← Back to search
NORTHROP GRUMMAN SYSTEMS CORP
MANHATTAN BEACH, CA, 90266
UnclaimedClaim this profile (free)
Other Than Small Business
Prime contracting experience
Showing the 50 most recent of 61 records from government sources. Past participation is not evidence of current teaming interest.
| Role | Agency | Description | Vehicle | Obligated | Action date | Period |
|---|---|---|---|---|---|---|
| Prime | Department of Defense Defense Contract Management Agency | ENHANCED POLAR SYSTEM RECAPITALIZATION - TWO PAYLOADS (P6&P7) | — | $472,119,311 | Jul 10, 2026 | Feb 6, 2018 – Feb 28, 2025 |
| Prime | National Aeronautics and Space Administration National Aeronautics and Space Administration | SPACECRAFT SUSTAINING ENGINEERING SUPPORT SERVICES FOR THE EARTH OBSERVING SYSTEM (EOS) AQUA AND AURA SPACECRAFT. THE PRINCIPAL PURPOSE OF THE REQUIREMENT IS FOR THE GOVERNMENT TO OBTAIN RAPID ENGINEERING RESPONSE IN THE EVENT OF ON ORBIT ANOMALIES. | — | $2,916,904 | Jun 25, 2026 | Apr 1, 2021 – Sep 30, 2026 |
| Prime | Department of Defense Defense Contract Management Agency | QUASI-CW OPERATION OF MID-INFRARED QUANTUM CASCADE LASERS INTEGRATED ON SILICON-BASED WAVEGUIDE CIRCUITS | — | $264,157 | May 28, 2026 | Apr 30, 2019 – Aug 24, 2021 |
| Prime | Department of Defense Department of the Air Force | AF MPP CYBERSEC REQUIREMENTS EDUCATION-NORTHROP GRUMMAN AEROSPACE SYSTEMS WILL PROVIDE 40 1-DAY CYBER SECURITY WORKSHOPS PER YEAR TO SMALL BUSINESSES AROUND THE COUNTRY. | — | $999,748 | Mar 27, 2026 | Sep 28, 2018 – Sep 28, 2019 |
| Prime | National Aeronautics and Space Administration National Aeronautics and Space Administration | SWIRP COMPACT SUBMM-WAVE AND LWIR POLARIMETERS FOR CIRRUS ICE PROPERTIES. THIS EFFORT COVERS THE NORTHROP GRUMMAN AEROSPACE SYSTEMS (NGAS) PORTION OF THE WORK BEING PERFORMED IN SUPPORT OF THE SWIRP PROGRAM FUNDED BY THE EARTH SCIENCE TECHNOLOGY OFFICE (ESTO) INSTRUMENT INCUBATOR PROGRAM (IIP) 2016 AND NGAS TASKS IN SUPPORT OF IIP 2016 COMPACT-WAVE AND LONG-WAVE INFRARED (LWIR) POLARIMETERS FOR CIRRUS ICE PROPERTIES (SWIRP). # ONE (1) 220 GHZ DUAL-POLARIZED RECEIVER # TWO (2) 680 GHZ DUAL-POLARIZED RECEIVERS # ONE (1) MINIATURIZED BEARING AND POWER TRANSFER ASSEMBLY # ELECTRICAL/DATA INTERFACE DOCUMENTATION FOR ITEMS 1-3 # MECHANICAL INTERFACE CONTROL DOCUMENT AND EXTERIOR CAD MODELS FOR ITEMS 1-3 THE SWIRP INSTRUMENT IS COMPRISED OF EIGHT PRIMARY SUB-SYSTEMS. NAMELY, 1. 680 GHZ DUAL-CHANNEL (HORIZONTALLY AND VERTICALLY POLARIZED, FROM HERE ON REFERRED TO AS H-POL AND V-POL) RECEIVERS WITH INTEGRATED ANTENNA FEED HORN 2. 220 GHZ DUAL-CHANNEL (H AND V-POL) RECEIVER WITH INTEGRATED ANTENNA FEED HORN 3. MINIATURIZED BEARING AND POWER TRANSFER ASSEMBLY (MINI-BAPTA) 4. LONGWAVE INFRARED CHANNELED SPECTRO-POLARIMETER (IRCSP) 5. ANTENNA REFLECTORS AND CALIBRATION TARGETS (I.E. PRIMARY, SECONDARY AND COLD-SKY REFLECTORS) 6. POWER CONDITIONING AND DISTRIBUTION SYSTEM 7. ANALOG TO DIGITAL CONVERTER (ADC) 8. COMMAND AND DATA HANDLING (C&DH) SYSTEM. NGAS (FROM HERE ON REFERRED TO INTERCHANGEABLY AS THE CONTRACTOR OR NORTHROP GRUMMAN) WILL BE RESPONSIBLE FOR THE DESIGN AND MANUFACTURING SUB-SYSTEMS 1-3, UNIVERSITY OF ARIZONA (UOA) WILL BE RESPONSIBLE FOR SUB-SYSTEM 4 AND GSFC WILL BE RESPONSIBLE FOR 5-8 AS WELL AS INTEGRATION AND TESTING OF THE INSTRUMENT. THE CONTRACTOR SHALL DESIGN, SIMULATE AND LAYOUT A CHIPSET FOR A DIRECT DETECTION RECEIVER. THE CONTRACTOR SHALL PERFORM DC AND RF MEASUREMENTS TO VALIDATE WAFER ELECTRICAL PERFORMANCE. THE CONTRACTOR WILL DESIGN A 680 GHZ DUAL-POLARIZED RECEIVER IN A COMPACT, LOW DC FORM FACTOR OPTIMIZED FOR PLACING IN A 2-ELEMENT ARRAY. THE CONTRACTOR WILL ALSO DESIGN A 220 GHZ DUAL-POLARIZED RECEIVER IN A COMPACT, LOW DC FORM FACTOR AND THE CONTRACTOR WILL PROVIDE ANALYSIS ON A MINI-BAPTA MEETING THE SWIRP PROGRAM NEEDS. | — | $1,667,050 | Sep 11, 2025 | Oct 1, 2017 – Nov 30, 2019 |
| Prime | National Aeronautics and Space Administration National Aeronautics and Space Administration | IGF::OT::IGF MODULAR SPACE VEHICLE AUXILIARY PAYLOAD SYSTEM (APS) MODULAR SPACE VEHICLE (MSV) TASK ORDER THE CONTRACTOR SHALL FURNISH ALL LABOR, SUPPLIES, MATERIALS, TRAVEL, OTHER DIRECT COSTS, AND FEES, NECESSARY TO ACCOMPLISH THE REQUIREMENTS CONTAINED IN THE ATTACHED TASK ORDER. SAP PURCHASE REQUISITION: 4200603314 | NNA11AA03BUSAspending | $77,303,409 | Sep 8, 2025 | Sep 14, 2016 – Apr 30, 2022 |
| Prime | Department of Defense Defense Contract Management Agency | IGF::OT::IGF GROUND BASED STRATEGIC DETTERENT TECHNOLOGY MATURATION AND RISK REDUCTION | — | $366,531,200 | Jun 25, 2025 | Aug 21, 2017 – Sep 8, 2020 |
| Prime | Department of Defense Department of the Air Force | PROJECT HERMES | — | $2,787,734 | Mar 17, 2025 | Apr 7, 2022 – Dec 31, 2025 |
| Prime | Department of Defense Defense Advanced Research Projects Agency | IGF::OT::IGF NGAS TA3 CHIPS PHASE I AWARD. ON THE DARPA COMMON HETEROGENEOUS INTEGRATION AND INTELLECTUAL PROPERTY (IP) REUSE STRATEGIES (CHIPS) TECHNICAL AREA 3 (TA3) CHIPS SUPPORTING TECHNOLOGIES PROGRAM, NORTHROP GRUMMAN AEROSPACE SYSTEMS (NGAS) TEAM WILL SUPPORT THE CHIPLETIZATION OF SUBCONTRACTOR DIGITAL IP. | — | $1,608,061 | Nov 1, 2024 | Aug 24, 2017 – Dec 30, 2019 |
| Prime | Department of Defense Department of the Air Force | REUSABLE HYPERSONIC AIRBREATHING ISR (RHAISR) | — | $14,530,418 | Sep 11, 2024 | Feb 14, 2020 – Apr 30, 2025 |
| Prime | National Aeronautics and Space Administration National Aeronautics and Space Administration | IGF::OT::IGF EOS AQUA AND AURA SPACECRAFT SUSTAINING ENGINEERING SUPPORT SERVICES | — | $2,874,913 | Sep 6, 2024 | Apr 1, 2016 – Mar 31, 2021 |
| Prime | Department of Defense Defense Contract Management Agency | IGF::OT::IGF NS - DAHI | — | $29,697,769 | Aug 14, 2024 | Feb 20, 2013 – May 30, 2018 |
| Prime | Department of Defense Defense Contract Management Agency | VIDEO SYNTHETIC APERTURE RADAR (VISAR) | — | $5,137,923 | Aug 14, 2024 | Dec 3, 2012 – Jul 3, 2015 |
| Prime | Department of Defense Defense Contract Management Agency | DYNAMIC RANGE-ENHANCED ELECTROINCS AND MATERIALS | — | $2,235,671 | Aug 14, 2024 | Dec 8, 2017 – Sep 10, 2020 |
| Prime | Department of Defense Defense Contract Management Agency | IGF::OT::IGF ADVANCED SCANNING TECHNOLOGY FOR IMAGING RADARS | — | $4,764,060 | Aug 14, 2024 | Apr 23, 2015 – Apr 30, 2018 |
| Prime | Department of Defense Defense Contract Management Agency | IGF::OT::IGF STRAFE | — | $109,768,573 | Aug 14, 2024 | Aug 23, 2016 – Jan 26, 2024 |
| Prime | Department of Defense Defense Contract Management Agency | IGF::OT::IGF - 100 GB/S RF BACKBONE PHASE 2 | — | $29,113,548 | Aug 7, 2024 | Sep 28, 2015 – Jun 14, 2019 |
| Prime | Department of Defense Defense Contract Management Agency | DARPA RESEARCH PROJECT (ENDURANCE). | — | $63,864,916 | Jul 24, 2024 | Oct 28, 2013 – May 31, 2019 |
| Prime | Department of Defense Defense Contract Management Agency | IGF::OT::IGF ON-ORBIT REPROGRAMMABLE DIGITAL WAVEFORM GENERATOR (ORDWG) | — | $14,610,504 | Jul 11, 2024 | May 19, 2016 – May 2, 2021 |
| Prime | Department of Defense Defense Contract Management Agency | IGF::OT::IGF - DARPA RESEARCH PROJECT. | — | $41,837,288 | Jul 10, 2024 | Aug 18, 2016 – May 17, 2019 |
| Prime | Department of Defense Defense Contract Management Agency | FIBER LASER PULSED SOURCE | — | $821,259 | Feb 13, 2024 | Jun 4, 2010 – Sep 19, 2011 |
| Prime | Department of Defense Defense Contract Management Agency | IGF::OT::IGF ARRAYS AT COMMERCIAL TIMESCALES (ACT) TRANSMITTER | — | $392,680 | Aug 29, 2023 | Apr 2, 2014 – Aug 3, 2015 |
| Prime | Department of Defense Defense Contract Management Agency | IGF::OT::IGF 100GB/S RADIO FREQUENCY BACKBONE | — | $5,026,032 | Aug 29, 2023 | Sep 5, 2013 – Feb 15, 2016 |
| Prime | Department of Defense Defense Contract Management Agency | ROBUST ELECTRIC LASER INITIATIVE | — | $24,748,597 | Aug 29, 2023 | Aug 12, 2010 – Jan 20, 2019 |
| Prime | Department of Defense Defense Contract Management Agency | ACT AIMS TO DRAMATICALLY SHORTEN THE TIMESCALES ASSOCIATED WITH ELECTROMAGNETIC ARRAY DEVELOPMENT, DEPLOYMENT AND UPGRADE. SPECIFICALLY TECHNICAL AREA 2 IS FOCUSED ON CREATING A CUSTOMIZABLE ELECTROMAGNETIC INTERFACE TO COMPLEMENT THE COMMON MODULE WITHIN THE ACT ARRAY BUILDING BLOCK. THIS RAPIDLY UPDATEABLE EM INTERFACE THUS ENABLES A COMMON HARDWARE BASE TO COVER A BROAD RANGE OF APPLICATIONS REQUIRING A PHASED ARRAY (E.G., EW, SIGINT, RADAR, COMMUNICATION SYSTEMS, ETC.). | — | $3,225,240 | Aug 29, 2023 | May 2, 2014 – May 31, 2016 |
| Prime | Department of Defense Defense Contract Management Agency | IGF::OT::IGF THE OBJECTIVE OF THE CIRCUIT REALIZATION AT FASTER TIMESCALES (CRAFT) PROGRAM IS TO DEVELOP TOOLS TO REVOLUTIONIZE THE DESIGN AND FABRICATION OF CUSTOM INTEGRATED CIRCUITS MORE EFFICIENTLY TO ENABLE HIGH-PERFORMANCE ELECTRONIC SOLUTIONS FASTER AND WITH MORE FLEXIBILITY. | — | $4,040,911 | Aug 29, 2023 | Mar 24, 2016 – Jul 15, 2018 |
| Prime | Department of Defense Defense Contract Management Agency | R&D SERVICES IN SUPPORT OF THE IARPA TRUSTED INTEGRATED CHIPS (TIC) PROGRAM FOR A BASE PERIOD AND 3 OPTIONS PERIODS (5 YEARS). | — | $4,052,667 | Aug 29, 2023 | Sep 6, 2012 – Sep 5, 2017 |
| Prime | Department of Defense Defense Contract Management Agency | IGF::OT::IGF DARPA RESEARCH PROJECT. | — | $1,695,063 | Aug 29, 2023 | Nov 2, 2016 – Feb 15, 2018 |
| Prime | Department of Defense Defense Contract Management Agency | RESEARCH AND DEVELOPMENT IN THE PHYSICAL, ENGINEERING, AND LIFE SCIENCES (EXCEPT BIOTECHNOLOGY) | — | $1,278,282 | Aug 29, 2023 | Jun 24, 2010 – Sep 30, 2013 |
| Prime | Department of Defense Defense Contract Management Agency | ELASTX PROGRAM | — | $17,614,725 | Aug 29, 2023 | May 20, 2010 – Jun 29, 2017 |
| Prime | Department of Defense Defense Contract Management Agency | RESEARCH STUDY | — | $947,022 | Aug 29, 2023 | May 6, 2011 – Jul 5, 2012 |
| Prime | Department of Defense Defense Contract Management Agency | IGF::OT::IGF HEL-JTO FLANC | — | $591,349 | Aug 29, 2023 | Jan 19, 2018 – Sep 30, 2020 |
| Prime | Department of Defense Defense Contract Management Agency | ADVANCED COMMUNICATION AFFORDABILITY (ACA) | — | $4,554,554 | Aug 29, 2023 | Nov 5, 2010 – Apr 7, 2014 |
| Prime | Department of Defense Defense Contract Management Agency | IGF::OT::IGF NORTHROP GRUMMAN AEROSPACE SYSTEMS MILITARY SATELLITE DESIGN. | — | $8,408,243 | Aug 29, 2023 | Nov 21, 2013 – Jan 31, 2015 |
| Prime | Department of Defense Defense Contract Management Agency | IGF::OT::IGF ELASTX2 | — | $5,418,982 | Aug 29, 2023 | Dec 17, 2015 – Feb 27, 2020 |
| Prime | Department of Defense Defense Contract Management Agency | IGF::OT::IGF ARRAYS AT COMMERCIAL TIMESCALES (ACT) RECIEVER | — | $307,177 | Aug 29, 2023 | Apr 2, 2014 – Jun 3, 2015 |
| Prime | Department of Defense Defense Contract Management Agency | IGF::OT::IGF A2AD WAFER LEVEL PACKAGING | — | $297,028 | Aug 29, 2023 | Jun 2, 2014 – Sep 2, 2015 |
| Prime | Department of Defense Defense Contract Management Agency | WSCE PHASE 1 | — | $1,042,309 | Aug 29, 2023 | Jan 9, 2013 – Dec 9, 2013 |
| Prime | Department of Defense Defense Contract Management Agency | DARPA SEEKS TO DEVELOP KNOWLEDGE AND TECHNOLOGIES THAT WILL SECURE THE US DOD'S TECHNOLOGICAL SUPERIORITY OVER CURRENT AND FUTURE ADVERSARIES IN THE FIELD OF COUNTERMEASURES TO ELECTRO-OPTICAL/INFRARED (EO/IR) GUIDED THREATS. THE NORTHROP GRUMMAN AEROSPACE SYSTEMS (NGAS) ADVANCED COUNTERMEASURES EO/IR STUDY (ACES) WILL DEVELOP AND EXERCISE PHYSICS BASED MODELING TOOLS TO EVALUATE, ASSESS, AND UNDERSTAND THE EFFICACY OF COUNTERMEASURE CONCEPTS. | — | $989,585 | Aug 29, 2023 | Apr 2, 2013 – Feb 7, 2014 |
| Prime | Department of Defense Defense Contract Management Agency | THE GOAL OF THE MICROSCALE PLASMA DEVICES (MPD) PROGRAM IS TO DESIGN, DEVELOP, AND CHARACTERIZE MPD TECHNOLOGIES, CIRCUITS, AND SUBSTRATES. IT IS ENVISIONED THAT BOTH TWO AND MULTI-TERMINAL DEVICES CONSISTING OF VARIOUS ARCHITECTURES WILL BE DEVELOPED AND OPTIMIZED UNDER THE SCOPE OF THIS PROGRAM. ENVISIONED MPDS WILL CONSIST OF TWO AND MULTI-TERMINAL COMPONENTS THAT ENABLE, CIRCUITS, SUBSTRATES AND CONTROLLABLE SURFACES, FOR ROBUST OPERATION IN EXTREME RADIATION AND TEMPERATURE ENVIRONMENTS. | — | $9,262,686 | Aug 29, 2023 | Dec 21, 2011 – May 1, 2016 |
| Prime | Department of Defense Defense Contract Management Agency | IGF::OT::IGF SIGNAL PROCESSING AT RF (SPAR): THE GOAL OF SPAR IS TO DEMONSTRATE NOVEL IN-BAND SIGNAL INTERFERENCE MITIGATION TECHNOLOGIES USING ANALOG SIGNAL PROCESSING TECHNIQUES AS WELL AS NOVEL CHIP-SCALE CIRCULATOR APPROACHES. | — | $2,860,093 | Aug 29, 2023 | Nov 4, 2016 – Feb 3, 2018 |
| Prime | Department of Defense Defense Contract Management Agency | IGF::OT::IGF VANISHING REPROGRAMMABLE RESOURCES (VAPR) | — | $463,617 | Aug 29, 2023 | Feb 24, 2014 – Nov 28, 2014 |
| Prime | Department of Defense Defense Contract Management Agency | IGF::OT::IGF XS-1 SPACEPLANE | — | $10,406,452 | Aug 29, 2023 | Jun 27, 2014 – Sep 30, 2017 |
| Prime | Department of Defense Defense Contract Management Agency | IGF::OT::IGF SHIVER II | — | $425,013 | Aug 29, 2023 | Sep 29, 2014 – Jul 10, 2015 |
| Prime | Department of Defense Defense Contract Management Agency | G-BAND RADIO INTERFACE FOR FUTURE ELECTRONICS NETWORKS (GRIFFIN) | — | $1,957,357 | Aug 29, 2023 | Jul 15, 2011 – Oct 15, 2013 |
| Prime | Department of Defense Defense Contract Management Agency | THZ COMMUNICATIONS | — | $5,927,505 | Aug 29, 2023 | Jul 24, 2019 – Dec 31, 2022 |
| Prime | Department of Defense Defense Contract Management Agency | THREADS NGAS | — | $387,426 | Aug 29, 2023 | Jul 23, 2010 – Jul 23, 2011 |
| Prime | Department of Defense Defense Contract Management Agency | IGF::OT::IGF RESEARCH ON INTRACHIP/INTERCHIP ENHANCED COOLING APPLICATIONS (ICECOOL) | — | $5,499,130 | Aug 29, 2023 | Dec 13, 2013 – Apr 30, 2018 |
| Prime | Department of Defense Defense Contract Management Agency | IGF::OT::IGF MICROSYSTEMS TECHNOLOGY OFFICE (MTO) EXCALIBUR/AFKT PROGRAM. | — | $729,814 | Aug 29, 2023 | Apr 10, 2015 – Jul 10, 2016 |
| Prime | Department of Defense Defense Contract Management Agency | IGF::OT::IGF JTO HIGH PERFORMANCE SBC OPTICAL GRATING TECHNOLOGY | — | $1,508,183 | Aug 29, 2023 | Nov 16, 2017 – Sep 17, 2021 |
Contract vehicles are shown only when present in the source record. Linked award numbers and vehicles open the authoritative record on USAspending.gov.
Agencies supported
- National Aeronautics and Space AdministrationGov-sourced
- Department of DefenseGov-sourced
Government-sourced data comes from SAM.gov, SBA and USAspending.gov and is attributed to its source. Items marked company-reported were provided by the company and are verified by FedSub only where labeled. FedSub is a private company and is not affiliated with SBA, GSA/SAM.gov, or any government agency.