← Back to search
FORT MYER CONSTRUCTION CORP
WASHINGTON, DC, 20018
UnclaimedClaim this profile (free)
Prime contracting experience
4 records from government sources. Past participation is not evidence of current teaming interest.
| Role | Agency | Description | Vehicle | Obligated | Action date | Period |
|---|---|---|---|---|---|---|
| Prime | Department of Transportation Federal Highway Administration | NORTH SECTION REHABILITATION OF GEORGE WASHINGTON MEMORIAL HIGHWAY- THE PROJECT CONSISTS OF THE RECONSTRUCTION OF APPROXIMATELY 7.5 MILES OF THE NORTHERN SECTION OF THE GEORGE WASHINGTON MEMORIAL PARKWAY (GWMP) BETWEEN SPOUT RUN AND THE I-495/CAPITAL | — | $175,098,589 | Sep 17, 2026 | Dec 7, 2021 – Dec 31, 2028 |
| Prime | Department of Transportation Federal Highway Administration | THIS REQUEST FOR PROPOSAL (DESIGN BUILD) FOR GEORGE WASHINGTON MEMORIAL PARKWAY MOUNT VERNON TRAIL RECONSTRUCTION, PROJECT NO. VA NP GWMP MVT(4) LOCATED IN ARLINGTON COUNTY AND THE CITY OF ALEXANDRIA, VIRGINIA AND THE DISTRICT OF COLUMBIA, WASHINGTON | — | $45,686,162 | Sep 16, 2026 | Nov 3, 2025 – May 31, 2029 |
| Prime | Department of Transportation Federal Highway Administration | PROJECT VA ST TFHRC 50(5): THE PROJECT INCLUDES EXCAVATING THE EXISTING TEST LANES, CONSTRUCTING UNDERGROUND CONCRETE WALLS, UNDERDRAIN AND STORM DRAIN SYSTEMS, SANITARY SEWER LINE, WATERLINE SYSTEM, ELECTRICAL CONDUIT SYSTEM, DRAINAGE IMPROVEMENT, | — | $4,592,378 | Aug 1, 2024 | Sep 14, 2022 – Jul 18, 2024 |
| Prime | Department of Transportation Federal Highway Administration | IGF::OT::IGF PROJECT: PRA-ROCR 10(5) THE PROJECT CONSISTS OF THE RECONSTRUCTION OF APPROXIMATELY 6.44 MILES OF BEACH DRIVE FROM THE ROCK CREEK AND POTOMAC PARKWAY TO THE MARYLAND STATE LINE, INCLUDING ROADSIDE PULLOUTS, PARKING AREAS, BRIDGES, AND EXIT/ENTRANCE RAMPS, AS WELL AS THE RECONSTRUCTION OF APPROXIMATELY 1.4 MILES OF THE MULTI-USE TRAIL BETWEEN THE PARKWAY AND BROAD BRANCH ROAD, ALL WITHIN THE ROCK CREEK PARK. THE WORK INCLUDES ASPHALT PAVEMENT REMOVAL AND ROADWAY EXCAVATION, AGGREGATE BASE, SUPERPAVE ASPHALT CONCRETE PAVEMENT, CONCRETE CURB AND GUTTER, DRAINAGE, RIPRAP, STONE MASONRY, TRAFFIC SIGNAL AND STREET LIGHTING REPLACEMENT, AND OTHER MISCELLANEOUS WORK. THE BRIDGE WORK INCLUDES STRUCTURAL CONCRETE REPAIRS, WATERPROOF MEMBRANE INSTALLATION, LATEX MODIFIED CONCRETE DECK OVERLAY, JOINT AND RAILING REPAIRS AND REPLACEMENTS, ELASTOMERIC BEARING PAD INSTALLATIONS, AND OTHER MISCELLANEOUS WORK. | — | $35,421,442 | Jul 31, 2024 | Jun 20, 2016 – Jun 24, 2024 |
Contract vehicles are shown only when present in the source record. Linked award numbers and vehicles open the authoritative record on USAspending.gov.
Agencies supported
- Department of TransportationGov-sourced
Government-sourced data comes from SAM.gov, SBA and USAspending.gov and is attributed to its source. Items marked company-reported were provided by the company and are verified by FedSub only where labeled. FedSub is a private company and is not affiliated with SBA, GSA/SAM.gov, or any government agency.