← Back to search

UNIVERSITY OF MIAMI

CORAL GABLES, FL, 33146

Prime contracting experience

10 records from government sources. Past participation is not evidence of current teaming interest.

RoleAgencyDescriptionVehicleObligatedAction datePeriod
Prime
Department of Defense
Department of the Army
NEW START SERDP MR23-3281 OPTICALLY DERIVED 3D MODELS FOR MUNITIONS LOCATION AND IDENTIFICATION—$738,259Jul 15, 2026Nov 17, 2023 – Nov 16, 2027
Prime
Department of Defense
Defense Health Agency
UNITED STATES SPECIAL OPERATIONS COMMAND, MINDFULNESS-BASED ATTENTION TRAINING IN SPECIAL OPERATIONS FORCES—$1,041,493Jun 16, 2026Feb 6, 2026 – Feb 5, 2030
Prime
Department of Health and Human Services
National Institutes of Health
HISPANIC COMMUNITY HEALTH STUDY - STUDY OF LATINOS (HCHS-SOL) MIAMI FIELD CENTER - TASK AREA A - CORE STUDY OPERATIONS75N92025D00009USAspending$3,317,452Feb 13, 2026Nov 30, 2024 – Nov 29, 2026
Prime
Department of Defense
Department of the Army
UNIVERSITY OF MIAMI EW23-7621 - ADVANCED HVAC LOAD MANAGEMENT USING CASCADE CONTROLS INTEGRATING CHILLERS, AIR HANDLING UNITS, AND TERMINAL BOXES—$715,141Jan 28, 2026Jan 26, 2024 – Jan 25, 2028
Prime
Department of Health and Human Services
National Institutes of Health
HISPANIC COMMUNITY HEALTH STUDY--STUDY OF LATINOS (HCHS-SOL)--FIELD CENTER-VISIT 3 BASIC EXAMINATION.75N92019D00013USAspending$910,464Dec 18, 2025May 1, 2021 – Jul 31, 2022
Prime
National Aeronautics and Space Administration
National Aeronautics and Space Administration
MARONET SYS CONSIST OF A SITE W/2 INSTRUMENTED BUOY W/ASSOCIATED CALIBRATION DEVICES TO MAINTAIN INSTRUMENT TRACEABILITY. IT'S DESIGNED TO PROVIDE RESOLUTION&ACCURACY NECESSARY FOR SYS VICARIOUS CALIBRATION OF OCI/PACE.—$4,616,851Jul 21, 2025Jul 1, 2020 – Dec 31, 2025
Prime
Department of Defense
Defense Health Agency
SOCOM BROAD AGENCY ANNOUNCEMENT FOR RESEARCH ENTITLED,MINDFULNESS TRAINING IN SPECIAL OPERATIONS FORCES CANDIDATES.—$1,097,523Jun 13, 2025Sep 25, 2020 – Sep 30, 2024
Prime
Department of Health and Human Services
National Institutes of Health
HISPANIC COMMUNITY HEALTH STUDY - STUDY OF LATINOS (HCHS-SOL) FIELD CENTER TASK AREA B YEAR 375N92019D00013USAspending$1,025,824Sep 27, 2024Aug 1, 2022 – Jan 31, 2024
Prime
Department of Health and Human Services
National Institutes of Health
HISPANIC COMMUNITY HEALTH STUDY (STUDY OF LATINOS) FIELD CENTER - CORE STUDY OPERATIONS75N92019D00013USAspending$8,384,232Nov 28, 2023Nov 30, 2018 – Nov 29, 2024
Prime
Department of Health and Human Services
National Institutes of Health
TASK AREA B2 VISIT 3 BASIC EXAM.75N92019D00013USAspending$778,557Mar 2, 2023Jan 15, 2020 – Apr 30, 2021

Contract vehicles are shown only when present in the source record. Linked award numbers and vehicles open the authoritative record on USAspending.gov.

Subcontracting experience

4 records from government sources. Past participation is not evidence of current teaming interest.

RoleAgencyDescriptionVehicleObligatedAction datePeriod
Subcontractor
Department of Commerce
SATELLITE OCEAN COLOR SYSTEM VICARIOUS CALIBRATION - MARINE OPTICAL BUOY (MOBY) OPERATIONS AND TECHNOLOGY REFRESH
SATELLITE OCEAN COLOR SYSTEM VIC
Parent award context
Parent award agency: Department of Commerce · National Oceanic and Atmospheric Administration
Parent award NAICS: 541715
Parent award performance state: HI
Parent award description: SATELLITE OCEAN COLOR SYSTEM VICARIOUS CALIBRATION - MARINE OPTICAL BUOY (MOBY) OPERATIONS AND TECHNOLOGY REFRESH
View parent award on USAspending
—$165,416Apr 27, 2026— – —
Subcontractor
Department of Defense
RE: PERFORMANCE DEMONSTRATION OF AN INTEGRATED WATER-SOURCE HEAT PUMP WATER HEATER SYSTEM TO MEET SIMULTANEOUS HEATING AND COOLING DEMANDS AT MILITARY INSTALLATIONS THE UM TEAM LED BY DR. GANG WANG WILL SERVE AS A SUBCONTRACT TO THE UNIVERSITY OF OKLAHOMA TO PARTICIPATE IN THE PROPOSED PROJECT ONCE IT IS AWARDED BY DOD ESTCP PROGRAM. THE DEMONSTRATION SITE IS LOCATED INSIDE TINKER AIR BASE. THE OVERALL PROJECT TASKS ARE SUMMARIZED BELOW. 1. DEVELOP A DEMONSTRATION PLAN FOR ESTCP REVIEW. 2. DESIGN AND INSTALLATION OF THE INTEGRATED WATER-SOURCE HPWP SYSTEM 3. IMPLEMENTATION OF INNOVATIVE OPERATION SEQUENCES. 4. VALIDATE AN EFFECTIVE OPERATIONAL SEQUENCE TO MAXIMIZE THE UTILIZATION FACTOR OF THE INTEGRATED WATER-SOURCE HEAT PUMP AND THEREFORE OBTAIN THE MAXIMUM EFFICIENCY 5. DEVELOP A VIABLE COMMERCIALIZATION PACKAGE FOR TECHNOLOGY TRANSITION 6. DRAFT THE FINAL PROJECT REPORT INCLUDING PERFORMANCE AND COST/BENEFIT ASSESSMENT. THE UM TEAM IS COMMITTED TO ASSIST WITH ALL THE SIX TASKS.
2024-71
Parent award context
Parent award agency: Department of Defense · Department of the Army
Parent award NAICS: 541715
Parent award performance state: OK
Parent award description: EW23-7909 - UNIVERSITY OF OKLAHOMA PERFORMANCE DEMONSTRATION OF AN INTEGRATED WATER-SOURCE HEAT PUMP WATER HEATER SYSTEM TO MEET SIMULTANEOUS HEATING AND COOLING DEMANDS AT MILITARY INSTALLATIONS
View parent award on USAspending
—$158,156Mar 28, 2024— – —
Subcontractor
Department of Transportation
OPTIONAL PHASES (PHASE 4 OF THE OPTIONAL PROJECT HAS BEEN AUTHORIZED) PHASE 4- CONDITION ASSESSMENT AND LOAD RATING- IN THIS TASK, DAMAGE INTERPRETATION GUIDELINE WILL BE DEVELOPED TO CORRELATE THE OBSERVED DAMAGES OR DETERIORATION IN FRP-SRC ELEMENTS TO SEVERITY LEVEL AND CONDITION RATING COMPATIBLE WITH THE FHWA€„¢S RECORDING AND CODING GUIDE FOR THE STRUCTURES INVENTORY AND APPRAISAL OF THE NATION€„¢S BRIDGES AND NBIS SCALES. THE ASSESSMENT WILL ALSO PROVIDE INFORMATION TO BE USED FOR LOAD RATING OF THE BRIDGE. THIS PHASE IS DIVIDED INTO THE FOLLOWING TASKS; TASK 4A- ESTABLISH CORRESPONDENCE BETWEEN DAMAGES AND CONDITION RATING. TASK 4B- PROVIDE INPUT FOR LOAD RATING. DELIVERABLE AND WORK DIVISION- AT THE END OF THIS TASK, A DRAFT AMENDMENT TO THE GUIDE FOR CONDITION RATING WILL BE SUBMITTED. RESULTS WILL BE SUMMARIZED IN THE FORM OF DECISION TREES AND FLOWCHARTS FOR AIDING THE INSPECTORS IN THEIR CONDITION RATING. FIU WILL PERFORM 90% OF THIS TASK, WHILE UM WILL CONTRIBUTE 10%. PHASE 4 WAS AMENDED TO INCLUDE TASK 5.1 TASK 5.1: FRP ELEMENTS TO INCLUDE IN THE MANUAL FOR BRIDGE INSPECTION SUB-TASK 4.1A: REVIEW/SYNTHESIZE AVAILABLE INFORMATION SUB-TASK 4.1B: RECOMMEND IF FRP SHOULD BE A SEPARATE MATERIAL CATEGORY SUB-TASK 4.1C: IDENTIFY BRIDGE ELEMENTS USING FRP EXTERNALLY INTERIM REPORT 4.1 ON SUMMARIZING RESULTS FROM THE SUBTASKS, DUE ON SEPTEMBER 15, 2023 SUB-TASK 4.1D: DEVELOP LANGUAGE TO INCLUDE IN AASHTO T-18 2024 BALLOT INTERIM REPORT 4.2 ON PROPOSED LANGUAGE FOR T-18 BALLOT, DUE ON OCTOBER 15, 2023 SUB-TASK 4.1E: PREPARE RECOMMENDATIONS FOR INSPECTION AND DAMAGE ASSESSMENT INTERIM REPORT 4.3 ON SUMMARIZING RESULTS FROM THE SUBTASKS, DUE ON OCTOBER 29, 2023 INTERIM REPORT 4 SUMMARIZING CONDITION RATING GUIDELINES PHASE 5- CASE STUDY €€Œ INSPECTION OF A FRP-REINFORCED CONCRETE BRIDGE- THE PIS HAVE BEEN INVOLVED WITH THE DESIGN AND CONSTRUCTION OF A THREE-SPAN FULLY FRP-REINFORCED CONCRETE BRIDGE WITH THE SUPPORT OF FLORIDA DEPARTMENT OF TRANSPORTATION (FDOT). THE BRIDGE IS PLANNED TO BE OPENED TO TRAFFIC IN THE SPRING OF 2021. FDOT HAS AGREED TO ALLOW THIS RESEARCH TEAM TO USE THIS BRIDGE AS TEST BED FOR APPLICATION OF NDE METHODS AND LOAD TESTING. USING INSPECTION GUIDE DEVELOPED IN THE PREVIOUS TASKS, THE TEAM WILL INSPECT THE BRIDGE AND RATE ITS CONDITION. THIS WILL PROVIDE AN EXCELLENT REFERENCE FOR FUTURE INSPECTIONS. THIS PHASE WILL INCLUDE ALSO A PILOT TRAINING WORKSHOP FOR DOT INSPECTORS TO GAGE THE PRACTICALITY AND RECEIVE COMMENTS FOR IMPROVEMENT. THIS PHASE IS DIVIDED INTO THE FOLLOWING TASKS; TASK 5A- CASE STUDY; INSPECTION OF A FRP-REINFORCED BRIDGE. TASK 5B- PILOT TRAINING WORKSHOP. DELIVERABLE AND WORK DIVISION- AT THE END OF THIS TASK, A REPORT SUMMARIZING THE RESULTS OF CASE STUDY AND WORKSHOP WILL BE SUBMITTED. FIU AND UM WILL CONTRIBUTE 50% EACH.
000513
Parent award context
Parent award agency: Department of Transportation · Federal Highway Administration
Parent award NAICS: 541715
Parent award performance state: FL
Parent award description: GUIDE FOR FIELD INSPECTION OF IN-SERVICE FRP REINFORCED/STRENGTHENED CONCRETE BRIDGE ELEMENTS
View parent award on USAspending
—$90,777Oct 26, 2023— – —
Subcontractor
Department of Transportation
BASE PROJECT/CONTRACT PHASE 1- REVIEW AND SYNTHESIS OF THE STATE-OF-THE-ART REGARDING FRP MATERIAL, APPLICATION AS FRP-RSC, EVALUATION TECHNIQUES, AND CONDITION ASSESSMENT METHODOLOGY- THIS PHASE IS DIVIDED INTO FOLLOWING TASKS; TASK 1A- DETERMINE THE BACKGROUND ON FRP MATERIAL AND ITS USE AS REINFORCEMENT OR STRENGTHENING OF BRIDGE CONCRETE ELEMENTS. INCLUDES DETAILS AND SPECIFICS FOR EACH APPLICATION THAT WOULD INFLUENCE THEIR PERFORMANCE AND EFFECTIVENESS OF EVALUATION TECHNIQUES. TASK 1B- REVIEW AVAILABLE STANDARDS AND SPECIFICATIONS FOR DESIGN AND MANUFACTURE, AND UNDERSTANDING OF DESIGN METHODOLOGY FOR FRP-RSC. TASK 1C- ANALYSIS TO DISTINGUISH DIFFERENCES IN SERVICEABILITY CRITERIA BETWEEN CONVENTIONAL STEEL REINFORCED CONCRETE AND FRP-RSC. THIS IS CRITICAL FOR CORRECTLY CORRELATING THE OBSERVATION OR EVALUATION RESULTS TO ASSESSMENT AND RATING OF THE CONDITION OF CONCRETE ELEMENTS. TASK 1D- IDENTIFY AND CLASSIFY TYPE OF DAMAGES OBSERVED FOR FRP INDEPENDENTLY OR IN CONJUNCTION WITH BONDED OR ENCASING CONCRETE. TASK 1E- IDENTIFY APPLICABLE OR PROMISING NDE METHODS FOR DAMAGE DETECTION OF FRP-RSC ELEMENTS, AND EVALUATE/RATE THEIR EFFECTIVENESS FOR VARIOUS TYPES OF DAMAGES IN EXTERNALLY BONDED OR IMBEDDED FRP. THE METHODS WILL INCLUDE DIRECT METHODS FOR DETECTION OF DAMAGE SUCH AS VISUAL (OR VISION-BASED) METHODS, TAP-TESTING, THERMAL IMAGING, ACOUSTIC, ULTRASONIC, RADIOGRAPHY, IMPACT ECHO AND IMPULSE RESPONSE, GROUND PENETRATING RADAR (GPR), ELECTRICAL CAPACITANCE TOMOGRAPHY, LASER VIBROMETRY, ETC. IT WILL ALSO INCLUDE INDIRECT METHODS THROUGH STATIC AND DYNAMIC LOAD TESTING USING MODAL ANALYSIS AND PARAMETRIC UPDATING TECHNIQUES. DELIVERABLE AND WORK DIVISION- AT THE END OF THIS TASK, A REPORT SUMMARIZING THE REVIEW WILL BE SUBMITTED. FIU WILL CONTRIBUTE 60% AND UM 40%. PHASE 2- INNOVATIVE APPROACHES AND SMALL-SCALE EXPERIMENTAL WORK- IN THIS TASK APPLICATION OF INNOVATIVE METHODS AND APPROACHES TO INSPECTION OF FRP-RSC BRIDGES WILL BE INTRODUCED AND THEIR FEASIBILITY WILL BE DISCUSSED. A NUMBER OF SMALL-SCALE FRP-REINFORCED CONCRETE ELEMENTS WILL BE FABRICATED IN THE LAB FOR DEMONSTRATION OF THE MOST PROMISING METHODS. THE FOCUS WILL BE ON CONCRETE WITH EMBEDDED FRP REINFORCEMENT FOR WHICH MAJOR ISSUES AND UNKNOWNS STILL REMAIN CONCERNING DETECTION OF FRP AND ITS DAMAGES. CONCEPTS FOR APPLICATION OF INNOVATIVE METHODS MAY INCLUDE; - IMPREGNATION OF FRP BARS, WITHIN THE RESIN OR THE SURFACE TREATMENT, WITH STEEL AND (ELECTRO) MAGNETICALLY RESPONSIVE PARTICLES TO MAKE THEM AND THEIR DAMAGES VISIBLE TO NDT USING ELECTROMAGNETIC WAVES, E.G., GPR AND CAPACITIVE IMAGING. - EFFECTIVE AND OPTIMIZED USE OF MEMS AND WIRELESS SENSOR NETWORKS TO SUPPORT CONTINUOUS MONITORING AND/OR PERIODIC LOAD TESTING. - APPLICATION OF STATIC AND DYNAMIC LOAD TESTING ENHANCED WITH THE USE OF NON-CONTACT SENSORS AND AIDED BY MACHINE LEARNING METHOD AND IOT. THIS PHASE WILL BE DIVIDED INTO THE FOLLOWING TASKS; TASK 2A- IDENTIFY NEW METHODS FOR INSPECTION OF FRP-RSC BRIDGES OR EXISTING METHODS APPLICABLE TO OTHER TYPES OF STRUCTURES TO BE ADAPTED FOR FRP-RSC. TASK 2B- DESIGN AND FABRICATE SMALL-SCALE SPECIMENS FOR LABORATORY TESTING. TASK 2C- LABORATORY TESTING OF SPECIMENS USING SELECTIVE INSPECTION/NDT METHODS. DELIVERABLE AND WORK DIVISION- AT THE END OF THIS TASK, A REPORT SUMMARIZING THE RESULTS WILL BE SUBMITTED. FIU AND UM WILL CONTRIBUTE 50% EACH. PHASE 3- DEVELOPMENT OF INSPECTION GUIDE- BASED ON THE RESULTS OF THE PREVIOUS TASKS AND PREVIOUS EXPERIENCES WITH SIMILAR WORK BY THE PIS, A DETAILED GUIDE FOR INSPECTION OF FRP-SRC BRIDGES WILL BE DEVELOPED TO SUPPLEMENT THE EXISTING GENERAL PURPOSE MANUALS AND GUIDELINES INCLUDING NBIS; AASHTO STANDARD SPECIFICATIONS FOR HIGHWAY BRIDGES AND THE MANUAL FOR CONDITION EVALUATION OF BRIDGES; THE SAFETY INSPECTION OF IN-SERVICE BRIDGES€€?PARTICIPANT NOTEBOOK, BRIDGE INSPECTOR€„¢S TRAINING MANUAL, AND RECORDING AND CODING GUIDE FOR STRUCTURE INVENTORY AND APPRAISAL OF NA
000513
Parent award context
Parent award agency: Department of Transportation · Federal Highway Administration
Parent award NAICS: 541715
Parent award performance state: FL
Parent award description: GUIDE FOR FIELD INSPECTION OF IN-SERVICE FRP REINFORCED/STRENGTHENED CONCRETE BRIDGE ELEMENTS
View parent award on USAspending
—$66,000Feb 28, 2022— – —

Contract vehicles are shown only when present in the source record. Linked award numbers and vehicles open the authoritative record on USAspending.gov.

Agencies supported

  • Department of Health and Human ServicesGov-sourced
  • Department of DefenseGov-sourced
  • National Aeronautics and Space AdministrationGov-sourced

Government-sourced data comes from SAM.gov, SBA and USAspending.gov and is attributed to its source. Items marked company-reported were provided by the company and are verified by FedSub only where labeled. FedSub is a private company and is not affiliated with SBA, GSA/SAM.gov, or any government agency.

UNIVERSITY OF MIAMI – Coral Gables, FL | UEI RQMFJGDTQ5V3 | FedSub