← Back to search

RED CANYON SOFTWARE, INC.

Location not reported

Unclaimed

AI-Generated Company Overview

Generating overview from available records...

Source Records

No company-reported description yet. Owners can add one after claiming the profile.

Capabilities

No capabilities recorded.

Prime contracting experience

No prime contract awards on record in current sources.

Subcontracting experience

43 records from government sources. Past participation is not evidence of current teaming interest.

RoleAgencyDescriptionVehicleObligatedAction datePeriod
Subcontractor
—
ENGINEERING AND IT SUPPORT SERVICES
SMS0015214
Parent award context
Parent award agency: National Aeronautics and Space Administration · National Aeronautics and Space Administration
Parent award NAICS: 541330
Parent award description: GROUND SYSTEMS AND MISSION OPERATIONS (GSMO-3)
View parent award on USAspending
CONT_AWD_80GSFC22CA020_8000_-NONE-_-NONE-$5,000,000Sep 19, 2022— – —
Subcontractor
—
RED CANYON LABOR SUB TD-167 WBS 6.4.9.05_OSIRIS-14-167
4101445900
Parent award context
Parent award agency: National Aeronautics and Space Administration · National Aeronautics and Space Administration
Parent award NAICS: 336414
Parent award description: ORIGINS SPECTRAL INTERPRETATION RESOURCE IDENTIFICATION SECURITY-REGOLITH EXPLORER (OSIRIS-REX) PHASE B EFFORT. UNDER THIS CONTRACT, THE CONTRACTOR SHALL PROVIDE THE RESOURCES NECESSARY TO COMPLETE MISSION DESIGN AND REQUIREMENTS FLOW DOWN ACTIVITIES CULMINATING IN AN OSIRIS-REX PROJECT MISSION DESIGN REVIEW (MDR). THE CONTRACTOR SHALL PROVIDE THE RESOURCES NECESSARY TO SUPPORT THE OSIRIS-REX PROJECT TO DEFINE AND COMPLETE THE DEFINITION OF THE PRELIMINARY DESIGN, AND THE PLANS FOR DEVELOPMENT, MANUFACTURE, TEST, VERIFICATION AND OPERATION OF A FLIGHT SYSTEM.
View parent award on USAspending
CONT_AWD_NNG12FD66C_8000_-NONE-_-NONE-$308,804Aug 26, 2020— – —
Subcontractor
—
RED CANYON LABOR SUB TD-182 (FSW) WBS 6.4.9.02 FSW TEST WBS 6.4.9.02 FSW INTEGRATION
4101536720
Parent award context
Parent award agency: National Aeronautics and Space Administration · National Aeronautics and Space Administration
Parent award NAICS: 336414
Parent award description: ORIGINS SPECTRAL INTERPRETATION RESOURCE IDENTIFICATION SECURITY-REGOLITH EXPLORER (OSIRIS-REX) PHASE B EFFORT. UNDER THIS CONTRACT, THE CONTRACTOR SHALL PROVIDE THE RESOURCES NECESSARY TO COMPLETE MISSION DESIGN AND REQUIREMENTS FLOW DOWN ACTIVITIES CULMINATING IN AN OSIRIS-REX PROJECT MISSION DESIGN REVIEW (MDR). THE CONTRACTOR SHALL PROVIDE THE RESOURCES NECESSARY TO SUPPORT THE OSIRIS-REX PROJECT TO DEFINE AND COMPLETE THE DEFINITION OF THE PRELIMINARY DESIGN, AND THE PLANS FOR DEVELOPMENT, MANUFACTURE, TEST, VERIFICATION AND OPERATION OF A FLIGHT SYSTEM.
View parent award on USAspending
CONT_AWD_NNG12FD66C_8000_-NONE-_-NONE-$348,072Aug 25, 2020— – —
Subcontractor
—
WBS 6.4.9.02 FSW TEST WBS 6.4.9.02 FSW INTEGRATION
4101536720
Parent award context
Parent award agency: National Aeronautics and Space Administration · National Aeronautics and Space Administration
Parent award NAICS: 336414
Parent award description: ORIGINS SPECTRAL INTERPRETATION RESOURCE IDENTIFICATION SECURITY-REGOLITH EXPLORER (OSIRIS-REX) PHASE B EFFORT. UNDER THIS CONTRACT, THE CONTRACTOR SHALL PROVIDE THE RESOURCES NECESSARY TO COMPLETE MISSION DESIGN AND REQUIREMENTS FLOW DOWN ACTIVITIES CULMINATING IN AN OSIRIS-REX PROJECT MISSION DESIGN REVIEW (MDR). THE CONTRACTOR SHALL PROVIDE THE RESOURCES NECESSARY TO SUPPORT THE OSIRIS-REX PROJECT TO DEFINE AND COMPLETE THE DEFINITION OF THE PRELIMINARY DESIGN, AND THE PLANS FOR DEVELOPMENT, MANUFACTURE, TEST, VERIFICATION AND OPERATION OF A FLIGHT SYSTEM.
View parent award on USAspending
CONT_AWD_NNG12FD66C_8000_-NONE-_-NONE-$143,024Aug 20, 2014— – —
Subcontractor
—
OSIRIS-15-350_ENGINEERING LABOR SUPPORT
4102354419
Parent award context
Parent award agency: National Aeronautics and Space Administration · National Aeronautics and Space Administration
Parent award NAICS: 336414
Parent award description: ORIGINS SPECTRAL INTERPRETATION RESOURCE IDENTIFICATION SECURITY-REGOLITH EXPLORER (OSIRIS-REX) PHASE B EFFORT. UNDER THIS CONTRACT, THE CONTRACTOR SHALL PROVIDE THE RESOURCES NECESSARY TO COMPLETE MISSION DESIGN AND REQUIREMENTS FLOW DOWN ACTIVITIES CULMINATING IN AN OSIRIS-REX PROJECT MISSION DESIGN REVIEW (MDR). THE CONTRACTOR SHALL PROVIDE THE RESOURCES NECESSARY TO SUPPORT THE OSIRIS-REX PROJECT TO DEFINE AND COMPLETE THE DEFINITION OF THE PRELIMINARY DESIGN, AND THE PLANS FOR DEVELOPMENT, MANUFACTURE, TEST, VERIFICATION AND OPERATION OF A FLIGHT SYSTEM.
View parent award on USAspending
CONT_AWD_NNG12FD66C_8000_-NONE-_-NONE-$70,432Aug 25, 2020— – —
Subcontractor
—
OSIRIS-REX SYSTEMS SUPPORT
4104147246
Parent award context
Parent award agency: National Aeronautics and Space Administration · National Aeronautics and Space Administration
Parent award NAICS: 336414
Parent award description: ORIGINS SPECTRAL INTERPRETATION RESOURCE IDENTIFICATION SECURITY-REGOLITH EXPLORER (OSIRIS-REX) PHASE B EFFORT. UNDER THIS CONTRACT, THE CONTRACTOR SHALL PROVIDE THE RESOURCES NECESSARY TO COMPLETE MISSION DESIGN AND REQUIREMENTS FLOW DOWN ACTIVITIES CULMINATING IN AN OSIRIS-REX PROJECT MISSION DESIGN REVIEW (MDR). THE CONTRACTOR SHALL PROVIDE THE RESOURCES NECESSARY TO SUPPORT THE OSIRIS-REX PROJECT TO DEFINE AND COMPLETE THE DEFINITION OF THE PRELIMINARY DESIGN, AND THE PLANS FOR DEVELOPMENT, MANUFACTURE, TEST, VERIFICATION AND OPERATION OF A FLIGHT SYSTEM.
View parent award on USAspending
CONT_AWD_NNG12FD66C_8000_-NONE-_-NONE-$169,826Dec 19, 2019— – —
Subcontractor
—
OSIRIS-REX SYSTEMS SUPPORT
4104147246
Parent award context
Parent award agency: National Aeronautics and Space Administration · National Aeronautics and Space Administration
Parent award NAICS: 336414
Parent award description: ORIGINS SPECTRAL INTERPRETATION RESOURCE IDENTIFICATION SECURITY-REGOLITH EXPLORER (OSIRIS-REX) PHASE B EFFORT. UNDER THIS CONTRACT, THE CONTRACTOR SHALL PROVIDE THE RESOURCES NECESSARY TO COMPLETE MISSION DESIGN AND REQUIREMENTS FLOW DOWN ACTIVITIES CULMINATING IN AN OSIRIS-REX PROJECT MISSION DESIGN REVIEW (MDR). THE CONTRACTOR SHALL PROVIDE THE RESOURCES NECESSARY TO SUPPORT THE OSIRIS-REX PROJECT TO DEFINE AND COMPLETE THE DEFINITION OF THE PRELIMINARY DESIGN, AND THE PLANS FOR DEVELOPMENT, MANUFACTURE, TEST, VERIFICATION AND OPERATION OF A FLIGHT SYSTEM.
View parent award on USAspending
CONT_AWD_NNG12FD66C_8000_-NONE-_-NONE-$40,976Aug 15, 2023— – —
Subcontractor
—
OSIRIS-REX SYSTEMS SUPPORT
4104147246
Parent award context
Parent award agency: National Aeronautics and Space Administration · National Aeronautics and Space Administration
Parent award NAICS: 336414
Parent award description: ORIGINS SPECTRAL INTERPRETATION RESOURCE IDENTIFICATION SECURITY-REGOLITH EXPLORER (OSIRIS-REX) PHASE B EFFORT. UNDER THIS CONTRACT, THE CONTRACTOR SHALL PROVIDE THE RESOURCES NECESSARY TO COMPLETE MISSION DESIGN AND REQUIREMENTS FLOW DOWN ACTIVITIES CULMINATING IN AN OSIRIS-REX PROJECT MISSION DESIGN REVIEW (MDR). THE CONTRACTOR SHALL PROVIDE THE RESOURCES NECESSARY TO SUPPORT THE OSIRIS-REX PROJECT TO DEFINE AND COMPLETE THE DEFINITION OF THE PRELIMINARY DESIGN, AND THE PLANS FOR DEVELOPMENT, MANUFACTURE, TEST, VERIFICATION AND OPERATION OF A FLIGHT SYSTEM.
View parent award on USAspending
CONT_AWD_NNG12FD66C_8000_-NONE-_-NONE-$231,482Dec 9, 2021— – —
Subcontractor
—
OSIRIS-REX SYSTEMS SUPPORT
4104147246
Parent award context
Parent award agency: National Aeronautics and Space Administration · National Aeronautics and Space Administration
Parent award NAICS: 336414
Parent award description: ORIGINS SPECTRAL INTERPRETATION RESOURCE IDENTIFICATION SECURITY-REGOLITH EXPLORER (OSIRIS-REX) PHASE B EFFORT. UNDER THIS CONTRACT, THE CONTRACTOR SHALL PROVIDE THE RESOURCES NECESSARY TO COMPLETE MISSION DESIGN AND REQUIREMENTS FLOW DOWN ACTIVITIES CULMINATING IN AN OSIRIS-REX PROJECT MISSION DESIGN REVIEW (MDR). THE CONTRACTOR SHALL PROVIDE THE RESOURCES NECESSARY TO SUPPORT THE OSIRIS-REX PROJECT TO DEFINE AND COMPLETE THE DEFINITION OF THE PRELIMINARY DESIGN, AND THE PLANS FOR DEVELOPMENT, MANUFACTURE, TEST, VERIFICATION AND OPERATION OF A FLIGHT SYSTEM.
View parent award on USAspending
CONT_AWD_NNG12FD66C_8000_-NONE-_-NONE-$290,620Dec 18, 2020— – —
Subcontractor
—
OSIRIS-REX SYSTEMS SUPPORT
4104147246
Parent award context
Parent award agency: National Aeronautics and Space Administration · National Aeronautics and Space Administration
Parent award NAICS: 336414
Parent award description: ORIGINS SPECTRAL INTERPRETATION RESOURCE IDENTIFICATION SECURITY-REGOLITH EXPLORER (OSIRIS-REX) PHASE B EFFORT. UNDER THIS CONTRACT, THE CONTRACTOR SHALL PROVIDE THE RESOURCES NECESSARY TO COMPLETE MISSION DESIGN AND REQUIREMENTS FLOW DOWN ACTIVITIES CULMINATING IN AN OSIRIS-REX PROJECT MISSION DESIGN REVIEW (MDR). THE CONTRACTOR SHALL PROVIDE THE RESOURCES NECESSARY TO SUPPORT THE OSIRIS-REX PROJECT TO DEFINE AND COMPLETE THE DEFINITION OF THE PRELIMINARY DESIGN, AND THE PLANS FOR DEVELOPMENT, MANUFACTURE, TEST, VERIFICATION AND OPERATION OF A FLIGHT SYSTEM.
View parent award on USAspending
CONT_AWD_NNG12FD66C_8000_-NONE-_-NONE-$9,602Nov 21, 2023— – —
Subcontractor
—
OSIRIS-REX SYSTEMS SUPPORT
4104147246
Parent award context
Parent award agency: National Aeronautics and Space Administration · National Aeronautics and Space Administration
Parent award NAICS: 336414
Parent award description: ORIGINS SPECTRAL INTERPRETATION RESOURCE IDENTIFICATION SECURITY-REGOLITH EXPLORER (OSIRIS-REX) PHASE B EFFORT. UNDER THIS CONTRACT, THE CONTRACTOR SHALL PROVIDE THE RESOURCES NECESSARY TO COMPLETE MISSION DESIGN AND REQUIREMENTS FLOW DOWN ACTIVITIES CULMINATING IN AN OSIRIS-REX PROJECT MISSION DESIGN REVIEW (MDR). THE CONTRACTOR SHALL PROVIDE THE RESOURCES NECESSARY TO SUPPORT THE OSIRIS-REX PROJECT TO DEFINE AND COMPLETE THE DEFINITION OF THE PRELIMINARY DESIGN, AND THE PLANS FOR DEVELOPMENT, MANUFACTURE, TEST, VERIFICATION AND OPERATION OF A FLIGHT SYSTEM.
View parent award on USAspending
CONT_AWD_NNG12FD66C_8000_-NONE-_-NONE-$52,551Jun 13, 2019— – —
Subcontractor
—
OSIRIS-REX SYSTEMS SUPPORT
4104147246
Parent award context
Parent award agency: National Aeronautics and Space Administration · National Aeronautics and Space Administration
Parent award NAICS: 336414
Parent award description: ORIGINS SPECTRAL INTERPRETATION RESOURCE IDENTIFICATION SECURITY-REGOLITH EXPLORER (OSIRIS-REX) PHASE B EFFORT. UNDER THIS CONTRACT, THE CONTRACTOR SHALL PROVIDE THE RESOURCES NECESSARY TO COMPLETE MISSION DESIGN AND REQUIREMENTS FLOW DOWN ACTIVITIES CULMINATING IN AN OSIRIS-REX PROJECT MISSION DESIGN REVIEW (MDR). THE CONTRACTOR SHALL PROVIDE THE RESOURCES NECESSARY TO SUPPORT THE OSIRIS-REX PROJECT TO DEFINE AND COMPLETE THE DEFINITION OF THE PRELIMINARY DESIGN, AND THE PLANS FOR DEVELOPMENT, MANUFACTURE, TEST, VERIFICATION AND OPERATION OF A FLIGHT SYSTEM.
View parent award on USAspending
CONT_AWD_NNG12FD66C_8000_-NONE-_-NONE--$329,503Feb 9, 2023— – —
Subcontractor
—
MISSION OPS SUPPORT OSIRIS-APEX MISSION
4106154056
Parent award context
Parent award agency: National Aeronautics and Space Administration · National Aeronautics and Space Administration
Parent award NAICS: 336414
Parent award description: ORIGINS SPECTRAL INTERPRETATION RESOURCE IDENTIFICATION SECURITY-REGOLITH EXPLORER (OSIRIS-REX) PHASE B EFFORT. UNDER THIS CONTRACT, THE CONTRACTOR SHALL PROVIDE THE RESOURCES NECESSARY TO COMPLETE MISSION DESIGN AND REQUIREMENTS FLOW DOWN ACTIVITIES CULMINATING IN AN OSIRIS-REX PROJECT MISSION DESIGN REVIEW (MDR). THE CONTRACTOR SHALL PROVIDE THE RESOURCES NECESSARY TO SUPPORT THE OSIRIS-REX PROJECT TO DEFINE AND COMPLETE THE DEFINITION OF THE PRELIMINARY DESIGN, AND THE PLANS FOR DEVELOPMENT, MANUFACTURE, TEST, VERIFICATION AND OPERATION OF A FLIGHT SYSTEM.
View parent award on USAspending
CONT_AWD_NNG12FD66C_8000_-NONE-_-NONE-$486,574Jan 16, 2024— – —
Subcontractor
—
QWALTEC SUPPORT - NEW DEVELOPMENT QUALTEC SUPPORT - BUG FIXES TECH CONCEPT AND BUSINESS MODELS FOR LEO CONSTRUCTION SERVICES FOR SALVAGE YARD P F692484: AF REHAB BUILDING 4 UNIT SUBST 2 YEAR CALIBRATION SERVICE CALIBRATION 2 YEAR QTRLY BONDED STK MAINTENANCE 2018 Q3&Q4 QTRLY BONDED STK MAINTENANCE 2019 Q1-Q4 QTRLY BONDED STK MAINTENANCE 2020 Q1&Q2 TLS-CX C-TAC PLUS TLS UNIT STX-BU SYSTEMTRACE BASE UNIT STX-1553 SYSTEMTRACE 1553 MONITOR PROBE PAD-CP C-TAC PLUS PAD UNIT CP-PBU-RD C-TAC PLUS BASE UNIT WITH REMO 2YR ON SITE CALIBRATION HP8510C 2YR 8510 REPAIR SERVICE 2 YEAR RTK_ONSITE REPAIR SA 2 YEAR RTK_ONSITE CALIBRATION SA BIT CLEANER. AC SMARTSTART PDU HPE 500W FS PLAT HT PLG LH PWR SPLY KIT HPE DL380 GEN10 12LFF CTO SERVER HPE 3Y PC 24X7 DL380 GEN10 SVC HPE 2U LFF EASY INSTALL RAIL KIT HPE DL380 GEN10 3LFF REAR SAS SATA KIT HPE DL380 GEN10 6136 XEON-G FIO KIT HPE DL380 GEN10 6136 XEON-G KIT HPE DL38X GEN10 4LFF MID-PLANE HDD HPE 10TB SAS 7.2K LFF SC HE 512E DS HDD HPE 16GB 1RX4 PC4-2666V-R SMART KIT HPE 96W SMART STORAGE BATTERY 145MM CBL HPE ILO ADV 1-SVR LIC 3YR SUPPORT HPE ETH 10GB 2P 562T ADPTR HPE SMART ARRAY P816I-A SR GEN10 CTRLR RADAR COAT THKNESS UNIT BOLT HARNESS ASSEMBLY STOWAGE ASSY SPD DRIVE ASSY SHIM STRIKER STIFFENER LEVER ASSY GUIDE-ASSY COMPENSATOR SWIVEL CABLE TSRL / KIT MAKE ORDER TSRL / KIT MAKE ORDER TSRL / KIT MAKE ORDER TSRL / KIT MAKE ORDER TSRL / KIT MAKE ORDER TSRL / KIT MAKE ORDER RPI MODULE RADAR CORP ( 813R250G01 2040) RADAR CORP (813R250G01 2035) MDLR RCVR EXCTR (103K601G01 1796) TIRE DRIVE CABLE MIDS-J TESTER STOWAGE BRACKET SKIN COVER PANEL ASSY COCKPIT CAMERA CDEEU VALVE NEG PRES RELIEF EJECTOR PUMP VALVE SOLENOID BEAM 16VH003002-5 SHELL LONG LEAD FUNDING DC SERVO AMPLIFIER CAE-CY 18 TSSC ECP ROTATING TELEMETRY SYSTEM ELECT DISTRIBUTION UNIT POWER PLANT OPERATORS T&M CCA PACKAGED RFIC ASSEMBLY SERVICE ITEM MINISET#3 MAINT. AND SUPPORT CY 2018 + SIMULATION MAINT. & SUPPORT CY 201 C3M MAINTENANCE AND SUPPORT CY 2018 GDBS MAINTENANCE AND SUPPORT CY 2018 OUTSOURCE-(3GPD11064011-501) OUTSOURCE-(3GPD11064021-501) OUTSOURCE-(3GPD11064031-501) OUTSOURCE-(3GPD11064052-501) OUTSOURCE-(3GPD11064241-501) SV09 SPRU TIMS WEEKLY MEETING MRR. SV10 SPRU TIMS WEEKLY MEETING MRR. SW-SUP-INCCLIENT INC-CLIENT INCONTROL CLIENT INC-SERV INCONTROL SERVER SW-SUP-INCSERV /SW SUPPORT SERVER HEATER RCS (HT691) HEATER RCS (HT689). HEATER RCS (HT605). HEATER RCS (HT633). HEATER RCS (HT700) HEATER RCS (HT699) HEATER RCS (HT698) HEATER RCS (HT696) HEATER RCS (HT671) HEATER RCS (HT690) HEATER RCS (HT695) HEATER RCS (HT692) HEATER RCS (HT693) HEATER RCS (HT694) BALANCE WEIGHT DETAILS WEIGHT BALLAST BLANCE WEIGHT DETAILS RFC-345 OUTSOURCE (20141612G2) OUTSOURCE (20141622G2) OUTSOURCE (20141624G2) OUTSOURCE (3GPD11060407-501) OUTSOURCE (20141622G2). OUTSOURCE-3GPD11060444-502. OUTSOURCE (20141624G2). OUTSOURCE-3GPD11060444-502 SV09 BISU TIMS WEEKLY MEETING MRR. SV10 BISU TIMS WEEKLY MEETING MRR. 1.0 TAPE 275XC BLACK KAPTON/3M 97057 1.5 WIDE TAPE ACRYLIC ADHESIVE POLYIM 3GPD21090024-502 3GPD21090023-501. 3GPD21060014-501 3GPD21060001-501 TAPE GE/BLK KAP/AL/9703 2.0 OUTSOURCE -(3GPD11065020-501) OUTSOURCE (3GPD11065003-501) SV09 FBA TIMS WEEKLY MEETING MRR. SV10 FBA TIMS WEEKLY MEETING MRR. OUTSOURCE (3GPD11065020-502) OUTSOURCE (3GPD11065012-501) N4691D 5071CU-068. 5071CU-058. E5071C 85131F BATTERY MODULE EXTENDED 9PX UPS 9PX 3U 6000 VA 5400W TAPE LEAD FOIL COND ADH 5 MIL'S THICK 1. TAPE LEAD FOIL COND ADH 10 MIL'S THICK 2 .50 LEAD FOIL TAPE 10 MIL THK UPCONVERTER UNIT QUAD (4) CHANNEL LAE SHELF ASSEMBLY LAE SHELF ASSEMBLY. 2M61032-501; REWORK TO ENGINEERING DRAWI 2M61049-501; REWORK TO ENGINEERING DRAWI ASSEMBLE PER ENGINEERING DRAWING AND PRO TOOLING / NRE REFURB SSRD AT NEA ROOT CAUSE INVESTIGATION OF THE SBIRS CE KLOC-BULD-DEV-MULT-SUB KLOC-USER-DEV-MULT-SUB THRUSTER BRACKET STRUT ASSEMBLY FIXTURE SERVER FREEWAY 3412 ##HM-FW3412R-400## EXT HW WAR 2ND YR ##SM-LPA-504## EXT
4103900313
Parent award context
Parent award agency: National Aeronautics and Space Administration · National Aeronautics and Space Administration
Parent award NAICS: 336414
Parent award description: THE LUCY SPACECRAFT AND MISSION OPERATIONS CONTRACT EMBODIES THE MISSION'S REQUIREMENT TO DESIGN, DEVELOPMENT, TEST, AND OPERATE THE LUCY SPACECRAFT BUS. LUCY WILL EXPLORE SIX JUPITER TROJAN ASTEROIDS TRAPPED BY JUPITERS GRAVITY IN TWO SWARMS THAT SHARE THE PLANETS ORBIT, ONE LEADING AND ONE TRAILING JUPITER IN ITS 12-YEAR CIRCUIT AROUND THE SUN. THE TROJANS ARE THOUGHT TO BE RELICS OF A MUCH EARLIER ERA IN THE HISTORY OF THE SOLAR SYSTEM, AND MAY HAVE FORMED FAR BEYOND JUPITERS CURRENT ORBIT.
View parent award on USAspending
CONT_AWD_NNG17FD73C_8000_-NONE-_-NONE-$96,325Oct 31, 2018— – —
Subcontractor
—
C&DH BOARD AND BOX TEST EQUIPMENT
4103900313
Parent award context
Parent award agency: National Aeronautics and Space Administration · National Aeronautics and Space Administration
Parent award NAICS: 336414
Parent award description: THE LUCY SPACECRAFT AND MISSION OPERATIONS CONTRACT EMBODIES THE MISSION'S REQUIREMENT TO DESIGN, DEVELOPMENT, TEST, AND OPERATE THE LUCY SPACECRAFT BUS. LUCY WILL EXPLORE SIX JUPITER TROJAN ASTEROIDS TRAPPED BY JUPITERS GRAVITY IN TWO SWARMS THAT SHARE THE PLANETS ORBIT, ONE LEADING AND ONE TRAILING JUPITER IN ITS 12-YEAR CIRCUIT AROUND THE SUN. THE TROJANS ARE THOUGHT TO BE RELICS OF A MUCH EARLIER ERA IN THE HISTORY OF THE SOLAR SYSTEM, AND MAY HAVE FORMED FAR BEYOND JUPITERS CURRENT ORBIT.
View parent award on USAspending
CONT_AWD_NNG17FD73C_8000_-NONE-_-NONE--$64,278Dec 13, 2022— – —
Subcontractor
—
2019 C&DH BOARD AND BOX TEST EQUIPMENT RED CANYON: EPS BOARD AND BOX TEST SPRT.
4104016357
Parent award context
Parent award agency: National Aeronautics and Space Administration · National Aeronautics and Space Administration
Parent award NAICS: 336414
Parent award description: THE LUCY SPACECRAFT AND MISSION OPERATIONS CONTRACT EMBODIES THE MISSION'S REQUIREMENT TO DESIGN, DEVELOPMENT, TEST, AND OPERATE THE LUCY SPACECRAFT BUS. LUCY WILL EXPLORE SIX JUPITER TROJAN ASTEROIDS TRAPPED BY JUPITERS GRAVITY IN TWO SWARMS THAT SHARE THE PLANETS ORBIT, ONE LEADING AND ONE TRAILING JUPITER IN ITS 12-YEAR CIRCUIT AROUND THE SUN. THE TROJANS ARE THOUGHT TO BE RELICS OF A MUCH EARLIER ERA IN THE HISTORY OF THE SOLAR SYSTEM, AND MAY HAVE FORMED FAR BEYOND JUPITERS CURRENT ORBIT.
View parent award on USAspending
CONT_AWD_NNG17FD73C_8000_-NONE-_-NONE-$529,722Mar 27, 2020— – —
Subcontractor
—
RED CANYON: EPS BOARD AND BOX TEST SPRT. 2019 C&DH BOARD AND BOX TEST EQUIPMENT
4104016357
Parent award context
Parent award agency: National Aeronautics and Space Administration · National Aeronautics and Space Administration
Parent award NAICS: 336414
Parent award description: THE LUCY SPACECRAFT AND MISSION OPERATIONS CONTRACT EMBODIES THE MISSION'S REQUIREMENT TO DESIGN, DEVELOPMENT, TEST, AND OPERATE THE LUCY SPACECRAFT BUS. LUCY WILL EXPLORE SIX JUPITER TROJAN ASTEROIDS TRAPPED BY JUPITERS GRAVITY IN TWO SWARMS THAT SHARE THE PLANETS ORBIT, ONE LEADING AND ONE TRAILING JUPITER IN ITS 12-YEAR CIRCUIT AROUND THE SUN. THE TROJANS ARE THOUGHT TO BE RELICS OF A MUCH EARLIER ERA IN THE HISTORY OF THE SOLAR SYSTEM, AND MAY HAVE FORMED FAR BEYOND JUPITERS CURRENT ORBIT.
View parent award on USAspending
CONT_AWD_NNG17FD73C_8000_-NONE-_-NONE-$432,390Apr 16, 2019— – —
Subcontractor
—
2019 C&DH BOARD AND BOX TEST EQUIPMENT RED CANYON: EPS BOARD AND BOX TEST SPRT.
4104016357
Parent award context
Parent award agency: National Aeronautics and Space Administration · National Aeronautics and Space Administration
Parent award NAICS: 336414
Parent award description: THE LUCY SPACECRAFT AND MISSION OPERATIONS CONTRACT EMBODIES THE MISSION'S REQUIREMENT TO DESIGN, DEVELOPMENT, TEST, AND OPERATE THE LUCY SPACECRAFT BUS. LUCY WILL EXPLORE SIX JUPITER TROJAN ASTEROIDS TRAPPED BY JUPITERS GRAVITY IN TWO SWARMS THAT SHARE THE PLANETS ORBIT, ONE LEADING AND ONE TRAILING JUPITER IN ITS 12-YEAR CIRCUIT AROUND THE SUN. THE TROJANS ARE THOUGHT TO BE RELICS OF A MUCH EARLIER ERA IN THE HISTORY OF THE SOLAR SYSTEM, AND MAY HAVE FORMED FAR BEYOND JUPITERS CURRENT ORBIT.
View parent award on USAspending
CONT_AWD_NNG17FD73C_8000_-NONE-_-NONE-$590,991Jun 4, 2020— – —
Subcontractor
—
2019 C&DH BOARD AND BOX TEST EQUIPMENT RED CANYON: EPS BOARD AND BOX TEST SPRT.
4104016357
Parent award context
Parent award agency: National Aeronautics and Space Administration · National Aeronautics and Space Administration
Parent award NAICS: 336414
Parent award description: THE LUCY SPACECRAFT AND MISSION OPERATIONS CONTRACT EMBODIES THE MISSION'S REQUIREMENT TO DESIGN, DEVELOPMENT, TEST, AND OPERATE THE LUCY SPACECRAFT BUS. LUCY WILL EXPLORE SIX JUPITER TROJAN ASTEROIDS TRAPPED BY JUPITERS GRAVITY IN TWO SWARMS THAT SHARE THE PLANETS ORBIT, ONE LEADING AND ONE TRAILING JUPITER IN ITS 12-YEAR CIRCUIT AROUND THE SUN. THE TROJANS ARE THOUGHT TO BE RELICS OF A MUCH EARLIER ERA IN THE HISTORY OF THE SOLAR SYSTEM, AND MAY HAVE FORMED FAR BEYOND JUPITERS CURRENT ORBIT.
View parent award on USAspending
CONT_AWD_NNG17FD73C_8000_-NONE-_-NONE-$729,314Aug 17, 2020— – —
Subcontractor
—
RED CANYON: EPS BOARD AND BOX TEST SPRT. 2019 C&DH BOARD AND BOX TEST EQUIPMENT
4104016357
Parent award context
Parent award agency: National Aeronautics and Space Administration · National Aeronautics and Space Administration
Parent award NAICS: 336414
Parent award description: THE LUCY SPACECRAFT AND MISSION OPERATIONS CONTRACT EMBODIES THE MISSION'S REQUIREMENT TO DESIGN, DEVELOPMENT, TEST, AND OPERATE THE LUCY SPACECRAFT BUS. LUCY WILL EXPLORE SIX JUPITER TROJAN ASTEROIDS TRAPPED BY JUPITERS GRAVITY IN TWO SWARMS THAT SHARE THE PLANETS ORBIT, ONE LEADING AND ONE TRAILING JUPITER IN ITS 12-YEAR CIRCUIT AROUND THE SUN. THE TROJANS ARE THOUGHT TO BE RELICS OF A MUCH EARLIER ERA IN THE HISTORY OF THE SOLAR SYSTEM, AND MAY HAVE FORMED FAR BEYOND JUPITERS CURRENT ORBIT.
View parent award on USAspending
CONT_AWD_NNG17FD73C_8000_-NONE-_-NONE-$432,390Apr 16, 2019— – —
Subcontractor
—
RED CANYON: EPS BOARD AND BOX TEST SPRT. 2019 C&DH BOARD AND BOX TEST EQUIPMENT
4104016357
Parent award context
Parent award agency: National Aeronautics and Space Administration · National Aeronautics and Space Administration
Parent award NAICS: 336414
Parent award description: THE LUCY SPACECRAFT AND MISSION OPERATIONS CONTRACT EMBODIES THE MISSION'S REQUIREMENT TO DESIGN, DEVELOPMENT, TEST, AND OPERATE THE LUCY SPACECRAFT BUS. LUCY WILL EXPLORE SIX JUPITER TROJAN ASTEROIDS TRAPPED BY JUPITERS GRAVITY IN TWO SWARMS THAT SHARE THE PLANETS ORBIT, ONE LEADING AND ONE TRAILING JUPITER IN ITS 12-YEAR CIRCUIT AROUND THE SUN. THE TROJANS ARE THOUGHT TO BE RELICS OF A MUCH EARLIER ERA IN THE HISTORY OF THE SOLAR SYSTEM, AND MAY HAVE FORMED FAR BEYOND JUPITERS CURRENT ORBIT.
View parent award on USAspending
CONT_AWD_NNG17FD73C_8000_-NONE-_-NONE-$729,314Feb 24, 2021— – —
Subcontractor
—
2019 C&DH BOARD AND BOX TEST EQUIPMENT RED CANYON: EPS BOARD AND BOX TEST SPRT.
4104016357
Parent award context
Parent award agency: National Aeronautics and Space Administration · National Aeronautics and Space Administration
Parent award NAICS: 336414
Parent award description: THE LUCY SPACECRAFT AND MISSION OPERATIONS CONTRACT EMBODIES THE MISSION'S REQUIREMENT TO DESIGN, DEVELOPMENT, TEST, AND OPERATE THE LUCY SPACECRAFT BUS. LUCY WILL EXPLORE SIX JUPITER TROJAN ASTEROIDS TRAPPED BY JUPITERS GRAVITY IN TWO SWARMS THAT SHARE THE PLANETS ORBIT, ONE LEADING AND ONE TRAILING JUPITER IN ITS 12-YEAR CIRCUIT AROUND THE SUN. THE TROJANS ARE THOUGHT TO BE RELICS OF A MUCH EARLIER ERA IN THE HISTORY OF THE SOLAR SYSTEM, AND MAY HAVE FORMED FAR BEYOND JUPITERS CURRENT ORBIT.
View parent award on USAspending
CONT_AWD_NNG17FD73C_8000_-NONE-_-NONE--$51,627Oct 12, 2022— – —
Subcontractor
—
RED CANYON: EPS BOARD AND BOX TEST SPRT. 2019 C&DH BOARD AND BOX TEST EQUIPMENT
4104016357
Parent award context
Parent award agency: National Aeronautics and Space Administration · National Aeronautics and Space Administration
Parent award NAICS: 336414
Parent award description: THE LUCY SPACECRAFT AND MISSION OPERATIONS CONTRACT EMBODIES THE MISSION'S REQUIREMENT TO DESIGN, DEVELOPMENT, TEST, AND OPERATE THE LUCY SPACECRAFT BUS. LUCY WILL EXPLORE SIX JUPITER TROJAN ASTEROIDS TRAPPED BY JUPITERS GRAVITY IN TWO SWARMS THAT SHARE THE PLANETS ORBIT, ONE LEADING AND ONE TRAILING JUPITER IN ITS 12-YEAR CIRCUIT AROUND THE SUN. THE TROJANS ARE THOUGHT TO BE RELICS OF A MUCH EARLIER ERA IN THE HISTORY OF THE SOLAR SYSTEM, AND MAY HAVE FORMED FAR BEYOND JUPITERS CURRENT ORBIT.
View parent award on USAspending
CONT_AWD_NNG17FD73C_8000_-NONE-_-NONE-$729,314Dec 10, 2020— – —
Subcontractor
—
2019 C&DH BOARD AND BOX TEST EQUIPMENT RED CANYON: EPS BOARD AND BOX TEST SPRT.
4104016357
Parent award context
Parent award agency: National Aeronautics and Space Administration · National Aeronautics and Space Administration
Parent award NAICS: 336414
Parent award description: THE LUCY SPACECRAFT AND MISSION OPERATIONS CONTRACT EMBODIES THE MISSION'S REQUIREMENT TO DESIGN, DEVELOPMENT, TEST, AND OPERATE THE LUCY SPACECRAFT BUS. LUCY WILL EXPLORE SIX JUPITER TROJAN ASTEROIDS TRAPPED BY JUPITERS GRAVITY IN TWO SWARMS THAT SHARE THE PLANETS ORBIT, ONE LEADING AND ONE TRAILING JUPITER IN ITS 12-YEAR CIRCUIT AROUND THE SUN. THE TROJANS ARE THOUGHT TO BE RELICS OF A MUCH EARLIER ERA IN THE HISTORY OF THE SOLAR SYSTEM, AND MAY HAVE FORMED FAR BEYOND JUPITERS CURRENT ORBIT.
View parent award on USAspending
CONT_AWD_NNG17FD73C_8000_-NONE-_-NONE-$469,581Jan 21, 2020— – —
Subcontractor
—
FSW DEVELOPMENT SUPPORT FSW ATLO SUPPORT LUCY SOFTWARE INTEGRATION/DEVELOPMENT
4104034989
Parent award context
Parent award agency: National Aeronautics and Space Administration · National Aeronautics and Space Administration
Parent award NAICS: 336414
Parent award description: THE LUCY SPACECRAFT AND MISSION OPERATIONS CONTRACT EMBODIES THE MISSION'S REQUIREMENT TO DESIGN, DEVELOPMENT, TEST, AND OPERATE THE LUCY SPACECRAFT BUS. LUCY WILL EXPLORE SIX JUPITER TROJAN ASTEROIDS TRAPPED BY JUPITERS GRAVITY IN TWO SWARMS THAT SHARE THE PLANETS ORBIT, ONE LEADING AND ONE TRAILING JUPITER IN ITS 12-YEAR CIRCUIT AROUND THE SUN. THE TROJANS ARE THOUGHT TO BE RELICS OF A MUCH EARLIER ERA IN THE HISTORY OF THE SOLAR SYSTEM, AND MAY HAVE FORMED FAR BEYOND JUPITERS CURRENT ORBIT.
View parent award on USAspending
CONT_AWD_NNG17FD73C_8000_-NONE-_-NONE-$770,117Nov 24, 2020— – —
Subcontractor
—
FSW DEVELOPMENT SUPPORT LUCY SOFTWARE INTEGRATION/DEVELOPMENT
4104034989
Parent award context
Parent award agency: National Aeronautics and Space Administration · National Aeronautics and Space Administration
Parent award NAICS: 336414
Parent award description: THE LUCY SPACECRAFT AND MISSION OPERATIONS CONTRACT EMBODIES THE MISSION'S REQUIREMENT TO DESIGN, DEVELOPMENT, TEST, AND OPERATE THE LUCY SPACECRAFT BUS. LUCY WILL EXPLORE SIX JUPITER TROJAN ASTEROIDS TRAPPED BY JUPITERS GRAVITY IN TWO SWARMS THAT SHARE THE PLANETS ORBIT, ONE LEADING AND ONE TRAILING JUPITER IN ITS 12-YEAR CIRCUIT AROUND THE SUN. THE TROJANS ARE THOUGHT TO BE RELICS OF A MUCH EARLIER ERA IN THE HISTORY OF THE SOLAR SYSTEM, AND MAY HAVE FORMED FAR BEYOND JUPITERS CURRENT ORBIT.
View parent award on USAspending
CONT_AWD_NNG17FD73C_8000_-NONE-_-NONE--$32,867Aug 1, 2023— – —
Subcontractor
—
LUCY SOFTWARE INTEGRATION/DEVELOPMENT FSW ATLO SUPPORT FSW DEVELOPMENT SUPPORT
4104034989
Parent award context
Parent award agency: National Aeronautics and Space Administration · National Aeronautics and Space Administration
Parent award NAICS: 336414
Parent award description: THE LUCY SPACECRAFT AND MISSION OPERATIONS CONTRACT EMBODIES THE MISSION'S REQUIREMENT TO DESIGN, DEVELOPMENT, TEST, AND OPERATE THE LUCY SPACECRAFT BUS. LUCY WILL EXPLORE SIX JUPITER TROJAN ASTEROIDS TRAPPED BY JUPITERS GRAVITY IN TWO SWARMS THAT SHARE THE PLANETS ORBIT, ONE LEADING AND ONE TRAILING JUPITER IN ITS 12-YEAR CIRCUIT AROUND THE SUN. THE TROJANS ARE THOUGHT TO BE RELICS OF A MUCH EARLIER ERA IN THE HISTORY OF THE SOLAR SYSTEM, AND MAY HAVE FORMED FAR BEYOND JUPITERS CURRENT ORBIT.
View parent award on USAspending
CONT_AWD_NNG17FD73C_8000_-NONE-_-NONE-$770,453Jun 27, 2019— – —
Subcontractor
—
FSW DEVELOPMENT SUPPORT FSW ATLO SUPPORT LUCY SOFTWARE INTEGRATION/DEVELOPMENT
4104034989
Parent award context
Parent award agency: National Aeronautics and Space Administration · National Aeronautics and Space Administration
Parent award NAICS: 336414
Parent award description: THE LUCY SPACECRAFT AND MISSION OPERATIONS CONTRACT EMBODIES THE MISSION'S REQUIREMENT TO DESIGN, DEVELOPMENT, TEST, AND OPERATE THE LUCY SPACECRAFT BUS. LUCY WILL EXPLORE SIX JUPITER TROJAN ASTEROIDS TRAPPED BY JUPITERS GRAVITY IN TWO SWARMS THAT SHARE THE PLANETS ORBIT, ONE LEADING AND ONE TRAILING JUPITER IN ITS 12-YEAR CIRCUIT AROUND THE SUN. THE TROJANS ARE THOUGHT TO BE RELICS OF A MUCH EARLIER ERA IN THE HISTORY OF THE SOLAR SYSTEM, AND MAY HAVE FORMED FAR BEYOND JUPITERS CURRENT ORBIT.
View parent award on USAspending
CONT_AWD_NNG17FD73C_8000_-NONE-_-NONE-$770,453Sep 26, 2019— – —
Subcontractor
—
LUCY SOFTWARE INTEGRATION/DEVELOPMENT
4104034989
Parent award context
Parent award agency: National Aeronautics and Space Administration · National Aeronautics and Space Administration
Parent award NAICS: 336414
Parent award description: THE LUCY SPACECRAFT AND MISSION OPERATIONS CONTRACT EMBODIES THE MISSION'S REQUIREMENT TO DESIGN, DEVELOPMENT, TEST, AND OPERATE THE LUCY SPACECRAFT BUS. LUCY WILL EXPLORE SIX JUPITER TROJAN ASTEROIDS TRAPPED BY JUPITERS GRAVITY IN TWO SWARMS THAT SHARE THE PLANETS ORBIT, ONE LEADING AND ONE TRAILING JUPITER IN ITS 12-YEAR CIRCUIT AROUND THE SUN. THE TROJANS ARE THOUGHT TO BE RELICS OF A MUCH EARLIER ERA IN THE HISTORY OF THE SOLAR SYSTEM, AND MAY HAVE FORMED FAR BEYOND JUPITERS CURRENT ORBIT.
View parent award on USAspending
CONT_AWD_NNG17FD73C_8000_-NONE-_-NONE-$770,453Apr 30, 2019— – —
Subcontractor
—
LUCY SOFTWARE INTEGRATION/DEVELOPMENT
4104034989
Parent award context
Parent award agency: National Aeronautics and Space Administration · National Aeronautics and Space Administration
Parent award NAICS: 336414
Parent award description: THE LUCY SPACECRAFT AND MISSION OPERATIONS CONTRACT EMBODIES THE MISSION'S REQUIREMENT TO DESIGN, DEVELOPMENT, TEST, AND OPERATE THE LUCY SPACECRAFT BUS. LUCY WILL EXPLORE SIX JUPITER TROJAN ASTEROIDS TRAPPED BY JUPITERS GRAVITY IN TWO SWARMS THAT SHARE THE PLANETS ORBIT, ONE LEADING AND ONE TRAILING JUPITER IN ITS 12-YEAR CIRCUIT AROUND THE SUN. THE TROJANS ARE THOUGHT TO BE RELICS OF A MUCH EARLIER ERA IN THE HISTORY OF THE SOLAR SYSTEM, AND MAY HAVE FORMED FAR BEYOND JUPITERS CURRENT ORBIT.
View parent award on USAspending
CONT_AWD_NNG17FD73C_8000_-NONE-_-NONE-$770,453Apr 30, 2019— – —
Subcontractor
—
FSW DEVELOPMENT SUPPORT FSW ATLO SUPPORT LUCY SOFTWARE INTEGRATION/DEVELOPMENT
4104034989
Parent award context
Parent award agency: National Aeronautics and Space Administration · National Aeronautics and Space Administration
Parent award NAICS: 336414
Parent award description: THE LUCY SPACECRAFT AND MISSION OPERATIONS CONTRACT EMBODIES THE MISSION'S REQUIREMENT TO DESIGN, DEVELOPMENT, TEST, AND OPERATE THE LUCY SPACECRAFT BUS. LUCY WILL EXPLORE SIX JUPITER TROJAN ASTEROIDS TRAPPED BY JUPITERS GRAVITY IN TWO SWARMS THAT SHARE THE PLANETS ORBIT, ONE LEADING AND ONE TRAILING JUPITER IN ITS 12-YEAR CIRCUIT AROUND THE SUN. THE TROJANS ARE THOUGHT TO BE RELICS OF A MUCH EARLIER ERA IN THE HISTORY OF THE SOLAR SYSTEM, AND MAY HAVE FORMED FAR BEYOND JUPITERS CURRENT ORBIT.
View parent award on USAspending
CONT_AWD_NNG17FD73C_8000_-NONE-_-NONE-$770,117Mar 18, 2020— – —
Subcontractor
—
MOS COMMAND & DOWNLINK DEV MOS MSA DEVELOPMENT
4104134787
Parent award context
Parent award agency: National Aeronautics and Space Administration · National Aeronautics and Space Administration
Parent award NAICS: 336414
Parent award description: THE LUCY SPACECRAFT AND MISSION OPERATIONS CONTRACT EMBODIES THE MISSION'S REQUIREMENT TO DESIGN, DEVELOPMENT, TEST, AND OPERATE THE LUCY SPACECRAFT BUS. LUCY WILL EXPLORE SIX JUPITER TROJAN ASTEROIDS TRAPPED BY JUPITERS GRAVITY IN TWO SWARMS THAT SHARE THE PLANETS ORBIT, ONE LEADING AND ONE TRAILING JUPITER IN ITS 12-YEAR CIRCUIT AROUND THE SUN. THE TROJANS ARE THOUGHT TO BE RELICS OF A MUCH EARLIER ERA IN THE HISTORY OF THE SOLAR SYSTEM, AND MAY HAVE FORMED FAR BEYOND JUPITERS CURRENT ORBIT.
View parent award on USAspending
CONT_AWD_NNG17FD73C_8000_-NONE-_-NONE-$511,656Jul 13, 2020— – —
Subcontractor
—
MOS COMMAND & DOWNLINK DEV MOS MSA DEVELOPMENT
4104134787
Parent award context
Parent award agency: National Aeronautics and Space Administration · National Aeronautics and Space Administration
Parent award NAICS: 336414
Parent award description: THE LUCY SPACECRAFT AND MISSION OPERATIONS CONTRACT EMBODIES THE MISSION'S REQUIREMENT TO DESIGN, DEVELOPMENT, TEST, AND OPERATE THE LUCY SPACECRAFT BUS. LUCY WILL EXPLORE SIX JUPITER TROJAN ASTEROIDS TRAPPED BY JUPITERS GRAVITY IN TWO SWARMS THAT SHARE THE PLANETS ORBIT, ONE LEADING AND ONE TRAILING JUPITER IN ITS 12-YEAR CIRCUIT AROUND THE SUN. THE TROJANS ARE THOUGHT TO BE RELICS OF A MUCH EARLIER ERA IN THE HISTORY OF THE SOLAR SYSTEM, AND MAY HAVE FORMED FAR BEYOND JUPITERS CURRENT ORBIT.
View parent award on USAspending
CONT_AWD_NNG17FD73C_8000_-NONE-_-NONE-$685,878Sep 28, 2021— – —
Subcontractor
—
MOS MSA DEVELOPMENT MOS COMMAND & DOWNLINK DEV
4104134787
Parent award context
Parent award agency: National Aeronautics and Space Administration · National Aeronautics and Space Administration
Parent award NAICS: 336414
Parent award description: THE LUCY SPACECRAFT AND MISSION OPERATIONS CONTRACT EMBODIES THE MISSION'S REQUIREMENT TO DESIGN, DEVELOPMENT, TEST, AND OPERATE THE LUCY SPACECRAFT BUS. LUCY WILL EXPLORE SIX JUPITER TROJAN ASTEROIDS TRAPPED BY JUPITERS GRAVITY IN TWO SWARMS THAT SHARE THE PLANETS ORBIT, ONE LEADING AND ONE TRAILING JUPITER IN ITS 12-YEAR CIRCUIT AROUND THE SUN. THE TROJANS ARE THOUGHT TO BE RELICS OF A MUCH EARLIER ERA IN THE HISTORY OF THE SOLAR SYSTEM, AND MAY HAVE FORMED FAR BEYOND JUPITERS CURRENT ORBIT.
View parent award on USAspending
CONT_AWD_NNG17FD73C_8000_-NONE-_-NONE-$608,446Jun 29, 2021— – —
Subcontractor
—
MOS MSA DEVELOPMENT MOS COMMAND & DOWNLINK DEV
4104134787
Parent award context
Parent award agency: National Aeronautics and Space Administration · National Aeronautics and Space Administration
Parent award NAICS: 336414
Parent award description: THE LUCY SPACECRAFT AND MISSION OPERATIONS CONTRACT EMBODIES THE MISSION'S REQUIREMENT TO DESIGN, DEVELOPMENT, TEST, AND OPERATE THE LUCY SPACECRAFT BUS. LUCY WILL EXPLORE SIX JUPITER TROJAN ASTEROIDS TRAPPED BY JUPITERS GRAVITY IN TWO SWARMS THAT SHARE THE PLANETS ORBIT, ONE LEADING AND ONE TRAILING JUPITER IN ITS 12-YEAR CIRCUIT AROUND THE SUN. THE TROJANS ARE THOUGHT TO BE RELICS OF A MUCH EARLIER ERA IN THE HISTORY OF THE SOLAR SYSTEM, AND MAY HAVE FORMED FAR BEYOND JUPITERS CURRENT ORBIT.
View parent award on USAspending
CONT_AWD_NNG17FD73C_8000_-NONE-_-NONE-$511,656Dec 17, 2019— – —
Subcontractor
—
LUCY MISSION OPS SUPPORT PHASE E MISSION
4104134787
Parent award context
Parent award agency: National Aeronautics and Space Administration · National Aeronautics and Space Administration
Parent award NAICS: 336414
Parent award description: THE LUCY SPACECRAFT AND MISSION OPERATIONS CONTRACT EMBODIES THE MISSION'S REQUIREMENT TO DESIGN, DEVELOPMENT, TEST, AND OPERATE THE LUCY SPACECRAFT BUS. LUCY WILL EXPLORE SIX JUPITER TROJAN ASTEROIDS TRAPPED BY JUPITERS GRAVITY IN TWO SWARMS THAT SHARE THE PLANETS ORBIT, ONE LEADING AND ONE TRAILING JUPITER IN ITS 12-YEAR CIRCUIT AROUND THE SUN. THE TROJANS ARE THOUGHT TO BE RELICS OF A MUCH EARLIER ERA IN THE HISTORY OF THE SOLAR SYSTEM, AND MAY HAVE FORMED FAR BEYOND JUPITERS CURRENT ORBIT.
View parent award on USAspending
CONT_AWD_NNG17FD73C_8000_-NONE-_-NONE-$218,218Dec 2, 2021— – —
Subcontractor
—
LUCY MISSION OPS SUPPORT PHASE E MISSION
4104134787
Parent award context
Parent award agency: National Aeronautics and Space Administration · National Aeronautics and Space Administration
Parent award NAICS: 336414
Parent award description: THE LUCY SPACECRAFT AND MISSION OPERATIONS CONTRACT EMBODIES THE MISSION'S REQUIREMENT TO DESIGN, DEVELOPMENT, TEST, AND OPERATE THE LUCY SPACECRAFT BUS. LUCY WILL EXPLORE SIX JUPITER TROJAN ASTEROIDS TRAPPED BY JUPITERS GRAVITY IN TWO SWARMS THAT SHARE THE PLANETS ORBIT, ONE LEADING AND ONE TRAILING JUPITER IN ITS 12-YEAR CIRCUIT AROUND THE SUN. THE TROJANS ARE THOUGHT TO BE RELICS OF A MUCH EARLIER ERA IN THE HISTORY OF THE SOLAR SYSTEM, AND MAY HAVE FORMED FAR BEYOND JUPITERS CURRENT ORBIT.
View parent award on USAspending
CONT_AWD_NNG17FD73C_8000_-NONE-_-NONE-$306,766Aug 17, 2022— – —
Subcontractor
—
LUCY MISSION OPS SUPPORT PHASE E MISSION
4104134787
Parent award context
Parent award agency: National Aeronautics and Space Administration · National Aeronautics and Space Administration
Parent award NAICS: 336414
Parent award description: THE LUCY SPACECRAFT AND MISSION OPERATIONS CONTRACT EMBODIES THE MISSION'S REQUIREMENT TO DESIGN, DEVELOPMENT, TEST, AND OPERATE THE LUCY SPACECRAFT BUS. LUCY WILL EXPLORE SIX JUPITER TROJAN ASTEROIDS TRAPPED BY JUPITERS GRAVITY IN TWO SWARMS THAT SHARE THE PLANETS ORBIT, ONE LEADING AND ONE TRAILING JUPITER IN ITS 12-YEAR CIRCUIT AROUND THE SUN. THE TROJANS ARE THOUGHT TO BE RELICS OF A MUCH EARLIER ERA IN THE HISTORY OF THE SOLAR SYSTEM, AND MAY HAVE FORMED FAR BEYOND JUPITERS CURRENT ORBIT.
View parent award on USAspending
CONT_AWD_NNG17FD73C_8000_-NONE-_-NONE-$603,225Dec 19, 2023— – —
Subcontractor
—
LUCY PHASE E MISSION OPS FSW SUPPORT LU
4104134787
Parent award context
Parent award agency: National Aeronautics and Space Administration · National Aeronautics and Space Administration
Parent award NAICS: 336414
Parent award description: THE LUCY SPACECRAFT AND MISSION OPERATIONS CONTRACT EMBODIES THE MISSION'S REQUIREMENT TO DESIGN, DEVELOPMENT, TEST, AND OPERATE THE LUCY SPACECRAFT BUS. LUCY WILL EXPLORE SIX JUPITER TROJAN ASTEROIDS TRAPPED BY JUPITERS GRAVITY IN TWO SWARMS THAT SHARE THE PLANETS ORBIT, ONE LEADING AND ONE TRAILING JUPITER IN ITS 12-YEAR CIRCUIT AROUND THE SUN. THE TROJANS ARE THOUGHT TO BE RELICS OF A MUCH EARLIER ERA IN THE HISTORY OF THE SOLAR SYSTEM, AND MAY HAVE FORMED FAR BEYOND JUPITERS CURRENT ORBIT.
View parent award on USAspending
CONT_AWD_NNG17FD73C_8000_-NONE-_-NONE-$140,005May 22, 2023— – —
Subcontractor
—
LUCY PHASE E MISSION OPS FSW SUPPORT LU
4104134787
Parent award context
Parent award agency: National Aeronautics and Space Administration · National Aeronautics and Space Administration
Parent award NAICS: 336414
Parent award description: THE LUCY SPACECRAFT AND MISSION OPERATIONS CONTRACT EMBODIES THE MISSION'S REQUIREMENT TO DESIGN, DEVELOPMENT, TEST, AND OPERATE THE LUCY SPACECRAFT BUS. LUCY WILL EXPLORE SIX JUPITER TROJAN ASTEROIDS TRAPPED BY JUPITERS GRAVITY IN TWO SWARMS THAT SHARE THE PLANETS ORBIT, ONE LEADING AND ONE TRAILING JUPITER IN ITS 12-YEAR CIRCUIT AROUND THE SUN. THE TROJANS ARE THOUGHT TO BE RELICS OF A MUCH EARLIER ERA IN THE HISTORY OF THE SOLAR SYSTEM, AND MAY HAVE FORMED FAR BEYOND JUPITERS CURRENT ORBIT.
View parent award on USAspending
CONT_AWD_NNG17FD73C_8000_-NONE-_-NONE-$169,046Jul 15, 2024— – —
Subcontractor
—
MOS COMMAND & DOWNLINK DEV
4104134787
Parent award context
Parent award agency: National Aeronautics and Space Administration · National Aeronautics and Space Administration
Parent award NAICS: 336414
Parent award description: THE LUCY SPACECRAFT AND MISSION OPERATIONS CONTRACT EMBODIES THE MISSION'S REQUIREMENT TO DESIGN, DEVELOPMENT, TEST, AND OPERATE THE LUCY SPACECRAFT BUS. LUCY WILL EXPLORE SIX JUPITER TROJAN ASTEROIDS TRAPPED BY JUPITERS GRAVITY IN TWO SWARMS THAT SHARE THE PLANETS ORBIT, ONE LEADING AND ONE TRAILING JUPITER IN ITS 12-YEAR CIRCUIT AROUND THE SUN. THE TROJANS ARE THOUGHT TO BE RELICS OF A MUCH EARLIER ERA IN THE HISTORY OF THE SOLAR SYSTEM, AND MAY HAVE FORMED FAR BEYOND JUPITERS CURRENT ORBIT.
View parent award on USAspending
CONT_AWD_NNG17FD73C_8000_-NONE-_-NONE-$15,486Nov 16, 2021— – —
Subcontractor
—
MOS MSA DEVELOPMENT MOS COMMAND & DOWNLINK DEV
4104134787
Parent award context
Parent award agency: National Aeronautics and Space Administration · National Aeronautics and Space Administration
Parent award NAICS: 336414
Parent award description: THE LUCY SPACECRAFT AND MISSION OPERATIONS CONTRACT EMBODIES THE MISSION'S REQUIREMENT TO DESIGN, DEVELOPMENT, TEST, AND OPERATE THE LUCY SPACECRAFT BUS. LUCY WILL EXPLORE SIX JUPITER TROJAN ASTEROIDS TRAPPED BY JUPITERS GRAVITY IN TWO SWARMS THAT SHARE THE PLANETS ORBIT, ONE LEADING AND ONE TRAILING JUPITER IN ITS 12-YEAR CIRCUIT AROUND THE SUN. THE TROJANS ARE THOUGHT TO BE RELICS OF A MUCH EARLIER ERA IN THE HISTORY OF THE SOLAR SYSTEM, AND MAY HAVE FORMED FAR BEYOND JUPITERS CURRENT ORBIT.
View parent award on USAspending
CONT_AWD_NNG17FD73C_8000_-NONE-_-NONE-$138,105Jun 5, 2019— – —
Subcontractor
—
LUCY MISSION OPS SUPPORT DEVELOP STL COM
4104134787
Parent award context
Parent award agency: National Aeronautics and Space Administration · National Aeronautics and Space Administration
Parent award NAICS: 336414
Parent award description: THE LUCY SPACECRAFT AND MISSION OPERATIONS CONTRACT EMBODIES THE MISSION'S REQUIREMENT TO DESIGN, DEVELOPMENT, TEST, AND OPERATE THE LUCY SPACECRAFT BUS. LUCY WILL EXPLORE SIX JUPITER TROJAN ASTEROIDS TRAPPED BY JUPITERS GRAVITY IN TWO SWARMS THAT SHARE THE PLANETS ORBIT, ONE LEADING AND ONE TRAILING JUPITER IN ITS 12-YEAR CIRCUIT AROUND THE SUN. THE TROJANS ARE THOUGHT TO BE RELICS OF A MUCH EARLIER ERA IN THE HISTORY OF THE SOLAR SYSTEM, AND MAY HAVE FORMED FAR BEYOND JUPITERS CURRENT ORBIT.
View parent award on USAspending
CONT_AWD_NNG17FD73C_8000_-NONE-_-NONE-$100,995Sep 22, 2022— – —

Contract vehicles are shown only when present in the source record.

Agencies supported

None recorded.

RED CANYON SOFTWARE, INC. — Federal Contractor Profile | FedSub