PULLMAN SST, INC.
Doing business as SHARED SYSTEMS TECHNOLOGY INC
COLUMBIA, MD, 21046
Prime contracting experience
3 records from government sources. Past participation is not evidence of current teaming interest.
| Role | Agency | Description | Vehicle | Obligated | Action date | Period |
|---|---|---|---|---|---|---|
| Prime | Department of the Interior National Park Service | STLI 312431, REHABILITATE EXTERIOR SYSTEMS OF MAIN IMMIGRATION BUILDING (GAOA PROJECT), STATUE OF LIBERTY NATIONAL MONUMENT, ELLIS ISLAND, NEW YORK COUNTY, NEW YORK | — | $36,854,905 | Sep 16, 2026 | Apr 14, 2023 – Dec 31, 2026 |
| Prime | General Services Administration Public Buildings Service | DESIGN BUILD SERVICES FOR THE RENOVATION OF THE PATRICK V. MCNAMARA PARKING GARAGE IN DETROIT, MICHIGAN. | — | $34,609,054 | Aug 13, 2026 | Jul 16, 2024 – Dec 6, 2026 |
| Prime | Department of the Interior National Park Service | UPPER PLAZA RENOVATION, PERRYS VICTORY MEMORIAL (PEVI 272171) - DESIGN BUILD GAOA | — | $27,151,797 | May 5, 2026 | Mar 11, 2025 – Jun 6, 2028 |
Contract vehicles are shown only when present in the source record. Linked award numbers and vehicles open the authoritative record on USAspending.gov.
Subcontracting experience
9 records from government sources. Past participation is not evidence of current teaming interest.
| Role | Agency | Description | Vehicle | Obligated | Action date | Period |
|---|---|---|---|---|---|---|
| Subcontractor | Department of Defense | MASONRY WORK PULLMAN 508 Parent award context Parent award agency: Department of Defense · Department of the Army Parent award NAICS: 237110 Parent award performance state: MI Parent award description: FY25 F41E2 374449 VGLZ232001 - MITIGATE MOISTURE INTRUSION INTO PUMP BUILDING B508 View parent award on USAspending | — | $209,850 | Feb 10, 2026 | — – — |
| Subcontractor | Department of Defense | MASONRY WORK PULLMAN 507 Parent award context Parent award agency: Department of Defense · Department of the Army Parent award NAICS: 237110 Parent award performance state: MI Parent award description: FY25 F41E2 374449 VGLZ232004 - REPAIR BUILDING 507 ENVELOPE TO MITIGATE MOISTURE INTRUSION INTO PUMP BUILDING. View parent award on USAspending | — | $203,245 | Feb 10, 2026 | — – — |
| Subcontractor | Department of Defense | POURED CONCRETE FOUNDATION AND STRUCTURE CONTRACTORS. 4102770022 Parent award context Parent award agency: Department of Defense · Department of the Army Parent award NAICS: 237990 Parent award performance state: OR Parent award description: IGF::OT::IGF REPLACEMENT OF MAIN UNIT GENERATOR TURBINE RUNNERS IN UNITS 1-14 AT MCNARY DAM POWERHOUSE, UMATILLA, OREGON, INCLUDING REWIND OF 3 MAIN UNIT GENERATORS. View parent award on USAspending | — | $1,404,290 | Dec 4, 2025 | — – — |
| Subcontractor | Department of Defense | POURED CONCRETE FOUNDATION AND STRUCTURE CONTRACTORS. 4102770022 Parent award context Parent award agency: Department of Defense · Department of the Army Parent award NAICS: 237990 Parent award performance state: OR Parent award description: IGF::OT::IGF REPLACEMENT OF MAIN UNIT GENERATOR TURBINE RUNNERS IN UNITS 1-14 AT MCNARY DAM POWERHOUSE, UMATILLA, OREGON, INCLUDING REWIND OF 3 MAIN UNIT GENERATORS. View parent award on USAspending | — | $321,652 | Nov 26, 2025 | — – — |
| Subcontractor | General Services Administration | 1. REMOVE BRICK
A. 2’X2’ AREA – ASSUME 2 WYTHE MAXIMUM, LOCATION VERIFIED BY GC/CM.
B. WILL SALVAGE BRICK WHEN POSSIBLE
2. CLEAN SPANDREL BEAM
A. ASSUME WIRE WHEEL TO CLEAN AND DETERMINE THICKNESS WITH ENGINEER
3. REPLACE BRICK
A. REPLACE BRICK IN 2’X2’ DEMOED AREA. CONSTRUCTION SERVICES · Prime awardUSAspending | 47PD0123D0001USAspending | $12,500 | Sep 25, 2025 | — – — |
| Subcontractor | Department of Labor | 1. GENERAL CONDITIONS
A. MOBILIZATION / DEMOBILIZATION
B. PREPLANNING / SITE SPECIFIC SAFETY REQUIREMENTS
C. ON SITE SUPERINTENDENT
D. PROJECT MANAGEMENT
E. PERFORM / PROVIDE MOCK UPS AS NEEDED
2. ACCESS / SCAFFOLD
A. PROVIDE SCAFFOLDING AT NORTH AND WEST ELEVATIONS OF BUILDING C
B. PROVIDE MANLIFTS AS NEEDED TO ACCESS THE SOUTH AND EAST ELEVATIONS OF BUILDING C
C. PROVIDE MANLIFTS AS NEEDED TO ACCESS BUILDINGS A / B / D.
D. PROVIDE EXTERIOR STAIRTOWER TO ROOF AT BUILDING C
E. PROVIDE FORKLIFT FOR MATERIAL AND EQUIPMENT LOADING / UNLOADING
3. TEMP ROOF PROTECTION
A. INCLUDES COORDINATION WITH ROOFING CONTRACTOR AS NEEDED
B. PROVIDE RUBBERIZED MEMBRANE TIED INTO ROOFING AND DRAPED OVER PARAPET WALL AFTER DEMOLITION AND UNTIL NEW ROOFING IS INSTALLED
C. SECURE DURING END OF EACH SHIFT – RE-TAPE AS NEEDED
4. DEMOLITION OF ROOF DECKING / JOISTS
A. DEMO / REMOVE ROOF DECKING (APPROX. 2,700 SFT)
B. REMOVE ROOF JOISTS TO EXPOSE PARAPET
C. ROOFING MATERIAL / HAZARDOUS MATERIAL ABATEMENT BY OTHERS
5. PARAPET DEMOLITION (NORTH AND WEST ELEVATIONS OF C-BLOCK)
A. REMOVE AND SALVAGE LIMESTONE COPING CAP (370 LFT)
B. CLEAN LIMESTONE COPING CAP AND PREP FOR REINSTALLATION
C. REMOVE AND SALVAGE BRICK FROM PARAPET WALL (1,515 SFT)
D. CLEAN BRICK AND PREP FOR REINSTALLATION
E. REMOVE AND SALVAGE LIMESTONE CORNICE BAND (370 LFT)
F. CLEAN LIMESTONE CORNICE BAND STONE AND PREP FOR REINSTALLATION
G. REMOVE AND SALVAGE EXISTING BRICK SOLDER COURSE
H. CLEAN / PREP BRICK FOR REINSTALLATION
6. REMOVE AND REPLACE STEEL LINTELS / SHELF ANGLE (370 LFT)
A. REMOVE DETERIORATED STEEL LINTEL
B. REPLACE WITH NEW STEEL ANGLE – BOLTED INTO CONCRETE PARAPET WALL
7. REBUILD PARAPET WALL – REPLACE MASONRY (370 LFT)
A. REBUILDING OF METAL STUDS / SHEATHING / STRUCTURAL STEEL / ANCHORS BY OTHERS
B. INSTALL SOLDIER BRICK COURSE (1,480 EA)
C. INSTALL LIMESTONE CORNICE BAND W/ NEW ANCHORS & STAINLESS STEEL EYEBOLTS
D. INSTALL AIR BARRIER ON EXTERIOR OF SHEATHING (1,600 SFT)
E. INSTALL LIQUID ARE BARRIER FLASHING AT TOP OF WALL (370 LFT)
F. PLACE SALVAGED EXTERIOR BRICK MASONRY – SINGLE WYTHE
G. INSTALL MULTI WYTHE BRICK / TOOTH IN MASONRY AT CORNERS TO REMAIN
H. INSTALL BRICK VENT DETAIL WORK (6 LOCATIONS)
I. PARAPET – SCUPPER DETAIL WORK (3 EACH)
J. INSTALL NEW CONTINUOUS STEEL TOP PLATE (3/8” X 10” X 370 LFT)
K. INSTALL NEW BRICK FLASHING UNDER COPING (370 LFT)
L. INSTALL SALVAGED COPING STONES
M. CLEAN MASONRY WALL – TOP OF PARAPET TO WINDOW AREA (2,600 SFT)
N. INSTALL SEALANT AT TOP AND BOTTOM OF PARAPET WALL (740 LFT)
8. REPLACEMENT BRICK (225 SFT OR 1,462 EA – MATERIAL ONLY
9. LIMESTONE COPING PATCHING (35 SFT)
A. SAWCUT / REMOVE DETERIORATED LIMESTONE MATERIAL
B. PREP AND PATCH WITH JAHN STONE PATCHING MORTAR
10. CONCRETE REPAIR – BEHIND LIMESTONE CORNICE (50 SFT)
A. SAWCUT / DEMO DETERIORATED CONCRETE (UP TO 3” DEPTH)
B. SANDBLAST / PREP
C. FORM REPAIRS
D. PLACE REPAIR MATERIALS
E. STRIP FORMS
11. CLEAN AND RE-POINT MASONRY AT EAST AND SOUTH PARAPET WALLS
A. CLEAN ALL MASONRY AS SHOWN ON PLANS (2,600 SFT)
B. TUCKPOINT DETERIORATED MORTAR JOINTS (ASSUME 50% TUCKPOINTING OR 8,450 LFT)
12. STABILIZE LIMESTONE BAND
A. DRILL THROUGH LIMESTONE AND INSTALL HELICAL ANCHORS, PATCH HOLE WITH MORTAR TO MATCH EXISTING COLOR (ASSUME 1 ANCHOR EVERY 12” OC)
I. C WING EAST AND SOUTH ELEVATIONS (370 EA)
II. D WING (740 EA)
III. A BLOCK (275 EA)
IV. B BLOCK (385 EA)
13. FULL HEIGHT PARAPET CONTROL JOINTS (REMOVE AND REPLACE) (144 LFT)
14. REMOVE, SALVAGED AND REINSTALL DECORATIVE LIMESTONE MEDALLION (1 EA)
15. REBUILD BRICK CHIMNEY ON ROOF
A. REMOVE CAPSTONES AND DISCARD
B. REMOVE BRICK, SALVAGE AND CLEAN FOR REINSTALLATION
C. INSTALL SALVAGED BRICK
D. INSTALL NEW CAPSTONES
16. TUCKPOINT AT PENTHOUSE
A. TUCKPOINT DETERIORATED MORTAR JOINTS AT PENTHOUSE BUILDING (1,560 LFT)
17. OPTION 1 – C WING EAST AND SOUTH FACADES
A. REPOINT VERTICAL / HORIZONTAL JOINTS OF LIMESTONE BAND ON EAST AND SOUTH FACADES OF C WING (370 LFT)
B. TUCKPOINT CORNICE VERTICAL JOINTS AND HORIZONTAL SVI-2319070-PSST Parent award context Parent award agency: Department of Labor · Office of the Assistant Secretary for Administration and Management Parent award NAICS: 236220 Parent award performance state: OH Parent award description: PROJECT 3975 DAYTON JCC - BUILDING 1 FACADE AND ENVELOPE REPAIRS FACADE AND ENVELOPE REPAIR - THE CONSTRUCTION WORK INVOLVES TARGETED REPAIRS TO THE DAMAGED AND DETERIORATED MASONRY. THE INSTALLATION OF A NEW MODIFIED BITUMEN ROOFING SYSTEM ON WING View parent award on USAspending | — | $2,323,370 | Feb 23, 2024 | — – — |
| Subcontractor | Department of Transportation | FURNISH CFRP STRENGTHENING SYSTEMS SC23005-002.V2 Parent award context Parent award agency: Department of Transportation · Federal Highway Administration Parent award NAICS: 237310 Parent award performance state: OR Parent award description: OR DOT 18(1), OR58: COAST FORK WILLAMETTE RIVER TO LOWER SALT CR BRIDGES. THE PRIMARY OBJECTIVE OF THE THIS PROJECT IS TO SEISMICALLY RETROFIT 3 BRIDGES ON OR-58 BETWEEN US-97 AND I-5. THE SCOPE OF WORK CONSISTS OF: STRUCTURE REPAIR, STRUCTURE SEISMI View parent award on USAspending | — | $409,030 | Aug 22, 2023 | — – — |
| Subcontractor | General Services Administration | COLLECT MORTAR SAMPLES FROM MASONRY FACADE 47PF0023F0057 · Prime awardUSAspending | 47PF0020D0026USAspending | $2,500 | Dec 6, 2022 | — – — |
| Subcontractor | General Services Administration | CONTRACTOR ASSISTANCE FOR BUILDING EXTERIOR EVALUATION. 9454296 Parent award context Parent award agency: General Services Administration · Public Buildings Service Parent award NAICS: 541310 Parent award performance state: DC Parent award description: DESIGN & A/E SERVICES FOR WATER INTRUSION REPAIRS & ALTERATIONS AT THE SIOUX FALLS U.S. COURTHOUSE. View parent award on USAspending | GS00P16BQD7009USAspending | $46,250 | Dec 1, 2021 | — – — |
Contract vehicles are shown only when present in the source record. Linked award numbers and vehicles open the authoritative record on USAspending.gov.
Agencies supported
- Department of the InteriorGov-sourced
- General Services AdministrationGov-sourced
Government-sourced data comes from SAM.gov, SBA and USAspending.gov and is attributed to its source. Items marked company-reported were provided by the company and are verified by FedSub only where labeled. FedSub is a private company and is not affiliated with SBA, GSA/SAM.gov, or any government agency.