← Back to search

PRISMECS LLC

HOUSTON, TX, 77027

Minority Owned

Subcontracting experience

2 records from government sources. Past participation is not evidence of current teaming interest.

RoleAgencyDescriptionVehicleObligatedAction datePeriod
Subcontractor
Agency for International Development
"THE FIELD ADVISORY SERVICES REQUIRED FOR THE INSTALLATION, PRE-COMMISSIONING CHECK, COMMISSIONING, PERFORMANCE TESTING, AND OPERATION OF THE TM2500-GEN6 INCLUDE: 1. SUPPORT ENERGOATOM (STATE ENTITY, GOVERNMENT OF UKRAINE) IN PREPARATION OF AN INSTALLATION SCHEDULE, WITH GE€„¢S GUIDANCE, TO ENSURE PROPER PLANNING/SCHEDULING FOR INSTALLATION AND COMMISSIONING OF THE POWER PLANT IN A TIMELY MANNER. 2. CONDUCT INSPECTION/CHECKING OF ALL GE PROVIDED EQUIPMENT, SUPPLIES, AND TOOLS TO ENSURE THEY ARE IN GOOD WORKING CONDITION BEFORE USE OR UNIT STARTUP. 3. PROVIDE ADVICE TO THE UKRAINIAN INSTALLERS ON THE PROPER INSTALLATION OF THE UNIT, COMMENSURATE WITH GE€„¢S INSTALLATION MANUAL AND REQUIREMENTS. 4. ENSURE THAT ALL INSTALLATION STEPS AND CHECKS THAT ARE PROVIDED/OUTLINED IN THE INSTALLATION MANUAL ARE PERFORMED PROPERLY BY INSTALLER/ENERGOATOM. 5. VERIFY THAT, ON EACH STEP OF THE INSTALLATION PROCESS, THE ENERGOATOM/INSTALLER HAS COMPLIED WITH GE€„¢S PROTOCOLS FOR INSTALLATIONS AND REQUIREMENTS AND UPON INSTALLERS SIGNING OF THE COMPLIANCE DOCUMENTS, SIGNOFF ON EACH STEP OF THE INSTALLATION, PRE-COMMISSIONING, AND COMMISSIONING PROCESS AS OBSERVER CONFIRMING COMPLIANCE WITH GE€„¢S REQUIREMENTS. 6. FOLLOW ALL GE€„¢S PROTOCOLS FOR PRE-COMMISSIONING CHECK-OUT AND COMMISSIONING, AND CONDUCT PRE-COMMISSIONING TESTS, STARTUP, AND COMMISSIONING OF THE UNIT UPON INSTALLATION, INCLUDING COMPLIANCE AND SIGNOFF ON ALL REQUIRED STEPS PER GE€„¢S INSTRUCTIONS. 7. PROVIDE ADVICE ON TESTING PROTOCOLS AND PROCEDURES UPON SUCCESSFUL STARTUP AND COMMISSIONING OF THE UNIT. 8. ADVISE ON PERFORMANCE TESTING OF THE UNIT AND REPORT ON RESULTS, AS COMPARED WITH GE€„¢S PERFORMANCE WARRANTIES PROVIDED IN THE CONTRACT. 9. INFORM TETRA TECH AND GE IMMEDIATELY REGARDING ANY EQUIPMENT DEFECT, LACK OF INSTALLERS€„¢ COMPLIANCE WITH GE€„¢S REQUIREMENTS, DELAY IN INSTALLATION SCHEDULE, OTHER ISSUE THAT MAY IMPACT PROPER INSTALLATION AND COMMISSIONING, OR ANY NON-COMPLIANCE WITH GE€„¢S STANDARDS/REQUIREMENTS, WHICH MAY RENDER THE GE€„¢S WARRANTEES NULL AND VOID. 10. PROVIDE ON THE JOB OPERATION AND MAINTENANCE TRAINING TO THE POWER PLANT STAFF, DURING AND AFTER COMMISSIONING, POTENTIALLY FOR AS LONG AS 6 MONTHS. THE SPECIFIC ACTIVITIES TO BE PERFORMED BY THE ADVISOR IS ANNEXED HEREWITH AS ATTACHMENT 1.1 TITLED AS €œFIELD ADVISORY SERVICES FOR INSTALLATION, PRE-COMMISSIONING, COMMISSIONING, TESTING, AND OPERATION€Ͽ½. THE SAME DOCUMENT INDICATES THE ROLES AND RESPONSIBILITIES OF THE OPERATOR OF THE UNIT (ENERGOATOM). SITE SURVEY FOR PROSPECTIVE NEW MOBILE GAS TURBINE POWER PLANT INSTALLATION ADDITIONALLY, SEPARATELY FROM THE SCOPE OF SERVICES SUPPORTING THE INSTALLATION AND COMMISSIONING OF THE GE TM2500+ GEN 6 PLANT OUTLINED ABOVE, THE GOVERNMENT OF UKRAINE ANTICIPATES DELIVERY OF ADDITIONAL GE TM2500+ OR LM2500XPRESS GAS TURBINE POWER PLANTS AND HAS PRELIMINARILY IDENTIFIED MULTIPLE CANDIDATE SITES FOR THESE ADDITIONAL UNITS€„¢ INSTALLATION. IN COORDINATION WITH GENERAL ELECTRIC AND TETRA TECH, THE CONTRACTOR WILL CONDUCT A PRELIMINARY DESK ASSESSMENT OF AT LEAST FIVE, BUT NO MORE THAN TEN, CANDIDATE SITES AS PROPOSED BY THE GOVERNMENT OF UKRAINE (MINISTRY OF ENERGY AND/OR MINISTRY OF COMMUNITIES, TERRITORIES, AND INFRASTRUCTURE DEVELOPMENT) FOR INSTALLATION. FROM THESE, SUBJECT TO SECURITY CONDITIONS AND RESTRICTIONS, THE CONTRACTOR WILL CONDUCT ON-SITE ASSESSMENTS OF AT LEAST TWO, BUT NO MORE THAN FIVE, OF THE MOST POTENTIALLY VIABLE SITES FROM THOSE ASSESSED DURING THE DESK ASSESSMENT. THE CONTRACTOR WILL REPORT THE CANDIDATE SITES€„¢ COMPLIANCE WITH MANDATORY SITE REQUIREMENTS, INCLUDING AVAILABILITY AND PROXIMITY OF SUPPORTING INFRASTRUCTURE (ROAD, WATER, FUEL, AND ELECTRIC GRID FOR POWER EVACUATION), GEOTECHNICAL CHARACTERISTICS, AND BALANCE-OF-PLANT REQUIREMENTS FOR ANY TM2500+ OR LM2500XPRESS INSTALLATION."
154-UCEM-1810-1198435
Parent award context
Parent award agency: Agency for International Development · Agency for International Development
Parent award NAICS: 541990
Parent award description: OVERSEAS CONTRACT
View parent award on USAspending
—$1,397,962May 8, 2023— – —
Subcontractor
Agency for International Development
"THE FIELD ADVISORY SERVICES REQUIRED FOR THE INSTALLATION, PRE-COMMISSIONING CHECK, COMMISSIONING, PERFORMANCE TESTING, AND OPERATION OF THE TM2500-GEN6 INCLUDE: 1. SUPPORT ENERGOATOM (STATE ENTITY, GOVERNMENT OF UKRAINE) IN PREPARATION OF AN INSTALLATION SCHEDULE, WITH GE€„¢S GUIDANCE, TO ENSURE PROPER PLANNING/SCHEDULING FOR INSTALLATION AND COMMISSIONING OF THE POWER PLANT IN A TIMELY MANNER. 2. CONDUCT INSPECTION/CHECKING OF ALL GE PROVIDED EQUIPMENT, SUPPLIES, AND TOOLS TO ENSURE THEY ARE IN GOOD WORKING CONDITION BEFORE USE OR UNIT STARTUP. 3. PROVIDE ADVICE TO THE UKRAINIAN INSTALLERS ON THE PROPER INSTALLATION OF THE UNIT, COMMENSURATE WITH GE€„¢S INSTALLATION MANUAL AND REQUIREMENTS. 4. ENSURE THAT ALL INSTALLATION STEPS AND CHECKS THAT ARE PROVIDED/OUTLINED IN THE INSTALLATION MANUAL ARE PERFORMED PROPERLY BY INSTALLER/ENERGOATOM. 5. VERIFY THAT, ON EACH STEP OF THE INSTALLATION PROCESS, THE ENERGOATOM/INSTALLER HAS COMPLIED WITH GE€„¢S PROTOCOLS FOR INSTALLATIONS AND REQUIREMENTS AND UPON INSTALLERS SIGNING OF THE COMPLIANCE DOCUMENTS, SIGNOFF ON EACH STEP OF THE INSTALLATION, PRE-COMMISSIONING, AND COMMISSIONING PROCESS AS OBSERVER CONFIRMING COMPLIANCE WITH GE€„¢S REQUIREMENTS. 6. FOLLOW ALL GE€„¢S PROTOCOLS FOR PRE-COMMISSIONING CHECK-OUT AND COMMISSIONING, AND CONDUCT PRE-COMMISSIONING TESTS, STARTUP, AND COMMISSIONING OF THE UNIT UPON INSTALLATION, INCLUDING COMPLIANCE AND SIGNOFF ON ALL REQUIRED STEPS PER GE€„¢S INSTRUCTIONS. 7. PROVIDE ADVICE ON TESTING PROTOCOLS AND PROCEDURES UPON SUCCESSFUL STARTUP AND COMMISSIONING OF THE UNIT. 8. ADVISE ON PERFORMANCE TESTING OF THE UNIT AND REPORT ON RESULTS, AS COMPARED WITH GE€„¢S PERFORMANCE WARRANTIES PROVIDED IN THE CONTRACT. 9. INFORM TETRA TECH AND GE IMMEDIATELY REGARDING ANY EQUIPMENT DEFECT, LACK OF INSTALLERS€„¢ COMPLIANCE WITH GE€„¢S REQUIREMENTS, DELAY IN INSTALLATION SCHEDULE, OTHER ISSUE THAT MAY IMPACT PROPER INSTALLATION AND COMMISSIONING, OR ANY NON-COMPLIANCE WITH GE€„¢S STANDARDS/REQUIREMENTS, WHICH MAY RENDER THE GE€„¢S WARRANTEES NULL AND VOID. 10. PROVIDE ON THE JOB OPERATION AND MAINTENANCE TRAINING TO THE POWER PLANT STAFF, DURING AND AFTER COMMISSIONING, POTENTIALLY FOR AS LONG AS 6 MONTHS. THE SPECIFIC ACTIVITIES TO BE PERFORMED BY THE ADVISOR IS ANNEXED HEREWITH AS ATTACHMENT 1.1 TITLED AS €œFIELD ADVISORY SERVICES FOR INSTALLATION, PRE-COMMISSIONING, COMMISSIONING, TESTING, AND OPERATION€Ͽ½. THE SAME DOCUMENT INDICATES THE ROLES AND RESPONSIBILITIES OF THE OPERATOR OF THE UNIT (ENERGOATOM). SITE SURVEY FOR PROSPECTIVE NEW MOBILE GAS TURBINE POWER PLANT INSTALLATION ADDITIONALLY, SEPARATELY FROM THE SCOPE OF SERVICES SUPPORTING THE INSTALLATION AND COMMISSIONING OF THE GE TM2500+ GEN 6 PLANT OUTLINED ABOVE, THE GOVERNMENT OF UKRAINE ANTICIPATES DELIVERY OF ADDITIONAL GE TM2500+ OR LM2500XPRESS GAS TURBINE POWER PLANTS AND HAS PRELIMINARILY IDENTIFIED MULTIPLE CANDIDATE SITES FOR THESE ADDITIONAL UNITS€„¢ INSTALLATION. IN COORDINATION WITH GENERAL ELECTRIC AND TETRA TECH, THE CONTRACTOR WILL CONDUCT A PRELIMINARY DESK ASSESSMENT OF AT LEAST FIVE, BUT NO MORE THAN TEN, CANDIDATE SITES AS PROPOSED BY THE GOVERNMENT OF UKRAINE (MINISTRY OF ENERGY AND/OR MINISTRY OF COMMUNITIES, TERRITORIES, AND INFRASTRUCTURE DEVELOPMENT) FOR INSTALLATION. FROM THESE, SUBJECT TO SECURITY CONDITIONS AND RESTRICTIONS, THE CONTRACTOR WILL CONDUCT ON-SITE ASSESSMENTS OF AT LEAST TWO, BUT NO MORE THAN FIVE, OF THE MOST POTENTIALLY VIABLE SITES FROM THOSE ASSESSED DURING THE DESK ASSESSMENT. THE CONTRACTOR WILL REPORT THE CANDIDATE SITES€„¢ COMPLIANCE WITH MANDATORY SITE REQUIREMENTS, INCLUDING AVAILABILITY AND PROXIMITY OF SUPPORTING INFRASTRUCTURE (ROAD, WATER, FUEL, AND ELECTRIC GRID FOR POWER EVACUATION), GEOTECHNICAL CHARACTERISTICS, AND BALANCE-OF-PLANT REQUIREMENTS FOR ANY TM2500+ OR LM2500XPRESS INSTALLATION."
154-UCEM-1810-1198435
Parent award context
Parent award agency: Agency for International Development · Agency for International Development
Parent award NAICS: 541990
Parent award description: OVERSEAS CONTRACT
View parent award on USAspending
—$1,397,962May 8, 2023— – —

Contract vehicles are shown only when present in the source record. Linked award numbers and vehicles open the authoritative record on USAspending.gov.

Government-sourced data comes from SAM.gov, SBA and USAspending.gov and is attributed to its source. Items marked company-reported were provided by the company and are verified by FedSub only where labeled. FedSub is a private company and is not affiliated with SBA, GSA/SAM.gov, or any government agency.

PRISMECS LLC – Houston, TX | UEI HZCNWNJGX6E4 | FedSub