RoleAgencyDescriptionVehicleObligatedAction datePeriod
Subcontractor
Agency for International Development
CRITICAL INFRASTRUCTURE CYBERSECURITY INCIDENT PREPAREDNESS ASSESSMENT (CICIPA) FOR THE JSC UKRAINIAN RAILWAYS (UKRZALIZNYTSIA)
PUR-KYI-24-0105
Parent award context
Parent award agency: Department of State · Department of State
Parent award NAICS: 541990
Parent award description: OVERSEAS CONTRACT
View parent award on USAspending
—$197,900Dec 24, 2024— – —
Subcontractor
Agency for International Development
CRITICAL INFRASTRUCTURE CYBERSECURITY INCIDENT PREPAREDNESS ASSESSMENT (CICIPA) FOR THE SE "UKRAINIAN SEA PORTS AUTHORITY"
PUR-KYI-24-0088
Parent award context
Parent award agency: Department of State · Department of State
Parent award NAICS: 541990
Parent award description: OVERSEAS CONTRACT
View parent award on USAspending
—$149,000Nov 14, 2024— – —
Subcontractor
Agency for International Development
THE SCOPE OF WORK FOR THIS ASSIGNMENT INCLUDES CONDUCTING A COMPREHENSIVE REVIEW OF EXISTING LEGISLATION (INCLUDING ENGAGING WITH RELEVANT STAKEHOLDERS) TO IDENTIFY BARRIERS IN THE REGULATORY FRAMEWORK AND/OR ITS IMPLEMENTATION AND PREPARE A REPORT ON THE IDENTIFICATION AND PROPOSED MEASURES FOR RESOLUTION OF THE REGULATORY AND IMPLEMENTATION BARRIERS HINDERING THE DEVELOPMENT OF DISTRIBUTED GENERATION IN UKRAINE THE SUBCONTRACTOR MUST CONDUCT A COMPREHENSIVE REVIEW OF EXISTING LEGISLATION, REGULATIONS, AND POLICIES RELATED TO PLANNING, CONSTRUCTION AND OPERATION OF DIFFERENT TYPES OF DISTRIBUTED GENERATION IN UKRAINE AND IDENTIFY SPECIFIC REGULATORY AND IMPLEMENTATION BARRIERS THAT HINDER THE DEVELOPMENT, GRID CONNECTION, AND SYSTEM AND MARKET INTEGRATION OF DERS. THE SUBCONTRACTOR IS STRONGLY RECOMMENDED TO ENGAGE WITH RELEVANT STAKEHOLDERS, INCLUDING GOVERNMENT BODIES, INDUSTRY REPRESENTATIVES, AND OTHER KEY PLAYERS IN THE ENERGY SECTOR IN ORDER TO GATHER INSIGHTS AND PERSPECTIVES ON THE CHALLENGES AND OPPORTUNITIES RELATED TO DERS. THE SUBCONTRACTOR SHALL ENGAGE WITH ELECTRICITY AND GAS DSOS FROM DIFFERENT REGIONS OF UKRAINE, ENTITIES THAT RECENTLY INSTALLED AND COMMISSIONED DERS (INCLUDING CGUS AND OTHER TYPES), PROJECT DESIGN/DEVELOPMENT COMPANIES, AND LOCAL/REGIONAL LEVEL AUTHORITIES (IF NEEDED). THE CONDUCTING OF INTERVIEWS WITH THE STAKEHOLDERS AND GATHERING OF FEEDBACK DEPENDS ON PARTICIPANTS' AVAILABILITY, WILLINGNESS TO PROVIDE INFORMATION AND TAKE PART IN THE INTERVIEWS. THE SUBCONTRACTOR SHOULD COMPILE AND PRIORITIZE A LIST OF IDENTIFIED REGULATORY AND IMPLEMENTATION BARRIERS BASED ON THE FINDINGS FROM THE LEGAL REGULATORY ANALYSIS AND STAKEHOLDER CONSULTATIONS AND ASSESS THE IMPACT OF THESE BARRIERS ON THE DEVELOPMENT AND INTEGRATION OF DISTRIBUTED GENERATION AND SMALL-SCALE COGENERATION. THE SUBCONTRACTOR MUST PROPOSE MEASURES TO REMOVE OR REDUCE THE IDENTIFIED REGULATORY BARRIERS. THE SUBCONTRACTOR SHALL NOT BE LIMITED TO LEGAL/REGULATORY BARRIERS AND ELABORATE ON THOSE OBSTACLES TO DER THAT ARISE AS THE RESULT OF DIFFERENT APPROACHES IN IMPLEMENTATIONS. THE SUBCONTRACTOR IS STRONGLY ENCOURAGED TO ELABORATE ON POSSIBLE INCENTIVES TO ENHANCE THE DEVELOPMENT OF DER. THE SUBCONTRACTOR MUST PREPARE A REPORT OUTLINING THE FINDINGS OF THE REGULATORY ANALYSIS, IDENTIFIED IMPLEMENTATION PROBLEMS, AND PROPOSED SOLUTIONS. THE REPORT MUST CONTAIN ACTIONABLE RECOMMENDATIONS FOR LEGISLATIVE AND REGULATORY CHANGES NECESSARY TO CREATE A CONDUCIVE ENVIRONMENT FOR DISTRIBUTED GENERATION INCLUDING SMALL-SCALE COGENERATION BY CARRYING OUT THESE TASKS, THE PROJECT AIMS TO CREATE A REGULATORY FRAMEWORK THAT SUPPORTS THE DEVELOPMENT, GRID CONNECTION, OPERATION AND MARKET PARTICIPATION OF DER, INCLUDING SMALL-SCALE COGENERATION, THEREBY ENHANCING THE OVERALL ENERGY SECURITY AND SUSTAINABILITY OF UKRAINE AS WELL AS BUSINESS ENVIRONMENT FOR DEVELOPMENT OF DERS. THE REPORT SHOULD BE DELIVERED IN UKRAINIAN AND ENGLISH. THE CONSULTANT MUST ACKNOWLEDGE THAT ESP IS THE MAIN RECIPIENT OF THE REPORT, BUT IT WILL BE SHARED WITH ENERGY AND UTILITIES COMMITTEE OF VERKHOVNA RADA, NEURC, THE MINISTRY OF ENERGY OF UKRAINE, MINISTRY OF COMMUNITIES AND TERRITORIES DEVELOPMENT AND INFRASTRUCTURE, AND OTHER RELEVANT STAKEHOLDERS TO BE DETERMINED BY ESP.
154-UCEM-1810-TO#5-217
Parent award context
Parent award agency: Agency for International Development · Agency for International Development
Parent award NAICS: 541990
Parent award description: OVERSEAS CONTRACT
View parent award on USAspending
—$45,000Oct 29, 2024— – —
Subcontractor
Agency for International Development
TASK 1: ANALYSIS OF THE MOST TRADABLE ELECTRICITY AND GAS PRODUCTS IN THE EU: €¢DESCRIPTION OF THE MOST TRADED CONTRACTS IN THE EU ON ELECTRICITY AND GAS SPOT AND FORWARD MARKETS, EXCHANGE TRADED, AND OTC. €¢IDENTIFY THE KEY ELEMENTS THAT MAKE THESE PRODUCTS ATTRACTIVE TO MARKET PARTICIPANTS. ASSUMPTIONS AND CAVEATS: €¢SUBCONTRACTOR€„¢S ANALYSIS WILL BE LIMITED TO UP TO 5 ELECTRICITY AND GAS STANDARD PRODUCTS (SPOT GAS, SPOT ELECTRICITY, FORWARD GAS, FORWARD ELECTRICITY EACH WITH RESPECTIVE CASH OR PHYSICAL SETTLEMENT) €¢BESPOKE CONTRACTS (END CUSTOMER INDUSTRIAL SUPPLY) SHALL NOT BE INCLUDED IN THE ANALYSIS. TASK 2: EVALUATE THE NEEDS OF UKRAINIAN COMMODITIES EXCHANGES AND MARKET PARTICIPANTS: €¢WITH ESP€„¢S SUPPORT, THE CONTRACTOR SHALL CONDUCT A SERIES OF INTERVIEWS WITH UKRAINIAN STAKEHOLDERS TO IDENTIFY THE MOST SOUGHT-AFTER PRODUCTS. PAGE 3 OF 5 THE NUMBER OF INTERVIEWS WILL BE LIMITED TO: (1) UP TO 10 STAKEHOLDERS IN THE ELECTRICITY SECTOR, (2) UP TO 10 STAKEHOLDERS IN THE GAS SECTOR, (3) UP TO 10 STAKEHOLDERS IN THE FINANCIAL MARKET. TIMELINE IS SUBJECT TO ACCESSIBILITY OF THE STAKEHOLDERS €¢REVIEW THE EXISTING CONTRACTS AND ANALYZE THE DEGREE OF THEIR STANDARDIZATION IN COMPARISON TO THE EU PRODUCTS (UP TO 5 POWER CONTRACTS FOR EACH TYPE OF POWER PRODUCT (PEAK, OFF PEAK, WEEKEND ETC.). OUTLINE THE MOST TRADED EXCHANGE AND OTC CONTRACTS AND PROVIDE THE KEY TAKEAWAYS. TASK 3: DRAFT A STANDARDIZED PRODUCT BOOK THAT WILL SERVE AS A TEMPLATE FOR THE EXCHANGES IN UKRAINE. THE PRODUCT BOOK MUST INCLUDE KEY CHARACTERISTICS OF CONTRACTS: €¢BASED ON THE FINDINGS IN TASKS 1 AND 2, OUTLINE: –ªA SPECIFICATION OF A BILATERAL SPOT GAS AND ELECTRICITY CONTRACT, STANDARD FIXED PROVISIONS AND STANDARD VARIABLE PROVISIONS (VOLUME, DELIVERY TIME, PLACE, ETC.) FOR GAS AND ELECTRICITYPRODUCTS1. (EXCHANGE TRADED AND OTC) –ªA SPECIFICATION OF A BILATERAL FORWARD GAS AND ELECTRICITY CONTRACT, STANDARD FIXED PROVISIONS AND STANDARD VARIABLE PROVISIONS (VOLUME, DELIVERY TIME, PLACE, ETC.) FOR GAS AND ELECTRICITY PRODUCTS. (EXCHANGE TRADED AND OTC) ASSUMPTIONS AND CAVEATS: €¢LOCALIZED FOR UKRAINE OTC FORWARD TERMS, INTER ALIA, FOR DIESEL AND SWAP FOR BASE COMMODITY INDEX HAD BEEN DEVELOPED IN 2020 BY USAID FST PROJECT ON THE FOUNDATION OF 2005 ISDA COMMODITY DEFINITIONS AND EXHIBITS; SUBCONTRACTOR EXPECTS TO ALIGN GAS AND POWER DERIVATIVE ON THOSE MASTER AGREEMENTS. TASK 4: REVIEW AND OUTLINE CURRENT TRADING RULES IN PROCEDURES PREVALENT IN THE EU O THE CONTRACTOR WILL REVIEW AND ANALYZE CURRENT TRADING RULES AND PROCEDURES ACROSS DIFFERENT POWER EXCHANGES (NUMBER OF TRADING SESSIONS, TRADING AND SETTLEMENT TIMELINES, MEMBERSHIP CRITERIA, ETC.) IN THE EU AND OUTLINE THE SIMILARITIES AND DIFFERENCES. THE PROCEDURES IDENTIFIED THROUGH THE REVIEW AND ANALYSIS WILL PROVIDE THE FOUNDATION FOR A TRADING RULE BOOK. THE DELIVERABLE FROM THIS TASK MUST ADHERE TO THE TYPICAL STRUCTURE OF A RULEBOOK IN THE EU (I.E. EEX,TGE, ETC.) TASK 5: BASED ON TASK 4, RECOMMEND THE BEST TRADING RULES AND PROCEDURES FOR UKRAINE. O THE CONTRACTOR WILL HOLD A SERIES OF INTERVIEWS WITH LOCAL MARKET PARTICIPANTS TO DISCUSS LEARNING FROM TASK 4 AND GATHER INSIGHTS INTO CURRENT MARKET OPERATIONS. BASED ON PARTICIPANTS FEEDBACK, THE CONTRACTOR WILL RECOMMEND THE MOST APPROPRIATE TRADING RULES AND PROCEDURES FOR TRADING ENERGY PRODUCTS IN UKRAINE. THE CONTRACTOR SHOULD ALSO OUTLINE A TRANSITION ROADMAP FROM BASIC SPOT CONTRACTS TOWARDS FUTURES CONTRACTS (I.E. HOW MUCH OR HOW LONG DO SPOT CONTRACTS HAVE TO BE TRADED TO ESTABLISH A RELIABLE PRICE OF THE UNDERLYING CONTRACT). AS A REFERENCE POINT, IT IS SUGGESTED THAT THE CONTRACTOR USE THE POLISH TGE, ROMANIAN BRM, AND GERMAN EEX.
154-UCEM-1810-TO#3-217
Parent award context
Parent award agency: Agency for International Development · Agency for International Development
Parent award NAICS: 541990
Parent award description: OVERSEAS CONTRACT
View parent award on USAspending
—$170,100Oct 8, 2024— – —
Subcontractor
Agency for International Development
ESG BENCHMARKING SERVES AS A FOUNDATIONAL ELEMENT OF THE ESG PROJECT AND WILL: A)PROVIDE A BENCHMARKING ASSESSMENT TO EVALUATE ESG PERFORMANCE FOR UKRNAFTA PEER COMPETITORS; B)OUTLINE CURRENT AND FORTHCOMING EUROPEAN UNION (EU) ESG REGULATORY REQUIREMENTS TO ENHANCE UKRNAFTA'S ALIGNMENT WITH EU STANDARDS; C)SUPPORT UKRNAFTA IN FRAMING THE BUSINESS CASE FOR BUILDING A ROBUST ESG STRATEGY IN THE CURRENT WARTIME CONTEXT. BASED ON THESE FINDINGS, UKRNAFTA WILL BE ABLE TO DETERMINE SHORT-, MEDIUM-, AND LONG-TERM ESG GOALS. INITIAL BASELINE GREENHOUSE GAS INVENTORY AND FRAMEWORK PERFORMING A GHG INVENTORY IS A CRITICAL PRELIMINARY STEP FOR MANAGING EMISSIONS. THIS INVOLVES IDENTIFYING BASELINE OPERATIONAL GHG EMISSIONS AND DEVELOPING AN INITIAL DATA-DRIVEN DECARBONIZATION OR NET ZERO TARGET FOR THAT BASELINE. THESE CALCULATIONS WILL SERVE AS A FOUNDATION FOR FURTHER DEVELOPMENT OF UKRNAFTA'S DECARBONIZATION EFFORTS. AS A PART OF THE GHG EMISSIONS, SUBCONTRACTOR SHOULD IDENTIFY THE TOP CLIMATE STRESSORS, WHICH MAY HAVE POTENTIAL FUTURE DIRECT PHYSICAL IMPACTS TO UKRNAFTA€„¢S INFRASTRUCTURE AND TO THE SUPPLY CHAIN, AND ACCORDINGLY GHG EMISSIONS. EXPECTED TIME HORIZON 2024-2050. DEVELOP A MATRIX RANKING THE IMPACT STATEMENTS BY CLIMATIC STRESSOR TO HELP IDENTIFY AREAS WHERE UKRNAFTA SHOULD FOCUS ITS ADAPTATION EFFORTS AND HOW TO PRIORITIZE ADAPTATION MEASURES EU ESG POLICY ASSESSMENT AND REPORTING THE EU ESG POLICY ASSESSMENT AND REPORTING WILL PROVIDE AN OVERVIEW OF EU POLICY, APPLICABLE REQUIREMENTS FOR UKRNAFTA, AND BOTH BASIC AND HIGH-LEVEL REPORTING REQUIREMENTS FOR CURRENT AND FORTHCOMING EU ESG REGULATIONS. BASED ON THESE FINDINGS UKRNAFTA WILL BE ABLE TO DEVELOP IT€„¢S FIRST NON-FINANCIAL REPORT, WHICH IN TURN WILL MAKE THE COMPANY MORE TRANSPARENT AND ATTRACTIVE TO EXTERNAL INVESTORS
154-UCEM-1810-TO#4-217
Parent award context
Parent award agency: Agency for International Development · Agency for International Development
Parent award NAICS: 541990
Parent award description: OVERSEAS CONTRACT
View parent award on USAspending
—$95,230Oct 8, 2024— – —
Subcontractor
Agency for International Development
CRITICAL INFRASTRUCTURE CYBERSECURITY INCIDENT PREPAREDNESS ASSESSMENT (CICIPA) FOR THE NAFTOGAZTEPLO
PUR-KYI-24-0054
Parent award context
Parent award agency: Department of State · Department of State
Parent award NAICS: 541990
Parent award description: OVERSEAS CONTRACT
View parent award on USAspending
—$35,000Sep 26, 2024— – —
Subcontractor
Agency for International Development
CONSULTING SERVICES TO ELABORATE ON (A) OVERVIEW OF THE GAS DISTRIBUTION MARKET OF UKRAINE AND ANALYSIS OF UKRAINIAN DSO PARAMETERS; (B) BENCHMARKING AND GAP ANALYSIS OF 5 EUROPEAN DSOS; (C) RECOMMENDATIONS ON DSOS TARGET OPERATIONAL MODEL, HIGHLIGHTING NECESSARY REGULATORY IMPROVEMENTS.
154-UCEM-1810-1213007
Parent award context
Parent award agency: Agency for International Development · Agency for International Development
Parent award NAICS: 541990
Parent award description: OVERSEAS CONTRACT
View parent award on USAspending
—$236,835Sep 23, 2024— – —
Subcontractor
Agency for International Development
"THE CONTRACTOR SHALL BE ENGAGED IN REVIEW AND UPDATING AN ARTICLE-BY-ARTICLE ASSESSMENT OF LEVEL OF IMPLEMENTATION OF THE EU ACQUIS APPLICABLE TO REMIT IN THE PROVISIONS OF LAW NO 3141-IX AND OTHER ENERGY SECTOR LAWS AND BYLAWS REFERENCED IN LAW NO 3141-IX OF. EU ACQUIS APPLICABLE TO REMIT CONSISTS OF PROVISIONS INCLUDED IN: €¢REMIT REGULATION (EU) 1227/2011, €¢COMMISSION IMPLEMENTING REGULATION (EU) NO 1348/2014 OF 17 DECEMBER 2014 ON DATA REPORTING IMPLEMENTING ARTICLE 8(1) AND ARTICLE 8(6) OF REGULATION (EU) NO 1227/2011 OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL ON WHOLESALE ENERGY MARKET INTEGRITY AND TRANSPARENCY"
154-UCEM-1810-TO#1-217
Parent award context
Parent award agency: Agency for International Development · Agency for International Development
Parent award NAICS: 541990
Parent award description: OVERSEAS CONTRACT
View parent award on USAspending
—$34,740Jul 31, 2024— – —
Subcontractor
Agency for International Development
"PREPARATION OF AMENDMENTS TO THE SECONDARY LEGISLATION INCLUDING: DEVELOP DRAFT AMENDMENTS TO THE MARKET RULES (AS WELL AS THE TRANSMISSION GRID CODE, COMMERCIAL METERING CODE AND ANY OTHER RELEVANT SECONDARY LEGISLATION IF DEEMED NECESSARY ACCORDING TO THE LEGAL AND TECHNICAL ANALYSIS MADE BY SUBCONTRACTOR) NECESSARY TO FULLY TRANSPOSE AND IMPLEMENT THE EB GL INCLUDING ALL PAN-EU, REGIONAL AND NATIONAL TCMS TO ENABLE CROSS-BORDER BALANCING ENERGY AND ANCILLARY SERVICES EXCHANGE BETWEEN UKRAINE AND EU MEMBER STATES AS WELL AS OTHER CONTRACTING PARTIES. ALIGN DRAFT AMENDMENTS WITH PARALLEL WORK STREAMS DEDICATED TO THE TRANSPOSITION INTO THE PRIMARY LAW TO THE EXTENT POSSIBLE (BASED ON AVAILABLE INFORMATION). PROVIDE NECESSARY AND COMPREHENSIVE RECOMMENDATIONS AND COMMENTS TO THE DRAFT AMENDMENTS TO CLARIFY AND RATIONALE THE PROPOSED PROVISIONS. AMENDMENTS, COMMENTS, AND RECOMMENDATIONS SHOULD BE PRESENTED IN THE FORM OF A COMPARATIVE TABLE WITH PROPER JUSTIFICATIONS OF THE PROPOSED AMENDMENTS. AMENDMENTS SHOULD BE CLEARLY BASED ON THE RELEVANT THE EU AND ENC ACQUIS (SPECIFICALLY, EB GL AND SPECIFIC PROVISIONS OF THE ELECTRICITY REGULATION RELATED TO BALANCING MARKETS OPERATIONS) AND EU BEST PRACTICES AND TRENDS. PREPARE A PRESENTATION WITH A SUMMARY AND OVERVIEW OF KEY CHANGES PROVIDED TO THE SECONDARY LEGISLATION. THIS ASSIGNMENT MAY INVOLVE THE DEVELOPMENT OF REGULATIONS FROM SCRATCH (DEPENDING ON THE RESULTS OF THE TECHNICAL AND LEGAL ANALYSIS PREPARED BY THE SUBCONTRACTOR IN COOPERATION AND CONSULTATION WITH ESP AND OTHER RELEVANT STAKEHOLDERS). THE DRAFT AMENDMENTS TO THE PRIMARY LEGISLATION NECESSARY TO SET A LEGAL BASIS FOR THE IMPLEMENTATION OF THE EB GL PRINCIPLES THAT WILL SERVE AS A BASIS FOR THIS PARTICULAR OBJECTIVE IS PRESENTED IN THE ANNEXES. IF THE DRAFT AMENDMENTS TO THE PRIMARY LEGISLATION PRESENTED IN THE ANNEXES ABOVE WERE REVISED OR UPDATED WITHIN THE LEGISLATIVE PROCESS, TETRA TECH SHALL PROVIDE THE SUBCONTRACTOR WITH THE REVISED OR UPDATED VERSION OF SUCH AMENDMENTS. THE SUBCONTRACTOR MUST TAKE THESE CHANGES INTO ACCOUNT IN THE PROCESS OF DEVELOPING SECONDARY LEGISLATION. WHILE CONDUCTING THE ACTIVITY, THE SUBCONTRACTOR MAY (INDEED, STRONGLY ENCOURAGED TO) CONTACT AND CONSULT (IN COORDINATION AND COMMUNICATION WITH ESP) WITH THE PRIMARY AND SECONDARY STAKEHOLDERS TO DISCUSS DIFFERENT ASPECTS, INCLUDING BUT NOT LIMITED TO THE NEED, CHALLENGES, LEGAL AND TECHNICAL INSIGHTS. ESP ALREADY ESTABLISHED A WORKING GROUP WITH RELEVANT STAKEHOLDERS, AND THIS WILL BE THE MAIN PLATFORM FOR CONSULTATIONS WITH THE STAKEHOLDERS WHILE THE SUBCONTRACTOR CAN HAVE AD-HOC MEETINGS WITH STAKEHOLDERS UNDER ESP COORDINATION. THE SUBCONTRACTOR SHALL PROVIDE REGULAR (WEEKLY) UPDATES ABOUT THE STATUS OF THE WORK. THE DRAFT AMENDMENTS SHOULD BE DELIVERED IN UKRAINIAN AND ENGLISH. THE SUBCONTRACTOR MUST ACKNOWLEDGE THAT ESP IS THE MAIN RECIPIENT OF THE REPORT, BUT IT WILL BE SHARED WITH UKRENERGO, NEURC, ENERGY COMMUNITY SECRETARIAT, THE MINISTRY OF ENERGY OF UKRAINE, AND OTHER RELEVANT STAKEHOLDERS TO BE DETERMINED BY ESP."
154-UCEM-1810-173
Parent award context
Parent award agency: Agency for International Development · Agency for International Development
Parent award NAICS: 541990
Parent award description: OVERSEAS CONTRACT
View parent award on USAspending
—$135,346Mar 22, 2024— – —
Subcontractor
Agency for International Development
WORK PREPARATION OF THE ASSESSMENT REPORT INCLUDING: €¢ ASSESSMENT OF THE CURRENT UKRAINIAN ELECTRICITY MARKET DESIGN FOR THE COMPLIANCE WITH THE EU INTERNAL MARKET(WHAT IS MISSING AND WHAT SHOULD BE CHANGED/IMPROVED). €¢ ASSESSMENT OF CHANGES IN THE EU MARKET DESIGN THE EU COMMISSION PROPOSED AND IMPLICATIONS ONUKRAINIAN ELECTRICITY MARKET, WHICH IS INTEGRATING TO THE EU MARKET. €¢ PROVIDE RECOMMENDATIONS ABOUT WHAT UKRAINE SHOULD ADOPT AND CHANGE (IN GENERAL, HIGH-LEVEL) TO BE IN-LINEWITH THE PROPOSALS AND TREND. €¢ CRITICAL ASSESSMENT AND RECOMMENDATIONS ABOUT COMPETITION, LIQUIDITY, CONCENTRATION (MARKET POWER) ANDROLE OF DIFFERENT PLAYERS IN THE UKRAINIAN ELECTRICITY MARKET. THE ANALYSIS TOUCHES UPON SUBJECT MATTER ANDPROPOSES MEASURES TO IMPROVE THE DESIGN AND OPERATION OF THE MARKET SEGMENTS, MITIGATE MARKET POWER ANDFOSTER COMPETITION, (MAY INCLUDE CALCULATIONS AS A JUSTIFICATION OF THE PROPOSALS).THE DRAFTING OF AMENDMENTS TO UKRAINIAN LEGISLATION BASED ON THE CONDUCTED ASSESSMENT IS NOT INCLUDED IN THE SCOPE OF WORK. THE REPORT SHOULD BE CLEARLY BASED ON THE RELEVANT THE EU ACQUIS AND EU BEST PRACTICES AND TRENDS. WHILE CONDUCTING THE ACTIVITY, THE SUBCONTRACTOR MAY (INDEED, STRONGLY ENCOURAGED TO) CONTACT AND CONSULT (IN COORDINATION AND COMMUNICATION WITH ESP) WITH THE PRIMARY AND SECONDARY STAKEHOLDERS TO DISCUSS DIFFERENT ASPECTS, INCLUDING BUT NOT LIMITED TO THE NEED, CHALLENGES, LEGAL AND TECHNICAL INSIGHTS. THE SUBCONTRACTOR CAN HAVE AD-HOC MEETINGS WITH STAKEHOLDERS UNDER ESP COORDINATION. THE SUBCONTRACTOR SHALL PROVIDE REGULAR (BI-WEEKLY) UPDATES ABOUT THE STATUS OF THE WORK TO THE WORKING GROUP THAT WILL BE ESTABLISHED BY ESP WITH PARTICIPATION FROM STAKEHOLDERS (E.G., NEURC, MARKET OPERATOR, UKRENERGO, MINISTRY OF ENERGY, ETC.) TO SUPERVISE THE IMPLEMENTATION OF THE PROJECT. THE REPORT SHOULD BE DELIVERED IN UKRAINIAN AND ENGLISH. THE SUBCONTRACTOR MUST ACKNOWLEDGE THAT ESP IS THE MAIN RECIPIENT OF THE REPORT, BUT IT WILL BE SHARED WITH NEURC, ENERGY COMMUNITY SECRETARIAT, THE MINISTRY OF ENERGY OF UKRAINE, VERKHOVNA RADA ENERGY COMMITTEE AND OTHER RELEVANT STAKEHOLDERS TO BE DETERMINED BY ESP.
154-UCEM-1810-163
Parent award context
Parent award agency: Agency for International Development · Agency for International Development
Parent award NAICS: 541990
Parent award description: OVERSEAS CONTRACT
View parent award on USAspending
—$93,520Mar 1, 2024— – —
Subcontractor
Agency for International Development
PREPARE A RE FIT REMEDY PLAN INCLUDING A ROADMAP AND DRAFTING OF THE CHANGES TO THE LEGISLATION REQUIRED FOR ITS IMPLEMENTATION ALONG WITH PROVIDING THE MEETINGS/PRESENTATIONS TO THE MINISTRY OF ENERGY, VERKHOVNA RADA, NEURC, ETC.
154-UCEM-1810-166
Parent award context
Parent award agency: Agency for International Development · Agency for International Development
Parent award NAICS: 541990
Parent award description: OVERSEAS CONTRACT
View parent award on USAspending
—$172,131Feb 1, 2024— – —
Subcontractor
Agency for International Development
RESEARCH OF LATE PAYMENTS ISSUE IN UKRAINE AND POSSIBLE SOLUTIONS
PUR-LVI-23-0029
Parent award context
Parent award agency: Agency for International Development · Agency for International Development
Parent award NAICS: 541690
Parent award description: FINANCIAL SECTOR REFORM ACTIVITY
View parent award on USAspending
—$130,234Dec 28, 2023— – —
Subcontractor
Agency for International Development
CRITICAL INFRASTRUCTURE CYBERSECURITY INCIDENT PREPAREDNESS ASSESSMENT (CICIPA) FOR MINISTRY OF SOCIAL POLICY OF UKRAINE AND STATE ENTERPRISE "INFORMATION AND COMPUTING CENTER OF THE MINISTRY OF SOCIAL POLICY OF UKRAINE"
PUR-KYI-23-0089
Parent award context
Parent award agency: Department of State · Department of State
Parent award NAICS: 541990
Parent award description: OVERSEAS CONTRACT
View parent award on USAspending
—$85,000Oct 23, 2023— – —
Subcontractor
Agency for International Development
UPPORT WITH THE REGULATION OF THE CYBER LEGION IN UKRAINE
PUR-KYI-23-0097
Parent award context
Parent award agency: Department of State · Department of State
Parent award NAICS: 541990
Parent award description: OVERSEAS CONTRACT
View parent award on USAspending
—$128,763Sep 22, 2023— – —
Subcontractor
Agency for International Development
CRITICAL INFRASTRUCTURE CYBERSECURITY INCIDENT PREPAREDNESS ASSESSMENT (CICIPA) FOR SECRETARIAT OF CABINET OF MINISTERS OF UKRAINE
PUR-KYI-23-0059
Parent award context
Parent award agency: Department of State · Department of State
Parent award NAICS: 541990
Parent award description: OVERSEAS CONTRACT
View parent award on USAspending
—$57,000Jul 6, 2023— – —
Subcontractor
Agency for International Development
CRITICAL INFRASTRUCTURE CYBERSECURITY INCIDENT PREPAREDNESS ASSESSMENT (CICIPA) FOR STATE ENTERPRISE "NATIONAL INFORMATION SYSTEMS"
PUR-KYI-23-0035
Parent award context
Parent award agency: Department of State · Department of State
Parent award NAICS: 541990
Parent award description: OVERSEAS CONTRACT
View parent award on USAspending
—$70,000Jun 28, 2023— – —

Contract vehicles are shown only when present in the source record. Linked award numbers and vehicles open the authoritative record on USAspending.gov.

Government-sourced data comes from SAM.gov, SBA and USAspending.gov and is attributed to its source. Items marked company-reported were provided by the company and are verified by FedSub only where labeled. FedSub is a private company and is not affiliated with SBA, GSA/SAM.gov, or any government agency.

KPMG-UKRAINE LTD. – Kyiv | UEI TKQZTKU8WUM3 | FedSub