SHALL PREPARE AND SUBMIT THE CONCEPT STUDY REPORT. View parent award on USAspending | — | $722,676 | Nov 17, 2021 | — – — |
Contract vehicles are shown only when present in the source record. Linked award numbers and vehicles open the authoritative record on USAspending.gov.
Government-sourced data comes from SAM.gov, SBA and USAspending.gov and is attributed to its source. Items marked company-reported were provided by the company and are verified by FedSub only where labeled. FedSub is a private company and is not affiliated with SBA, GSA/SAM.gov, or any government agency.