← Back to search

FARADAY TECHNOLOGY, INC.

ENGLEWOOD, OH, 45315

UnclaimedClaim this profile (free)

Prime contracting experience

19 records from government sources. Past participation is not evidence of current teaming interest.

RoleAgencyDescriptionVehicleObligatedAction datePeriod
Prime
Department of Defense
Department of the Air Force
CONCENTRIC ULTRA-DARK SOLAR-THERMAL ABSORBER/METASURFACE THERMAL EMITTER FOR THERMOPHOTOVOLTAIC POWER CONVERSION—$749,996Jul 20, 2026Sep 30, 2024 – Mar 31, 2027
Prime
National Aeronautics and Space Administration
National Aeronautics and Space Administration
EO14042 FY22 SBIR PHASE II LEO MANUFACTURING OF 3D PRINTED COVETIC NANOMATERIALS FOR ADVANCED ELECTRONICS—$799,996Jul 14, 2026May 10, 2022 – May 10, 2027
Prime
Department of Defense
Department of the Navy
RESEARCH AND DEVELOPMENT—$999,999Jul 1, 2026Jul 1, 2026 – Jan 8, 2029
Prime
National Aeronautics and Space Administration
National Aeronautics and Space Administration
PHASE II STTR CLIMATE ENHANCING RESOURCE UTILIZATION THROUGH ULTRA-LOW-TEMPERATURE, ELECTROLYTIC CARBON DIOXIDE VALORIZATION ON MARS—$899,967Jun 16, 2026Feb 11, 2025 – Feb 10, 2027
Prime
Department of Defense
Department of the Navy
SBIR PHASE II—$999,997May 28, 2026May 28, 2026 – Jun 8, 2028
Prime
Department of Defense
Department of the Navy
RESEARCH AND DEVELOPMENT—$1,035,898May 14, 2026Sep 9, 2024 – Sep 30, 2027
Prime
Department of Defense
Missile Defense Agency
SBIR/STTR PHASE II R&D - HIGHLY UNIFORM GOLD COATINGS FOR ELECTRONICS RELIABILITY AND PROTECTION FROM SPACE ENVIRONMENTS—$1,509,970May 8, 2026Nov 20, 2023 – Aug 20, 2026
Prime
Department of Defense
Department of the Navy
BASE—$1,699,970Mar 20, 2026Apr 24, 2024 – Mar 20, 2027
Prime
Department of Defense
Missile Defense Agency
SBIR/STTR PHASE II R&D FUNCTIONALLY GRADED COATINGS FOR ENHANCED OXIDATION RESISTANCE OF SHARP HYPERSONIC LEADING EDGES—$1,509,102Nov 20, 2025Mar 10, 2025 – Mar 9, 2027
Prime
Department of Defense
Department of the Air Force
ON-DEMAND ADDITIVE MANUFACTURING OF ASTRONOMICAL MIRRORS—$1,249,992Sep 8, 2025May 14, 2024 – Aug 3, 2026
Prime
Department of Defense
Department of the Air Force
SBIR 23.1 PHASE II, "REMOTELY ACTIVATED LITHIUM RESERVE BATTERY EMPOWERING MISSILE GUIDANCE SET"—$1,799,994Jun 5, 2025Jun 5, 2023 – Dec 5, 2025
Prime
Department of Defense
Department of the Air Force
IN-FIELD REPAIR OF COATINGS ON AIRCRAFT SYSTEMS WITH ENHANCED ADHESION AND CORROSION RESISTANCE—$1,249,995Jun 24, 2024Feb 10, 2023 – Aug 12, 2025
Prime
Environmental Protection Agency
Environmental Protection Agency
SBIR PHASE II PROPOSAL #B19P2-3A01 - ELECTROCHEMICAL EXTRACTION AND REMEDIATION OF PFAS IN SOILS. FARADAY TECHNOLOGY, INC.—$300,000May 4, 2022Jun 1, 2020 – May 31, 2023
Prime
Environmental Protection Agency
Environmental Protection Agency
SBIR PHASE II PROPOSAL #B19P2-1C02 - ELECTROCHEMICAL PRETREATMENT OF PFAS-CONTAMINATED AQUEOUS EFFLUENTS. FARADAY TECHNOLOGY, INC—$300,000May 4, 2022Jun 1, 2020 – May 31, 2023
Prime
Department of Defense
Department of the Army
SBIR PHASE 1—$259,612Mar 16, 2022Mar 16, 2022 – Sep 30, 2022
Prime
National Aeronautics and Space Administration
National Aeronautics and Space Administration
AMONG NUMEROUS TECHNOLOGICAL ADVANCES SOUGHT IN ORDER TO FACILITATE HUMAN SPACE TRAVEL, INNOVATIONS ARE NEEDED THAT SUPPORTS THE MASS- AND ENERGY-EFFICIENT MAINTENANCE OF CLOSED AIR, WATER, AND WASTE SYSTEMS IN SPACECRAFT HABITATS THAT OPERATE ON PLANETARY ENVIRONMENTS SUCH AS MARS AND WITHIN MICROGRAVITY. WASTE-WATER TREATMENT SYSTEM ON BOARD THE ISS IS ONE SUCH SYSTEM THAT HAS LIFETIME/DURABILITY LIMITATIONS AND WOULD BENEFIT FROM IMPROVEMENTS. THEREFORE, IN THIS PHASE II STTR PROGRAM FARADAY WILL CONTINUE THE TECHNOLOGY DEVELOPMENT EFFORTS OF THE PHASE I BY: (1) LEVERAGING EXISTING KNOWLEDGE IN THE COMBINED EXPERTISE OF FARADAY AND UPR FOR DEVICE DESIGN AND TESTING UNDER ZERO GRAVITY CONDITIONS; (2) EXPLORING THE BACTERIA FOR UREA BIOREACTOR AND ELECTROCATALYST FOR AMMONIA REACTOR TAILORED FOR ZERO GRAVITY CONDITIONS OF OUR SUBCONTRACTOR UPR, (3) OPTIMIZING THE ELECTROCATALYTIC EFFICIENCY AND WASTE WATER TREATMENT RATE WITH ON-BOARD WATER SIMULATES, (4) VALIDATING PERFORMANCE UNDER ZERO GRAVITY CONDITIONS; AND (5) DESIGNING AND BUILDING A DEMONSTRATION-SCALE BIO-ELECTROCHEMICAL REACTOR UNIT CAPABLE OF MEETING NASA REQUIRED SPECIFICATIONS . THIS EVALUATION WILL ENABLE TRL ENHANCEMENT AND DEMONSTRATE A POTENTIAL PATH FORWARD FOR PHASE II SCALE-UP AND ASSESSMENT OF THE BIO-ELECTROCHEMICAL SYSTEM IN ZERO-GRAVITY ENVIRONMENTS. THIS TECHNOLOGY HAS THE POTENTIAL TO BE AN INTEGRAL PART OF LONG TERM LIFE SUPPORT ON NASA S MANNED SPACE MISSIONS.—$754,290Feb 23, 2022Sep 26, 2018 – Jun 25, 2022
Prime
National Aeronautics and Space Administration
National Aeronautics and Space Administration
ENVIRONMENTAL CONTROL AND LIFE SUPPORT FOR SPACECRAFT AND HABITAT—$288,999Feb 3, 2022Apr 29, 2020 – Apr 30, 2022
Prime
National Aeronautics and Space Administration
National Aeronautics and Space Administration
DEVELOP AN APPROACH TO SCALABLY APPLY CARBON NANOTUBE BASED BLACK COATINGS TO LARGE AREA SURFACE AND DEMONSTRATE THE COATING S POTENTIAL TO SUPPRESS SCATTERED LIGHT, WITHSTAND LAUNCH CONDITIONS, AND RESIST RADIATION EFFECTS AND ATOMIC OXYGEN EROSION.—$754,996Jan 18, 2022Aug 8, 2019 – Aug 7, 2022
Prime
National Aeronautics and Space Administration
National Aeronautics and Space Administration
IGF::OT::IGF AMONG THE NUMEROUS TECHNOLOGICAL ADVANCES SOUGHT IN ORDER TO FACILITATE HUMAN SPACE TRAVEL, SOLUTIONS ARE NEEDED FOR TECHNOLOGY THAT SUPPORTS ENERGY-EFFICIENT MAINTENANCE OF CLOSED AIR, WATER, AND WASTE SYSTEMS IN MICROGRAVITY SPACECRAFT HABITATS, LIKE MARS. IN PARTICULAR, A TECHNIQUE FOR THE IN-SITU GENERATION OF CLEANING/SANITIZING SOLUTIONS IS NEEDED TO REDUCE THE DEMAND OF EARTH BASED MATERIALS LIKE CLEANING SUPPLIES TO MEET PERSONAL HYGIENE REQUIREMENT DURING SPACE MISSIONS. THEREFORE, IN THIS PHASE II SBIR PROGRAM, FARADAY WILL CONTINUE THE TECHNOLOGY DEVELOPMENT EFFORTS OF THE PHASE I BY: (1) DEMONSTRATING THE POTENTIAL OF THE DEVICE DESIGN BY TESTING UNDER ZERO GRAVITY; (2) OPTIMIZING THE GDE CATALYTICS, STRUCTURE, AND WETTABILITY, (3) DEMONSTRATING THE POTENTIAL TO USE ONBOARD ISS WATER UTILITIES, (4) DEVELOPING AN ELECTROCHEMICAL PEROXIDE DETECTOR, AND (5) DESIGNING AND BUILDING AN?-SCALE REACTOR TO PRODUCE 1 L/DAY OF 2 W/W% H2O2. THIS EVALUATION WILL ENABLE TRL ENHANCEMENT AND DEMONSTRATE A POTENTIAL PATH FORWARD FOR DEMONSTRATION. THIS TECHNOLOGY HAS THE POTENTIAL TO BE AN ALTERNATIVE METHOD FOR SYNTHESIS OF COMMERCIAL HYDROGEN PEROXIDE OR IN-SITU ONSITE DISINFECTION OF PROCESS WASTE STREAMS AND COULD BE AN INTEGRAL PART OF LONG TERM LIFE SUPPORT ON NASA'S MANNED SPACE MISSIONS.—$1,038,963Jan 10, 2022May 1, 2017 – Apr 30, 2022

Contract vehicles are shown only when present in the source record. Linked award numbers and vehicles open the authoritative record on USAspending.gov.

Agencies supported

  • National Aeronautics and Space AdministrationGov-sourced
  • Department of DefenseGov-sourced
  • Environmental Protection AgencyGov-sourced

Government-sourced data comes from SAM.gov, SBA and USAspending.gov and is attributed to its source. Items marked company-reported were provided by the company and are verified by FedSub only where labeled. FedSub is a private company and is not affiliated with SBA, GSA/SAM.gov, or any government agency.

FARADAY TECHNOLOGY, INC. – Englewood, OH | UEI ZL5LDDLNHGN4 | FedSub