RoleAgencyDescriptionVehicleObligatedAction datePeriod
Subcontractor
General Services Administration
LEAD TIME (MOBILIZATION TIME FROM NOTIFICATION OF NEED TO EQUIPMENT SET-UP) FOR ANY EQUIPMENT QUOTED MUST BE LESS THAN OR EQUAL TO THREE BUSINESS DAYS. ALL PRICES QUOTED SHOULD BE BASED ON THE ASSUMPTION THAT EQUIPMENT WILL BE USED FOR THE MINIMUM USAGE CHARGE AMOUNT (IF ANY) FOR EACH CALL, WITH TOTAL USAGE UP TO THE MAXIMUM NUMBER OF DAYS SPECIFIED BELOW. FOR EXAMPLE, IF MINIMUM USAGE CHARGE FOR A 220 TON CRANE IS 1 DAY, THE QUOTE SHOULD ASSUME THE EQUIPMENT WILL BE DELIVERED, SET UP, USED, AND RETURNED ON EACH OCCASION FOR ONE DAY EACH. MOBILIZATION AND ANY ASSOCIATED EXPENSES WOULD BE INCURRED FOR EACH CALL. I3 IS REQUESTING A DAILY RATE QUOTATION FOR EACH PIECE OF EQUIPMENT. PRIOR TO AWARDING A PURCHASE ORDER, I3 WILL ESTABLISH A NOT TO EXCEED (NTE) LEVEL OF EFFORT (LOE) CONTRACT WITH THE AWARDED CONTRACTOR(S) BASED ON THE ESTIMATED DAYS OF USE FOR THE SPECIFIED EQUIPMENT.
SBY000080
Parent award context
Parent award agency: General Services Administration · Federal Acquisition Service
Parent award NAICS: 541712
Parent award performance state: TN
Parent award description: THIS TASK ORDER PROVIDES DESIGN, DEVELOPMENT, ENGINEERING AND INTEGRATION, TESTING, AND SYSTEM CHECKOUT OF ALL SYSTEM COMPONENTS AND SUBSYSTEMS OF THE PHOENIX TEST APPARATUS. THE SCOPE INCLUDES FINAL DEMONSTRATION OF THE INTEGRATED TEST CAPABILITY TO ENSURE THE CAPABILITY MEETS THE OVERALL OPERATIONAL METRICS DEFINED IN THE TO.
View parent award on USAspending
GS00Q14OADS416USAspending$29,957Feb 24, 2022— – —
Subcontractor
General Services Administration
LEAD TIME (MOBILIZATION TIME FROM NOTIFICATION OF NEED TO EQUIPMENT SET-UP) FOR ANY EQUIPMENT QUOTED MUST BE LESS THAN OR EQUAL TO THREE BUSINESS DAYS. ALL PRICES QUOTED SHOULD BE BASED ON THE ASSUMPTION THAT EQUIPMENT WILL BE USED FOR THE MINIMUM USAGE CHARGE AMOUNT (IF ANY) FOR EACH CALL, WITH TOTAL USAGE UP TO THE MAXIMUM NUMBER OF DAYS SPECIFIED BELOW. FOR EXAMPLE, IF MINIMUM USAGE CHARGE FOR A 220 TON CRANE IS 1 DAY, THE QUOTE SHOULD ASSUME THE EQUIPMENT WILL BE DELIVERED, SET UP, USED, AND RETURNED ON EACH OCCASION FOR ONE DAY EACH. MOBILIZATION AND ANY ASSOCIATED EXPENSES WOULD BE INCURRED FOR EACH CALL. I3 IS REQUESTING A DAILY RATE QUOTATION FOR EACH PIECE OF EQUIPMENT. PRIOR TO AWARDING A PURCHASE ORDER, I3 WILL ESTABLISH A NOT TO EXCEED (NTE) LEVEL OF EFFORT (LOE) CONTRACT WITH THE AWARDED CONTRACTOR(S) BASED ON THE ESTIMATED DAYS OF USE FOR THE SPECIFIED EQUIPMENT.
SBY000080
Parent award context
Parent award agency: General Services Administration · Federal Acquisition Service
Parent award NAICS: 541712
Parent award performance state: TN
Parent award description: THIS TASK ORDER PROVIDES DESIGN, DEVELOPMENT, ENGINEERING AND INTEGRATION, TESTING, AND SYSTEM CHECKOUT OF ALL SYSTEM COMPONENTS AND SUBSYSTEMS OF THE PHOENIX TEST APPARATUS. THE SCOPE INCLUDES FINAL DEMONSTRATION OF THE INTEGRATED TEST CAPABILITY TO ENSURE THE CAPABILITY MEETS THE OVERALL OPERATIONAL METRICS DEFINED IN THE TO.
View parent award on USAspending
GS00Q14OADS416USAspending$29,957Feb 24, 2022— – —
Subcontractor
General Services Administration
LEAD TIME (MOBILIZATION TIME FROM NOTIFICATION OF NEED TO EQUIPMENT SET-UP) FOR ANY EQUIPMENT QUOTED MUST BE LESS THAN OR EQUAL TO THREE BUSINESS DAYS. ALL PRICES QUOTED SHOULD BE BASED ON THE ASSUMPTION THAT EQUIPMENT WILL BE USED FOR THE MINIMUM USAGE CHARGE AMOUNT (IF ANY) FOR EACH CALL, WITH TOTAL USAGE UP TO THE MAXIMUM NUMBER OF DAYS SPECIFIED BELOW. FOR EXAMPLE, IF MINIMUM USAGE CHARGE FOR A 220 TON CRANE IS 1 DAY, THE QUOTE SHOULD ASSUME THE EQUIPMENT WILL BE DELIVERED, SET UP, USED, AND RETURNED ON EACH OCCASION FOR ONE DAY EACH. MOBILIZATION AND ANY ASSOCIATED EXPENSES WOULD BE INCURRED FOR EACH CALL. I3 IS REQUESTING A DAILY RATE QUOTATION FOR EACH PIECE OF EQUIPMENT. PRIOR TO AWARDING A PURCHASE ORDER, I3 WILL ESTABLISH A NOT TO EXCEED (NTE) LEVEL OF EFFORT (LOE) CONTRACT WITH THE AWARDED CONTRACTOR(S) BASED ON THE ESTIMATED DAYS OF USE FOR THE SPECIFIED EQUIPMENT.
SBY000080
Parent award context
Parent award agency: General Services Administration · Federal Acquisition Service
Parent award NAICS: 541712
Parent award performance state: TN
Parent award description: THIS TASK ORDER PROVIDES DESIGN, DEVELOPMENT, ENGINEERING AND INTEGRATION, TESTING, AND SYSTEM CHECKOUT OF ALL SYSTEM COMPONENTS AND SUBSYSTEMS OF THE PHOENIX TEST APPARATUS. THE SCOPE INCLUDES FINAL DEMONSTRATION OF THE INTEGRATED TEST CAPABILITY TO ENSURE THE CAPABILITY MEETS THE OVERALL OPERATIONAL METRICS DEFINED IN THE TO.
View parent award on USAspending
GS00Q14OADS416USAspending$29,957Feb 24, 2022— – —
Subcontractor
General Services Administration
LEAD TIME (MOBILIZATION TIME FROM NOTIFICATION OF NEED TO EQUIPMENT SET-UP) FOR ANY EQUIPMENT QUOTED MUST BE LESS THAN OR EQUAL TO THREE BUSINESS DAYS. ALL PRICES QUOTED SHOULD BE BASED ON THE ASSUMPTION THAT EQUIPMENT WILL BE USED FOR THE MINIMUM USAGE CHARGE AMOUNT (IF ANY) FOR EACH CALL, WITH TOTAL USAGE UP TO THE MAXIMUM NUMBER OF DAYS SPECIFIED BELOW. FOR EXAMPLE, IF MINIMUM USAGE CHARGE FOR A 220 TON CRANE IS 1 DAY, THE QUOTE SHOULD ASSUME THE EQUIPMENT WILL BE DELIVERED, SET UP, USED, AND RETURNED ON EACH OCCASION FOR ONE DAY EACH. MOBILIZATION AND ANY ASSOCIATED EXPENSES WOULD BE INCURRED FOR EACH CALL. I3 IS REQUESTING A DAILY RATE QUOTATION FOR EACH PIECE OF EQUIPMENT. PRIOR TO AWARDING A PURCHASE ORDER, I3 WILL ESTABLISH A NOT TO EXCEED (NTE) LEVEL OF EFFORT (LOE) CONTRACT WITH THE AWARDED CONTRACTOR(S) BASED ON THE ESTIMATED DAYS OF USE FOR THE SPECIFIED EQUIPMENT.
SBY000080
Parent award context
Parent award agency: General Services Administration · Federal Acquisition Service
Parent award NAICS: 541712
Parent award performance state: TN
Parent award description: THIS TASK ORDER PROVIDES DESIGN, DEVELOPMENT, ENGINEERING AND INTEGRATION, TESTING, AND SYSTEM CHECKOUT OF ALL SYSTEM COMPONENTS AND SUBSYSTEMS OF THE PHOENIX TEST APPARATUS. THE SCOPE INCLUDES FINAL DEMONSTRATION OF THE INTEGRATED TEST CAPABILITY TO ENSURE THE CAPABILITY MEETS THE OVERALL OPERATIONAL METRICS DEFINED IN THE TO.
View parent award on USAspending
GS00Q14OADS416USAspending$29,957Feb 24, 2022— – —
Subcontractor
General Services Administration
LEAD TIME (MOBILIZATION TIME FROM NOTIFICATION OF NEED TO EQUIPMENT SET-UP) FOR ANY EQUIPMENT QUOTED MUST BE LESS THAN OR EQUAL TO THREE BUSINESS DAYS. ALL PRICES QUOTED SHOULD BE BASED ON THE ASSUMPTION THAT EQUIPMENT WILL BE USED FOR THE MINIMUM USAGE CHARGE AMOUNT (IF ANY) FOR EACH CALL, WITH TOTAL USAGE UP TO THE MAXIMUM NUMBER OF DAYS SPECIFIED BELOW. FOR EXAMPLE, IF MINIMUM USAGE CHARGE FOR A 220 TON CRANE IS 1 DAY, THE QUOTE SHOULD ASSUME THE EQUIPMENT WILL BE DELIVERED, SET UP, USED, AND RETURNED ON EACH OCCASION FOR ONE DAY EACH. MOBILIZATION AND ANY ASSOCIATED EXPENSES WOULD BE INCURRED FOR EACH CALL. I3 IS REQUESTING A DAILY RATE QUOTATION FOR EACH PIECE OF EQUIPMENT. PRIOR TO AWARDING A PURCHASE ORDER, I3 WILL ESTABLISH A NOT TO EXCEED (NTE) LEVEL OF EFFORT (LOE) CONTRACT WITH THE AWARDED CONTRACTOR(S) BASED ON THE ESTIMATED DAYS OF USE FOR THE SPECIFIED EQUIPMENT.
SBY000080
Parent award context
Parent award agency: General Services Administration · Federal Acquisition Service
Parent award NAICS: 541712
Parent award performance state: TN
Parent award description: THIS TASK ORDER PROVIDES DESIGN, DEVELOPMENT, ENGINEERING AND INTEGRATION, TESTING, AND SYSTEM CHECKOUT OF ALL SYSTEM COMPONENTS AND SUBSYSTEMS OF THE PHOENIX TEST APPARATUS. THE SCOPE INCLUDES FINAL DEMONSTRATION OF THE INTEGRATED TEST CAPABILITY TO ENSURE THE CAPABILITY MEETS THE OVERALL OPERATIONAL METRICS DEFINED IN THE TO.
View parent award on USAspending
GS00Q14OADS416USAspending$29,957Feb 24, 2022— – —
Subcontractor
General Services Administration
LEAD TIME (MOBILIZATION TIME FROM NOTIFICATION OF NEED TO EQUIPMENT SET-UP) FOR ANY EQUIPMENT QUOTED MUST BE LESS THAN OR EQUAL TO THREE BUSINESS DAYS. ALL PRICES QUOTED SHOULD BE BASED ON THE ASSUMPTION THAT EQUIPMENT WILL BE USED FOR THE MINIMUM USAGE CHARGE AMOUNT (IF ANY) FOR EACH CALL, WITH TOTAL USAGE UP TO THE MAXIMUM NUMBER OF DAYS SPECIFIED BELOW. FOR EXAMPLE, IF MINIMUM USAGE CHARGE FOR A 220 TON CRANE IS 1 DAY, THE QUOTE SHOULD ASSUME THE EQUIPMENT WILL BE DELIVERED, SET UP, USED, AND RETURNED ON EACH OCCASION FOR ONE DAY EACH. MOBILIZATION AND ANY ASSOCIATED EXPENSES WOULD BE INCURRED FOR EACH CALL. I3 IS REQUESTING A DAILY RATE QUOTATION FOR EACH PIECE OF EQUIPMENT. PRIOR TO AWARDING A PURCHASE ORDER, I3 WILL ESTABLISH A NOT TO EXCEED (NTE) LEVEL OF EFFORT (LOE) CONTRACT WITH THE AWARDED CONTRACTOR(S) BASED ON THE ESTIMATED DAYS OF USE FOR THE SPECIFIED EQUIPMENT.
SBY000080
Parent award context
Parent award agency: General Services Administration · Federal Acquisition Service
Parent award NAICS: 541712
Parent award performance state: TN
Parent award description: THIS TASK ORDER PROVIDES DESIGN, DEVELOPMENT, ENGINEERING AND INTEGRATION, TESTING, AND SYSTEM CHECKOUT OF ALL SYSTEM COMPONENTS AND SUBSYSTEMS OF THE PHOENIX TEST APPARATUS. THE SCOPE INCLUDES FINAL DEMONSTRATION OF THE INTEGRATED TEST CAPABILITY TO ENSURE THE CAPABILITY MEETS THE OVERALL OPERATIONAL METRICS DEFINED IN THE TO.
View parent award on USAspending
GS00Q14OADS416USAspending$29,957Feb 24, 2022— – —
Subcontractor
General Services Administration
LEAD TIME (MOBILIZATION TIME FROM NOTIFICATION OF NEED TO EQUIPMENT SET-UP) FOR ANY EQUIPMENT QUOTED MUST BE LESS THAN OR EQUAL TO THREE BUSINESS DAYS. ALL PRICES QUOTED SHOULD BE BASED ON THE ASSUMPTION THAT EQUIPMENT WILL BE USED FOR THE MINIMUM USAGE CHARGE AMOUNT (IF ANY) FOR EACH CALL, WITH TOTAL USAGE UP TO THE MAXIMUM NUMBER OF DAYS SPECIFIED BELOW. FOR EXAMPLE, IF MINIMUM USAGE CHARGE FOR A 220 TON CRANE IS 1 DAY, THE QUOTE SHOULD ASSUME THE EQUIPMENT WILL BE DELIVERED, SET UP, USED, AND RETURNED ON EACH OCCASION FOR ONE DAY EACH. MOBILIZATION AND ANY ASSOCIATED EXPENSES WOULD BE INCURRED FOR EACH CALL. I3 IS REQUESTING A DAILY RATE QUOTATION FOR EACH PIECE OF EQUIPMENT. PRIOR TO AWARDING A PURCHASE ORDER, I3 WILL ESTABLISH A NOT TO EXCEED (NTE) LEVEL OF EFFORT (LOE) CONTRACT WITH THE AWARDED CONTRACTOR(S) BASED ON THE ESTIMATED DAYS OF USE FOR THE SPECIFIED EQUIPMENT.
SBY000080
Parent award context
Parent award agency: General Services Administration · Federal Acquisition Service
Parent award NAICS: 541712
Parent award performance state: TN
Parent award description: THIS TASK ORDER PROVIDES DESIGN, DEVELOPMENT, ENGINEERING AND INTEGRATION, TESTING, AND SYSTEM CHECKOUT OF ALL SYSTEM COMPONENTS AND SUBSYSTEMS OF THE PHOENIX TEST APPARATUS. THE SCOPE INCLUDES FINAL DEMONSTRATION OF THE INTEGRATED TEST CAPABILITY TO ENSURE THE CAPABILITY MEETS THE OVERALL OPERATIONAL METRICS DEFINED IN THE TO.
View parent award on USAspending
GS00Q14OADS416USAspending$29,957Feb 24, 2022— – —
Subcontractor
General Services Administration
TO SUPPORT THIS TECHNOLOGY DEVELOPMENT, LOGISTICS EQUIPMENT SUPPORT IS NECESSARY THROUGHOUT THE EFFORT. THIS SUPPORT MUST INCLUDE SERVICES IN THE MOBILIZATION AND OPERATION OF CRANES, LOWBOYS, FORKLIFTS, AND MANLIFTS IN A VARIETY OF WEIGHT CLASSES. THE PROCUREMENT OF THIS EQUIPMENT SUPPORT IS IN COMPLIANCE WITH LOGISTICS REQUIREMENTS LEVIED IN THE PHOENIX TASK ORDER (PWS 5.1.3, 5.2.2, AND 5.2.2).
SBY000080
Parent award context
Parent award agency: General Services Administration · Federal Acquisition Service
Parent award NAICS: 541712
Parent award performance state: TN
Parent award description: THIS TASK ORDER PROVIDES DESIGN, DEVELOPMENT, ENGINEERING AND INTEGRATION, TESTING, AND SYSTEM CHECKOUT OF ALL SYSTEM COMPONENTS AND SUBSYSTEMS OF THE PHOENIX TEST APPARATUS. THE SCOPE INCLUDES FINAL DEMONSTRATION OF THE INTEGRATED TEST CAPABILITY TO ENSURE THE CAPABILITY MEETS THE OVERALL OPERATIONAL METRICS DEFINED IN THE TO.
View parent award on USAspending
GS00Q14OADS416USAspending$37,491Jan 11, 2022— – —
Subcontractor
General Services Administration
LEAD TIME (MOBILIZATION TIME FROM NOTIFICATION OF NEED TO EQUIPMENT SET-UP) FOR ANY EQUIPMENT QUOTED MUST BE LESS THAN OR EQUAL TO THREE BUSINESS DAYS. ALL PRICES QUOTED SHOULD BE BASED ON THE ASSUMPTION THAT EQUIPMENT WILL BE USED FOR THE MINIMUM USAGE CHARGE AMOUNT (IF ANY) FOR EACH CALL, WITH TOTAL USAGE UP TO THE MAXIMUM NUMBER OF DAYS SPECIFIED BELOW. FOR EXAMPLE, IF MINIMUM USAGE CHARGE FOR A 220 TON CRANE IS 1 DAY, THE QUOTE SHOULD ASSUME THE EQUIPMENT WILL BE DELIVERED, SET UP, USED, AND RETURNED ON EACH OCCASION FOR ONE DAY EACH. MOBILIZATION AND ANY ASSOCIATED EXPENSES WOULD BE INCURRED FOR EACH CALL. I3 IS REQUESTING A DAILY RATE QUOTATION FOR EACH PIECE OF EQUIPMENT. PRIOR TO AWARDING A PURCHASE ORDER, I3 WILL ESTABLISH A NOT TO EXCEED (NTE) LEVEL OF EFFORT (LOE) CONTRACT WITH THE AWARDED CONTRACTOR(S) BASED ON THE ESTIMATED DAYS OF USE FOR THE SPECIFIED EQUIPMENT.
SBY000080
Parent award context
Parent award agency: General Services Administration · Federal Acquisition Service
Parent award NAICS: 541712
Parent award performance state: TN
Parent award description: THIS TASK ORDER PROVIDES DESIGN, DEVELOPMENT, ENGINEERING AND INTEGRATION, TESTING, AND SYSTEM CHECKOUT OF ALL SYSTEM COMPONENTS AND SUBSYSTEMS OF THE PHOENIX TEST APPARATUS. THE SCOPE INCLUDES FINAL DEMONSTRATION OF THE INTEGRATED TEST CAPABILITY TO ENSURE THE CAPABILITY MEETS THE OVERALL OPERATIONAL METRICS DEFINED IN THE TO.
View parent award on USAspending
GS00Q14OADS416USAspending$37,491Jan 11, 2022— – —

Contract vehicles are shown only when present in the source record. Linked award numbers and vehicles open the authoritative record on USAspending.gov.

Government-sourced data comes from SAM.gov, SBA and USAspending.gov and is attributed to its source. Items marked company-reported were provided by the company and are verified by FedSub only where labeled. FedSub is a private company and is not affiliated with SBA, GSA/SAM.gov, or any government agency.

GILLEY CONSTRUCTION, INC. – Manchester, TN | UEI S5AVNCLKW573 | FedSub