TETRA TECH, INC.
Doing business as TETRA TECH
CHICAGO, IL, 60606
Prime contracting experience
46 records from government sources. Past participation is not evidence of current teaming interest.
| Role | Agency | Description | Vehicle | Obligated | Action date | Period |
|---|---|---|---|---|---|---|
| Prime | Environmental Protection Agency Environmental Protection Agency | REGION 5, SUPERFUND TECHNICAL ASSESSMENT & RESPONSE TEAM VI (START VI), TASK ORDER FOR REMOVAL ACTIVITIES. | 68HE0525D0004USAspending | $8,131,251 | Oct 7, 2026 | Dec 4, 2024 – Nov 20, 2029 |
| Prime | Environmental Protection Agency Environmental Protection Agency | EAST PALESTINE TRAIN DERAILMENT CONTRACTOR SUPPORT UNDER THE NATIONAL RESPONSE SYSTEM, CERCLA, AND OTHER AUTHORITIES. | 68HE0525D0004USAspending | $4,654,124 | Oct 2, 2026 | Jun 10, 2025 – Nov 20, 2029 |
| Prime | Environmental Protection Agency Environmental Protection Agency | FEDERATED METALS CORP. WHITING SUPERFUND SITE: R5, SFGLAES, SEMD, TETRATECH, RI/FS & RD TO | 68HE0523D0004USAspending | $2,838,971 | Sep 29, 2026 | Sep 27, 2024 – Dec 19, 2028 |
| Prime | Environmental Protection Agency Environmental Protection Agency | CROSS BROTHERS SUPERFUND SITE, SSID 0586, NEW SEMD SFGLAES TETRATECH TASK ORDER, CONTRACT 68HE0523D0004. | 68HE0523D0004USAspending | $2,265,322 | Sep 21, 2026 | Sep 25, 2026 – Sep 5, 2031 |
| Prime | Environmental Protection Agency Environmental Protection Agency | TASK ORDER #02 - TECHNICAL SUPPORT AND TRAINING ACTIVITIES | 68HE0320D0003USAspending | $6,399,338 | Sep 16, 2026 | Jul 1, 2020 – Dec 31, 2026 |
| Prime | Environmental Protection Agency Environmental Protection Agency | TASK ORDER #05 - REMEDIAL ASSESSMENT SUPPORT ACTIVITIES | 68HE0320D0003USAspending | $8,474,356 | Sep 9, 2026 | Aug 6, 2020 – Dec 31, 2026 |
| Prime | Environmental Protection Agency Environmental Protection Agency | REGION 5, SUPERFUND TECHNICAL ASSESSMENT & RESPONSE TEAM VI (START VI), TASK ORDER FOR PROGRAM AND ADMINISTRATIVE OVERHEAD (PAO) | 68HE0525D0004USAspending | $1,237,707 | Sep 1, 2026 | Nov 25, 2024 – Nov 20, 2029 |
| Prime | Environmental Protection Agency Environmental Protection Agency | REGION 5, SUPERFUND TECHNICAL ASSESSMENT & RESPONSE TEAM VI (START VI), TASK ORDER FOR LINDSAY LIGHT SITE (SSID# 05YT). | 68HE0525D0004USAspending | $494,796 | Aug 31, 2026 | May 16, 2025 – Apr 23, 2027 |
| Prime | Environmental Protection Agency Environmental Protection Agency | REMEDIAL ACQUISITION FRAMEWORK (RAF) DESIGN AND ENGINEERING SERVICES (DES) DES PROJECT TITLE: BENFIELD INDUSTRIES, INC. SUPERFUND SITE OPERABLE UNIT 1 (OU1) REMEDIAL DESIGN WAYNESVILLE, HAYWOOD COUNTY, NORTH CAROLINA | 68HE0318D0014USAspending | $601,768 | Aug 21, 2026 | Feb 20, 2026 – Sep 29, 2028 |
| Prime | Environmental Protection Agency Environmental Protection Agency | REGION 5, SUPERFUND TECHNICAL ASSESSMENT & RESPONSE TEAM VI (START VI), TASK ORDER FOR PRE-REMEDIAL ACTIVITIES. | 68HE0525D0004USAspending | $509,197 | Aug 19, 2026 | Dec 4, 2024 – Nov 20, 2029 |
| Prime | Environmental Protection Agency Environmental Protection Agency | REGION 5, SUPERFUND TECHNICAL ASSESSMENT & RESPONSE TEAM VI (START VI), THIS INITIAL ORDER IS TO OBLIGATE FUNDS FOR MAIN STREET WELL FIELD SSID: 05D3 IN THE AMOUNT OF $265,011.11. | 68HE0525D0004USAspending | $265,011 | Aug 19, 2026 | Jul 31, 2025 – Dec 1, 2026 |
| Prime | Environmental Protection Agency Environmental Protection Agency | SHIAWASSEE RIVER RIFS SUPERFUND SITE. SSID 051D. | 68HE0523D0004USAspending | $2,328,545 | Aug 14, 2026 | Jun 2, 2026 – May 31, 2031 |
| Prime | Environmental Protection Agency Environmental Protection Agency | TASK ORDER #01 - REMOVAL SUPPORT AND PREPAREDNESS/PREVENTION ACTIVITIES | 68HE0320D0003USAspending | $18,425,189 | Aug 11, 2026 | Jul 1, 2020 – Dec 31, 2026 |
| Prime | Environmental Protection Agency Environmental Protection Agency | CLIN 0002 EAST TROY SUPERFUND SITE REMEDIAL DESIGN INITIAL TASK ORDER AWARD | 68HE0318D0014USAspending | $2,689,064 | Jul 21, 2026 | Apr 1, 2021 – Mar 31, 2028 |
| Prime | Environmental Protection Agency Environmental Protection Agency | REGION 5, SUPERFUND TECHNICAL ASSESSMENT & RESPONSE TEAM VI (START VI). THIS TASK ORDER IS FOR WORK AT THE LASALLE ELECTRICAL UTILITIES SITE. | 68HE0525D0004USAspending | $297,028 | Jul 7, 2026 | Jul 31, 2025 – Jun 30, 2028 |
| Prime | Environmental Protection Agency Environmental Protection Agency | TASK ORDER #03 - SITE ASSESSMENT SUPPORT ACTIVITIES | 68HE0320D0003USAspending | $5,569,049 | Jul 7, 2026 | Jul 1, 2020 – Dec 31, 2026 |
| Prime | Environmental Protection Agency Environmental Protection Agency | ALLIED PAPER CONTRACTOR SUPPORT SERVICES UNDER THE NATIONAL RESPONSE SYSTEM, CERCLA, AND OTHER AUTHORITIES; SITE ID: 059B. | 68HE0525D0004USAspending | $2,522,550 | Jul 6, 2026 | Apr 23, 2025 – Apr 8, 2027 |
| Prime | Environmental Protection Agency Environmental Protection Agency | REGION 5, SUPERFUND TECHNICAL ASSESSMENT & RESPONSE TEAM VI (START VI); TARGETED BROWNFIELDS ASSESSMENT TASK ORDER. | 68HE0525D0004USAspending | $317,000 | Jul 6, 2026 | Sep 30, 2025 – Nov 20, 2029 |
| Prime | Environmental Protection Agency Environmental Protection Agency | TAR LAKE REMEDIAL DESIGN (DES - JOFOC) | 68HE0318D0014USAspending | $823,389 | Jun 17, 2026 | Jul 26, 2023 – Sep 29, 2028 |
| Prime | Environmental Protection Agency Environmental Protection Agency | ACME STEEL COKE PLANT SUPERFUND SITE (B5AY): R5, SFGLAES, SEMD, TETRA TECH (68HE0523D0004), RI TASK ORDER | 68HE0523D0004USAspending | $1,398,228 | Jun 2, 2026 | Jun 2, 2026 – May 31, 2029 |
| Prime | Environmental Protection Agency Environmental Protection Agency | REMEDIAL ACQUISITION FRAMEWORK (RAF), DESIGN AND ENGINEERING SERVICES (DES), CLIN 002, AWARD OF ESTECH GENERAL CHEMICAL SUPERFUND SITE | 68HE0318D0014USAspending | $1,415,614 | Apr 30, 2026 | Jun 15, 2022 – Dec 31, 2026 |
| Prime | Environmental Protection Agency Environmental Protection Agency | RAF DES TASK ORDER FOR OVERSIGHT SUPPORT COOPER DRUM SUPERFUND SITE | 68HE0318D0014USAspending | $8,772,804 | Apr 7, 2026 | Nov 17, 2023 – Nov 16, 2028 |
| Prime | Environmental Protection Agency Environmental Protection Agency | SUPERFUND & GREAT LAKES ARCHITECTURE AND ENGINEERING SERVICES (SFGLAES): TORCH LAKE FS&RD SUPPORT | 68HE0523D0004USAspending | $900,856 | Mar 30, 2026 | May 13, 2024 – Mar 31, 2027 |
| Prime | Environmental Protection Agency Environmental Protection Agency | REGION 5, SUPERFUND TECHNICAL ASSESSMENT & RESPONSE TEAM VI (START VI), EMERGENCY RESPONSE (ER) EQUIPMENT TASK ORDER. | 68HE0525D0004USAspending | $1,015,491 | Mar 19, 2026 | Mar 25, 2025 – Nov 20, 2029 |
| Prime | Environmental Protection Agency Environmental Protection Agency | R10 DES: EASTERN MICHAUD FLATS (EMF) SUPERFUND SITE FIELD OVERSIGHT AND TECHNICAL SUPPORT | 68HE0318D0014USAspending | $5,058,118 | Mar 16, 2026 | Feb 26, 2026 – Sep 29, 2028 |
| Prime | Environmental Protection Agency Environmental Protection Agency | TASK ORDER #04 - BROWNFIELD ASSESSMENT SUPPORT ACTIVITIES | 68HE0320D0003USAspending | $2,204,234 | Feb 6, 2026 | Aug 5, 2020 – Jun 30, 2026 |
| Prime | Environmental Protection Agency Environmental Protection Agency | 2025 CALIFORNIA WILDFIRES AND STRAIGHT-LINE WINDS EVENT START DATE: 1/10/2025 END DATE: 1/10/2026 R5 CROSSOVER SUPPORT FOR R9 FOR EMERGENCY SUPPORT FOR SOCAL WILDFIRES FOR THE REMOVAL OF HAZARDOUS MATERIALS AND HOUSEHOLD WASTE. | 68HE0525D0004USAspending | $1,179,351 | Nov 26, 2025 | Feb 25, 2025 – Feb 25, 2025 |
| Prime | Environmental Protection Agency Environmental Protection Agency | REGION 5, SUPERFUND TECHNICAL ASSESSMENT & RESPONSE TEAM VI (START VI), TASK ORDER FOR BULK OIL SPILL RESPONSE ACTIVITIES. | 68HE0525D0004USAspending | $1,250,000 | Oct 22, 2025 | Dec 4, 2024 – Nov 20, 2029 |
| Prime | Environmental Protection Agency Environmental Protection Agency | SUPERFUND TECHNICAL ASSESSMENT&RESPONSE TEAM (START), REGION 5, TASK ORDER FOR BULK REMOVAL ACTIVITIES | 68HE0519D0005USAspending | $57,387,337 | Oct 7, 2025 | Jan 24, 2020 – Apr 7, 2025 |
| Prime | Environmental Protection Agency Environmental Protection Agency | TO 04.68HE0519F0072, REMEDIAL ACTIVITIES, START V, REGION 5 | 68HE0519D0005USAspending | $2,014,266 | Sep 1, 2025 | Aug 12, 2019 – Apr 7, 2025 |
| Prime | Environmental Protection Agency Environmental Protection Agency | SUPERFUND TECHNICAL ASSESSMENT AND RESPONSE TEAM (START) START V, REGION 5, TASK ORDER FOR TOWN OF PINES SITE | 68HE0519D0005USAspending | $304,526 | Sep 1, 2025 | Feb 10, 2023 – Apr 7, 2025 |
| Prime | Environmental Protection Agency Environmental Protection Agency | START V, REGION 5, TASK ORDER FOR POST REMEDIAL INVESTIGATION (RI) SUPPORT AT THE KEYSTONE CORRIDOR GROUND WATER CONTAMINATION SITE, OPERABLE UNIT 2 (B5VX) | 68HE0519D0005USAspending | $390,078 | Sep 1, 2025 | Apr 14, 2023 – Apr 7, 2025 |
| Prime | Environmental Protection Agency Environmental Protection Agency | START V, REGION 5, TASK ORDER FOR SOURCE AREA INVESTIGATION SUPPORT AT THE LUSHER STREET GROUND WATER CONTAMINATION SUPERFUND SITE | 68HE0519D0005USAspending | $388,187 | Sep 1, 2025 | Sep 13, 2023 – Apr 7, 2025 |
| Prime | Environmental Protection Agency Environmental Protection Agency | PR-R5-20-00346 - FUNDING TO INITIATE TASK ORDER FOR SUB-AREA PLAN REVISIONS ON START (68HE0519D0005). | 68HE0519D0005USAspending | $741,922 | Aug 29, 2025 | May 28, 2020 – Jan 7, 2025 |
| Prime | Environmental Protection Agency Environmental Protection Agency | TO 02.68HE0519F0069, REMOVAL CERCLA ACTIVITIES, START V, REGION 5 | 68HE0519D0005USAspending | $3,857,096 | Aug 29, 2025 | Aug 9, 2019 – Apr 7, 2025 |
| Prime | Environmental Protection Agency Environmental Protection Agency | START V, REGION 5, TO FOR REGIONAL BUY-INS | 68HE0519D0005USAspending | $2,206,505 | Aug 29, 2025 | Jul 2, 2020 – Apr 7, 2025 |
| Prime | Environmental Protection Agency Environmental Protection Agency | START V, REGION 5, TASK ORDER FOR SHIAWASSEE RIVER SUPERFUND SITE | 68HE0519D0005USAspending | $346,933 | Aug 27, 2025 | May 27, 2020 – Jan 7, 2025 |
| Prime | Environmental Protection Agency Environmental Protection Agency | (BUY-IN) TO R5 START V TETRA TECH, INC CONTRACT #68HE0519D0005, TO PROCURE THE SERVICES OF A QUALIFIED ENVIRONMENTAL CONTRACTOR TO PERFORM INDEPENDENT OPTIMIZATION REVIEWS. | 68HE0519D0005USAspending | $5,349,433 | Aug 27, 2025 | Jan 22, 2020 – Apr 7, 2025 |
| Prime | Environmental Protection Agency Environmental Protection Agency | PR-R5-19-00544 - FUNDING FOR NEW TO ON START 5 FOR ER EQUIPMENT. | 68HE0519D0005USAspending | $2,427,352 | Aug 26, 2025 | Sep 23, 2019 – Apr 7, 2025 |
| Prime | Environmental Protection Agency Environmental Protection Agency | SUPERFUND TECHNICAL ASSESSMENT&RESPONSE TEAM (START), REGION 5, DATA MANAGEMENT TASK ORDER | 68HE0519D0005USAspending | $251,238 | Aug 26, 2025 | Mar 13, 2020 – Apr 7, 2025 |
| Prime | Environmental Protection Agency Environmental Protection Agency | SUPERFUND TECHNICAL ASSESSMENT&RESPONSE TEAM (START), REGION 5, RESPONSIBLE PARTY REMOVAL ACTIVITIES AT ALLIED PAPER SITE | 68HE0519D0005USAspending | $1,599,993 | Aug 24, 2025 | Sep 6, 2019 – Apr 7, 2025 |
| Prime | Environmental Protection Agency Environmental Protection Agency | SUPERFUND TECHNICAL ASSESSMENT&RESPONSE TEAM (START), REGION 5, PROGRAM AND ADMINISTRATIVE TASKS: CONTRACT TASKS, RESPONSE AND READINESS TASKS. | 68HE0519D0005USAspending | $2,796,184 | Aug 24, 2025 | Jul 8, 2019 – Apr 7, 2025 |
| Prime | Environmental Protection Agency Environmental Protection Agency | PM: BRAD STIMPLE. TETRA TECH START CONTRACT NO. 68HE0519D0005, TASK ORDER TARGET BROWNFIELDS ASSESSMENTS ACTIVITIES. | 68HE0519D0005USAspending | $3,772,341 | Aug 24, 2025 | Sep 18, 2019 – Apr 7, 2025 |
| Prime | Environmental Protection Agency Environmental Protection Agency | TO 03.68HE0519F0071, REMOVAL OPA SITE WORK, START V, REGION 5 TO 3, REMOVAL OPA SITE WORK | 68HE0519D0005USAspending | $1,440,233 | Aug 13, 2025 | Aug 12, 2019 – Apr 7, 2025 |
| Prime | Environmental Protection Agency Environmental Protection Agency | SUPERFUND & GREAT LAKES ARCHITECT AND ENGINEERING SERVICES (SFGLAES) - JUNCTION REACHES SUPPLEMENTAL SUBSURFACE INVESTIGATIONS | 68HE0523D0004USAspending | $490,345 | Jul 2, 2025 | Apr 3, 2024 – Jan 31, 2025 |
| Prime | Environmental Protection Agency Environmental Protection Agency | TASK ORDER TITLE: REMEDIAL ACQUISITION FRAMEWORK (RAF) - ABC ONE HOUR CLEANERS SUPERFUND SITE REMEDIAL INVESTIGATION/FEASIBILITY STUDY (RI/FS) FOR OPERABLE UNIT 3 (OU3), REGION 4 PRODUCE/SERVICE CODE: F108 ENVIRONMENTAL REMEDIATION | 68HE0318D0014USAspending | $284,660 | Jun 26, 2025 | Jun 26, 2025 – Sep 29, 2028 |
Contract vehicles are shown only when present in the source record. Linked award numbers and vehicles open the authoritative record on USAspending.gov.
Subcontracting experience
3 records from government sources. Past participation is not evidence of current teaming interest.
| Role | Agency | Description | Vehicle | Obligated | Action date | Period |
|---|---|---|---|---|---|---|
| Subcontractor | Department of Housing and Urban Development | MULTIFAMILY ASSESSMENT CONTRACTORS FOR GREEN RESILIENT AND RETROFIT PROGRAM 115169-2 Parent award context Parent award agency: Department of Housing and Urban Development · Department of Housing and Urban Development Parent award NAICS: 541611 Parent award performance state: DC Parent award description: MULTIFAMILY ASSESSMENT CONTRACTORS FOR GREEN RESILIENT AND RETROFIT PROGRAM View parent award on USAspending | 86615324A00001USAspending | $222,983 | Nov 7, 2024 | — – — |
| Subcontractor | Department of Defense | LABOR, SITE RESTORATION 18-008/003 Parent award context Parent award agency: Department of Defense · Department of the Army Parent award NAICS: 562910 Parent award performance state: ME Parent award description: SEDIMENT REMOVAL AND ENVIRONMENTAL MITIGATION CALLAHAN MINE SUPERFUND SITE BROOKSVILLE MAINE View parent award on USAspending | W912WJ18D0007USAspending | $476,050 | May 30, 2024 | — – — |
| Subcontractor | Department of Defense | LABOR 18-008/003 Parent award context Parent award agency: Department of Defense · Department of the Army Parent award NAICS: 562910 Parent award performance state: ME Parent award description: SEDIMENT REMOVAL AND ENVIRONMENTAL MITIGATION CALLAHAN MINE SUPERFUND SITE BROOKSVILLE MAINE View parent award on USAspending | W912WJ18D0007USAspending | $573,652 | Dec 5, 2023 | — – — |
Contract vehicles are shown only when present in the source record. Linked award numbers and vehicles open the authoritative record on USAspending.gov.
Agencies supported
- Environmental Protection AgencyGov-sourced
Government-sourced data comes from SAM.gov, SBA and USAspending.gov and is attributed to its source. Items marked company-reported were provided by the company and are verified by FedSub only where labeled. FedSub is a private company and is not affiliated with SBA, GSA/SAM.gov, or any government agency.