← Back to search
DOTZLER CONSTRUCTION, INC.
Doing business as DOTZLER CONSTRUCTION INC
LOMPOC, CA, 93436
UnclaimedClaim this profile (free)
Small BusinessHUBZoneWOSB
Subcontracting experience
21 records from government sources. Past participation is not evidence of current teaming interest.
| Role | Agency | Description | Vehicle | Obligated | Action date | Period |
|---|---|---|---|---|---|---|
| Subcontractor | Department of Defense | CLEAR/GRUB SITE TO CONSTRUCT NEW DRY CAMPING SPOTS WITH ACCESS ROAD. NORTH COAST CONSTRUCTION Parent award context Parent award agency: Department of Defense · Department of the Air Force Parent award NAICS: 236220 Parent award performance state: CA Parent award description: XUMU 25-2909 MARSHALLIA RANCH DRY CAMPING. THE CONTRACTOR SHALL PERFORM MAINTENANCE, REPAIR, AND MINOR CONSTRUCTION IAW SABER MASTER SPECIFICATIONS AND ATTACHMENT 1 STATEMENT OF WORK. View parent award on USAspending | FA461025D0003USAspending | $1,246,696 | Sep 4, 2025 | — – — |
| Subcontractor | Department of Defense | CONCRETE INSPECTION, INFILL CANNISTER & INSPECTION, INFILL STAGE ERECTION PIT AND INSPECTION. 2504-NCC-05-0 Parent award context Parent award agency: Department of Defense · Department of the Army Parent award NAICS: 238910 Parent award performance state: CA Parent award description: DEMO CANNISTER ERECTION STRUCTURE, AND BACK FILL, VSFB, CA View parent award on USAspending | — | $921,171 | Apr 22, 2025 | — – — |
| Subcontractor | Department of Defense | MOBILIZATION:
· ALL APPROPRIATE SIGNAGE WILL BE POSTED ON SITE PRIOR TO START OF CONSTRUCTION.
· CONTAINMENT AREA WILL BE SET UP TO STORE POSSIBLY CONTAMINATED SOIL UNTIL TEST RESULTS ARE RECEIVED.
· TEST SOIL.
DEMOLITION:
· CONCRETE ON THE NORTH SIDE OF THE HVAC UNITS WILL BE SAW CUT 24€Ͽ½ AWAY FROM THE BOLLARDS TO ALLOW FOR DEMOLITION
AROUND THE HVAC UNITS.
· ALL CONCRETE WILL BE DEMOLISHED AND REMOVED UP TO EXPANSION JOINTS AND NEW SAW CUT AROUND HVAC UNITS.
DEMOLITION OF CONCRETE TO INCLUDE FROM EAST EDGE OF FACILITY CONCRETE PAD TO EDGES OF ASPHALT.
· NO HEAVY EQUIPMENT WILL BE USED WITHIN 4 FEET OF THE 2 X IRP SITES. AREA WILL BE EXCAVATED BY HAND ONLY.
· AN ADDITIONAL 15€„¢ OF ASPHALT WILL BE SAW CUT AND DEMOLISHED TO ALLOW FOR NEW CONCRETE SLAB MEASURING 51€„¢ X 123€„¢.
· EXISTING SOIL UNDER CONCRETE / ASPHALT WILL BE REMOVED TO A DEPTH OF 15€Ͽ½. SOIL WILL BE STORED ON SITE UNTIL TEST RESULTS
ARE RECEIVED.
INSTALLATION:
· 6273 SQ. FOOT AREA WILL BE COMPACTED TO A MAXIMUM DENSITY OF 95%
· 6€Ͽ½ INCHES OF CLASS 2 AGGREGATE BASE WILL BE INSTALLED IN NEWLY EXCAVATED AND COMPACTED AREA. (APPROXIMATELY 116
CUBIC YARDS)
· CONCRETE FORMS WILL BE INSTALLED AS NECESSARY.
· #5 REBAR WILL BE INSTALLED ON 18€Ͽ½ CENTER EACH WAY.
· INSTALL 9€Ͽ½ OF TYPE 2 PORTLAND CEMENT 4000 PSI WITH A BROOM FINISH. (APPROXIMATELY 174 CUBIC YARDS)
· RELIEF JOINTS WILL BE SAW CUT INTO NEW CONCRETE SLAB NO MORE THAN EVERY 15€„¢ ON CENTER. RELIEF JOINTS WILL BE AT LEAST
2.25€Ͽ½ DEEP AND 1/8€Ͽ½ WIDE.
· NEW CONCRETE PAD WILL BE SLOPED AWAY FROM THE FACILITY TO PREVENT WATER INTRUSION.
CLOSE OUT:
· TURN IN ALL CLOSE OUT DOCUMENTS. 1914-62 Parent award context Parent award agency: Department of Defense · Department of the Air Force Parent award NAICS: 236220 Parent award performance state: CA Parent award description: REPAIR DRIVEWAY B9320 View parent award on USAspending | FA461020D0003USAspending | $339,736 | Oct 30, 2024 | — – — |
| Subcontractor | Department of Defense | CONCRETE, PLUMBING, CABINETS, AND COUNTERTOPS 2403-NCC-05-0 Parent award context Parent award agency: Department of Defense · Department of the Army Parent award NAICS: 236220 Parent award performance state: CA Parent award description: B1819 ADMIN RENOVATION View parent award on USAspending | — | $179,743 | Oct 14, 2024 | — – — |
| Subcontractor | Department of Defense | DEMOLITION:
· EXISTING FURNITURE WILL BE DISASSEMBLED, REMOVED, STORED ON SITE OR DISPOSED OF DEPENDING ON USER€„¢S REQUEST.
· CARPET WILL BE REMOVED UP TO EXTERIOR OF SECURITY CAGE.
· SECURITY CAGE WILL BE UNBOLTED AND MOVED TO REMOVE CARPET BENEATH CAGE AND SAFE. SAFE WILL REMAIN IN SECURITY
CAGE THROUGHOUT DURATION OF CONSTRUCTION.
· EXISTING 2€„¢X4€„¢ LIGHT FIXTURES WILL BE REMOVED AND DISPOSED OF PROPERLY.
INSTALLATION:
· PROVIDE AND INSTALL NEW €œCOMMERCIAL GRADE€Ͽ½ DEADBOLT IN EXISTING ENTRY DOOR.
· PROVIDE AND INSTALL NEW WALL EXTENDING FULL WIDTH OF THE ROOM WITH SOLID CORE WOOD FINISH ENTRY DOOR AND DISBURSING
WINDOW. PERSONNEL ENTRY DOOR WILL BE EQUIPPED WITH €œCOMMERCIAL GRADE€Ͽ½ LOCKING HARDWARE. WALL WILL EXTEND
ABOVE EXISTING T€Ͽ½BAR CEILING. WALL WILL BE TAPED, TEXTURED AND PAINTED TO MATCH EXISTING.
· PROVIDE AND INSTALL SOLID SURFACE COUNTER TOPS ON BOTH SIDES OF PASS OF DISBURSING WINDOW.
· PROVIDE AND INSTALL NEW SECURITY SHUTTER ON NEW DISBURSING WINDOW.
· PROVIDE AND INSTALL NEW WALL EXTENDING FROM NORTH WALL TO SOUTH EDGE OF SECURITY CAGE. WALL WILL EXTEND ABOVE TBAR
CEILING AND BE TAPED, TEXTURED AND PAINTED TO MATCH EXISTING.
· PROVIDE AND INSTALL NEW 24€Ͽ½ X 24€Ͽ½ NYLON CARPET TILE: SHAW CONTRACT; VISIBLE TILE; COLOR €œEMIT€Ͽ½ OR EQUIVALENT WITH 4€Ͽ½
NYLON TOP BOUND CARPET COVE BASE; COLOR €œADRIFT€Ͽ½ OR EQUIVALENT THROUGHOUT ROOM 105.
· INTERIOR OF ROOM 105 WILL BE PAINTED TO MATCH EXISTING.
· 4 NEW 2€„¢X4€„¢ LED LIGHT FIXTURES WILL BE PROVIDED AND INSTALLED TO ACCOMMODATE NEW WALL CONFIGURATION AS NECESSARY.
· EXISTING T€Ͽ½BAR CEILING WILL BE MODIFIED / RECONFIGURED TO ACCOMMODATE NEW WALLS.
· EXISTING SECURITY CAGE WITH SAFE WILL BE REINSTALLED IN SAME LOCATION AS EXISTING. 1914-49 · Prime awardUSAspending | FA461020D0003USAspending | $91,594 | Aug 12, 2024 | — – — |
| Subcontractor | Department of Defense | MOBILIZE / DEMOLITION:
· MOBILIZE TO SITE AND SET UP. ALL APPROPRIATE SIGNAGE WILL BE POSTED.
· REMOVE EXISTING VOLCANIC ROCK AND SET ASIDE FOR REUSE.
· POT HOLE AROUND FACILITY TO VERIFY EXISTING UTILITIES.
· EXISTING SPRINKLER SYSTEM AND TIMER WILL BE REMOVED AND DISPOSED OF PROPERLY
· EXISTING CONCRETE PADS AT ENTRANCE AND REAR OF BUILDING WILL BE REMOVED AND DISPOSED OF PROPERLY.
· EXCAVATE DOWN ALONG THE EAST, SOUTH AND NORTH SIDES OF BUILDING TO EXPOSE FOOTING.
· FOOTING WILL BE PRESSURE WASHED TO REMOVE ALL SOIL AND DEBRIS.
FRENCH DRAIN(NORTH, SOUTH, EAST SIDE):
· FOOTING WILL BE WATERPROOFED AND MIRADRAIN SYSTEM WILL BE INSTALLED.
· FILTER FABRIC WILL BE INSTALLED IN BOTTOM OF TRENCH.
· 6 INCHES OF ¾ INCH ROCK WILL BE INSTALLED ON TOP OF FILTER FABRIC.
· A 6€Ͽ½INCH FILTER FABRIC WRAPPED PERFORATED PIPE WILL BE PLACED ON TOP OF ¾ IN ROCK.
· RUN DRAIN LINES OUT ON 2 SIDES AND DAYLIGHT, PLACE SCREEN ON PIPE ENDS.
· 12 INCHES OF ¾ INCH ROCK WILL BE INSTALLED ON TOP OF PERFORATED PIPE.
· BACKFILL AND COMPACT.
· SET CONCRETE FORMS AT ENTRYWAY TO FACILITY. REPLACE CONCRETE.
· INSTALL RAIN GUTTERS AND DOWN SPOUTS ON ALL 4 SIDES OF BUILDING. GUTTERS AND DOWN SPOUTS WILL BE STANDARD BASE
COLORS TO MATCH EXISTING. DOWN SPOUTS WILL INCLUDE ANGLED TRANSITION PIECES AND SPLASH BLOCKS WHERE NECESSARY.
DOWN SPOUTS WILL BE PIPPED AWAY FROM BUILDING.
· EXISTING VOLCANIC ROCK WILL BE REINSTALLED IN SAME LOCATION AS EXISTING. 1914-50 · Prime awardUSAspending | FA461020D0003USAspending | $85,331 | Aug 12, 2024 | — – — |
| Subcontractor | Department of Defense | MOBILIZE:
• APPROPRIATE SIGNAGE IS POSTED ON SITE.
• RESTROOM WILL REMAIN ON SITE FOR THE DURATION OF THE PROJECT.
• CONTAINMENT WILL BE SET UP TO MITIGATE DUST.
• PROVIDE MOLD MITIGATION PLAN.
DEMOLITION / MOLD MITIGATION:
• DEMO CREW ON SITE TO CUT AND REMOVE WALLPAPER, WET MOLDY SHEETROCK AND INSULATION TO A HEIGHT OF 4’ FROM FLOOR.
• EXPOSED FRAMING AND SHEETROCK NOT BEING REMOVED WILL BE TREATED WITH FUNGICIDE.
• REMOVE CARPET AND PADDING AT STAIRS FROM BOTTOM TO TOP OF STAIRS.
• DEMO OLD TELEPHONE SHELVING IN HALLWAY.
• RE‐MOVE OLD FLASH BOARD OFF WALL AND TURN IN TO PACIFIC COAST CLUB.
• REMOVE INSULATION FROM FLOOR UP TO APPROXIMATELY 4FT AROUND PERIMETER OF THE RESTROOM AND HALLWAY ENTRANCE.
REPAIRS:
• ENSURE ALL AREAS ARE FREE OF MOISTURE PRIOR TO INSTALLATION OF ANY FINISHES.
• PROVIDE AND REPLACE ALL EXPOSED WALL INSULATION AS NEEDED.
• PROVIDE AND INSTALL NEW SHEETROCK. REPAIR ALL WALLS, TAPE & TEXTURE TO MATCH EXISTING.
• PRIME & PAINT ALL WALLS IN MAIN ENTRANCE AND IN STAIRWELL TO MATCH EXISTING.
• PAINT DOORS AT EXISTING STAIRS TO MATCH EXISTING.
• REPAIR EXISTING WOOD BASE BOARD AT STAIRS.
• INSTALL FLEXCO RUBBER TREADS AND RUBBER TILES WITH A RAISED ROUND CIRCULAR PROFILE. TREADS TO HAVE VI STRIP AT TOP AND BOTTOM OF EACH FLIGHT. RUBBER TILES TO BE INSTALLED AT TOP, MIDDLE AND LOWER LANDINGS.
• INSTALL NEW WOOD BASE BOARD TO MATCH EXISTING BASE, PAINT GRADE.
• COMPLETE ALL WORK AS DESCRIBED IN SOO AND DESIGN DRAWING PROVIDED.
SCOPE OF WORK INCLUDES BUT IS NOT LIMITED TO:
• DAILY CLEAN‐UP IS INCLUDED
• SUBCONTRACTOR SHALL SUBMIT WEEKLY SAFETY MEETING MINUTES EVERY WEEK TO SJD&B PROJECT MANAGER 1914-38-A Parent award context Parent award agency: Department of Defense · Department of the Air Force Parent award NAICS: 236220 Parent award performance state: CA Parent award description: RENOVATE/UPGRADE RESTROOMS AND REPAIR DRAINAGE SYSTEM View parent award on USAspending | FA461020D0003USAspending | $56,731 | Jul 17, 2024 | — – — |
| Subcontractor | Department of Defense | · ALL WORK WILL BE DONE IN PHASES. EACH PHASE WILL BE COMPLETED LEAVING THE USER WITH A COMPLETE AND
USABLE PRODUCT PRIOR TO STARTING OF THE NEXT PHASE.
· PHASES TO INCLUDE.
A. PHASE 1 €€Œ BLDG. 8173, ROOMS 143 & 145
B. PHASE 2 €€Œ BLDG. 8173, ROOMS 108 & 110
C. PHASE 3 €€Œ BLDG. 8173, ROOMS 172 & 174
D. PHASE 4 €€Œ BLDG. 8175, ROOMS 115 & 116
· NCC WILL PROVIDE ALL MATERIAL, LABOR, AND EQUIPMENT TO INSTALL NEW ACCESSORIES, MIRRORS AND REPAINT
WALL & CEILING IN FACILITY 8173 & 8175. EIGHT TOTAL RESTROOM MEN & WOMEN€„¢S, ALL FLOOR MOUNTED
PARTITION.
· NCC WILL PROVIDE ALL MATERIAL, LABOR, AND EQUIPMENT TO DEMO AND INSTALL NEW PARTITIONS IN FACILITY 8173 &
8175. #8 RESTROOM MEN & WOMEN€„¢S, ALL FLOOR MOUNTED PARTITION. 1914-39-C Parent award context Parent award agency: Department of Defense · Department of the Air Force Parent award NAICS: 236220 Parent award performance state: CA Parent award description: RENOVATE AND UPGRADE RESTROOMS AT BUILDING 8173 AND BUILDING 8175 View parent award on USAspending | FA461020D0003USAspending | $151,283 | Oct 18, 2023 | — – — |
| Subcontractor | Department of Defense | MOBILIZE TO SITE. DEMO DONE BY OTHERS. NCC ROUGHT-IN PLUMBING INSTALLS NEW TOILETS AND SINK, INSTALL NEW ACCESSORIES IN RESTROOM. REPAIR SHEETROCK. INSTALL NEW PRIME & PAINT. INSTALL RESTROOM CABINET& MIRROR. INSTALL NEW FRONT CABINETS & STAINLESS-STEEL TOPS AND ON WALL WERE NEEDED, PER GUARD SHACK. PROVIDE NEW EXHAUST FAN, PROVIDE, AND INSTALL ELECTRIC HEATERS. REUSE EXISTING ELECTRICAL UPDATING PER CODE, REFRIGERATION PIPING AND PIPING INSULATION. START UP AND CHECK OUT SYSTEM. INSTALL NEW 8X8 QUARRY TILE, ASHEN GRAY TO OFFICE AND JANITORS CLOSET FLOOR. USING 6€Ͽ½ COVE BASE. BATHROOM WAINSCOT AT 4€„¢ HIGH AND WET WALL BEHIND TOILET TO CEILING. BATHROOM FLOOR DAL TILE 2X2 KEYSTONE DESERT GRAY. THIS GOES TO ALL FOUR GUARD SHACKS. CHANGE OUT ALL BROKEN WINDOWS AT #6 GUARD SHACKS. BULLET-RESISTANT GLASS, UL LEVEL 8 WITH FILM. 23055-03 Parent award context Parent award agency: Department of Defense · Department of the Air Force Parent award NAICS: 236220 Parent award performance state: CA Parent award description: RENOVATE GUARD SHACK RESTROOMS AND REPAIR WINDOW View parent award on USAspending | FA461020D0001USAspending | $814,267 | Oct 5, 2023 | — – — |
| Subcontractor | Department of Defense | · ALL EXISTING TOILETS, URINALS, SINKS, COUNTERS, FIXTURES, ACCESSORIES AND PARTITIONS WILL BE DEMOLISHED AND TURNED INTO
VSFB RECYCLE CENTER OR LOCAL LANDFILL OFF BASE.
· REMOVE AND DISPOSE OF EXISTING CERAMIC TILES ON WALLS AND FLOOR.
· REMOVE AND DISPOSE OF DRYWALL.
· CONCRETE SLAB WILL BE SAW CUT AND REMOVED TO EXPOSE SOIL. HAND DIG TO EXPOSE EXISTING SEWER LINES.
· RECEIPTS WILL BE PROVIDED FOR ALL TURNED IN MATERIAL.
REPAIR PLUMBING:
· EXISTING SEWER LINE WILL BE REPLACED TO 2 FEET OUTSIDE OF EXTERIOR WALL.
· SEWER LINE REPLACEMENT WILL INCLUDE ALL INTERIOR BELOW GRADE PLUMBING, DRAINS AND LATERALS IN BOTH RESTROOMS.
· ALL FLOOR DRAINS WILL BE REPLACED WITH NEW.
· ALL DRAINS, P€Ͽ½TRAPS AND SEWER LINES WILL BE SNAKED / INSPECTED TO ENSURE THEY ARE FUNCTIONING PROPERLY.
VESTIBULE:
· REMOVE WALLPAPER, PATCH AND TEXTURE TO MATCH EXISTING.
· PRIME AND PAINT TO MATCH EXISTING.
MEN€„¢S RESTROOM 149:
· INSTALL ALL NEW ELECTRICAL PER BASE STANDARDS INCLUDING NEW GFI OUTLETS ABOVE COUNTER TOP.
· INSTALL NEW 5/8 SHEETROCK ON WALLS.
· GREEN BOARD WILL BE USED ON ALL WET WALLS.
· PLACE THREE COAT OF MUD AND TEXTURE ON WALLS AND CEILING.
· WALLS AND CEILING IN MEN€„¢S ROOM WILL BE PRIMED AND PAINTED WITH A MINIMUM OF TWO FINISH COATS. (PAINT TO BE
DETERMINED).
· INSTALL NEW SOLID CORE STAIN GRADE BURCH DOOR WITH PUSH / PULL AND CLOSURE HARDWARE, STAINLESS STEEL KICK PLATE EACH
SIDE OF DOOR.
· DOOR WILL BE ADA COMPLIANT WITH HANDICAP ACCESSIBLE SIGN INSTALLED.
· FLOOR WILL BE TILED WITH FLOOR CROSSVILLE, COLOR PALETTE, ASK04 (UPS) 12€Ͽ½ X 24€Ͽ½BORDER 2€Ͽ½ X 2€Ͽ½ FILL AND RETRO ACTIVE 2.0
RET09 PHANTOM PO 6€Ͽ½ X 12€„¢ COVE BASE OR EQUIVALENT.
· REPLACE WALL TILE WITH RETRO ACTIVE 2.0 RET05 SNOW BLIND PO 12€Ͽ½ X 24€Ͽ½ OR EQUIVALENT.
· GROUT LATICRETE 78 STERLING SILVER.
· ALL TILE WILL BE UNIFORM THROUGHOUT THE RESTROOM.
· REPLACE EXHAUST FAN / SUPPLY AND RETURN REGISTERS.
· INSTALL 4 NEW AMERICAN STANDARD PRILO 1.1 €€Œ 1.6 GPF TOILETS AND 5 NEW AMERICAN STANDARD ALL BROOK 0.5 GPF URINALS
WITH ASSOCIATED VALVES, ELECTRONIC SENSOR AND FLUSHOMETER, COLOR WHITE OR EQUIVALENT.
· REPLACE EXISTING SINKS / COUNTER TOP WITH NEW TRIPLE LAVATORY SINK WITH WHITE ONYX CORIAN COUNTERTOP AND PIONITE
PFA60 SUEDE PLASTIC LAMINATE BOTTOM SKIRTS OR EQUIVALENT.
DOCUSIGN ENVELOPE ID: 9CC7B2EF0E1B2DE-9D1354EB--44C21969-8AD91639-23867463E8B66A25AF79DC79
CONTRACTOR€„¢S INITIALS _______ PAGE 4 OF 24 SUBCONTRACTOR€„¢S INITIALS _______
· NEW STAINLESS€Ͽ½STEEL ACCESSORIES TO INCLUDE 1 COMBINATION PAPER TOWEL DISPENSER / WASTE DISPOSAL, 3 SOAP DISPENSER,
1 HAND DRYER AND 1 FULL€Ͽ½LENGTH STAINLESS€Ͽ½STEEL FRAME MIRRORS MOUNTED ABOVE THE SINKS.
· INSTALL 1 AUTOMATED HAND SANITIZER DISPENSER. INSTALL ADA COMPLIANT GRAB BARS IN ADA STALL.
· REPLACE LIGHTING OVER SINK WITH NEW LED LIGHTING PER €œFACILITY STANDARDS€Ͽ½ AND SOW.
· INSTALL NEW FLOOR MOUNTED ARBORITE W€Ͽ½461 EV SULAWOSI DUNES TOILET PARTITIONS.
· EACH STALL WILL BE EQUIPPED WITH STAINLESS STEEL, LARGE ROLL TOILET PAPER DISPENSER, TOILET SEAT DISPENSER, AND COAT
HOOK.
· ONE ARBORITE W€Ͽ½461 EV SULAWOSI DUNES PARTITION WILL BE INSTALLED BETWEEN EACH URINAL.
· REPLACE ALL RECESSED CAN LIGHTING WITH NEW LED. PER "FACILITY STANDARDS" AND SOO.
WOMEN€„¢S RESTROOM 148:
· INSTALL ALL NEW ELECTRICAL PER BASE STANDARDS INCLUDING NEW GFI OUTLETS ABOVE COUNTER TOP.
· INSTALL NEW 5/8 SHEETROCK ON WALLS.
· GREEN BOARD WILL BE USED ON ALL WET WALLS.
· PLACE THREE COAT OF MUD AND TEXTURE ON WALLS AND CEILING.
· WALLS AND CEILING IN WOMEN€„¢S ROOM (INCLUDING SITTING ROOM) WILL BE PRIMED AND PAINTED WITH A MINIMUM OF TWO
FINISH COATS. (PAINT TO BE DETERMINED).
· INSTALL NEW SOLID CORE STAIN 1914-38 Parent award context Parent award agency: Department of Defense · Department of the Air Force Parent award NAICS: 236220 Parent award performance state: CA Parent award description: RENOVATE/UPGRADE RESTROOMS AND REPAIR DRAINAGE SYSTEM View parent award on USAspending | FA461020D0003USAspending | $413,733 | Aug 10, 2023 | — – — |
| Subcontractor | Department of Defense | PROJECT INITIATION:
€¢ PORTABLE RESTROOM WILL BE MOBILIZED TO SITE FOR WORKER USE.
€¢ ALL APPROPRIATE SIGNAGE WILL BE CLEARLY POSTED.
€¢ CONTINUAL COORDINATION WILL BE DONE WITH THE FACILITY MANAGER TO ENSURE NO INTERFERENCE WITH CURRENT
TENANTS AND THEIR DAY-TO-DAY ACTIVITIES.
DEMOLITION:
€¢ ABATEMENT / DEMO WILL BE PERFORMED UNDER A NEGATIVE PRESSURE ENCLOSURE (NPE) WITH HEPA VACUUM
AND CDPH APPROVED WORKERS IN PPE AND AIR SAMPLES BY A COMPETENT PERSON.
€¢ ROOM 206 WILL BE PROPERLY MARKED AND PROTECTED DURING ABATEMENT ACTIVITIES.
€¢ EXISTING ¾ HEIGHT WALLS, CUBICLES WILL BE DEMOLISHED AND DISPOSED OF PROPERLY.
€¢ EXISTING T-BAR CEILING SYSTEM WILL BE DEMOLISHED AND DISPOSED OF PROPERLY.
€¢ UNNECESSARY DUCTING IN THE LAB WILL BE ABANDONED / DEMOED AS NEEDED.
€¢ EXISTING COMS, ELECTRICAL DROPS, LIGHT FIXTURES, SUPPLY / RETURN REGISTERS WILL BE DEMOLISHED.
€¢ ENTRY EXIT DOORS TO ROOM 206 WILL BE DEMOLISHED.
€¢ 9 EXISTING DOORS AND 6 FRAMES WILL BE DEMOLISHED, INCLUDING 3 ENTRY (DOORS AND FRAMES), 4
OFFICE(3 DOORS 1 DOOR AND FRAME) AND 2 CORRIDORS (DOORS AND FRAMES).
€¢ EXISTING CARPET AND BASEBOARDS WILL BE REMOVED AND DISPOSED OF PROPERLY IN ROOM 206
€¢ EXISTING ACM MATERIAL WILL BE ABATED AND DISPOSED OF PROPERLY IN ROOM 206.
€¢ EXISTING WALL BETWEEN 210 AND HALLWAY WILL BE CUT AND DEMOLISHED TO ALLOW FOR ENTRY WAY. EXISTING WALL
BETWEEN ROOM 210 AND HALLWAY WILL BE CUT AND DEMOLISHED TO ALLOW FOR NEW ARCHED ENTRYWAY.
€¢ EXISTING WALL BETWEEN OFFICE 1 AND 2 WILL BE DEMOLISHED TO CREATE ONE LARGE OFFICE.
CONSTRUCTION / REMODEL:
€¢ INSTALL NEW TIE-BAR CEILING WITH NEW 24€Ͽ½ X24€Ͽ½ X1€Ͽ½ (PART # 98221 FLAT WHITE BY USG HALCYON) OR EQUIVALENT.
€¢ TWO FULL SIZED GLASS-SEE-THROUGH DOORS WITH LOCKING CAPABILITIES WILL BE INSTALLED IN THEIR PLACE. NEW GLASS
DOORS WILL INCLUDE PANIC HARDWARE.
€¢ DOOR IN ROOM 210 WILL BE REMOVED AND REFRAMED TO SWING AWAY FROM NEW ARCHWAY. NEW DOOR WILL
INCLUDE PARALLEL ARM DOOR CLOSER AND PANIC HARDWARE. BOTH EXTERIOR DOORS TO ROOM 206 WILL BE REMOVED /
REFRAMED. TWO NEW 3€„¢X7€„¢ X1/2€Ͽ½ THICK FRAMED ALUMINUM, TEMPERED SEE-THROUGH GLASS DOORS WITH LOCKS
AND PARALLEL ARM DOOR CLOSERS WILL BE INSTALLED. SOUTHERN EXTERIOR DOOR TO ROOM 206 WILL BE REMOVED AND
REFRAMED. NEW FRAME AND SOLID BIRCH DOOR WILL BE INSTALLED WITH PARALLEL ARM DOOR CLOSER AND CIPHER
SECURITY CODE LOCK. FOUR OFFICE DOORS WILL BE DEMOLISHED. THREE NEW SOLID BIRCH DOORS WITH FRAMES WILL BE
INSTALLED IN TWO EXISTING OFFICES AND NEWLY RECONFIGURED OFFICE. ALL THREE DOORS WILL INCLUDE KEY AND BUTTON
DOOR KNOBS.
€¢ RECONFIGURE DOORS PER SOO AND DRAWING, FILL -IN TWO DOORS. REVERSE THE SWING ON ONE DOOR. INSTALL TWO
NEW GLASS DOORS & FRAMES WITH ¼ TEMPERED GLASS AND PARALLEL ARM DOOR CLOSERS PER PAGE 7 DOOR LAYOUT.
ADD PARALLEL ARM DOOR CLOSER AND CIPHER SECURITY LOCK ON THE REMAINING NEW EXTERIOR DOOR.
€¢ RECONFIGURATION OF EXISTING HARD WALLED OFFICES, DEMO WALL AND FRAME IN ONE OPENING, PER LAYOUT. INSTALL
3 NEW CLEAR BIRCH DOORS. PATCH AND REPAIR ALL WALLS, SKIM COAT AND TEXTURE ALL WALLS. 1 COAT OF PRIMER AND 2
COATS OF PAINT WITH SEMI-GLOSS.
€¢ BREAK ROOM, INSTALL NEW BASE CABINETS APPROXIMATELY 60€Ͽ½ X 24€Ͽ½, WITH CORIAN COUNTERTOP AND WITH 4€Ͽ½ BACK
SPLASH WITH AN UPPER CABINET. NEW SINK AND GARBAGE DISPOSAL. INSTALL NEW WALL MOUNTED FILTERED BOTTLED
WATER COOLER MODEL LZS8WSSP WITH UNDER SINK RO SYSTEM. PREP BREAKROOM FOR FRIDGE, PROVIDED BY
DOCUSIGN ENVELOPE ID: 7CBCC2E7065A5B88--C535678D--4425F1CB--8B0290C0--7498AE34909598195EE27E39
CONTRACTOR€„¢S INITIALS _______ PAGE 4 OF 24 SUBCONTRACTOR€„¢S INITIALS _______
OTHERS.
€¢ ALL CABINETS WILL BE LAMINATED AND INCLUDE HANDLES / HARDWARE. LAMINATE (2102-T-ROYAL PEWTER BY LAMIN
€€Œ ART) OR EQUIVALENT.
€¢ INSTALL NEW FLOORING PER SOW, MANNINGTON €œHUSK€Ͽ½ MODULAR CARPET TILES WITH€Ͽ½ HUSKâ 1914-34 Parent award context Parent award agency: Department of Defense · Department of the Air Force Parent award NAICS: 236220 Parent award performance state: CA Parent award description: RENOVATE ADMINISTRATION OFFICE AT BUILDING 8500, ROOM 206 AT VANDENBERG SFB. View parent award on USAspending | FA461020D0003USAspending | $738,429 | Jul 10, 2023 | — – — |
| Subcontractor | Department of Defense | INSTALL NEW FIRE WATER TO, FAC, 15501 VAFB 230001.07 Parent award context Parent award agency: Department of Defense · Department of the Air Force Parent award NAICS: 236220 Parent award performance state: CA Parent award description: REHABILITATE BUILDING 15501 ON VANDENBERG SPACE FORCE BASE, CALIFORNIA View parent award on USAspending | FA461020D0009USAspending | $315,825 | Apr 6, 2023 | — – — |
| Subcontractor | Department of Defense | INSTALL NEW FIRE WATER TO, FAC, 15501 VAFB 230001.07 Parent award context Parent award agency: Department of Defense · Department of the Air Force Parent award NAICS: 236220 Parent award performance state: CA Parent award description: REHABILITATE BUILDING 15501 ON VANDENBERG SPACE FORCE BASE, CALIFORNIA View parent award on USAspending | FA461020D0009USAspending | $176,614 | Apr 6, 2023 | — – — |
| Subcontractor | Department of Defense | SET UP CONTAINMENT FOR EACH RESTROOM: ABATEMENT/DEMO WILL BE PERFORMED UNDER A NEGATIVE PRESSURE ENCLOSURE (NPE) WITH HEPA VACUUM AND CDPH APPROVED WORKERS IN PPE AND AIR SAMPLES BY A COMPETENT PERSON. ALL AREAS WILL BE PROPERLY MARKED AND PROTECTED DURING ABATEMENT ACTIVITIES.
LEAD-BASED GLAZING CERAMIC TILE / ASBESTOS ABATEMENT / DEMOLITION: REMOVE AND DISPOSE OF EXISTING LEAD-BASED GLAZING CERAMIC TILES ON WALLS AND FLOOR. REMOVE AND DISPOSE OF CLASS II NON-FRIABLE ASBESTOS DRYWALL, DRYWALL WITH ASBESTOS JOINT COMPOUND ON WALLS. SHORT WALL IN WOMEN€„¢S RESTROOM WILL BE DEMOLISHED TO ACCOMMODATE ADA COMPLIANCE. ALL EXISTING TOILETS, URINALS, SINKS, COUNTERS, FIXTURES, ACCESSORIES AND PARTITIONS WILL BE DEMOLISHED AND TURNED INTO VSFB RECYCLE CENTER OR LOCAL LANDFILL OFF BASE. RECEIPTS WILL BE PROVIDED FOR ALL TURNED IN MATERIAL.
REPAIR PLUMBING: ALL FLOOR DRAINS WILL BE REPLACED WITH NEW. ALL DRAINS, P-TRAPS AND SEWER LINES WILL BE SNAKED / INSPECTED TO ENSURE THEY ARE FUNCTIONING PROPERLY.
MEN€„¢S RESTROOM: INSTALL ALL NEW ELECTRICAL PER BASE STANDARDS INCLUDING 2 NEW GFI OUTLETS ABOVE COUNTER TOP. INSTALL NEW 5/8 SHEETROCK ON WALLS AND HARD CEILING. GREEN BOARD WILL BE USED ON ALL WET WALLS. PLACE THREE COAT OF MUD AND TEXTURE ON WALLS AND CEILING. WALLS AND CEILING IN MEN€„¢S ROOM WILL BE PRIMED AND PAINTED WITH PPG 14-15 FRENCH CREAM OR EQUIVALENT WITH A MINIMUM OF TWO FINISH COATS. INSTALL NEW SOLID CORE STAIN GRADE BURCH DOOR & FRAME WITH PUSH / PULL AND CLOSURE HARDWARE, STAINLESS STEEL KICK PLATE EACH SIDE OF DOOR. DOOR WILL BE ADA COMPLIANT WITH HANDICAP ACCESSIBLE SIGN INSTALLED. FLOOR WILL BE TILED WITH DALTILE KEYSTONES, MOSAIC COLOR BODY PORCELAIN 2€Ͽ½X2€Ͽ½ URBAN PUTTY D161 OR EQUIVALENT. REPLACE WALL TILE WITH DAL-TILE RITTENHOUSE SQUARE WALL TILE, RANDOM TRICOLOR 2€Ͽ½X4€Ͽ½ BRICK JOINT MEN€„¢S: MATT; ARCHITECTURAL GRAY, ARTIC WHITE & ELEMENTAL TAN SHALL BE FLOATED LEVEL WITH LARGE WALL TILE DAL-TILE 12€Ͽ½X24" FABRIQUE P690 GRIS LINEN OR EQUIVALENT. FLOOR TILE GROUT LATICRETE, 40 LATTE OR EQUIVALENT. WALLS WILL BE GROUTED WITH LATICRETE 24 NATURAL GRAY OR EQUIVALENT. ALL TILE WILL BE UNIFORM THROUGHOUT THE RESTROOM. REPLACE EXHAUST FAN. INSTALL 3 NEW AMERICAN STANDARD PRILO 1.1 €€Œ 1.6 GPF TOILETS AND 2 NEW AMERICAN STANDARD ALL BROOK 0.5 GPF URINALS WITH ASSOCIATED VALVES, ELECTRONIC SENSOR AND FLUSHOMETER, COLOR WHITE OR EQUIVALENT. REPLACE EXISTING SINKS / COUNTER TOP WITH NEW DOUBLE LAVATORY SINK WITH SOLID CORE TOP, PLASTIC LAMINATE BOTTOM SKIRTS. COUNTER TOP AND SKIRT TO BE POINITE, PEARL OF THE ORIENT, AG601 SUEDE OR EQUIVALENT. NEW STAINLESS-STEEL ACCESSORIES TO INCLUDE 2 COMBINATION PAPER TOWEL DISPENSER / WASTE DISPOSAL, 2 SOAP DISPENSER AND 2 24€Ͽ½ X 36€Ͽ½ STAINLESS STEEL FRAME MIRRORS MOUNTED ABOVE EACH SINK. INSTALL 1 NEW 1€„¢X2€„¢ LED LIGHT ABOVE EACH MIRROR. INSTALL NEW CEILING HUNG SOLID PHENOLIC CORE TOILET PARTITIONS, BEIGE OR EQUIVALENT. EACH STALL WILL BE EQUIPPED WITH STAINLESS STEEL, LARGE ROLL TOILET PAPER DISPENSER, TOILET SEAT DISPENSER, AND COAT HOOK. ONE PARTITION WILL BE INSTALLED BETWEEN THE TWO URINALS. INSTALL NEW 2€„¢X2€„¢ FLUSH MOUNT LED WITH MOTION DETECTOR LIGHTING SYSTEM EQUIPPED WITH EMERGENCY LIGHTING (ONE OVER EACH STALL AS EXISTING).
WOMEN€„¢S RESTROOM: INSTALL ALL NEW ELECTRICAL PER BASE STANDARDS INCLUDING 2 NEW GFI OUTLETS ABOVE COUNTER TOP. INSTALL NEW 5/8 SHEETROCK ON WALLS AND HARD CEILING. GREEN BOARD WILL BE USED ON ALL WET WALLS. PLACE THREE COAT OF MUD AND TEXTURE ON WALLS AND CEILING. WALLS AND CEILING IN WOMEN€„¢S RESTROOM WILL BE PRIMED AND PAINTED WITH PPG 14-15 FRENCH CREAM OR EQUIVALENT WITH A MINIMUM OF TWO FINISH COATS. INSTALL NEW SOLID CORE STAIN GRADE BURCH DOOR & FRAME WITH PUSH / PULL AND CLOSURE HARDWARE, STAINLESS STEEL KICK PLATE EACH SIDE OF DOOR. DOOR WILL BE ADA COMPLIANT WITH HANDICAP ACCESSIBLE SIGN INSTALLED. FLOOR WILL BE TILED WITH DALTILE KEYS 1914-31 Parent award context Parent award agency: Department of Defense · Department of the Air Force Parent award NAICS: 236220 Parent award performance state: CA Parent award description: RENOVATE/UPGRADE CHAPEL RESTROOMS View parent award on USAspending | FA461020D0003USAspending | $307,704 | Oct 5, 2022 | — – — |
| Subcontractor | Department of Defense | EARTHWORK 20-2200.024 Parent award context Parent award agency: Department of Defense · Department of the Air Force Parent award NAICS: 236220 Parent award performance state: CA Parent award description: RENOVATION OF MINISTRY CENTER AT VANDENBERG AIR FORCE BASE View parent award on USAspending | FA461020D0007USAspending | $53,765 | Sep 19, 2022 | — – — |
| Subcontractor | Department of Defense | EARTHWORK 20-2200.024 Parent award context Parent award agency: Department of Defense · Department of the Air Force Parent award NAICS: 236220 Parent award performance state: CA Parent award description: RENOVATION OF MINISTRY CENTER AT VANDENBERG AIR FORCE BASE View parent award on USAspending | FA461020D0007USAspending | $178,548 | Sep 19, 2022 | — – — |
| Subcontractor | Department of Defense | EARTHWORK, MECHANICAL YARD PIPING AND SIDEWALK 20-2200.024 Parent award context Parent award agency: Department of Defense · Department of the Air Force Parent award NAICS: 236220 Parent award performance state: CA Parent award description: RENOVATION OF MINISTRY CENTER AT VANDENBERG AIR FORCE BASE View parent award on USAspending | FA461020D0007USAspending | $277,444 | Sep 19, 2022 | — – — |
| Subcontractor | Department of Defense | EARTHWORK 20-2200.024 Parent award context Parent award agency: Department of Defense · Department of the Air Force Parent award NAICS: 236220 Parent award performance state: CA Parent award description: RENOVATION OF MINISTRY CENTER AT VANDENBERG AIR FORCE BASE View parent award on USAspending | FA461020D0007USAspending | $71,365 | Sep 19, 2022 | — – — |
| Subcontractor | Department of Defense | EARTHWORK, MECHANICAL YARD PIPING AND SIDEWALK 20-2200.024 Parent award context Parent award agency: Department of Defense · Department of the Air Force Parent award NAICS: 236220 Parent award performance state: CA Parent award description: RENOVATION OF MINISTRY CENTER AT VANDENBERG AIR FORCE BASE View parent award on USAspending | FA461020D0007USAspending | $348,802 | Sep 19, 2022 | — – — |
| Subcontractor | Department of Defense | MOBILIZE: SET UP PLASTIC CONTAINMENT WALL TO MITIGATE DUST TO REST OF BUILDING. ALL APPROPRIATE SIGNS WILL BE POSTED.
SELECTIVE DEMOLITION: REMOVE ALL FIXTURES AND SET ASIDE FOR LATER INSTALLATION. DEMO ALL VINYL FLOORING. DEMO SHEETROCK ON
WEST WALL. DEMO ALL DRAINS, SUPPLY LINES AND VENT PIPES IN WEST WALL. SAW CUT CONCRETE FLOOR FOR SEWER DRAIN REMOVAL. SEWER
LINE WILL BE DEMOED TO 2 FEET OUTSIDE NORTH WALL. DUE TO A SEPARATE CONTRACT, AMERICAN WATER WILL EXCAVATE AND DEMO SEWER
LINE FROM 2 FEET OUTSIDE NORTH WALL TO SEPTIC TANK.
PLUMBING: INSTALL NEW VENTS, COPPER SUPPLY LINES AND ANGLE STOPS FOR SINK, WATER HEATER AND TOILET. INSTALL NEW DRAIN PIPING
AND MOUNTING FLANGE FOR SINK AND TOILET. ALL CONCRETE WILL BE PATCHED, FINISHED AND SEALED ACCORDING TO VINYL FLOOR
MANUFACTURE SPECIFICATIONS. WE WILL CONDUCT A MOISTURE TEST PRIOR TO FLOORING INSTALLATION.
WALLS AND FLOORS: WEST WALL WILL BE SHEET ROCKED WITH GREEN BOARD, TAPED, MUDDED, TEXTURED, PRIMED AND PAINTED TO MATCH
EXISTING WALLS. ACCOLADE PLUS WITH DIAMOND 10 TECHNOLOGY HOMOGENEOUS SHEET FLOORING WITH INTEGRAL FLASH COVE BASE OR
EQUAL WILL BE INSTALLED ON PREPARED CONCRETE FLOOR. ALL EXISTING FIXTURES WILL BE REINSTALLED. 1914-23-B · Prime awardUSAspending | FA461020D0003USAspending | $30,600 | Jul 12, 2022 | — – — |
| Subcontractor | Department of Defense | SUBCONTRACTOR AGREES TO FURNISH ALL NECESSARY MANAGEMENT, SUPERVISION, LABOR, EQUIPMENT, POWER, SUPPLIES, MATERIALS,
PERMITS, MACHINERY, TOOLS, CARTAGE, INSURANCE, ENGINEERING, TESTING, SERVICES, FACILITIES, AND ANY OTHER ACT OR THING ("LABOR AND
MATERIALS") REQUIRED TO DILIGENTLY AND FULLY PERFORM AND COMPLETE THE WORK DESCRIBED HEREIN IN STRICT COMPLIANCE WITH THE
CONSTRUCTION DRAWINGS AND PROJECT SPECIFICATIONS.
MOBILIZE: SET UP CONTAINMENT. CONSTRUCT A TEMPORARY PARTITION WALL FROM ROOM 5 TO ROOM 7 ON VANDENBERG SFB BUILDING
10373 RESTROOM 6, STORAGE ROOM 7. ABATEMENT/DEMO WILL BE PERFORMED UNDER A NEGATIVE PRESSURE ENCLOSURE (NPE) WITH
HEPA VACUUM AND CDPH APPROVED WORKERS IN PPE AND AIR SAMPLES BY A COMPETENT PERSON. ALL AREAS WILL BE PROPERLY
MARKED AND PROTECTED DURING ABATEMENT ACTIVITIES.
LEAD-BASED GLAZING CERAMIC TILE COMPONENT ABATEMENT / DEMOLITION: REMOVE AND DISPOSE OF EXISTING LEAD-BASED
GLAZING CERAMIC TILES ON WALLS AND FLOOR.
ASBESTOS ABATEMENT: REMOVE AND DISPOSE OF CLASS II NON-FRIABLE ASBESTOS DRYWALL, DRYWALL WITH ASBESTOS JOINT COMPOUND
ON WALLS.
SELECTIVE DEMOLITION: REMOVAL AND DISPOSAL OF EXISTING CONCRETE. SAW CUT CONCRETE SLAB FOR NEW SEWER LINES FROM ROOM 6, 7
AND HALLWAY TO PERIMETER WALL. REMOVE AND DISPOSE OF EXISTING CONCRETE. REMOVE EXISTING SINK AND TOILET FIXTURES. REMOVE
ALL EXISTING PLUMBING FIXTURES, TOILET AND ASSOCIATED VALVES. COMPLETELY REMOVE EXISTING DROP CEILING SYSTEM (CEILING TILES &
GRID).
DEMO / REPAIR PLUMBING: DEMO PLUMBING IN WALLS AND REPLACE WITH ABS. CAP AND PLUG OLD LINES. EXISTING SEWER LINE WILL BE
CUT, CAPPED OFF AND ABANDONED IN PLACE. DRAINS / CLEAN OUTS IN JANITOR CLOSET AND MECHANICAL ROOM WILL BE SNAKED AND
INSPECTED FOR PROPER DRAINAGE. REPLACE IF NECESSARY. RUN NEW 4€Ͽ½ ABS (SCHEDULE 80) SEWER PIPE WITH CLEANOUT THROUGH OR
UNDER EXISTING FOOTING AND TIE-INTO EXISTING 8€Ͽ½ CLAY LINE OUTSIDE. TIE-IN TO EXISTING 8€Ͽ½ LINE WILL BE COORDINATED WITH AND
INSPECTED BY AMERICAN WATER. AFTER TESTING ALL NEW DRAINPIPE IS DRAINING PROPERLY, BACKFILL AND COMPACT ALL AREAS. INSTALL
NEW DOWEL PINS, AND PLACE BACK 3000PSI CONCRETE. REPAIR WITH EXISTING FLOORING WITH LIKE IN KIND. HAND DIG IN FRONT OF POST
OFFICE TO EXPOSE 4€Ͽ½ CLEAN-OUT, CUT AND REMOVE. PIPE WILL BE FILLED WITH SLURRY, CAPPED AND ABANDONED IN PLACE. BACKFILL WILL BE
REPLACED AND COMPACTED.
ELECTRICAL: INSTALL NEW ELECTRICAL LIGHT SWITCH, MOTION SENSOR, GFCI NEXT TO VANITY SINK. INSTALL 2 NEW 400 CFM EXHAUST FANS,
ONE IN RESTROOM AND THE OTHER IN JANITOR€„¢S ROOM. INSTALL NEW 2X2 LED LIGHT FIXTURE WITH EMERGENCY LIGHTING IN RESTROOM.
RESTROOM: INSTALL NEW 5/8 SHEETROCK (GREEN BOARD ON WET WALLS) ON WALLS AND HARD CEILING. INSTALL NEW ACCESS PANEL. PLACE
THREE COAT OF MUD AND TEXTURE ON WALLS AND CEILING. WALLS AND CEILING IN ROOM 6 WILL BE PRIMED AND PAINTED WITH PPG 14-15
FRENCH CREAM OR EQUIVALENT WITH A MINIMUM OF TWO FINISH COATS. INSTALL NEW 30 X 70 CLEAR FINISH BURCH DOOR & FRAME WITH
PUSH / PULL AND CLOSURE HARDWARE, STAINLESS STEEL KICK PLATE EACH SIDE OF DOOR INCLUDING LOCK. DOOR WILL BE ADA COMPLIANT WITH
HANDICAP ACCESSIBLE SIGN INSTALLED. PER THE GOVERNMENT SOO, FLOOR TILE AND BASE WILL BE REPLACED IN ROOM 6 WITH DAL-TILE
KEYSTONES, MOSAIC COLOR BODY PORCELAIN, 2X2 URBAN PUTTY SPECKLE D201 (OR EQUIVALENT) AND DALTILE RITTENHOUSE SQUARE WALL
TILE, RANDOM TRI-COLOR 2X4 BRICK JOINT (OR EQUIVALENT) AND SHALL BE FLOATED LEVEL WITH LARGE WALL TILE, DALTILE FABRIQUE 12X24
P686 CRÃƑ¨ME LINEN (OR EQUIVALENT) TO A STANDARD HEIGHT OF 4 FEET. INSTALL NEW TOILET AND ASSOCIATED VALVES, FLUSHOMETER, COLOR
WHITE. INSTALL NEW 24€Ͽ½X 36€Ͽ½ VANITY WITH UNDER MOUNT SINK WITH GLAZED PORCELAIN MARBLE STONE LOOK TOP (OR EQUIVALENT). NEW
STAINLESS-STEEL ACCESSORIES TO INCLUDE LARGE ROLL TOILET PAPER DISPENSER, SEAT DISPENSER AND SANITARY NAPKIN DISPOSAL, SOAP
DISPENSER, PAPER TOWEL DISPENSER/WASTE DISPOSAL, ADA COMPLIANT GRAB BARS AND 24€Ͽ½ X 36€Ͽ½ STAINLESS STEEL FRAME MIRRO 1914-20-A · Prime awardUSAspending | FA461020D0003USAspending | $101,263 | May 19, 2022 | — – — |
Contract vehicles are shown only when present in the source record. Linked award numbers and vehicles open the authoritative record on USAspending.gov.
Government-sourced data comes from SAM.gov, SBA and USAspending.gov and is attributed to its source. Items marked company-reported were provided by the company and are verified by FedSub only where labeled. FedSub is a private company and is not affiliated with SBA, GSA/SAM.gov, or any government agency.