← Back to search

SK INFRARED INC

DUBLIN, OH, 43016

UnclaimedClaim this profile (free)
Minority Owned

Prime contracting experience

8 records from government sources. Past participation is not evidence of current teaming interest.

RoleAgencyDescriptionVehicleObligatedAction datePeriod
Prime
Department of Defense
Department of the Air Force
SUPERLATTICE-BASED INFRARED FOR GUIDANCE AND HIGH-TEMPERATURE TARGETING—$1,400,000Jul 22, 2026Aug 4, 2025 – Aug 4, 2027
Prime
Department of Defense
Department of the Air Force
STTR 2 - LARGE AREA SIGESN DETECTOR ARRAYS WITH CONTRACTOR: SK INFRARED LLC—$1,250,000Jun 23, 2026Jun 14, 2024 – Jan 14, 2027
Prime
Department of Defense
Department of the Navy
RESEARCH AND DEVELOPMENT 873 AUTHORITY—$999,998May 7, 2025May 7, 2025 – Mar 12, 2027
Prime
Department of Defense
Department of the Navy
RESEARCH AND DEVELOPMENT—$999,828Sep 5, 2024Sep 8, 2023 – Sep 12, 2025
Prime
Department of Defense
Department of the Air Force
SMALL BUSINESS TECHNOLOGY TRANSFER (STTR) TOPIC AF20A-TCSO1, PHASE II, SHORT-WAVE INFRARED DETECTOR ARRAYS—$500,000Mar 6, 2023Sep 28, 2020 – Mar 3, 2023
Prime
Department of Defense
Department of the Army
THIS IS A PHASE II SMALL BUSINESS INNOVATION RESEARCH (SBIR) EFFORT WITH A FOUR (4) MONTH BRIDGE AND A TWENTY FOUR (24) MONTH BASE.—$1,149,999Apr 5, 2022Jan 23, 2020 – Aug 22, 2022
Prime
Department of Defense
Department of the Air Force
SI-COMPATIBLE HIGH OPERATING TEMPERATURE MID-WAVE INFRARED FOCAL PLANE ARRAYS—$750,000Mar 8, 2022Mar 8, 2022 – Jun 8, 2023
Prime
National Aeronautics and Space Administration
National Aeronautics and Space Administration
WE PROPOSE TO ADVANCE THE STATE-OF-THE-ART IN SHORT WAVE INFRARED (SWIR) AVALANCHE.PHOTODIODES (APD) TO MEET NASA'S NEEDS FOR ADVANCEMENTS IN STAR TRACKING TECHNOLOGY..IN THE PHASE I EFFORT, WE UNDERTOOK A FEASIBILITY STUDY FOR DEVELOPMENT OF FIELD.PROGRAMMABLE SWIR DETECTORS USING A PIN-APDARCHITECTURE WITH ANTIMONIDE-BASED.SUPERLATTICE MATERIALS. THIS STUDY DEMONSTRATED THAT A PIN-APD ARCHITECTURE PROVIDES.SUPERIOR SIGNAL-TO-NOISE RATIO (SNR) AT LOW BIAS VOLTAGE AND, WITH AN OPTIMIZED MATERIAL,.CAN ALSO PROVIDE THE BEST SNR AT HIGH BIAS VOLTAGE (WITH AVALANCHE GAIN). THE GOAL OF THE.PROPOSED PHASE II EFFORT IS TO ENGINEER THE PROCESS OF TURNING THESE MATERIALS INTO A FOCAL.PLANE ARRAY (FPA). THIS DEMONSTRATION WILL FABRICATE, PASSIVATE, AND HYBRIDIZE A SMALL.FORMAT ARRAY (~256X256) TO A COMMERCIALLY AVAILABLE APDREADOUT INTEGRATED CIRCUIT.(ROIC). THIS DEMONSTRATION IMAGER WILL VALIDATE AND SUPPORT NASA'S MISSION FOR.ADVANCING STAR TRACKING BY ENABLING DETECTION OF OPTICAL COMMUNICATIONS SIGNALS.(1550 NM) AND IMAGING THE STARFIELD ACROSS THE NEAR INFRARED (NIR) AND SWIR.—$1,125,000Jan 20, 2022Aug 11, 2019 – Oct 25, 2022

Contract vehicles are shown only when present in the source record. Linked award numbers and vehicles open the authoritative record on USAspending.gov.

Agencies supported

  • Department of DefenseGov-sourced
  • National Aeronautics and Space AdministrationGov-sourced

Government-sourced data comes from SAM.gov, SBA and USAspending.gov and is attributed to its source. Items marked company-reported were provided by the company and are verified by FedSub only where labeled. FedSub is a private company and is not affiliated with SBA, GSA/SAM.gov, or any government agency.

SK INFRARED INC – Dublin, OH | UEI H9KWYKZ4YFL7 | FedSub