← Back to search
RLF & CN JV
Doing business as RLF
ORLANDO, FL, 32814
UnclaimedClaim this profile (free)
Prime contracting experience
14 records from government sources. Past participation is not evidence of current teaming interest.
| Role | Agency | Description | Vehicle | Obligated | Action date | Period |
|---|---|---|---|---|---|---|
| Prime | Department of Defense Department of the Navy | A-E DESIGN SERVICES FOR FY25 MILCON PROJECT P-300 OPERATING STORAGE, JET FUEL SYSTEM AVIANO AIR BASE, AVIANO, ITALY | N6247023D0013USAspending | $3,396,920 | Jun 16, 2026 | Aug 29, 2025 – Jun 30, 2028 |
| Prime | Department of Defense Department of the Navy | DD2 CAISSON CERTIFICATION AND OVERHAUL | N6247023D0013USAspending | $1,500,280 | Jun 3, 2026 | Jul 24, 2025 – Jul 31, 2027 |
| Prime | Department of Defense Department of the Navy | DRY DOCK 2 WATERFRONT PRODUCTION FACILITY, PORTSMOUTH NAVAL SHIPYARD KITTERY MAINE | N6247023D0013USAspending | $3,438,102 | Apr 15, 2026 | Sep 20, 2024 – Sep 30, 2026 |
| Prime | Department of Defense Department of the Navy | PRELIMINARY DESIGN AUTHORITY (PDA) FOR P347, PV INSTALLATION OVER EXISTING WATER CANAL. | N6247023D0013USAspending | $1,092,328 | Apr 13, 2026 | Apr 9, 2026 – Sep 14, 2026 |
| Prime | Department of Defense Department of the Navy | PRELIMINARY DESIGN AUTHORITY (PDA) FOR P346, BATTERY ENERGY STORAGE SYSTEM. | N6247023D0013USAspending | $485,752 | Apr 8, 2026 | Apr 8, 2026 – Sep 14, 2026 |
| Prime | Department of Defense Department of the Navy | FISCAL YEAR 2019 MILITARY CONSTRUCTION P256: SHIPS MAINTENANCE FACILITY, POST CONSTRUCTION AWARD SERVICES | N6247023D0013USAspending | $389,467 | Apr 1, 2026 | May 15, 2024 – Aug 31, 2027 |
| Prime | Department of Defense Department of the Navy | P664 FME LAB DB RFP, NMIC SUITLAND MD | N6247023D0013USAspending | $1,608,754 | Mar 20, 2026 | Aug 20, 2025 – Sep 30, 2026 |
| Prime | Department of Defense Department of the Navy | P139 MICROGRID AND SCADA | N6247023D0013USAspending | $2,162,976 | Mar 3, 2026 | Dec 17, 2025 – Dec 19, 2026 |
| Prime | Department of Defense Department of the Navy | FY25, MILCON ERCIP, SOUDA BAY- A-E DESIGN SERVICES FOR P999 ADVAN | N6247023D0013USAspending | $4,852,917 | Jan 14, 2026 | Sep 23, 2024 – Apr 20, 2026 |
| Prime | Department of Defense Department of the Navy | SIOP NNSY BUILDING M22 STRUCTURAL, CIVIL, AND FUTURE MEDICAL FACILITY STUDIES. | N6247023D0013USAspending | $1,610,578 | Dec 29, 2025 | Sep 15, 2025 – Feb 6, 2027 |
| Prime | Department of Defense Department of the Navy | P1701 FUEL STORAGE FACILITIES | N6247023D0013USAspending | $963,907 | Dec 18, 2025 | May 9, 2025 – Dec 30, 2029 |
| Prime | Department of Defense Department of the Navy | ENGINEER SERVICES TO DEVELOP DESIGN-BUILD RFP FOR DEMOLITION OF NNSY BL-172, SIOP | N6247023D0013USAspending | $871,277 | Sep 18, 2025 | Sep 12, 2025 – Sep 28, 2027 |
| Prime | Department of Defense Department of the Navy | P005 OPERATION STORAGE, JET FUEL SYSTEM MORON SPAIN | N6247023D0013USAspending | $3,460,419 | Sep 12, 2025 | Sep 11, 2025 – Mar 10, 2027 |
| Prime | Department of Defense Department of the Navy | P664 FOREIGN MATERIEL EXPLOITATION (FME) LAB PLANNING, ENGINEERIN | N6247023D0013USAspending | $2,712,788 | Jun 26, 2025 | Sep 26, 2024 – Aug 30, 2025 |
Contract vehicles are shown only when present in the source record. Linked award numbers and vehicles open the authoritative record on USAspending.gov.
Agencies supported
- Department of DefenseGov-sourced
Government-sourced data comes from SAM.gov, SBA and USAspending.gov and is attributed to its source. Items marked company-reported were provided by the company and are verified by FedSub only where labeled. FedSub is a private company and is not affiliated with SBA, GSA/SAM.gov, or any government agency.